TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Acceptance of Subdivision Improvements in Westbrook Subdivision- -
Phase 1
DATE: May 24, 2011
2007
City Engineer Gus Psihoyos is recommending acceptance of the public improvements,
with the exception of the storm water detention facilities, that the developer, Callahan
Construction, has recently completed on North Westbrook Drive, South Westbrook
Drive, Trails Edge Drive, Pebble Creek Drive and Commerce Park in Westbrook
Subdivision — Phase 1. Maintenance of said improvements shall be the responsibility of
the owner, Callahan Construction, for a period of two years from the date of
acceptance. The storm water detention facilities may be accepted after 80% of the lots
in the entire Westbrook Subdivision are developed and adequate erosion control
measures are installed on the remaining 20% of the Tots.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
Y Y 9
SUBJECT: Acceptance of Subdivision Improvements in Westbrook Subdivision —
Phase 1
DATE: May 17, 2011
INTRODUCTION
BACKGROUND
DISCUSSION
Dubuque
All-America City
1'
2007
The enclosed material provides for City Council acceptance of the public improvements
on North Westbrook Drive, South Westbrook Drive, Trails Edge Drive, Pebble Creek
Drive, and Commerce Park which the developer, Callahan Construction, has recently
completed in Westbrook Subdivision — Phase 1.
As a condition of subdivision plat approval through Resolution No. 385 -03, the
developer of Westbrook Subdivision — Phase 1 was required to install certain
improvements including street paving with curb, sanitary sewer main, watermain, storm
sewers and catch basins, detention facilities, and boulevard street lighting and to
dedicate these improvements to the City upon completion.
The Subdivision Ordinance requires that upon completion of all the required public
improvements, the subdivider shall notify the City in writing of the completion of the
improvements, requesting that the City either approve or reject the acceptance of the
improvements, together with a statement of reasons for any rejection.
On December 7, 2010, Callahan Construction requested City's acceptance of the
improvements in Westbrook Subdivision — Phase 1. Upon inspections in March and
April, 2011, it has been determined that the public improvements required by Resolution
385 -03 have been completed, with the exception of the storm water detention facilities,
in accordance with plans approved by the City Council and in conformance with City
specifications.
RECOMMENDATION
I would, therefore, recommend that the City Council accept the public improvements
with the exception of the storm water detention facilities. Maintenance of said public
improvements shall be the responsibility of the owner, Callahan Construction, for a
period of two (2) years from the date of acceptance by City Council. The storm water
detention facilities may be accepted after 80 percent of the lots in the entire Westbrook
Subdivision are developed and adequate erosion control measures are installed on the
remaining 20 percent of the lots.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution accepting the public
improvements, with the exception of storm water detention facilities, in Westbrook
Subdivision — Phase 1.
Prepared by Ron Turner, PLS
RESOLUTION NO. 175-11
ACCEPTING PUBLIC IMPROVEMENTS IN WESTBROOK SUBDIVISION — PHASE 1
Whereas, pursuant to Resolution 385 -03, certain public improvements were
installed by the developer of Westbrook Subdivision — Phase 1.
Whereas, the improvements have been completed and the City Manager has
examined the work and has filed a certificate stating that the same has been completed
in accordance with the plans approved by the City Council and in conformance with City
specifications, and has recommended that the improvements be accepted by the City
Council.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved and
that said public improvements for Lots 1 through 48 of Block 1, Lots 1 through 10 Block
3, and Lots F, G, H, I, J, and K of Westbrook Subdivision, except the stormwater
detention facilities, be and the same is hereby accepted.
Section 2. - That - maintenance- of said public improvements shall be the
responsibility of the owner, Callahan Construction, for a period of two (2) years from the
date of this resolution.
Attest:
Passed, approved and adopted this 6th day of June
Kev n S. Firnst -hI, Acting ity Clerk
, 2011.
o L1
Roy D. Buol, Mayor
December 7, 2010
To: Gus (City Dubuque Engineering)
RE: Westbrook Subdivision
This letter is to notify Dubuque engineering that Westbrook Subdivision has completed all its
improvements and is asking for acceptance. If you have questions please call Joel Callahan at
563 - 213 -1015.
Callahan Construction, Inc
Joel Callahan
563 - 213 -1015
Callahan Construction, Inc.
7629 Commerce Park
Dubuque, IA 52002
PH: 563- 588 -4273 Fax: 563- 582 -4314
THE CITY OF
DUB
Mastnpicce on the Mississippi
C )MMERCE PARK
DISCLAIMER: This information was compiled
using the Dubuque Area Geographic Information System
( DAGIS), which includes data created by both the City of
Dubuque and Dubuque County. It is understood that, while
the City of Dubuque and participating agencies utilized the
most current and accurate information available, DAGIS and
h's suppliers do not warrant the accuracy or currency of the
information or data contained herein. The City and participating
agencies shall not be held liable for any direct, indirect, incidental,
consequential, punitive, or special damages, whether foreseeable or
foreseeable, arising out of the authorized or unauthorized use of
this data or the inability to use this data or out of any breach of
warranty whatsoever.
Westbrook Subdivision -Phase 1
400 200 0
1 inch = 1,000 feet
400 800 1,200 1,600 Feet
Vicinity Map
W E
A produce or
DAGIS;�
ooeuoea Aa IA GaOGeAFMIC INFORMATION 1TeTEM
Map Prepared by:
City of Dubuque
Engineering Division
50 West 13th Street
Dubuque, Iowa 52001
Phone: (563) 589 -4270
Fax: (563) 589 -4205
THE CITY OF
DUB
Masterpiece on the Mississippi
DISCLAIMER: This information was compiled
using the Dubuque Area Geographic Information System
DAGIS), which includes data created by both the City of
Dubuque and Dubuque County. It is understood that, while
he City of Dubuque and participating agencies utilized the
most current and accurate Information available, DAGIS and
OS suppliers do not warrant the accuracy or currency of the
nfonnation or data contained herein. The CRy and pertoipating
agencies shall not be held liable for any direct, indirect, inddental,
sequential, punitive, or special damages, whether foreseeable or
consequential,
unforeseeable, arising out of the authorized or unauthorized use of
this data or the Inability to use this data or out of any breech of
warranty whatsoever.
Westb -ook Subdivision -Phase 1
100 50 0
5#a
1 inch = 250 feet
100 200 300
Accent Public Im rovements
400 Feet
D f- -'
DUEODUE LIMA GaOGAApMIC ieeeOlMATIOR S•STER
Map Prepared by:
City of Dubuque
Engineering Division
50 West 13th Street
Dubuque, Iowa 52001
Phone: (563) 589 -4270
Fax: (563) 589 -4205