2011 CDBG Access Ramp Installation Project
CIP 2601236
June 28, 2011
111-AmeticaCity
I'll!
2007
Through the competitive quotation process for public improvements, the 2011 CDBG
Access Ramp Installation Project was awarded on June 16, 2011, to Skyline Trucking &
Storage, in the amount of $30,767.
City Engineer Gus Psihoyos recommends that the award for the 2011 CDBG Access
Ramp Installation Project be officially recorded in the minutes of the City Council.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
Michel C. Van Milligen
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: 2011 CDBG Access Ramp Installation Project
CIP 2601236
DATE: June 24, 2011
The 2011 CDBG Access Ramp Installation Project provides for the replacement
of twenty -one (21) access ramps at various locations.
The following is a summary of the bids received:
Skyline Trucking & Storage, Inc. $30,767.00
D &D Concrete, Inc. $31,697.50
Through the competitive quotation process for public improvements, this project
was awarded on June 16, 2011, to Skyline Trucking & Storage of Dubuque,
Iowa, in the amount of $30,767.00.
In accordance with the competitive quotation requirements of Iowa Code, Section
26.14, it is necessary that the award for the 2011 CDBG Access Ramp
Installation Project be officially recorded in the minutes of the City Council.
cc: Jenny Larson, Budget Director
Jon Dienst, PE
K: \JANE SMITH \PROJECTS\2011 CURB RAMPS\2011 06 -24 -11 Council Memo re 2011 CDBG Access
Ramp Installation, R1.doc Jane Smith, Engineering Technician
Dubuque
httil
All-America City
2007
CITY OF DUBUQUE ENGINEERING
BID TAB FOR:
2011 CDBG ACCESS RAMP INSTALLATION PROJECT Engineer Estimate
ITEM
Demoltion & Removal
1. PC Concrete Sidewalk, Remove
2. PC Concrete Curb & Gutter, 2.5'
Removal
Construction
3. Graded Stone Base
4. PC Concrete Sidewalk, 6" Construct 2051.00 S.F. $7.00 $14,357.00
5. PC Concrete Curb & Gutter, 2.5' 205.00 L.F. $31.00 $6,355.00
Construct
6. PC Concrete Access Ramp
Detectable Warning Area
(Each = 2' x 4' area)
7. Hot Mix Asphalt Patch,
8. Backfill, Topsoil
9. Sod
10. Traffic Control & Safety Control
11. Erosion Control
12. Mobilization
TOTAL BID
% Over /Under Engineer Estimate
Bid Date: 6 16 2011
QTY. UNIT UNIT COST TOTAL COST UNIT COST TOTAL COST
2051.00 S.F. $0.60 $1,230.60 $1.00 $2,051.00
205.00 L.F. $5.00 $1,025.00 $6.00 $1,230.00
40.00 Ton $15.00 $600.00 $14.00 $560.00
35.00 Each $150.00 $5,250.00 $145.00 $5,075.00
10.00 Ton
113.00 S.Y.
15.00 S.Y.
1.00 Lump Sum
1.00 Lump Sum
1.00 Lump Sum
$125.00
$12.00
$10.00
$500.00
$400.00
$500.00
SKYLINE CONSTRUCTION
Bidder
$6.00 $12,306.00
$30.00 $6,150.00
$1,250.00 $125.00 $1,250.00
$1,356.00 $15.00 $1,695.00
$150.00 $10.00 $150.00
$500.00 $100.00 $100.00
$400.00 $100.00 $100.00
$500.00 $100.00 $100.00
$32,973.60 $30,767.00
- 7.17%
D & D CONCRETE INC
Bidder
UNIT COST TOTAL COST
$2.00 $4,102.00
$10.00 $2,050.00
$18.00 $720.00
$5.50 $11,280.50
$20.00 $4,100.00
$90.00 $3,150.00
$130.00 $1,300.00
$15.00 $1,695.00
$20.00 $300.00
$1,000.00 $1,000.00
$500.00 $500.00
$1,500.00 $1,500.00
$31,697.50
-4.03%