Carnegie-Stout Public Library Renovation Project_Contract No. 2Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Carnegie -Stout Public Library Renovation Project Contract No. 2 - Doors, Frames and Hardware (Supply Materials Only) (CIP 1001141 & 1011141) DATE: July 22, 2011 Dubuque kittil All-America City 1 2007 City Engineer Gus Psihoyos is recommending acceptance of the Carnegie -Stout Public Library Renovation Project — Contract No. 2 — Doors, Frames and Hardware (Supply Only), as completed by Doors, Inc. in the final contract amount of $95,791.00, which is a 12.1% increase from the original contract in the amount of $85,449.00. This increase was due to two change orders for miscellaneous added work to accommodate installation of interior solid -core doors, revisions to hollow metal frames and additional changed hardware based on submitted review changes. I concur with the recommendation and respectfully request Mayor and City Council approval. /2 Mich el C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: FROM: Gus Psihoyos, City Engineer _ Michael C. Van Milligen, City Mana•er SUBJECT: Carnegie -Stout Public Library Renovation Project Contract No. 2 - Doors, Frames and Hardware (Supply Materials Only) (CIP 1001141 & 1011141) DATE: INTRODUCTION July 18, 2011 Dubuque biltri 'm4°61° 111/7 2007 The enclosed resolution provides for the acceptance of the construction contract for the Carnegie -Stout Public Library Renovation Project - Contract No. 2. BACKGROUND The Carnegie -Stout Public Library Renovation Project included: - A complete renovation of all public and staff spaces. - Update of the obsolete HVAC system to one that is designed to be environmentally efficient. - New furnishings and equipment. - Expanded wireless access and computer services. - New roof on the original building - New sidewalk and steps including a snow melt system for the newer building. - Upgraded security system. - Reopening of the stairwell to the second level in the original building. - Reopening of the original mezzanine and uncovering of the rear skylight in the original building. Multiple prime construction bids were awarded for this project. Contract No. 2 - Doors, Frames and Hardware (Supply Only) was awarded to Doors, Inc. of Davenport, Iowa. DISCUSSION The Carnegie -Stout Public Library Renovation Project, Contract No. 2 - Doors, Frames and Hardware (Supply Only) was completed by Doors, Inc. in the final contract amount of $95,791.00, which is a 12.1% increase from the original contract in the amount of 1 $85,449.00. This contract involved two change orders that resulted in a net cost change to the project of $10,342.00. Change order work involved: miscellaneous added work to accommodate installation of interior solid -core doors; revisions to hollow metal frames; and additional or changed hardware based on submittal review changes. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $95,791.00 for the Carnegie -Stout Public Library Renovation Project, Contract No. 2 — Doors, Frames and Hardware (Supply Only). BUDGET IMPACT The summary of probable total cost for the Carnegie -Stout Public Library Renovation Project is summarized as follows: PROJECT COSTS Award Final Construction Hard Costs Amount Available Fundraising to Date (Cash and Pledges) Base Construction Work $ 85,449.00 $ 95,791.00 $ 2,400,000 General Funds $ 1,210,589 TOTAL PROJECT COST $ 85,449.00 $ 95,791.00 The project funding summary is as follows: CITY FUNDING SOURCES CIP No. Fund Description Funding Amount Available Fundraising to Date (Cash and Pledges) $ 1,746,782 1001141/ 1011141 GO Bond (TIF Abated) $ 2,400,000 General Funds $ 1,210,589 Total City Funding $ 3,610,589 LIBRARY FUNDING SOURCES Fund Source Funding Amount -; Available Fundraising to Date (Cash and Pledges) $ 1,746,782 Curtis Collection Sale $ 501,750 Heade Painting Sale (Estimated) $ 253,710 Total Library Funding $ 2,502,242 otal City Funding $ 3,610,589 otal Library Funding $ 2,502,242 otal Project Funding $ 6,112,831 2 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $95,791.00 to Doors, Inc. for the Carnegie -Stout Public Library Renovation Project, Contract No. 2 — Doors, Frames and Hardware (Supply Only). cc: Jenny Larson, Budget Director Susan Henricks, Library Director Steve Sampson Brown, Project Manager 3 Attest Kevin S. Fir tahl, Acting City Clerk RESOLUTION NO. 236A -11 ACCEPTING THE CARNEGIE -STOUT PUBLIC LIBRARY RENOVATION PROJECT, CONTRACT NO. 2 — DOORS, FRAMES AND HARDWARE (SUPPLY ONLY) AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Carnegie -Stout Public Library Renovation Project, Contract No. 2 — Doors, Frames and Hardware (Supply Only) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the General Obligation Bonds (TIF Abated), Library Renovation General Funds, Library Fund - Raising (cash and pledges), Curtis Collection Sale, and Heade Painting Sale appropriations for the contract amount of $95,791.00 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 1st day of August /011. Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CARNEGIE- STOUT PUBLIC LIBRARY RENOVATION PROJECT, CONTRACT NO. 2 — DOORS, FRAMES AND HARDWARE (SUPPLY ONLY) The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Carnegie -Stout Public Library Renovation Project, Contract No. 2 — Doors, Frames and Hardware (Supply Only), that the Project has been performed in cornpliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $95,791.00. Dated this er day of Syoy , 2011. City Engineer Filed in the office of the City Clerk on thep25 day of Q 2011. Kevin S. Firn ahl, Acting City Clerk APPLICATION AND CERTIFICAT,,({E� FOR PQYM AIA DOCUMENT G702 /CMa il� .` 1 "'��,'% TO: (Owner) City of Dubuque 50 W 13th Dubuque, IA. 52001 Project: Dubuque Carnegie Stout Public Library RECEIVED ;ERR 0 5 2rdll FROM: (Material Supplier) Doors Inc. Davenport 110 W. 55th StjJRR �1NT=;�uhuqu3, !A Davenport , IA VIA CONSTRUCTION MANAGER: Contract For: HM, WD, and HDW VIA ARCHITECT: OPN Architects City of Dubuque NSTRUCTION MANAGER - ADVISOR EDITION LA— A '' +y/ 4 PAGE 1 of 2 PAGES APPLICATION NO: )K PERIOD TO: 4/1/2011 PROJECT NO: E -mail - Rick Golus CONTRACT DATE: 2/20/2009 Distribution to: 7 OWNER CONSTRUCTION MANAGER CI ARCHITECT ❑ CONTRACTOR CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached. 1. ORIGINAL CONTRACT SUM $ 85 449 00 2. Net change by Change Orders 3. CONTRACT SUM TO DATE (Line 1 ± 2) 4. TOTAL COMPLETED & STORED TO DATE (Column G on G703) 5. RETAINAGE: a. 0.00% of Completed Work (Column D + E on G703) b. 0.00% of Stored Material (Column F on G703) Total Retainage (Lines 5a _ 5B or Total in Column 1 of G703) 6: TOTAL EARNED LESS RETAINAGE (Line 4 less Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE $ $ The undersigned Contractor certifies that to the best of the Contractor's knowledge, infor- mation and belief the Work covered by this Application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contracto 'for Work for which pre4ous Certificates for Payment were issued and pay - �ts re Ivied from the Owner, an hat urrent payment shown herein is no due. SUPPLIER: �.j � $ - ie-ls eoK/o,31401 $ x6.305 -e 45,7g1. $ 96�JA5,� 5 '73/ 0.00 0.00 to of v i t _. ounty of: •L G ` Subsgrib6d and sworn t -Wiry Public: 1' { My Commission expiths: before me this `� day / ii �jjJ MM `41V. I Ct 1 �1( /`1%( Date: °r It ARCHITECT'S CERTIFICATE FOR PAYMENT $ 0.00 In accordance with the Contract Documents, based on on -site observations and the data $ a°�°' `' Crivcomprising this application, the Architect certifies to the Owner that to the best of the � Architect's knowledge, informatoin and belief the work has progressed as indicated, the �,oP�uality of the Work is in accordance with the Contract Documents, and the Contractor is $ �� entitled to payment of the AMOUNT CERTIFIED. 2,102.00 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 less Line 6) $ 0.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner *1417656:1313— , i0 $0.00 Total approved this Month $0.00 $0.00 TOTAL 4 24,"' $0.00 NET CHANGES by Change Order -$4+10158713e--- 1 10,34z, 170 AMOUNT CERTIFIED $ �lo.a.oc (Attach explanation if amount certified differs from the amount applied for. Initial all figures on this Application and on the Continuation Sheet that are changed to conform to the amount certified.) CONSTR By: ARCHITECT. O� • "ER° AM Date: 6' 1' This Certificate is not n- !otiabl- The AMOUNT CERTIFIED is paya.le only to the Con- tractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. Date: �0,)3,/ By: Users may obtain validation of this document by requesting of the license a completed AIA Do�I�p�fb 01/ Certification of Documents Authenticity ' /GIST 7 - /e -4/ AIA DOCUMENT G703 - CONTINUATION SHEET FOR G702 - 1992 EDITION - AIA - C1992 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W. WASHINGTON, D.C. 20006 -523 G702CMa -1992 CONTINUATION SHEET AIA DOCUMENT G703 AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing Contractor's signed certification is attached. In tabulations below, amounts are stated to the nearest dollar. Use Column I on Contracts where variable retainage for line items may apply. APPLICATION NO: 11 APPLICATION DATE: 3/30/2011 PERIOD TO: 4/1/2011 ARCHITECT'S PROJECT NO: CM's PROJECT NO: E -mail - Rick Golus A B C D E F G H I ITEM NO. DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIALS PRESENTLY STORED (NOT IN D OR E) TOTAL COMPLETED AND STORED TO DATE (D +E +F) o �o (G _ C) BALANCE TO FINISH (C - G) Retainage FROM PREVIOUS APPLICATION (D + E) THIS PERIOD 1 Base Contract $85,449.00 $83,347.00 $2,102.00 $0.00 $85,449.00 100.0% $0.0 $0.00 2 Change Order #001 $9,926.00 $9,926.00 $0.00 $0.00 $9,926.00 100.0% $0.0 $0.00 3 Dr. Pulls /Quote #2568 $416.00 $416.00 $0.00 $0.00 $416.00 100.0% $0.0 $0.00 4 Invoice 89745 -c1;‘ - $0.00 $0.00 f1tG$ 100.0% $0.0 $0.00 -$$ 5 Invoice 89746 $/ r11G 14 $0.00 $0.00 py1M t d 100.0% $0.0 $0.00 �f -4,._ ! 415/141. ill, 6 ' zv- et' 7q Leo GRAND TOTALS $96736 - - $2,102.00 $0.00 9ir69 $0.00 $0.00 Users may obtain validation of this document by reauestina of the license a comnleted AIA Document D401 - Certification of Document's Authenticity AIA DOCUMENT G703 - CONTINUATION SHEET FOR G702 - 1992 EDITION -AIA - C1992 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W. WASHINGTON, D.C. 20006 -5232 G703 -1992