Loading...
IA 32 GEometric and Signalization Improvements US 20 to JFKMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road (Iowa DOT Project No. STP -A -32- 1(29)-- 86 -31) (CIPs 2501814, 2501815) DATE: June 29, 2011 Dubuque kittell AU- America City 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road, as completed by Portzen Construction, Inc., in the final contract amount of $669,133.27, which is a 3.0% increase from the original contract amount of $649,793.80. This increase is due to additional required subgrade stabilization along with the installation of subdrain along IA 32. I concur with the recommendation and respectfully request Mayor and City Council approval. MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Michel C. Van Milligen Masterpiece on the Mississippi DATE: June 24, 2011 INTRODUCTION BACKGROUND DISCUSSION TO: Michael C. Van Milligen, City FROM: Gus Psihoyos, City Engineer SUBJECT: IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road (Iowa DOT Project No. STP -A -32- 1(29)-- 86 -31) (CIPs 2501814, 2501815) Dubuque hild AM- America City 1 a I I 1 2007 The enclosed resolution provides for the acceptance of the construction contract for the IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road, Iowa DOT Project No. STP -A -32- 1(29)-- 86 -31. The IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road, provided for the following: Fiber optics installation from Plaza Drive to John F. Kennedy Road; signal modifications at Chavenelle Road, Pennsylvania Avenue, Holliday Drive, Plaza Drive, and John F. Kennedy Road; grading and HMA paving of a southbound right -turn lane at Pennsylvania Avenue; lengthening and PCC paving of a southbound left -turn lane at Pennsylvania Avenue; lengthening and paving of a northbound left -turn lane at Pennsylvania Avenue. The IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $669,133.27, which is a 3.0% increase from the original contract amount of $649,793.80. The increase is due to additional required subgrade stabilization along with the installation of subdrain along IA 32. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $669,133.27 for the IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road, Iowa DOT Project No. STP -A -32- 1(29) - -86- 31 BUDGET IMPACT The summary of project cost for the IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road, Iowa DOT Project No. STP -A -32- 1(29)- -86 -31 is as follows: Construction Contract Contingency Engineering /Contract Administration Equipment Pre - Purchase Total Project Cost The project funding summary is as follows: CIP Funding Source 2501814 ICAAP Funding NW Arterial Capacity Improvements Engineering /Contract Administration 2501815 Traffic Consultant Services Total Project Funding ACTION TO BE TAKEN Award Final $ 649,793.80 62,026.55 97,000.00 11,818.00 $820,638.35 $669,133.27 0 105,934.94 13,723.00 $788,791,21 Amount $448, 086.00 234,770.27 8,934.94 97.000.00 $788,791.21 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $669,133.27 to Portzen Construction, Inc. for the IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road, Iowa DOT Project No. STP -A -32- 1(29) - -86- 31 Prepared by David Ness, Civil Engineer II cc: Julie Neebel, IIW Engineers & Surveyors, PC Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer RESOLUTION NO. 207 -11 ACCEPTING THE IA 32 GEOMETRIC AND SIGNALIZATION IMPROVEMENTS PROJECT, US 20 TO JOHN F. KENNEDY ROAD (IOWA DOT PROJECT NO. STP -A- 32- 1(29)-- 86 -31) AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road (Iowa DOT Project No. STP -A -32- 1(29)-- 86 -31) (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from ICAAP funding, Northwest Arterial Capacity Improvements, and Traffic Consultant Services appropriations for the contract amount of $669,133.27 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest Ke Passed, approved and adopted this 5th day of Jul 2011. S. Firn - ahl, Acting City Clerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE IA 32 GEOMETRIC AND SIGNALIZATION IMPROVEMENTS PROJECT, US 20 TO JOHN F. KENNEDY ROAD (IOWA DOT PROJECT NO. STP -A -32- 1(29)-- 86 -31) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the IA 32 Geometric and Signalization Improvements Project, US 20 to John F. Kennedy Road (Iowa DOT Project No. STP -A -32- 1(29)-- 86 -31), that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $788,791.21 Dated this aq day of — Swuc , 2011. Filed in the office of the City Clerk on the "Iday o City Engineer /.!/./• :474'1 !! /�1e Kevi S. Firnsta Acting Cit CI ITEM NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM PREVIOUS TOTAL THIS PERIOD TOTAL TO DATE PERCENT QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT 0010 2102 - 0425070 SPECIAL BACKFILL 50 TON $16.00 27 6 $441.60 0 $0.00 27.6 $441.60 55% 0020 2102 - 2710070 EXCAVATION, CLASS 10, ROADWAY AND BORROW 796 CY $8.00 796 $6,368.00 0 $0.00 796 $6,368.00 100% 0030 2105 - 8425015 TOPSOIL, STRIP SALVAGE & SPREAD 58 CY $10.00 53 $530.00 -26.3 ($263.00) 26.7 $267.00 46% 0040 2115 - 0100000 MODIFIED SUBBASE ` 469.26 CY $30.00 469.26 $14,077.80 0 $0.00 469.26 $14,077.80 100% 0050 2121 - 7425020 GRANULAR SHOULDERS, TYPE B 105 TON $12.00 192.69 $2,312.28 0 $0.00 192.69 $2,312.28 184% 0060 2123 - 7450000 SHOULDER CONSTRUCTION, EARTH 6 STA $150.00 6 $900.00 0 $0 00 6 $900.00 100% 0070 2301 - 1033085 STANDARD OR SLIP FORM PORTLAND CEMENT CONCRETE PAVEMENT, CLASS C, CLASS 3 DURABILITY, 8.5 IN 1087 SY $42.00 1089.69 $45,766.98 0 $0.00 1089.69 $45,766.98 100% 0080 2301 - 4874500 MEDIAN, P.C. CONCRETE, AS PER PLAN *DELETED* 38 SY $75.00 0 $0.00 0 $0.00 0 $0.00 0% 0090 2303- 0042500 HOT MIX ASPHALT MIXTURE (3,000,000 ESAL, INTERMEDIATE COURSE, 1/2 IN MIX 570 TON $62.75 726.83 $45,608.58 0 $0.00 726.83 $45,608.58 128% 0100 2303 -0043500 HOT MIX ASPHALT MIXTURE (3,000,000 ESAL, SURFACE COURSE, 1/2 IN MIX, NO SPECIAL FRICTION REQUIREMENT 220 TON $62.75 125.79 $7,893.32 0 $0.00 125.79 $7,893.32 57% 0110 2303 - 0246428 ASPHALT BINDER, PG 64 -28 48 TON $575.00 51 $29,325.00 0 $0.00 51 $29,325.00 106% 0120 2435 -0251100 INTAKE SW -511 1 EA $1,900.00 1 $1,900.00 0 $0.00 1 $1,900.00 100% 0130 2435 -0600120 INTAKE ADJUSTMENT, MAJOR 1 EA $1,500.00 1 $1,500.00 0 $0.00 1 $1,500.00 100% 0140 2503 -0114215 STORM SEWER GRAVITY MAIN, TRENCHED, RCP 2000D, 15" 9 LF $60.00 15.5 $930.00 0 $0.00 15.5 $930.00 172% 0150 2507- 3250005 ENGINEERING FABRIC 15 SY $15.00 23 $345.00 0 $0.00 23 $345.00 153% 0160 2507- 8029000 EROSION STONE 15 TON $20.00 22.2 $444.00 0 $0.00 22.2 $444.00 148% 0170 2510 - 6745850 REMOVAL OF PAVEMENT 661 SY $5.00 702.74 $3,513.70 0 $0.00 702.74 $3,513.70 106% 0180 2510 - 6750600 REMOVAL OF INTAKE AND UTILITY ACCESS 6 EA $350.00 2 $700.00 0 $0.00 2 $700.00 33% 0190 2511 - 6745900 REMOVAL OF SIDEWALK ` 23 SY $6.00 61 $366.00 0 $0.00 61 $366.00 265% 0200 2511 - 7526004 SIDEWALK, P.C. CONCRETE, 4 IN 25.56 SY $38.25 25.56 $977.67 0 $0.00 25.56 $977.67 100% 0210 2511- 7526006 SIDEWALK, P.C. CONCRETE, 6 IN 32.8 SY $65.00 32.8 $2,132.00 0 $0.00 32.8 $2,132.00 100% 0220 2511 - 7528100 DETECTABLE WARNINGS FOR CURB RAMPS 8 SF $45.00 8 $360.00 0 $0.00 8 $360.00 100% 0230 2523 -0000310 HANDHOLES AND JUNCTION BOXES 12 EA $2,600.00 11 $28,600.00 0 $0.00 11 $28,600.00 92% 0240 2524 - 6765010 REMOVE AND REINSTALL SIGN 8 EA $126.00 4.5 $567.00 0 $0.00 4.5 $567.00 56% 0250 2524- 9275100 WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN X 4 IN 133 LF $9.50 0 $0.00 0 $0.00 0 $0.00 0% 0260 2524 - 9325001 TYPE A SIGNS, SHEET ALUMINUM 19 SF $26.25 15 $393.75 6.25 $164.06 21.25 $557.81 112% 0270 2525 -0000100 TRAFFIC SIGNALIZATION 1 LS $177,000.00 1 $177,000.00 0 $0.00 1 $177,000.00 100% OWNER: City of Dubuque PROJECT: IA 32 Geometric and Signalization Improvements Project, US 20 to JFK IDOT PROJECT NO. STP-A-32-1(29)--86-31 IIW PROJECT NO: 09192 -06 CONTRACTOR'S PAYMENT FORM CONTRACT PAYMENT NO. CONTRACT COMPLETION DATE: SITE 01- CONTRACT COMPLETION DATE: ACTUAL START DATE: November 5, 2010 August 20, 2010 July 19, 2010 DETAILED ESTIMATE OF CONTRACT WORK COMPLETED TO DATE `= Quantity Adjusted By Change Order SUBTOTAL WORK COMPLETED - PAGE 1 7 FINAL AMOUNT OF CONTRACT ORIGINAL: $649,793.80 REVISED: $669,133.27 PREPARED BY: IIW ENGINEERS & SURVEYORS, P.C. PAGE 1/4 CONTRACTOR: Portzen Construction, Inc. ADDRESS: 205 Stone Valley Dr Dubuque, IA 52003 -9746 PHONE: 1563- 557 -7642 FAX: 1(563) 557 -9048 DATES OF PAYMENT FROM: TO: Commencement Completion ($98.94) $372,853.74 0280 2525 - 0000120 REMOVAL OF TRAFFIC SIGNALIZATION 1 LS $4,000.00 1 $4,000.00 0 $0.00 1 $4,000.00 100% 0290 2526 - 8285000 CONSTRUCTION SURVEY DELETED* 1 LS $8,400.00 0 $0.00 0 $0.00 0 $0.00 0% 0320 2527- 9263180 PAVEMENT MARKINGS REMOVED 5.91 STA $105.00 9 $945.00 0 $0.00 9 $945.00 152% 0330 2528- 8445110 TRAFFIC CONTROL 1 LS $19,695.00 1 $19,695.00 0 $0.00 1 $19,695.00 100% 0340 2533 - 4980005 MOBILIZATION 1 LS $66,000.00 1 $66,000.00 0 $0.00 1 $66,000.00 100% 0350 2599 - 9999005 CONNECT TO EXISTING HANDHOLE OR CONTROL CABINET 10 EA $200.00 5 $1,000.00 0 $0.00 5 $1,000.00 50% 0360 2599 - 9999005 FIBER OPTIC HUB CABINET, COMPLETE 1 EA $5,500.00 1 $5,500.00 0 $0.00 1 $5,500.00 100% 0370 2599 - 9999005 FIBER VAULT, 48" 1 EA $3,075.00 1 $3,075.00 0 $0.00 1 $3,075.00 100% 0380 2599- 9999005 WAVETRONICS HD MICROWAVE SENSOR, COMPLETE DELETED* 3 EA $18,500.00 0 $0.00 0 $0.00 0 $0.00 0% 0390 2599 - 9999009 CONDUIT, INNERDUCT, PUSHED, 4" WITH 4 -1" CONDUITS 4544 LF $19.65 4544 $89,289.60 0 $0.00 4544 $89,289.60 100% 0400 2599- 9999009 CONDUIT, RIGID PVC, PUSHED, 2" 287 LF $12.50 0 $0.00 0 $0.00 0 $0.00 0% 0410 2599 - 9999009 CONDUIT, RIGID PVC, TRENCHED, 2" 145 LF $8.00 204 $1,632.00 0 $0.00 204 $1,632.00 141% 0420 2599 - 9999009 CONDUIT, RIGID PVC, TRENCHED, 3" 39 LF $9.50 23 $218.50 0 $0.00 23 $218.50 59% 0430 2599 - 9999009 CONDUIT, RIGID PVC, TRENCHED, 4" 32 LF $11.75 29 $340.75 0 $0.00 29 $340.75 91% 0440 2599 - 9999009 FIBER CABLE; 48 SINGLE MODE AND 24 MULTIPLE MODE 7222 LF $2.20 7222 $15,888.40 0 $0.00 7222 $15,888.40 100% 0450 2601 - 2634100 MULCH 0.05 ACRE $700.00 0.257 $179.90 0 $0.00 0.257 $179.90 514% 0460 2601 - 2636043 SEED & FERTILIZE (RURAL) 0.05 ACRE $30,000.00 0.257 $7,710.00 0 $0.00 0.257 $7,710.00 514% CONTRACT PAYMENT NO. 7 FINAL (CONTRACT WORK COMPLETED - CONTINUED ITEM NO. ITEM CODE CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY' UNIT 1 UNIT COST PREVIOUS TOTAL QUANTITY AMOUNT THIS PERIOD QUANTITY AMOUNT TOTAL TO DATE QUANTITY AMOUNT PERCENT "= Quantity Adjusted By Change Order SUBTOTAL WORK COMPLETED - PAGE 2 TOTAL WORK COMPLETED TO DATE $0.00 ($98.9 PAGE 2/4 $215,474.15 1 $588,327.891 CH. ORD. NO. CHANGE ORDER ITEM DESCRIPTION CHANGE ORDER ITEM PREVIOUS TOTAL THIS PERIOD TOTAL TO DATE QUANTITY UNIT UNIT COST QUANTITY AMOUNT QUANTITY AMOUNT QUANTITY AMOUNT PERCENT 1 2510- 6750600 7001(0180)- Removal of Intake and Utility Access AA -1 EA $350.00 - - - - - - - 1 2526 - 8285000 7002(0290)- Construction Survey AA -1 LS $8,400.00 - - - - - - - 2 2115 -0100000 7003(0040) - Modified Subbase AA 14.26 CY $30.00 - - - - - - - 3 2525 - 0000100 7004(027) - Traffic Signalization 1 LS $5,469.20 1 $5,469.20 0 $0.00 1 $5,469.20 100% 3 2502 - 8220196 7005(8002) - Subdrain Outlet, RF -19E AB -3 EA $150.00 - - - - - - - 3 2599 - 9999005 7006(038) - Wavetronic HD Microwave Sensor, Complete AA -3 EA $18,500.00 - - 5 2301- 4874500 7007(0080)- Median, PCC, As per Plan -38 SY $75.00 - - - - - - - 5 2511 - 7526004 7008(0200) - Sidewalk, PCC, 4 Inch 7.555 SY $38.25 - - - - - - - 5 2511- 7526006 7009(0210) - Sidewalk, PCC, 6 Inch 29.8 SY $65.00 - - - - - - - 5 2511- 7528100 7010(0220)- Detectable Warnings for Curb Ramps -22 SF $45.00 - - - - - - - 6 2599- 9999005 7011 (0330) - Traffic Control 1 LS ($984.75) 0 $0.00 1 ($984.75) 1 ($984.75) 100% 1 2502- 8212034 8001 - Subdrain, Longitudinal (Shoulder), 4 Inch 1800 LF $9.50 497 $4,721.50 0 $0.00 497 $4,721.50 28% 1 2502 - 8220196 8002 - Subdrain Outlet, RF -19E Deleted 3 EA $150.00 0 $0.00 0 $0.00 0 $0.00 0% 1 2599 - 9999010 8003 - Partial Removal of Handhole 1 LS $475.00 1 $475.00 0 $0.00 1 $475.00 100% 1 2599- 9999020 8004 - Subgrade Stabilization 500 TON $22.50 310.9 $6,995.25 0 $0.00 310.9 $6,995.25 62% 2 2102- 2710080 8005- Excavation, Class 10, Unstable Material 14.26 CY $16.00 14.26 $228.16 14.26 $228.16 28.52 $456.32 200% 2 2527 - 9263109 8006 - Painted Pavement Marking, Waterborne or Solvent - Based 67.7 STA $84.00 65.54 $5,505.36 0 $0.00 65.54 $5,505.36 97% 2 2527- 9263137 8007 - Painted Symbols and Legends, Waterborne or Solvent -Based 12 EA $99.00 12 $1,188.00 0 $0.00 12 $1,188.00 100% 3 2599 - 9999005 8008 - Wavetronic HD Microwave Sensor, Complete 3 EA $18,166.00 3 $54,498.00 0 $0.00 3 $54,498.00 100% 3 2599 - 9999005 8009 - Subdrain Outlet, RF -19E Revised 1 EA $140.00 1 $140.00 0 $0.00 1 $140.00 100% 3 2502 - 8220197 8010 - Subdrain Outlet, RF -19F 6 EA $300.00 6 $1,800.00 0 $0.00 6 $1,800.00 100% 3 2502 - 8212304 8011 - Subdrain, Standard, Perforated, 4 Inch, As Per Plan 57 LF $9.50 57 $541 50 0 $0.00 57 $541.50 100% CONTRACT PAYMENT NO. 7 FINAL DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLETED TO DATE PAGE 3/4 = jus te in ADoveieelow contract items TOTAL CHANGE ORDER WORK ($756.59) $80,805.38 • CONTRACT PAYMENT NO. 17 FINAL CERTIFICATION OF CONTRACTOR: The undersigned contractor certifies that to the best of his knowledge, information and belief the work covered by this Contract Payment has been completed in accordance with the Contract Documents for this project; that this Contract Payment is a true and correct statement of the amount of the work completed to the date of this Contract Payment and that the amounts paid to the contractor will be utilized by him to pay for labor, materials, equipment and subcontracts involved in the performance of this contract. CONTRACTOR: Portzen Construction, Inc. BY: .< G S1A� Julie P. Necbel, P'.E. APPROVAL OF OWNER: City of Dubuque BY I o•A.7" N � APPROVED: TOTAL CONTRACT AND CHANGE ORDER WORK PERFORMED TO DATE Less: Amount Retained Per Contract 3% Value of Stored Materials (See Attached List) Less: Stored Materials Amount Retained Per Contract 5% Net Amount Earned to Date Less: Previous Amount Earned BALANCE DUE TO CONTRACTOR THIS PAYMENT Micha- Van Milligen City of Dub pquprjIowa APPROVED: , r! _ 431 Gus Psihoyos, City Engineer City of Dubuque, Iowa TITLE: Portzen Construction, Inc. I hereby certify that the ab. e . t = - ' detail the correct amount of all work required to complete the above improvements. TITLE: l 1�/ ( £ ..ZL. DATE: C " l RECOMMENDATION OF ENGINEER: In accordance with the Contract Documents for this project, the undersigned Engineer recommends payment to the Contractor of the balance due this payment as shown. IIW ENGINEERS & SURV 11 ` BY:' ��++ p TITLE. Project Manager DATE: 0 ✓ . 2 o` Vl AMOUNT PAID f 21 / 1 4 DATE: 10—Z T lft PAGE 4/4 $669,133.27 $0.00 $0.00 $0.00 $669,133.27 $649,889.14 $19,244.131