Jackson St & W Locust St Resurf D~ ~ck~ MEMORANDUM July 28, 2004 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Jackson Street and West Locust Street Resurfacing (CIP 300443: Fiscal Year 2003 Annual Street Program) Acting Public Works Director/City Engineer Gus Psihoyos is recommending acceptance of the Jackson Street and West Locust Street Resurfacing Project, as completed by Mathy Construction Co., in the final contract amount of $1,162,381.33. I concur with the recommendation and respectfully request Mayor and City Council approval. (nLJ ~ ~~\/f¡¡ß{~ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, Acting Public Works Director/City Engineer , , ) ¡ .. D~ ~ck~ MEMORANDUM July 26, 2004 FROM: Michael C. Van Milligen, City Manager Q Gus Psihoyos, Assistant City Engineer ~. . TO: SUBJECT: Jackson Street and West Locust Street Resurfacing (CIP 300443: Fiscal Year 2003 Annual Street Program) INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Jackson Street and West Locust Street Resurfacing Project. DISCUSSION Work has been completed on the project by River City Paving, A Division of Mathy Construction Co. of Kieler, Wisconsin, in the final contract amount of $1,162,381.33. The project included the milling of the existing surface along the gutter and a 2" overlay of Jackson Street from 22nd to 30th Street and West Locust Street from 1 ih to Clarke Drive. The project also included: replacement of catch basins and deteriorated portions of curb and gutter; and the installation of fiber optic conduit along the West Locust Street portion. RECOMMENDA nON I recommend that the City Council accept the improvements and the final contract be established at $1,162,381.33. BUDGET IMPACT A summary of the project cost is as follows: Award Final Total Project Cost $1,241,143.29 115,409.53 63.475.24 $1,420,028.06 $1,162,381.33 0 48,209.95 $1,210,591.28 Construction Contract Contingency Engineering The project was funded by 80% Federal STP funds (with a maximum of $943,600), with the City paying the remaining 20%. (Note: The STP funds were increased per the request of the City.) Engineering costs will not be reimbursed. The project funding is as follows: Total Project Funding Award Final $ 700,028.06 $ 384,702.62 720,000.00 825,888.66 $1,420,028.06 $1,210,591.28 Street Construction Fund STP Fund ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Mike Felderman, PE cc: Roger Walton, PE, Iowa Department of Transportation Dawn Lang, Budget Director Mike Felderman, PE RESOLUTION NO. 301-04 ACCEPTING IMPROVEMENT Whereas, the contract for the Jackson Street and West Locust Street Resurfacing Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Street Construction Fund and the Federal STP Fund in amounts equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 2nd day of August, 2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 302-04 FINAL ESTIMATE Whereas, the contract for the Jackson Street and West Locust Street Resurfacing Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA Section 1. That the cost of said improvement is hereby determined to be $1,210,591.28 and the said amount shall be paid from the Street Construction Fund and the Federal STP Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 2nd day of August, 2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk City of Dubuque PARTIAL PAYMENT: FINAL DATE: May 6. 2.0.04 PROJECT NAME: Jackson and Locust slre..t R"mfacing CONTRACT AMOUNT $816.272.89 CONTRACTOR: River City Paving QTY. CODE ITEM UNIT UNIT COST TO DATE COST I 2110.3825.01.0 GRANULAR MAT'L TON 12 118.0.67 $14,168..04 2 2212..0475.095 CLEAN+PREPARATION OF BASE MILE 960.0 2.12 $2.0,352..0.0 3 2212-5.07.031.0 PATCH, FULL-DEPTH REPAIR SY 64 2572.71 $164,653.44 4 2213-67455.0.0 RMVLOFCURB STA 46.0 33.41 $15,368.6.0 5 2214.514515.0 PAV'T, SCARIFICATION SY 1.35 4.0657.12 $54,887.11 6 23.03..0.0.0.01.0.0 HMA COMMERCIAL MIX (lNCL ASPH BINDER) TON 41.96 6723..09 $282,10.0.86 7 23.03-.0.02338.0 HMA (3DDK ESAL) I.S, 318", NO FRIC TON 3.0.56 .0 $.0..0.0 8 23.03..0246422 ASPH BINDER, PG 64.22 TON 252.8 245.57 $62,.08.0.1.0 9 23.03.34.0.0.0.0.0 ADJUSTMENT OF FIXTURE EACH 3.0.0 12.0 $36,.0.0.0..0.0 10 25.03-448.05.04 STORM SWR UTILITY ACCESS RA.5D TOP ONLY EACH 55.0 3D $16,5.0.0..0.0 II 25.03.84623.0.0 UTILITY ACCESS, SPECIAL EACH 75.0 II $8,25.0,.0.0 12 2511.7526.0.04 SIDEWALK, PCC, 4" SY 25.92 175.43 $4,547.15 IJ 2512.1725256 CURB+GUTTER, PCC, 2.5' LF 13 3391.7 $44,.092.1.0 14 2518.691.0.0.0.0 SAFETY CLOSURE EACH 25 $35.0..0.0 15 2527.9263111 PAINTED PAV'TMARK, WATERBORNE STA 44 . $4.994..0.0 16 2528.844511.0 TRAFFIC CONTROL LS 1438.0 .___$14,38.0..0.0 17 2528.8445112 FLAGGER DAY 215 $86.0..0.0 18 2533498.0.0.05 MOBILIZATION LS 590.0.0 $59,.0.0.0..0.0 19 2598.881.02.0.0 WATER MAIN FITTING LB 2 $6,794..0.0 2.0 2599.9999.0.05 STORM SEWER, INTAKES IDI.B Each 178.0 $24,92.0..0.0 21 2599.9999.0.09 FURNISH AND INSTALL 1@5 in PVC DUCT LF .. 18.5 $.0..0.0 22 26.01.2639010 SOO SQ 116.66 $.0..0.0 23 26.01.2643110 W A TER.SODISPEC DITCH CNTUSLOPE PROTECT MGAL 37.5 $.0..0.0 24 2212.5.07.033.0 PATCHES BY COUNT Each 7.0 1.08 $7,56.0..0.0 EXTRA WORK 8.0.01 23.03.69110.0.0 HMAPAV'TSAMPLE LS I 2.0.0.0 $2,.0.0.0..0.0 8.0.02 23.03..0.02338.0 HMA (3DDK ESAL) 1.5, 3/8", NO FRIC TON 3.0.56 4225.14 $129,12.0.28 8.0.03 2212.5.075.0.0.0 SURFACE PATCHES TON liD 252.36 $27,759.6.0 8.0.04 2105.8425.055 TOPSOIL. FURNISH ANO SPREAD CY 29.8 3.05 $9,.089..0.0 8.0.05 2599.9999.0.05 DRAIN TILE REPAIR EACH 45 6 $27.0..0.0 8.0.06 2123.745.0.02.0 SHLD FINISH, EARTH STA 12.0 31..01 $3,721.2.0 8.0.07 2999.9999.01.0 CLEARING AND GRUBBING (TREE REMOVAL) LS 1.072.5 $1,.072.5.0 8.0.08 2999.9999.01.0 SODDING AND WATERING LS 1747.0.85 $17,47.0.85 8.0.09 2999.9999.010 ROCK EXCAVATION LS 7458 $7,458..0.0 8.010 2599-9999.0.09 FURNISH AND INSTALL 1@5inPVC DUCT LF 6625 $122,562.5.0 TOTAL DUE CONTRACTOR $1.162,381.33 ENGINEERING $48,2.09.95 I hereby certify that the above statement shnws in detail the correct amount of all work required to complete the above improvement =^,W"'ffiA' n ""'.>OW Gus Psihoyos ~ Assistant City Engineer APPROVED: Michael Van Milligen, City Manager City of Dubuque,lnwa The unde"igned, ,4¿,o , contmctor for the above improvement, does hereby accept the above "Total Due Contmctor", as full settlement for all claims for said improvement ::NTRA~~",~~