Loading...
Westbrook Subdivision Phase I_Acceptance of Public ImprovementsMasterpiece on the Mississippi MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Mi hael C. Van Milligen Dubuque bltd All-America City TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Acceptance of Subdivision Improvements in Westbrook Subdivision- - Phase 1 DATE: May 24, 2011 2007 City Engineer Gus Psihoyos is recommending acceptance of the public improvements, with the exception of the storm water detention facilities, that the developer, Callahan Construction, has recently completed on North Westbrook Drive, South Westbrook Drive, Trails Edge Drive, Pebble Creek Drive and Commerce Park in Westbrook Subdivision — Phase 1. Maintenance of said improvements shall be the responsibility of the owner, Callahan Construction, for a period of two years from the date of acceptance. The storm water detention facilities may be accepted after 80% of the lots in the entire Westbrook Subdivision are developed and adequate erosion control measures are installed on the remaining 20% of the Tots. I concur with the recommendation and respectfully request Mayor and City Council approval. Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Y Y 9 SUBJECT: Acceptance of Subdivision Improvements in Westbrook Subdivision — Phase 1 DATE: May 17, 2011 INTRODUCTION BACKGROUND DISCUSSION Dubuque All-America City 1' 2007 The enclosed material provides for City Council acceptance of the public improvements on North Westbrook Drive, South Westbrook Drive, Trails Edge Drive, Pebble Creek Drive, and Commerce Park which the developer, Callahan Construction, has recently completed in Westbrook Subdivision — Phase 1. As a condition of subdivision plat approval through Resolution No. 385 -03, the developer of Westbrook Subdivision — Phase 1 was required to install certain improvements including street paving with curb, sanitary sewer main, watermain, storm sewers and catch basins, detention facilities, and boulevard street lighting and to dedicate these improvements to the City upon completion. The Subdivision Ordinance requires that upon completion of all the required public improvements, the subdivider shall notify the City in writing of the completion of the improvements, requesting that the City either approve or reject the acceptance of the improvements, together with a statement of reasons for any rejection. On December 7, 2010, Callahan Construction requested City's acceptance of the improvements in Westbrook Subdivision — Phase 1. Upon inspections in March and April, 2011, it has been determined that the public improvements required by Resolution 385 -03 have been completed, with the exception of the storm water detention facilities, in accordance with plans approved by the City Council and in conformance with City specifications. RECOMMENDATION I would, therefore, recommend that the City Council accept the public improvements with the exception of the storm water detention facilities. Maintenance of said public improvements shall be the responsibility of the owner, Callahan Construction, for a period of two (2) years from the date of acceptance by City Council. The storm water detention facilities may be accepted after 80 percent of the lots in the entire Westbrook Subdivision are developed and adequate erosion control measures are installed on the remaining 20 percent of the lots. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution accepting the public improvements, with the exception of storm water detention facilities, in Westbrook Subdivision — Phase 1. Prepared by Ron Turner, PLS RESOLUTION NO. 175-11 ACCEPTING PUBLIC IMPROVEMENTS IN WESTBROOK SUBDIVISION — PHASE 1 Whereas, pursuant to Resolution 385 -03, certain public improvements were installed by the developer of Westbrook Subdivision — Phase 1. Whereas, the improvements have been completed and the City Manager has examined the work and has filed a certificate stating that the same has been completed in accordance with the plans approved by the City Council and in conformance with City specifications, and has recommended that the improvements be accepted by the City Council. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said public improvements for Lots 1 through 48 of Block 1, Lots 1 through 10 Block 3, and Lots F, G, H, I, J, and K of Westbrook Subdivision, except the stormwater detention facilities, be and the same is hereby accepted. Section 2. - That - maintenance- of said public improvements shall be the responsibility of the owner, Callahan Construction, for a period of two (2) years from the date of this resolution. Attest: Passed, approved and adopted this 6th day of June Kev n S. Firnst -hI, Acting ity Clerk , 2011. o L1 Roy D. Buol, Mayor December 7, 2010 To: Gus (City Dubuque Engineering) RE: Westbrook Subdivision This letter is to notify Dubuque engineering that Westbrook Subdivision has completed all its improvements and is asking for acceptance. If you have questions please call Joel Callahan at 563 - 213 -1015. Callahan Construction, Inc Joel Callahan 563 - 213 -1015 Callahan Construction, Inc. 7629 Commerce Park Dubuque, IA 52002 PH: 563- 588 -4273 Fax: 563- 582 -4314 THE CITY OF DUB Mastnpicce on the Mississippi C )MMERCE PARK DISCLAIMER: This information was compiled using the Dubuque Area Geographic Information System ( DAGIS), which includes data created by both the City of Dubuque and Dubuque County. It is understood that, while the City of Dubuque and participating agencies utilized the most current and accurate information available, DAGIS and h's suppliers do not warrant the accuracy or currency of the information or data contained herein. The City and participating agencies shall not be held liable for any direct, indirect, incidental, consequential, punitive, or special damages, whether foreseeable or foreseeable, arising out of the authorized or unauthorized use of this data or the inability to use this data or out of any breach of warranty whatsoever. Westbrook Subdivision -Phase 1 400 200 0 1 inch = 1,000 feet 400 800 1,200 1,600 Feet Vicinity Map W E A produce or DAGIS;� ooeuoea Aa IA GaOGeAFMIC INFORMATION 1TeTEM Map Prepared by: City of Dubuque Engineering Division 50 West 13th Street Dubuque, Iowa 52001 Phone: (563) 589 -4270 Fax: (563) 589 -4205 THE CITY OF DUB Masterpiece on the Mississippi DISCLAIMER: This information was compiled using the Dubuque Area Geographic Information System DAGIS), which includes data created by both the City of Dubuque and Dubuque County. It is understood that, while he City of Dubuque and participating agencies utilized the most current and accurate Information available, DAGIS and OS suppliers do not warrant the accuracy or currency of the nfonnation or data contained herein. The CRy and pertoipating agencies shall not be held liable for any direct, indirect, inddental, sequential, punitive, or special damages, whether foreseeable or consequential, unforeseeable, arising out of the authorized or unauthorized use of this data or the Inability to use this data or out of any breech of warranty whatsoever. Westb -ook Subdivision -Phase 1 100 50 0 5#a 1 inch = 250 feet 100 200 300 Accent Public Im rovements 400 Feet D f- -' DUEODUE LIMA GaOGAApMIC ieeeOlMATIOR S•STER Map Prepared by: City of Dubuque Engineering Division 50 West 13th Street Dubuque, Iowa 52001 Phone: (563) 589 -4270 Fax: (563) 589 -4205