TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Pump Room Roof Replacement - CIP 740 -2206
DATE: July 22, 2011
Dubuque
htial
All- AmedcaCIty
2007
Water Department Manager Bob Green recommends preliminary approval of the
specifications and initiation of the bidding process for the Pump Room Roof
Replacement Project. It is further recommended that a public hearing be set for
August 15, 2011.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mi ael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Bob Green, Water Department Manager
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Bob Green, Water Department Manager,
SUBJECT: Pump Room Roof Replacement — CIP 740 -2206
DATE: July 18, 2011
Dubuque
AN-Ameticacny
1
2007
INTRODUCTION
The attached Resolutions authorize the bidding procedure for the Pump Room Roof
Replacement.
BACKGROUND
The life expectancy of rolled flat roofs is normally twenty years. This roof is in excess of
20 years and has deteriorated and exhibiting substantial leakage.
OBJECTIVE
This project provides for the replacement one -third of the main plant roof (the other two -
thirds was replaced in Fiscal Year 2000).
PROJECT SCHEDULE
The schedule for the project is as follows:
Initiate Public Bidding Process
Publish Notice to Bidders, Advertise for Bids
Publish Public Hearing Notice on Plans & Specifications
Public Hearing on Plans & Specifications
Receipt of Bid Proposals (Bid Letting)
Award Construction Contract
Project Completion Date
August 1, 2011
August 4, 2011
August 4, 2011
August 15, 2011
August 23, 2011
September 6, 2011
November 4, 2011
RECOMMENDATION
It is recommended that the City Council give preliminary approval to the specifications
for the Pump Room Roof Replacement, and to establish the date of August 15, 2011 for
the public hearing on the specifications for this program and hereby authorize the City
Clerk to advertise for bid proposals.
BUDGET IMPACT
The estimate of probable cost for the Pump Room Roof Replacement is as follows:
Estimated Construction Cost $121 ,000.00
Engineering Design & Inspection Fees $ 9,600.00
Total Estimated Project Cost $130,600.00
CIP NO. FUND DESCRIPTION FUND AMOUNT BUDGETED
740 -2206 Pump Room Roof Replacement $110,115.00
BUDGET DEFICIT
$ 20,485.00
NOTE: This project is funded through the FY2011 Water Department Capital
Improvement Budget. The budget shortfall for the Pump Room Roof Replacement could
be funded by FY2011 excess funds carried over from the Park Hill Roofing Project, CIP
740 -2207 ($10,969.83) and the Olympic Heights Pump Station, CIP 740 -2031
($18,558.00)
ACTION TO BE TAKEN
The City Council is requested to establish the date of the Public Hearing on the
specifications for this program and to authorize the City Clerk to advertise for proposal
through the adoption of the enclosed Resolutions.
Attachments
cc: Jenny Larson, Budget Director
Kevin Firnstahl, Acting City Clerk
Jacqueline Rodriguez, Water Plant Manager
File
NOTICE TO BIDDERS
CITY OF DUBUQUE
PUBLIC
IMPROVEMENT
PROJECT
EAGLE POINT
PUMPING STATION
RE -ROOF
Time and Place for
Ming Sealed Propo-
sals. Sealed bids for
the work comprising
each improvement as
stated below must be
filed before 10:00 a.m.
on August 23, 2011, in
the Office of the City
Clerk, City Hall - First
Floor, 50 West 13th
Street, Dubuque, Iowa.
Time and Place
Sealed Proposals
Will be Opened and
Considered. Sealed
proposals will be
opened and bids
tabulated at 10:00 a.m.
on August 23, 2011, at
City Hall - Conference
Room A, 50 West 13th
Street, Dubuque, Iowa,
for consideration by
the City Council
(Council) at its meeting
on September 6, 2011.
The City of Dubuque,
Iowa, reserves the
right to reject any and
all bids.
Time for Commence-
ment and Comple-
tion of Work. Work on
each improvement
shall be commenced
within 10 days after
the Notice to Proceed
has been issued and
shall be fully com-
pleted by November 4,
2011.
Bid Security. Each
bidder shall accom-
pany its bid with a bid
security as security
that the successful
bidder will enter into a
contract for the work
bid upon and will
furnish after the award
of contract a corporate
surety bond, accept-
able to the govern-
mental entity, for the
faithful performance of
the contract, in an
amount equal to one
hundred percent of the
amount of the
contract. The bid
security shall be in the
amount of ten percent
(10 %) of the amount of
the contract and shall
be in the form of a
cashier's check or
certified check drawn
on a state - chartered or
federally chartered
bank, or a certified
share draft drawn on a
state- chartered or
federally chartered
credit union, or the
governme al entity
may provide for a
bidder's bond with
corporate surety
satisfactory to the
governmental entity.
The bid bond shall
contain no conditions
excepted as provided
in this section.
Contract Docu-
ments. Copies of the
plans and specifica-
tions may be obtained
at Tri -State Blue Print
& Framing, 696 Central
Avenue, Dubuque, Iowa
52001. Telephone 563 -
556-3030;facsimile:563-
556 -1525. No plan
deposit is required.
Preference for Iowa
Products and Labor.
By virtue of statutory
authority, preference
will be given to
products arid • provi-
sions grown and coal
produced within the
State of Iowa, and to
Iowa domestic labor, to
the extent lawfully
required under Iowa
statutes.
Sales Tax. The bidder
should not include
sales tax in its bid. A
sales tax exemption
certificate will be
available for all
material purchased for
incorporation in the
project.
General Nature of
Public Improvement.
The Eagle Point Pump-
ing Station Re -Roof
• project consists of
removal of existing
fully adhered roof
membrane and
damaged insulation.
Installing new fully
adhered single ply
membrane over roof
insulation, perimeter
flashing and limited
roof drain re -work and
masonry work.
Published in the
Telegraph Herald
Newspaper August 5,
' 2011.
• It 8/5
STATE OF IOWA {SS:
DUBUQUE COUNTY
CERTIFICATION OF PUBLICATION
I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa
corporation, publisher of the Telegraph Herald,a newspaper of general circulation
published in the City of Dubuque, County of Dubuque and State of Iowa; hereby
certify that the attached notice was published in said newspaper on the following
dates: August 05, 2011, and for which the charge is $40.57.
Subscribed to before me, a Notary Public in and for Dubuque County, Iowa,
this ? 5 day of -rev-1#, , 20 // .
Notary Public in and for Dubuque County, Iowa.
'lil_ -
MARY K, WESTERMEYH
Commletlon Number it e
RESOLUTION NO. 243 -11
PUMP ROOM ROOF REPLACEMENT
PRELIMINARY APPROVAL OF THE SPECIFICATIONS, FORM OF CONTRACT, AND
ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON THE
SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND
ORDERING THE ADVERTISEMENT FOR BIDS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
The proposed specifications, form of contract and estimated cost for the construction
cost to replace the pump room roof in an estimated amount of $121,000.00 are hereby
preliminarily approved and ordered filed in the office of the City Clerk for public
inspection.
A public hearing will be held on the 15th day of August, at 6:30 p.m. in the
Historic Federal Building Council Chambers at which time interested persons may
appear and be heard for or against the proposed specifications, form of contract and
estimated cost of said Project, and the City Clerk be and is hereby directed to cause the
attached notice of the time and place of such hearing to be published in a newspaper
having general circulation in the City of Dubuque, Iowa, which notice shall be published
not Tess than four days nor more than twenty days prior to the date of such hearing. At
the hearing, any interested person may appear and file objections to the proposed
specifications, form of contract, or estimated cost of the Project.
The Pump Room Roof Replacement project is hereby ordered to be advertised
for bids.
The amount of the security to accompany each bid shall be in an amount which
shall conform to the provisions of the Notice to Bidders hereby approved.
The City Clerk is hereby directed to advertise for bids for the improvements
herein provided, by publishing the attached Notice to Bidders to be published in a
newspaper having general circulation in the City of Dubuque, Iowa, which notice shall
be published not Tess than four but not more than forty -five days before the date for
filing bids before 10:00 a.m. on the 23 day of August. Bids shall be opened and read
by the City Clerk at 10:00 a.m. and will be submitted to the City Council for final action
at the public hearing at 6:30 p.m. on the 6 day of September, in the Historic Federal
Building Council Chambers (Second Floor), 350 West 6 Street, Dubuque, Iowa.
Passed, adopted and approved this 1 day of August, 2011.
Attes
Kevin Firnstah , Acting City Clerk
Roy D. uol, Mayor
NOTICE OF PUBLIC HEARING ON THE SPECIFICATIONS, FORM OF CONTRACT,
AND ESTIMATED COST FOR THE PUMP ROOM ROOF REPLACEMENT PROJECT
NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a
public hearing on the proposed specifications, form of contract and estimated cost for
the Pump Room Roof Replacement Project, in accordance with the provisions of
Chapter 26, Code of Iowa, at 6:30 p.m., on the 15th day of August, 2011, in the Historic
Federal Building Council Chambers (Second Floor) 350 West 6th Street, Dubuque,
Iowa. Said proposed specifications, form of contract and estimated cost are now on file
in the office of the City Clerk. At said hearing any interested person may appear and file
objections thereto.
The scope of the Project is as follows:
The Eagle Point Pumping Station Re -Roof project consists of removal of existing fully
adhered roof membrane and damaged insulation. Installing new fully adhered single ply
membrane over roof insulation, perimeter flashing and limited roof drain re -work and
masonry work.
Any visual or hearing- impaired persons needing special assistance or persons with
special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or
TDD at (563) 690 -6678 at least 48 hours prior to the meeting.
Published this
day of / P:2172011. 2011.
Kevin Firnstahl, Acting City Clerk
NOTICE TO BIDDERS
CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT
EAGLE POINT PUMPING STATION RE -ROOF
Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each
improvement as stated below must be filed before 10:00 a.m. on August 23, 2011, in the Office
of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa.
Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will
be opened and bids tabulated at 10:00 a.m. on August 23, 2011, at City Hall - Conference
Room A, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at
its meeting on September 6, 2011. The City of Dubuque, Iowa, reserves the right to reject any
and all bids.
Time for Commencement and Completion of Work. Work on each improvement shall be
commenced within 10 days after the Notice to Proceed has been issued and shall be fully
completed by November 4, 2011.
Bid Security. Each bidder shall accompany its bid with a bid security as security that the
successful bidder will enter into a contract for the work bid upon and will furnish after the award
of contract a corporate surety bond, acceptable to the governmental entity, for the faithful
performance of the contract, in an amount equal to one hundred percent of the amount of the
contract. The bid security shall be in the amount of ten percent (10 %) of the amount of the
contract and shall be in the form of a cashier's check or certified check drawn on a state -
chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or
federally chartered credit union, or the governmental entity may provide for a bidder's bond with
corporate surety satisfactory to the governmental entity. The bid bond shall contain no
conditions excepted as provided in this section.
Contract Documents. Copies of the plans and specifications may be obtained at Tri -State
Blue Print & Framing, 696 Central Avenue, Dubuque, Iowa 52001. Telephone 563 - 556 -3030;
facsimile: 563 - 556 -1525. No plan deposit is required.
Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be
given to products and provisions grown and coal produced within the State of Iowa, and to Iowa
domestic labor, to the extent lawfully required under Iowa statutes.
Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate
will be available for all material purchased for incorporation in the project.
General Nature of Public Improvement.
The Eagle Point Pumping Station Re -Roof project consists of removal of existing fully adhered
roof membrane and damaged insulation. Installing new fully adhered single ply membrane over
roof insulation, perimeter flashing and limited roof drain re -work and masonry work.