TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Lower Bee Branch Creek Restoration Project, Construction Contract
Amendments (CIP #7201654)
DATE: June 14, 2011
Dubuque
All-America City
1 1 1
2007
City Engineer Gus Psihoyos recommends City Council approval of the execution of two
change orders totaling $284,029.70 amending the construction contract with Tschiggfrie
Construction for the Lower Bee Branch Creek Restoration Project to include the
installation of a hike /bike trail rest area and lighting along the hike /bike trail from the
Audubon Overlook north to the railroad facility on Garfield Avenue. Pursuant to the
terms of the River Enhancement Community Attraction and Tourism Grant Agreement,
the City is obligated to construct these items.
On August 16, 2011 the City Council adopted Resolution 336 -10 awarding the
construction contract for the Lower Bee Branch Creek Restoration Project to Tschiggfrie
Excavating in the amount of $10,836,588.85. Because Tschiggfrie's base bid exceeded
the estimate by $2.1 million, the alternate bid items for the hike /bike trail rest area and
lighting were not included. At the time of project award, it was noted that the alternate
bid items would warrant further consideration depending on the available contingency
as construction proceeded toward completion.
At the City's request, Tschiggfrie provided Change Order No. 20 ($22,957.70) and
Change Order No. 21 ($261,072.00) which would add the bike path rest area and
hike /bike trail lighting required per the RECAT Grant Agreement. The attached drawing
shows the location of the improvements. The proposed cost of the change orders are
based primarily on the unit prices submitted when the project was initially let last
summer with slight adjustments based on material costs, changing the fixtures to LED,
changing the light poles to include banner & planter baskets, and changing the light
poles so that they can accommodate a drip irrigation system that will save on
maintenance costs and cut down on water use. In addition, the number of electric
service pedestals was increased to ensure that the electrical outlets at each light pole
can accommodate festival -like events along the trail.
The unit prices reflect what the City would expect to pay. There is no reason to expect
better prices if the proposed work was re -bid. And while the lighting and bike rest area
could be constructed following the completion of the Lower Bee Branch Creek
Restoration Project, there are obvious benefits of coordinating their installation with the
trail to be constructed as part of the current contract.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
MicIl'ael C. Van Milligen
Masterpiece on the Mississippi
MEMORANDUM
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Lower Bee Branch Creek Restoration Project, Construction Contract
Amendments (CIP #7201654)
DATE: June 14, 2011
INTRODUCTION
The purpose of this memo is to seek authorization to approve the execution of two
change orders amending the construction contract with Tschiggfrie Construction for the
Lower Bee Branch Creek Restoration Project to include the construction of a hike /bike
trail rest area and lighting along the hike /bike trail.
BACKGROUND
On May 3, 2010 the City Council adopted Resolution 150 -10 approving the proposed
plans and specifications for the Lower Bee Branch Creek Restoration Project. The bid
documents included several alternate bid items including trail lighting and a bike rest
area.
On August 16, 2011 the City Council adopted Resolution 336 -10 awarding the
construction contract for the Lower Bee Branch Creek Restoration Project to Tschiggfrie
Excavating in the amount of $10,836,588.85. Because Tschiggfrie's base bid exceeded
the estimate by $2.1 million, the alternate bid items for the hike /bike trail rest area and
lighting were not included. At the time of project award, it was noted that the alternate
bid items would warrant further consideration depending on the available contingency
as construction proceeded toward completion.
On October 4, 2010 the City Council adopted Resolution 390 -10 authorizing the Mayor
to sign and submit a River Enhancement Community Attraction and Tourism (RECAT)
grant application to Vision Iowa for RECAT Program Funding for the Bee Branch Creek
Restoration Project. The RECAT program is designed to assist communities in the
development and creation of multiple purpose attraction or tourism facilities. Eligible
projects are recreational and entertainment attractions that are open to the general
public, and relate to, connect with, and enhance a river, lake, or river corridor. Projects
must be located within a city. Up to one -third of the total project cost can be requested
from RECAT. The funding sought was for planned and proposed amenities to enhance
the Bee Branch Creek Restoration Project. The application included the construction of
Lower Bee Branch Creek Restoration Project Alternate Bid Items for the trail lighting
and bike path rest areas.
Dubuque
kittd
AI4ivalraG$y
I 111!
2007
On March 9, 2011, the State Vision Iowa Board awarded $2,250,000 in RECAT funds
for amenities associated with the Bee Branch Creek Restoration project.
On April 4, 2011 the City Council adopted resolution 114 -11 approving the RECAT
Grant Agreement and authorizing the City Manager to execute the Grant Agreement.
Per the agreement, the City must construct the amenities outlined in the RECAT grant
application.
DISCUSSION
Per the terms of the RECAT Grant Agreement, the City is obligated to construct the bike
rest area north of 16 Street and install trail lighting along the hike /bike trail already
included in the construction contract for the Lower Bee Branch Creek Restoration
Project.
At the City's request, Tschiggfrie provided Change Order No. 20 ($22,957.70) and
Change Order No. 21 ($261,072.00) which would add the bike path rest area and
hike /bike trail lighting required per the RECAT Grant Agreement. The attached drawing
shows the location of the improvements. The proposed cost of the change orders are
based primarily on the unit prices submitted when the project was initially let last
summer with slight adjustments based on material costs, changing the fixtures to LED,
changing the Tight poles to include banner & planter baskets, and changing the Tight
poles so that they can accommodate a drip irrigation system that will save on
maintenance costs and cut down on water use. In addition, the number of electric
service pedestals was increased to ensure that the electrical outlets at each light pole
can accommodate festival -like events along the trail.
The unit prices reflect what the City would expect to pay. There is no reason to expect
better prices if the proposed work was re -bid. And while the lighting and bike rest area
could be constructed following the completion of the Lower Bee Branch Creek
Restoration Project, there are obvious benefits of coordinating their installation with the
trail to be constructed as part of the current contract.
RECOMMENDATION
I recommend amending the construction contract for the Lower Bee Branch Creek
Restoration Project to include the construction of a rest area adjacent to the hike /bike
trail north of 16 Street and to include the installation of lighting along the trail from the
Audubon Overlook north to the railroad facility on Garfield Avenue.
BUDGET IMPACT
With the adoption of the FY2012 CIP budget for the Bee Branch Creek Restoration
Project (CIP #7201654), funds were established for the lighting and the hike /bike rest
area.
ACTION TO BE TAKEN
I respectfully request authorization to execute the attached Change Order No. 20 and
Change Order No. 21 amending the construction contract for the Lower Bee Branch
Creek Restoration Project to include the installation of a hike /bike trail rest area and
lighting along the hike /bike trail to be constructed as part of the Lower Bee Branch
Creek Restoration Project.
Prepared by Deron Muehring
cc: Barry Lindahl, City Attorney
Marie Ware, Leisure Services Manager
Deron Muehring, Civil Engineer II
Attachs.
Rest Area
Lighting
Bee Branch Channel
Ampitheater
Bioretention areas
Bridge
Grass Field
Linear Park
Recreation Trail
America's River III:
Bee Branch Creek
Restoration & Gateway
II IL tl,'U:
APPROVED
f
Change Order No.
Project:
Engineer
Contractor.
Description of Change:
20 1
Lower Bee Branch Creek Restoration Project
Strand & Associates
Tschiggfrie Excavating
Bike Path Rest Area. Contract to include Altemate Bid Item #2 elements from the original bid dated May 25, 2010. Change order
amount will be based on line item quantities and unit prices attached hereto. Light pole shall be Strenberg or equal with irrigation
option, LED luminaire, two basket brackets, and one banner arm. See attached schedule for pay items.
This document shall become a supplement to the Contract and all provisions shall apply hereto.
RECOMMENDED
.l _
G EER - Strand & Associated - rfc.
CONTRAC OR - Tschi•gfrie Excavating, Inc.
?�13a1 C S
Change Order Date:
Original Contract:
Previous Change Orders:
Current Change Order.
New Contract Amount:
DATE
s125 I,o
DATE
//
DAT
9- May -11
$10,836,588.85
-$4, 573.43
$22,957.70
$10,854,973.12
NO. DESCRIPTION
ALTERNATE BID 32 - BIKE PATH BENCH AREAS
A2.1 Critehed A07 8.9 OC
A22 Gramme MOM
A2.3 4-IN Concrete Sidewalk
A2.4 SAM Sbar>tk
A2.5 Planter
A2.6 Bendws
A2.7 Trash RCCep:ede
A2.6 Bike Rack
A2.9 Lgh*Ng FbSkre
A2.1O Light Polo
A2.11 Liaht Pale Base
A2.12 Unae,Powkd E eoriral Wra and Condu6 WWCCkkafawd Sad
TOTAL
LOWER BEE BRANCH CREEK RESTORATION PR
SID RESULT TABULATION
25-Ntay - -16
13100ER
TxJt7p901e Excoratkic
UNIT TOTAL
PRIGS PRICE
QUANTITY
26 TON 523.65 5620.10
25 CY 321.70 3542.50
373 SF 54.10 31,629,30
354 SF 34-20 5.1,48630
1 LS 37.730.00 37.730.00
2 EA S1 00 $2.76290
1 EA 51,324.00 $1.92890
1 EA 5744.E 2744.00
1 EA 51649.00 31.849.00
1 EA *2.556.00 22.888.00
1 EA 51,45:.00 31.451.00
25 LF S21 AO 5535.00
*22.953.701
: CM OI
Description of Change:
Change Order No.
21
Project: Lower Bee Branch Creek Restoration Project Original Contract:
Engineer. Strand & Associates Previous Change Orders:
Contractor. Tschiggfrie Excavating Current Change Order:
New Contract Amount:
Hike /Bike Trail Lighting. Contract to include Alternate Bid Item #4 elements from the original bid dated May 25, 2010. Change order
amount will be based on line item quantities and unit prices attached hereto. Light poles to be Sternberg or equal with irrigation option,
LED luminaire, two basket brackets and one banner arm. See attached schedule for pay items.
This document shall become a supplement to the Contract and all provisions shall apply hereto.
RECOMMENDED
/
ENGINEER - Strand & Associates, Inc.
APPROVED
/
J
I W6.41 _ i D`( S fc ccei.) (.;;CA.,‹ ^4 SaOT / �S li�v�t�'n12
CONTRACTOR - schiggfrie Excavating, Inc.
APP VED
`L
F DUBUQUE
Change Order Date: 9- May -11
s' 3 J '
DATE
DATE
DATE
$10,836,588.85
$18,384.27
$261,072.00
$11,116,045.12
loo LOZS
oo OL1S OE
00 OS/ OS Osczs
oo"raa es ao OSC IS
$
o scs aozao'lS
oo•oor'o¢s ooaa
00 009 oossc
00 00 On
001
oosz
e
se
oc
O¢
Al11Nr110
301$41 SJ131d
Tr1O1 11Ni1
OulW0 0 1 7 . 06 14a1
04hZ1'PS
NOLLY1fBri 11f183>i Ofi
Vol NOLLY801S3M )I33 3 KONYZia 3313 Vamc I
Trial
moped POd iCya5 vocuJostssu urrome 601IM It iIUO3
moue pwPedum3$*PPe* rue •aM f
wand
1oslP S warts
ore sled tan
qod uaei'1
ONIPU SWIM
SNIJ.H911 • Sr* 018 91VNY911Y
N011Ak)830