Carnegie-Stout Public Library Renovation_Contract No. 5Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Carnegie -Stout Public Library Renovation Project Contract No. 5 - Acoustical Tile Ceilings (CIP 1001141 & 1011141) DATE: July 22, 2011 Dubuque trail All- America City ' 111. ' 2007 City Engineer Gus Psihoyos is recommending acceptance of the Carnegie -Stout Public Library Renovation Project — Contract No. 5 — Acoustical Tile Ceilings, as completed by Artisan, in the final contract amount of $102,627.74, which is a 14.4% increase from the original contract in the amount of $89,700.00. This increase was due to four change orders for miscellaneous added work to accommodate revised installation plans for new HVAC assemblies, light fixtures, switches and occupancy sensors; provide acoustical tile ceiling revisions for modified fire alarm interface and smoke detectors; and provide molding modifications at elevator lobby. I concur with the recommendation and respectfully request Mayor and City Council approval. MicISael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer 0 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Mana•er FROM: Gus Psihoyos, City Engineer _ SUBJECT: Carnegie -Stout Public Library Renovation Project Contract No. 5 - Acoustical Tile Ceilings (CIP 1001141 & 1011141) Dubuque kittd u-America cly 2007 DATE: July 20, 2011 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Carnegie -Stout Public Library Renovation Project - Contract No. 5. BACKGROUND The Carnegie -Stout Public Library Renovation Project included: - A complete renovation of all public and staff spaces. - Update of the obsolete HVAC system to one that is designed to be environmentally efficient. - New furnishings and equipment. - Expanded wireless access and computer services. - New roof on the original building - New sidewalk and steps including a snow melt system for the newer building. - Upgraded security system. - Reopening of the stairwell to the second level in the original building. - Reopening of the original mezzanine and uncovering of the rear skylight in the original building. Multiple prime construction bids were awarded for this project. Contract No. 5 - Acoustical Tile Ceilings was awarded to Artisan Ceiling Systems Ceilings of Waterloo, Iowa. DISCUSSION The Carnegie -Stout Public Library Renovation Project - Contract No. 5 - Acoustical Tile Ceilings was completed by Artisan, in the final contract amount of $102,627.74, which is a 14.4% increase from the original contract in the amount of $89,700.00. This contract Page 1 of 3 involved four change orders that resulted in a net cost change to the project of $12,927.74. Change order work involved: miscellaneous added work to accommodate revised installation plans for new HVAC assemblies, Tight fixtures, switches and occupancy sensors; provide acoustical tile ceiling revisions for modified fire alarm interface and smoke detectors; and provide molding modifications at elevator lobby. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $102,627.74 for the Carnegie -Stout Public Library Renovation Project — Contract No. 5 — Acoustical Tile Ceilings. BUDGET IMPACT The summary of probable total cost for the Carnegie -Stout Public Library Renovation Project is summarized as follows: PROJECT COSTS Award Final Construction Hard Costs Amount Available Fundraising to Date (Cash and Pledges) Base Construction Work $ 89,700.00 $ 102,627.74 $ 2,400,000 General Funds $ 1,210,589 TOTAL PROJECT COST $ 89,700.00 $ 102,627.74 The project funding summary is as follows: CITY FUNDING SOURCES CIP No. Fund Description Fundin. Amount Available Fundraising to Date (Cash and Pledges) $ 1,746,782 1001141/ 1011141 GO Bond (TIF Abated) $ 2,400,000 General Funds $ 1,210,589 Total City Funding $ 3,610,589 LIBRARY FUNDING SOURCES Fund Source • Funding "Amount Available Fundraising to Date (Cash and Pledges) $ 1,746,782 Curtis Collection Sale $ 501,750 Heade Painting Sale (Estimated) $ 253,710 Total Library Funding $ 2,502,242 Total City Funding $ 3,610,589 Total Library Funding $ 2,502,242 Total Project Funding $ 6,112,831 Page 2 of 3 t ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $102,627.74 to Artisan Ceilings for the Carnegie -Stout Public Library Renovation Project — Contract No. 5 — Acoustical Tile Ceilings. cc: Jenny Larson, Budget Director Susan Henricks, Library Director Steve Sampson Brown, Project Manager Page 3 of 3 RESOLUTION NO. 237 -11 ACCEPTING THE CARNEGIE -STOUT PUBLIC LIBRARY RENOVATION PROJECT, CONTRACT NO. 5 — ACOUSTICAL TILE CEILINGS AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Carnegie -Stout Public Library Renovation Project, Contract No. 5 — Acoustical Tile Ceilings has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the General Obligation Bonds (TIF Abated), Library Renovation General Funds, Library Fund - Raising (cash and pledges), Curtis Collection Sale, and Heade Painting Sale appropriations for the contract amount of $102,627.74 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest Passed, approved and adopted this 1s t day of August , 2011. l / /1 Ke in S. Firn tahl, Acting City Jerk Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CARNEGIE- STOUT PUBLIC LIBRARY RENOVATION PROJECT, CONTRACT NO. 5 — ACOUSTICAL TILE CEILINGS. The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Carnegie -Stout Public Library Renovation Project, Contract No. 5 — Acoustical Tile Ceilings, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $102,627.74. Dated this A►11- day of JLLts , 2011. Filed in the office of the City Clerk on th14241/1 day of Kevi - S. Firnst- I, Acting City erk City Engineer 011. APPUCATION AND CERTIFICATION FOR PAYMENT AIA DOCUMENTS G702 TO OWNER CITY OF DUBUQUE PROJECT: CARNEGIE -STOUT PUBIJCAPPLICATION NO: 15 DUBUQUE, IA LIBRARY RENOVATION PERIOD TO: 3/31/2011 FROM CONTRACTOR: ARTISAN CEILING SYSTEMS PROJECT NOS: 07128.50/ 4053 SERGEANT RD WATERLOO, IA CONTRACT FOR ACOUSTICAL CEtUNGS VIA CONSTRUCTION MANAGER: THE DURANTGROUP INC VIA ARCHITECT: OPN ARCHITECTS INC CONTRACT DATE: 10/20/2008 PAGE ONE OF TWO Distribution to: OWNER CONSTRUCTION MANAGER JUN 0 6 ARCHITECT CONTRA- Ti n2 4 T z CONTRACTOR'S APPLICATION FOR PAYMENT The undersigned Canttrachor certifies that to the best of the Contractors knowledge, Infor- Appiiptiori is made for payments, as sown below in connacdon with the contract mation and belief the Work covered by thisApplication for Payment has been completed Continuation Sheet, AIA Document G708, is attached in accordance with the Contract Documents, that all amounts have been paid by the 1 ORIGINAL CONTRACT SUM $ 89,700.00 Contractor for Work for which previous Certifiatios for Payment we issued and pay - 2 Net Change By Change Orders. /,,,9',27- 71pinc- $ ments received from the Owner, andthat current payment shown herein is now due. 3 CONTRACT SUM TO DATE /0a7 7,V $ 402,899:74-- 4 TOTAL COMPLETED & STORED TO DATE / (arw-- CONTRACTOR (Column G on G702) 04, b3a7-•7Y S-- :71. PIC BYL., ir/ ,ill. ARTISAN CEILING SYSTEMS 5 RETAINAGE: a. 5% of Completed Work $ (Columns D + E on G703) b. 5% of Stored Material S (Column F on G703) Total Retarnage (Line 5a + 5b or Total in Column] ofG703) State of Iowa County of: Black Hawk Subscribed and sworn to before me this 25th day of March, 2011 $ Notary Public: Dora Smith My Commission expires: 2-21-2014 6 TOTAL EARNED LESS RETAINAGE 102.- (Line 4 Tess Line 5 Total) ic151, (mall 1920326:71-- CERTIFICATE FOR PAYMENT 7 LESS PREVIOUS CERTIFICATED FOR PAYMENT /04 5�r/ pmLt --tn accordance with the Contract Documents, based on on-site obsrvadons and the data (Line 6 from prior Certificate) comprising this application, the Construction Manager and Architect certify to the Owner Date: 3125/2011 L4.r` 'r ..."'" DORA – rt _ = COMMISSION NO. 715209 • FCOMMISSION UA 21 M BRUA • • B 8 CURRENT PAYMENT DUE 9 BALANCE TO FINISH, INCLUDING RETAINAGE (Line 3 fess Line 6) $ 100.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner s -Wd'11,4 ,zszr74 Total approved this Month s . s - TOTALS I,i l,1y ...12,125.74- 3 - NET CHANGES by Change Order _: s 402E7r that to the best of their knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contrat Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. lCO,(7)0 AMOUNT CERTIFIED (Afeched exprenaLon if amount coaled differs from the amount ap #ed for. infhal aAfigures on tills Application and on the ConDlnrlatioe Sheet !hat changed to conJbrmt to the amount cerr'I!ect) CONSTRUCTION 9Y. ARCHrrE This CertI sate is not otiable. Date: i Data /! e AMOUNT CERTIFIED is payable only to the Con- ia,001,'7q tractor named herein. assurance, payment and acceptance of payment are without MAC- prejudice to a hts • - Owner or Contractor under this contract 7 -17— if CONTINUATION SHEET AIA DOCUMENT G703 AIR DOCUMENT G702, APPUCATfON AND CERTIFICATION FOR PAYMENT, containing Contractor's signed certification Is attached. In tabulations below, amounts se stated to tilt nearest dollar. Use Column f co Contrails where variable retalnage for ens flans mayappy. APPLICATION NO: 15 APPLICATION DATE 3/25/2011 PERIOD TO: 3/31/2011 ARCHITECTS PROJECT NO: 07128.50/ PAGE2 OF 2 PAGES A' B I C _ D E F 0 H I ITEM NO DESCRIPTION OF WORK SCHEDULED VALUE WORK COMPLETED MATERIAL TOTAL COMPLETED AND STORED TO DATE (D +E +F) % (G/C) BALANCE TO FINISH (C-3) RETAINAGE (IF VARIABLE RATE) FROM PREVIOUS APPLICATION (D +E) THIS PERIOD PRESENTLY STORED (NOT IN D OR E) 1 2 3 4 5 Acoustical Ceilings S Specialities Change Order #1 Change Order #2 Change Order ;a3 Change Order #4 $ 89,700.00 I � $ 3434. 1- $ 2,842.00 $ 6,203.08 $ 449.00 3431,,?../ l G a o 5 . •ems joy,. 4a•7, 94 - - Total Contract _ $ 44920325Th- Material $ 54400.00 $ 54,400.00 $ - $ 54,400.00 100% $ - $ 2,720.00 Labor $ 47275.71 $ 47,275.71 $ - $ 47275.71 100% $ - $ 2,363.79 CLOSE OUT DOGS $ 100.00 $ 100.00 $ 100.00 100% $ - $ 5.00 PROGRESS CLEANING $ 500.00 $ 500.00 $ 500.00 100% $ - $ 25.00 LEED CONDITIONS $ 350.00 3 350.00 $ 350.00 100% $ - $ 17.50 Total Contract $ 102,625.71 16a, Ga7. '”I 1117(62 4 •P7.74 lie. 2 , /P ,97, 74 GRAND TOTALS $ '102,1 71 $ 102,625.71 $ - $ - $ 12,625 • 100% $ - $ - 55,-1312 n vapdsatlon of mIs document by requeatlrg Or the Iloense a Completed AIA Document D401- Cer110aatIon or Documents Authenticity G703 -1992