MEMORANDUM
December 28, 2004
TO:
The Honorable Mayor and City Council Members
FROM:
Michael C. Van Milligen, City Manager
SUBJECT: Fengler Street Bridge Reconstruction Project
Acting Public Works Director/City Engineer Gus Psihoyos is recommending acceptance
of the Fengler Street Bridge Reconstruction Project, as completed by Taylor
Construction, Inc. in the final contract amount of $1,147,078.75.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
/ll il C /11 £f
I LC <"1/ 11¿L--..
Midhael c. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, Acting Public Works Director
-;
u
D~
~ck~
MEMORANDUM
December 27, 2004
TO:
Michael C. Van Milligen, City Manager
AD
FROM:
Gus Psihoyos, Acting Public Works Director
SUBJECT: Fengler Street Bridge Reconstruction Project
INTRODUCTION
The enclosed resolutions provide for the acceptance of the construction contract for the
Fengler Street Bridge Reconstruction Project.
BACKGROUND
The Fengler Street Bridge was closed in August of 2001 after an inspection by City staff
and IIW Engineers & Surveyors, P.C., observed an accelerated deterioration of the
bridge deck and support columns. Large sections of the underside of the concrete deck
had fallen from the bridge onto the railroad tracks below. With sections of the bridge
deck in extremely poor condition, it was possible that a heavy load could cause
additional damage to the deck, making it unsafe for traffic. For these reasons and in the
interest of public safety, the bridge was immediately closed.
The Fengler Street Bridge Reconstruction Project included the complete demolition and
removal of the existing bridge structure and the construction of a new pretensioned-
prestressed concrete beam bridge in the same location. The existing bridge columns
were removed while the existing deep pile foundation were salvaged and incorporated
into the new structure.
The new concrete structure was constructed to current roadway and bridge geometry
design standards, including a wider 34-foot bridge roadway with an 8-inch thick
concrete deck. The bridge piers and abutment supports were reconstructed in the
approximate same locations. The new bridge has 5-foot wide sidewalks on each side of
the bridge with pedestrian sidewalks installed on both sides of the approach roadway,
which match into both bridge sidewalks. Due to the steep side slopes at each roadway
approach section to the bridge, the outside edge of the sidewalks on grade required the
installation of a pedestrian ornamental hoop railing along these sections.
Additionally, due to the steep side slopes at each roadway approach section to the
bridge, concrete vehicular barrier rail was installed, which extended towards both
Kerper and Garfield. The original asphalt roadway approach pavement was removed
and reconstructed with a concrete pavement, which match into Garfield and the Kerper-
Fengler intersection.
The substructure of the bridge was constructed to comply with both the horizontal and
vertical clearance requirements of the railroad. Railroad standards required that the
bridge piers be constructed with crash walls, which have been incorporated into the new
structure while utilizing as much of the salvaged deep pile foundation as possible.
MITIGATION MEASURES
Due to the excessive and unusual deterioration of the original concrete bridge deck
directly above the railroad mainline, staff had a full-depth section of the concrete deck
removed and sent to Construction Technology Laboratories, Inc., which performed a
petrographic examination and chemical analysis of the deck sample.
Based upon the results of the examination and analysis of the deck sample, the
findings were incorporated in the new concrete bridge design to prevent similar future
deterioration conditions. The new bridge was constructed with improved methods and
materials including; epoxy coated reinforcing steel in the bridge deck and support
columns; the inclusion of a slag admixture in the concrete mix design which will make
the bridge deck more impermeable to chloride penetration; and the construction of air
vents between the bridge deck and support beams which will aide in ventilating the
underside of the bridge and dissipate the heat of the locomotive engine exhaust.
ARCHITECTURAL ESTHETIC FEATURES
Other design components built-in into the Fengler Street Bridge project included adding
several architectural esthetic features to the new structure which include; incorporating
buff colored concrete to the vehicular barrier rail; installing buff colored decorative
concrete balustrade railings on the outside of both bridge sidewalks; and installing six
ornamental lighting fixtures to the bridge.
PROJECT SCHEDULE - COMPLETION INCENTIVE
Since the Fengler Bridge is such an essential link to the Kerper Peninsula, the
construction contract included an early completion incentive. If the project would have
been completed prior to the specified early completion date of June 15, 2002, the
contract included a $3,000 bonus per calendar day, to a maximum of $50,000.
The bridge was permanently open to vehicular traffic on June 28, 2002, which did not
qualify Taylor Construction for the early completion incentive. Conversely, the project
was fully complete prior to the specified late completion date of June 30, 2002, which
negated the imposing of liquidated damages.
All non-critical items such as the aesthetic components, bridge lighting, pedestrian
handrailing, sidewalks and landscaping were substantially completed by the specified
date of August 30, 2002.
RAILROAD COORDINATION
The project required extensive communication and coordination with the railroad, I&M
Rail Link, which allowed construction operations to take place within the railroad right-
of-way. The railroad also required that a railroad employee (flag person) be on-site
during construction to coordinate train schedules and site safety with the bridge
contractor, which the City hired directly. The final cost of the railroad personnel on-site
during construction was $3,970 which is less than the $15,000 initially estimated.
DISCUSSION
The Fengler Street Bridge Reconstruction Project has been completed by Taylor
Construction, Inc. of New Vienna, Iowa, in the final contract amount of $1,147,078.75,
which is a 0.8% decrease from the original contract in the amount of $1,156,824.81.
Acceptance of the construction contract was delayed while staff worked with the
contractor to resolve concerns regarding the aesthetic appearance of the concrete
approach barrier rail incorporated on the project. Taylor Construction agreed and has
performed the necessary repairs to improve the non-uniform appearance of the railing
profile. Staff has reviewed the aesthetic repairs and feels the work is in conformity with
the lines, grades, cross sections and dimensions, including tolerances as shown in the
contract documents.
RECOMMENDATION
I recommend that the City Council accept the improvements and the final contract be
established at $1,147,078.75.
BUDGET IMPACT
The project cost summary for the Fengler Street Bridge Reconstruction Project is as
follows:
Estimate Bid Final
Construction Contract $998,818.00 $1,156,824.81 $ 1,147,078.75
Contingency 99,881.00 99,881.00
Engineering Design Services 42,000.00 49,000.00 61,591.00
Construction Engineering Inspection 25,000.00 25,000.00 40,328.17
Railroad Flagger Services 15,000.00 15,000.00 3,970.00
Potential Early Completion Incentive 50,000.00 50,000.00
Other Misc. Costs 13,205.61
Total Project Cost $1,230.699.00 $1,395.705.81 $1.256.368.62
The project-funding summary is as follows:
Fengler Street Bridge
Algona Street Surplus
Bridge Repair and Maintenance
CIP No. 300724
CIP No. 300585
CIP No. 300218
$ 790,298.62
450,256.00
15,814.00
Total Project Funding
$1.256.368.62
The project will be funded from the Street Construction Fund under the Capital
Improvement Budget for the Fengler Street Bridge in the amount of $790,298.62 for
Fiscal Year 2002. Additional funding will be from the remaining balance from the Algona
Street Reconstruction Project in the amount of $450,256, and $15,814 from the Fiscal
Year 2002 appropriation for General Bridge Repair and Maintenance.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolutions accepting the
improvement and establishing the final construction cost.
Prepared by Robert Schiesl, PE
cc: Dawn Lang, Administrative Services Manager
Robert Schiesl, Civil Engineer
Dennis Waugh, IIW Engineers & Surveyors
RESOLUTION NO. 1-05
ACCEPTING IMPROVEMENT
Whereas, the contract for the Fengler Street Bridge Reconstruction
Project has been completed and the City Manager has examined the work and
filed his certificate stating that the same has been completed according to the
terms of the contract, plans and specifications and recommends its acceptance.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved
and that said improvement be and the same is hereby accepted.
BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby
directed to pay to the contractor from the Fiscal Year 2002 Street Construction
Fund in amounts equal to the amount of his contract, less any retained
percentage provided for therein. .
Passed, approved and adopted this 3rd day of January
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, City Clerk
RESOLUTION NO. 2-05
FINAL ESTIMATE
Whereas, the contract for the Fengler Street Bridge Rconstruction Project
has been completed and the City Engineer has submitted his final estimate
showing the cost thereof including the cost of estimates, notices and inspection
and all miscellaneous costs.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the cost of said improvement is hereby determined to
be $1,256,368.62 and the said amount shall be paid from the Fiscal Year 2002
Street Construction Fund of the City of Dubuque, Iowa.
Passed, approved and adopted this 3rd day of January, 2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, City Clerk
City of Dubuque - Engineering Division
Final Payment Form
PAYMENT NO: Council Final
PROJECT NAME: Fengler Bridge Reconstruction Project DATE: December 22, 2004
CONTRACTOR: Taylor Construction, Inc. CONTRACT AMOUNT: $1,156,824.81
BID ITEM DESCRIPTION II UNIT II UNIT COST I
1 Excavation. Class 13, Roadway & Borrow CY $ 5.25 2079.00 $ 10,914.75
2 Modified Subbase TON $ 12.00 1039.99 $ 12,479.88
3 Bridge Approach Section SY $ 36.00 165.14 $ 5,945.04
4 PCC Pavement, 8 Inch SY $ 32.00 1683.26 $ 53,864.32
5 ACC, Binder Course, 314 In. Mix TON $ 65.00 DELETED $
6 ACC, Surface Course, 1/2 In. Mix TON $ 59.50 DELETED $
7 Removal of Existing Bridge LS $ 50,000.00 1.00 $ 50,000.00
8 Excavation, Class 20 CY $ 50.00 471.61 $ 23,580.50
9 Structural Concrete (Bridge) CY $ 280.00 563.02 $ 157,645.60
10 Reinforcing Steel LB $ 0.50 7238.00 $ 3,619.00
11 Reinforcing Steel, Epoxy Coated LB $ 0.60 116648.60 $ 69,989.16
12 Beams, Pretensioned Prestressed Concrete, LXC42 EA $ 5,200.00 14.00 $ 72,800.00
13 Beams, Pretensioned Prestressed Concrete, LSC75(MOD) EA $ 8,400.00 7.00 $ 58,800.00
14 Structural Steel LB $ 2.00 4903.00 $ 9,806.00
15 Concrete Barrier Railing LF $ 45.00 333.70 $ 15,016.50
16 Concrete Barrier Railing, Aesthetic LF $ 550.00 380.70 $ 209,385.00
17 Ornamental Metal Railing LF $ 80.85 560,40 $ 45,308.34
18 Steel Pipe Pedestrian Hand Railing LF $ 35.00 333.20 $ 11,662.00
19 Piles, Drive Wood(Treated Timber Foundation Piles) LF $ 1.00 1286.20 $ 1,286.20
20 Piles, Drive Steel Bearing, HP 10X42 LF $ 1.00 1302.10 $ 1,302.10
21 Piles, Furnish Wood(Treated Timber Foundation Piles) LF $ 14.00 1401.56 $ 19,621.84
22 Piles, Furnish Steel Bearing, HP 10X42 LF $ 17.00 1320.00 $ 22,440.00
23 Prebored Holes LF $ 50.00 171.00 $ 8,550.00
24 Stonm Sewer Utility Access RA-50 EA $ 1,300.00 DELETED $
25 Remove Storm Sewer Pipe less than or equal to 36" LF $ 12.00 65.00 $ 780.00
26 Intake, Special, Single, as per Plan EA $ 1,500.00 2.00 $ 3,000.00
27 Sewer Pipe, 20000 Stonm, 18 In. Dia. LF $ 37.50 34.00 $ 1,275.00
28 Sewer Pipe, 20000 Stonm, 24 In. Dia. LF $ 44.50 7.50 $ 333.75
29 Removal of Guardrail LF $ 5.00 946.00 $ 4,730.00
30 Removal of Pavement SY $ 2.75 1561.77 $ 4,294.87
31 Sidewalk, P.C. Concrete, 4" SF $ 4.25 1007.72 $ 4,282.81
32 Sidewalk, Reinforced P.C. Concrete, 5" SF $ 6.50 3981.25 $ 25,878.13
33 Removal of Sidewalk SF $ 0.50 2029.00 $ 1,014.50
34 Curb and Gutter, P.C. Concrete, 2.5 Ft LF $ 16.00 DELETED $
35 Relocate Fire Hydrant EA $ 1,600.00 1.00 $ 1,600.00
36 Erosion Control LS $ 9,500.00 1.00 $ 9,500.00
37 Concrete Barrier, Approach, RE-46 EA $ 2,500.00 4.00 $ 10,000.00
38 Concrete Barrier, Approach, RE-44E LF $ 60.00 480.00 $ 28,800.00
39 Concrete Barrier, Approach, RE-44F LF $ 90.00 80.00 $ 7,200.00
40 Safety Closure EA $ 200.00 2.00 $ 400.00
41 Painted Pavement Markings LF $ 0.50 878.00 $ 439.00
42 Remove Existing Street Lights and Foundation EA $ 400.00 4.00 $ 1,600.00
43 Light Pole and Fixture, Ornamental EA $ 2,580.00 6.00 $ 15,480.00
44 Light Poie, Foundation, & Fixture, 30' Commercial EA $ 2,210.00 1.00 $ 2,210.00
45 Eiectrical Service LS $ 325.00 1.00 $ 325.00
46 Pull Boxes EA $ 145.00 1.00 $ 145.00
47 Electrical Wire #6, THW LF $ 0.65 619.60 $ 402.74
48 Electrical Wire #8, THW LF $ 0.51 730.80 $ 372.71
49 Eiectrical Wire #10, THW LF $ 0.33 675.20 $ 222.82
50 Electrical Wire #14, THW LF $ 0.15 212.00 $ 31.80
51 Eiectrical Conduit, 3/4" PVC LF $ 1.45 365,40 $ 529.83
52 Electrical Conduit, 2", PVC LF $ 2.50 309.80 $ 774.50
53 Traffic Control LS $ 3,200.00 1.00 $ 3,200.00
54 Mobilization EA $ 105,000.00 1.00 $ 105,000.00
55 Modular Block Reta;n;ng Wall SF $ 26.00 DELETED
56 Macadam Stone Slope Protection
548.00
19,180.00
35.00
Sy
TOTAL AMOUNT EARNED TO DATE" BASE BID: I $1,117,018.68
ADD CHANGE ORDER - EXTRA WORK ITEM II UNIT II UNIT COST I
57 Electrical Conduit, 1-1/4", PVC LF $ 2.00 16.80 $
58 Stabalization Stone. 3" Breaker TON $ 11.22 1253.33 $
59 Stonm Sewer, Bedding Stone, 1" Clean TON $ 13.81 46.87 $
60 Curb and Gutter, Remove & Replace, 2.0 Ft. LF $ 25.27 52.90 $
61 Storm Sewer, Concrete Collar, Replaced RA-50 (Item No.24) EA $ 431.20 1.00 $
62 Storm Sewer, DIP, 12 In. Dia., Labor & Equipment Only EA $ 712.58 1.00 $
63 Water Hydrant, Relocation EA $ 1,026.16 1.00 $
64 Pavement Markings, Paint Symbols & Legends EA $ 40.25 5.00 $
65 PCC Driveway LS $ 449.94 1.00 $
66 Excavation, Shape Abutements LS $ 1,910.15 1.00 $
67 Excavation, Rough Grade Side Slopes LS $ 1,287.00 1.00 $
68 Excavation, Place Topsoil on Side Slopes LS $ 7,140.10 1.00 $
69 Reinforcing Steel, Additional, Unit Price Increase LB $ 0.11 315.00 $
70 Reinforcing Steel, Additional, Unit Price Increase LB $ 0.18 117.00 $
71 PCC Test Cylinders EA $ 2.56 16.00 $
72 Light Pole, Mast Anm & Pole Change (item No. 44) LS $ 725.00 1.00 $
TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: I $
TOTAL AMOUNT EARNED TO DATE: 1$
TOTAL DUE CONTRACTOR:
CONSTRUCTION ENGINEERtNG & INSPECTION: I $
TOTAL CONSTRUCTION COST:
CERTIFICATE OF THE CITY MANAGER:
33.60
14,062.36
647.27
1,336.78
431.20
712.58
1,026.16
201.25
449.94
1,910.15
1,287.00
7,140.10
34.65
21.06
40.96
725.00
30,060.07 I
1.147,078.751
1$
1,147,078.75 I
30,523.261
1$
1,177,602.01 I
APPROVED:
i hereby certify that the above statement shows in detail the correct amount of all work required to complete the atiove
improvement.
APPROVED:
Michael Van Milligen, City Manager
City of DUbUqUe,~
oj .~~ -~-
Gus Psihoyos, Acting Public Works Director
City of Dubuque, Iowa
CERTIFICATE OF THE CONTRACTOR:
contractor for the above improvement. does hereby
The undersigned,
Taylor Construction, Inc.
accept the above "Total Due Contractor", as full settlement for all claims for said improvement.
CONTRACTOR:
Taylor Construction, Inc.
It""- 'III 'IIL--'
TITLE:
.S?e
¡1-z,Z-tl'-/
DATE: