Loading...
Carter Rd Detention Basin accep DU~@UE ~ck~ MEMORANDUM November 29, 2004 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Carter Road Detention Basin Project (CIP 320063: Carter Road Detention Basin) Acting Public Works Director/City Engineer Gus Psihoyos is recommending acceptance of the Carter Road Detention Basin Project, as completed by Tschiggfrie Excavating Co., in the final contract amount of $749,060.88 (construction contract of $692,810.88 and an early completion bonus of $56,250.00). I concur with the recommendation and respectfully request Mayor and City Council approval. " fL' ~ /1' / // ." // / lu L /(/l;)!I' , Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, Acting Public Works Director/City Engineer ,'~, -"~ , . , I ) I D~ ~ck~~ MEMORANDUM December 6, 2004 FROM: Michael C. Van Milligen, City Manager Gus Psihoyos, Acting Public Works Director ß 0 TO: SUBJECT: Carter Road Detention Basin Project (CIP 320063: Carter Road Detention Basin) INTRODUCTION The enclosed resolutions provide for the acceptance of the Carter Road Detention Basin Project. BACKGROUND The Carter Road Detention Basin was the first Drainage Basin Master Plan project for the Bee Branch watershed to be constructed. It is mainly comprised of an earthen dam approximately 350 feet long and 40 feet high, The principal outlet of the dry bottom detention basin is a 15-inch culvert and a 24-inch gated culvert, The high flow outlet is a 48-inch diameter riser pipe that is approximately 37-feet high. A 350-foot long asphalt access road provides access to the outlet structure for operation and maintenance needs. In May of 2003, the City Council approved the selection of Veenstra & Kimm, Inc. to provide engineering and design services for the Carter Road Detention Basin and in July of 2003 the City Council approved the outlet structure design for the project. In October of 2003, the City Council awarded the project to the low bidder, Tschiggfrie Excavating Co, of Dubuque, Iowa with a $750,00 per day early completion bonus, with a maximum bonus of $67,500. DISCUSSION Tschiggfrie Excavating Co, has completed the project in the final contract amount of $749,060.88 (construction contract of $692,810.88 and an early completion bonus of $56,250,00), RECOMMENDATION I recommend the acceptance of the improvements and establishment of the final contract in the amount of $749,060,88 (construction contract of $692,810.88 and bonus of $56,250.00). BUDGET IMPACT The summary of the project costs is as follows: Estimate Award Final Construction Contingency Engineering Property Acquisitions Early Completion Bonus Total Project Cost $687,590.00 68,759,00 132,000,00 150,000,00 67,500.00 $1,105,849.00 $590,316.35 68,759.00 132,000,00 150,000.00 67,500,00 $1,008,575.35 $692,810.88 0 186,420.45 140,833.30 56,250.00 $1,076,314.63 The project will be funded from the Fiscal Year 2004 General Storm Sewer Construction funds for CIP 320063 (Carter Road Detention Basin Project--$989,478), CIP 320233 (Terminal Street Storm Sewer Project--$72,OOO), and CIP 320A69 (Goethe/Sheridan Storm Sewer Project--$116,OOO). Both the Terminal and Goethe/Sheridan Storm Sewer Projects will be rebudgeted, ACTION TO BE TAKEN I respectfully request the adoption of the attached resolution accepting the Carter Road Detention Basin Project and establishing the final construction contract in the amount of $749,060.88 (construction contract of $692,810.88 and bonus of $56,250.00). Prepared by Deron Muehring cc: Barry Lindahl, Corporation Counsel Dawn Lang, Budget Director Deron Muehring, Civil Engineer II Leo Foley, Veenstra & Kimm RESOLUTION NO. 438-04 ACCEPTING IMPROVEMENT Whereas, the contract for the Carter Road Detention Basin Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Fiscal Year 2004 General Storm Sewer Construction Fund in amount equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 6th day of December, 2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 439-04 FINAL ESTIMATE Whereas, the contract for the Carter Road Detention Basin Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $1,076,314.63 and the said amount shall be paid from the Fiscal Year 2004 General Storm Sewer Construction Project of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of December, 2004. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Attest: City of Dubuque ENGINEERING DIVISION DESCR'PTION FINAL CONTRACT AMOUNT FOR: CARTER ROAD DETENTION BASIN PROJECT AMOUNT EARNED Cleorl"9 & Geeb"", Key T,,"ch U"cl","ed E"","o" & Emb,"kme"' Overtoppl", St,blll,,',o" 2" St'blll,I"9 M,te,I,1 12" DIP S,"II"" (Steel Cooed) 18" DIP S,"lIory (Steel Cooed) 36" RCP Sto,m Sewor E~e"'lo" 18" RCP Sto,m Sew" 15" RCPP (Low-He'd p""", Plpel 24" DIP G,ted/R""'lood 36" RCPP (Low-H"d p""", Pipe) 48" RCPP (Low-H"d p""", Pipe) H'9h Flow '"',ke Steect", Low Levell"t'ke Steect", J"ct,oo Steect", Stillm, B"I" St,"dord 48" M'"hole M,ohole Ex " Dep'h 24" K"lfe G,te Rlp-R'p Seedlo, Deb,l, Cootcol Fe"I"9 Po" 6" G"oolor S,b B", 4" ACC P,vemeet Additio"al Wo,. 12"DIP 18"DIP S,"II"" Sew" Plpm9 Chlmooy S",' Dcop Co"oo"loo Rook E,,"v,tioo Eo,""d 18" DIP E"c"ed 10" DIP SS/PCC R,mp/G"dl"9 Incentive Pay Eorly Completio" Bon" QUANTITY 1 LS 2900 CY 1 LS 3622,22 SY 8876 CY 132 LF 307 LF 2HF 3HF 90 LF 90 LF 152 LF 37 LF 1 E, 1 E, 1 E' 1 LS 5 E, 4 LF 1 E, 62857 Ton 1 LS 160 LF 67294 Too 259,86 Ton 75 D,y, TOTAL DUE CONTRACTOR: ENGINEERING: PROPERTY ACQUISITION: TOTAL PROJECT COST: 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS 1 LS Date: 22-Nov-O4 UNIT PRICE '12,000,00 $3,00 $170,70000 $5290 $1735 $9060 $13020 $9100 $91,65 $4420 $98,05 $13720 $190,35 $6,43805 $8,85230 $12,45105 $38,464,05 $1,12240 $16945 $14,04000 $1715 $720000 $21 60 $1325 $4870 $12,00000 $8,70000 $170,70000 $191,61544 $1,539,99 $11,95920 $39,97140 $2,18400 $3,116,10 $3,97800 $8,82450 $20,85440 $7,04295 $6,43805 $885230 $12,45105 $38,464,05 $5,61200 $67780 $14,04000 $10,77998 $7,20000 $3,45600 $8,91646 $1265518 $10,97124 $31,59800 ($51,93060) $1,72500 $5,22600 $30,IB350 $11,79570 $5,09960 $3615485 $10,97124 $31,57675 ($51,93060) $1,725,00 $5,22600 $30,16350 $11,795,70 $5,09960 $36,15485 $750,00 $56,25000 $749.060,88 $186,420_45 $140833,30 I !2~;>~,:'}~-,~;[ .Q~ G" P,lhoyo" Actin9 P,bllc Wo,k, Di"cto,/City En,ine" City of D,b,q"" low, The Undersigned. , cont,actor for the above Improvement, does hereby accept the above "Tot" Due Cont,actor", as full settlement for all claims for said improvement. APPROVED, BY: