RISE Agree Bergfeld Chav Rd Ext
D~~-@uE
~~~
MEMORANDUM
December 27,2004
TO:
The Honorable Mayor and City Council Members
FROM:
Michael C. Van Milligen, City Manager
SUBJECT: RISE Project Agreement - 2005-R-016
Chavenelle Road Connection through the Dubuque Industrial Center West
3rd Addition
The City of Dubuque has been awarded a Revitalize Iowa's Sound Economy (RISE)
grant from the Iowa Department of Transportation to connect Chavenelle Road through
the Dubuque Industrial Center West 3rd Addition.
Economic Development Director Bill Baum recommends City Council approval of a
Project Agreement with the Iowa Department of Transportation for a RISE Project in the
amount of $1 ,258,574, or 50% of total RISE eligible project costs, whichever is less, for
the Chavenelle Road Connection project.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
/~JJ ~ fltlL-
Míchael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
William Baum, Economic Development Director
. J-.:
CITY OF DUBUQUE, IOWA
MEMORANDUM
December 27,2004
TO:
Michael Van Milligen, City Manager
FROM: William Baum, Economic Development Director ff~tü,~--
SUBJECT: RISE Project Agreement -- 2005-R-016 !
Chavenelle Road Connection through the Dubuque'fndustrial Center West
3rd Addition
INTRODUCTION
This memorandum presents for City Council approval a project agreement with the Iowa
Department of Transportation for a Revitalize Iowa's Sound Economy (RISE) Project for
the connection of Chavenelle Road through the Dubuque Industrial Center West 3rd
Addition. The City Council is requested to adopt a resolution approving the attached
RISE Agreement.
BACKGROUND
On December 14, 2004, the Iowa Department of Transportation (IDOT) Commission met
and approved the City's application for RISE program funds to construct the connection
of Chavenelle Road through the Dubuque Industrial Center West 3rd Addition. The
planned roadway improvements include the grading and paving of the connection that
extends approximately 4,850 from the current temporary cul-de-sac by Geise
Manufacturing to the easterly end point by the Nordstrom Distribution Center. This street
connection will provide direct access through the expanding industrial park to the NW
Arterial.
The Commission awarded the City a RISE grant of $1 ,258,574 or 50% of total RISE
eligible project costs, whichever is less, to complete the roadway. IDOT has authorized
the City to begin incurring RISE eligible costs effective from the award date, but
reimbursement cannot be made until the attached agreement has been fully executed.
DISCUSSION
Attached to this memorandum is a resolution that provides for the approval of the
Agreement for a RISE Project for the connection of Chavenelle Road through the
Dubuque Industrial Center West 3rd Addition. It also authorizes and directs the Mayor
and City Clerk to execute two copies of the agreement on behalf of the City.
Two copies of the agreement are attached to the resolution for signature. The
agreement contains the standard RISE grant provisions. There are no unusual project
specific conditions or requirements in the agreement.
RECOMMENDATION
I recommend that the City Council approve the attached RISE Agreement by adopting
the attached resolution. The Agreement will provide funding for 50% of the cost to build
the Chavenelle Road connection. I believe that the terms and conditions of the
Agreement are reasonable and consistent with the City's plan for development of the
industrial property.
ACTION STEP
The action step is to adopt the attached resolution.
attachments
F: \U S ERS\Pmyh re\WP DOCS\I N DP ARK'" I SE\ChavRd3 rdAdd RIS EAg ree.M EM. doc
RESOLUTION NO. 5-05
RESOLUTION APPROVING AN AGREEMENT FOR R.I.S.E. PROJECT FUNDING
WITH THE IOWA DEPARTMENT OF TRANSPORTATION RELATING TO THE
CONNECTION OF CHAVENELLE ROAD THROUGH THE DUBUQUE
INDUSTRIAL CENTER WEST 3RD ADDITION.
Whereas, the City of Dubuque has developed plans for the connection of
Chavenelle Road through the Dubuque Industrial Center West 3rd Addition; and
Whereas, the City has requested funding under the State of Iowa's R.I.S.E.
(Revitalize Iowa's Sound Economy) Program; and
Whereas, the City's application was approved by order of the Transportation
Commission on December 14, 2004; and
Whereas, the Iowa Department of Transportation has prepared and submitted
for City Council approval an Agreement relating to the R.I.S. E. grant, a copy of which is
attached hereto and by this reference made a part hereof; and
Whereas, the City Council finds that the proposed agreement is acceptable and
necessary to the growth and development of the city.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1.
That the Iowa Department of Transportation Agreement for a
R.I.S.E. Program Project, Agreement No. 2005-R-016, is hereby
approved.
Section 2.
That the Mayor and City Clerk are hereby authorized and directed
to execute two copies of the Agreement on behalf of the City of
Dubuque and forward the executed copies to the Iowa Department
of Transportation for their approval.
Passed, approved and adopted this 3rd day of January, 2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, City Clerk
F: IUSERS\Pmyh re IWPDOCS~ N DP ARKIRI SEIC h avRd3rdAddRISEAgree .res.d oc
~ 1~~~I~~~~ont Of Tra ~~~7~tiOn
~ Fax: 515-233-7857
December 20, 2004
Ref.: 762
RM-2100(637)-9D-31
Bill Baum
Economic Development Director
50 West 13th Street
Dubuque, IA 52001
Dear Mr. Baum:
Enclosed are two unsigned originals of Iowa DOT Agreement Number 2005-R-016 that
has been prepared for the above referenced project. Please review the agreement and
if acceptable, present it to the City Council for further action.
Following signature by the city, please return both originals to me for signature by the
Iowa DOT. A fully-executed original will be returned to you for your files.
Effective December 14, 2004, the city is hereby authorized to incur costs for project
expenditures on the above referenced RISE project prior to execution of a formal
agreement. However, no reimbursement can be made by the Department until the
agreement has been fully executed. The agreement identifies what project activities
and associated costs are eligible for RISE funding and reimbursement.
Please note that the agreement contains a clause stating that plans, specifications and
other proposed contract documents must be submitted to the Iowa DOT for review at
least thirty (30) days prior to the project letting. We will expedite our reviews as much
as possible, but your schedule needs to allow this amount of time for completing
reviews and making any necessary revisions. Any necessary revisions will need to be
made prior to sending out any bid documents.
If you have any questions, please feel free to contact me.
TV
Enclosures
Sincerely,
~ ()o.-f-
Tom Vaughan
Office of Systems Planning
Planning and Programming Division
Iowa Department of Transportation
Agreement for a
Revitalize Iowa's Sound Economy Program (RISE) Project
RECIPIENT: City of Dubuque
PROJECT NO: RM-21O0(637)-9D-31
IOWA DOT
AGREEMENT NO.: 2005-R-016
This is an agreement between the City of Dubuque (hereinafter referred to as Recipient) and the
Iowa Department of Transportation (hereinafter referred to as the DOT). The Recipient
submitted an application to the DOT for funding through the Revitalize Iowa's Sound Economy
(RISE) fund under Iowa Code Chapter 315 (2003), and the application was approved by
Transportation Commission Order No. PP-2005-35 on December 14, 2005.
Pursuant to the terms of this agreement, and applicable statutes and administrative rules the DOT
agrees to provide funding to the Recipient for the authorized and approved costs for eligible
items associated with the grading and paving of approximately 4,850 feet of Chavenelle Road in
the Dubuque Industrial Center West, 3rd Addition.
In consideration of the foregoing and the mutual promises contained in this agreement, the
parties agree as follows:
1.
The Recipient shall be the lead organization for carrying out the provisions of this
agreement.
2.
All notices required under this agreement shall be made in writing to the DOT's and/or
the Recipient's contact person. The DOT's contact person shall be Tom Vaughan, Office
of Systems Planning, 800 Lincoln Way, Ames, Iowa 50010, 515-239-1788. The
Recipient's contact person shall be Bill Baum, Economic Development Director, 50 West
13th Street, Dubuque, Iowa 52001. Ph: 563-589-4393
3.
The Recipient shall be responsible for the development and completion of the following
described project:
Grade and pave approximately 4,850 feet of Chavenelle Road in the Dubuque Industrial
Center West, 3rd Addition. The proposed pavement would be 37-foot wide, constructed
with lO-inch thick Portland Cement Concrete.
See Exhibit A.
4.
5.
6.
Eligible project costs for the project described in Section 3 of this agreement, listed
above, which are incurred after the effective date of this agreement shall be paid as
follows:
City RISE Funds (Grant):
City Local Contribution:
Project Total:
$1,258,574
$1,258,574
$2,517,148
The local contribution stated above may include cash or non-cash contributions to the
project. The Recipient shall certify to the DOT the value of any non-cash contribution to
the project prior to it being incurred. For right of way contributions, the recipient shall
submit an appraisal from a qualified independent appraiser. The DOT reserves the right
to review the Recipient's certificate of value and has sole authority to determine the value
of the Recipient's non-cash contribution for the purposes of this agreement. If, as a result
of the DOT's determination, the Recipient's total cash and non-cash contribution is below
that stated in the terms of this agreement, the Recipient shall increase its cash
contribution in order to complete the Recipient's local contribution, or the grant and/or
loan amount associated with this project shall be reduced accordingly.
The portion of total project costs paid by grant, shall not exceed the amount stated above
$1,258,574 or 50 percent of the total cost of the eligible items, whichever is the smaller
amount. Any cost overruns shall be paid solely by the applicant.
7.
Project activities or costs eligible for funding include only those items set out in Exhibit
B which is attached hereto and by this reference incorporated into this agreement, and
which are necessary to complete the project as described in Section 3.
8.
Activities or costs ineligible for funding include but are not limited to those items set out
in Exhibit C which is attached hereto and by this reference incorporated into this
agreement.
9.
Notwithstanding any other provisions of this contract, if funds anticipated for the
continued fulfillment of this contract are at any time not forthcoming or insufficient,
either through the failure of the State of Iowa to appropriate funds or discontinuance or
material alteration of the program for which funds were provided, the DOT shall have the
right to terminate this contract without penalty by giving not less than ninety (90) days
written notice.
10.
The DOT reserves the right to delay reimbursement of funds to the Recipient if necessary
to maintain a positive cash flow. If such a delay is necessary and lasts more than five
working days, the DOT shall so notify the Recipient in writing and shall give the
Recipient an estimate of when reimbursement might be expected. The DOT shall
establish a system to equitably make reimbursements to all Recipients so affected.
11.
The attached project implementation schedule, Exhibit D, shall be used unless the
Recipient submits to the DOT, no later than 30 days subsequent to the Recipient's
signature date on this agreement, a revised implementation schedule.
12.
13.
14.
15.
16.
17.
The Recipient must have let the contract or construction started within three years of the
date this project is approved by DOT. If the Recipient does not do this, they will be in
default for which the DOT can revoke funding commitments. This agreement may be
extended for periods up to six months upon receipt of a written request from the
Recipient at least sixty (60) days prior to the deadline.
If any part of this agreement is found to be void and unenforceable, the remaining
provisions of this agreement shall remain in effect.
It is the intent of both parties that no third party beneficiaries be created by this
agreement.
This agreement shall be executed and delivered in two or more copies, each of which so
executed and delivered shall be deemed to be an original and shall constitute but one and
the same instrument.
This agreement is not assignable without the prior written consent of the DOT.
If the project described in Section 3 of this agreement crosses a DOT primary road, then:
A.
B.
D.
The Recipient shall convey title to the State of Iowa, by quit claim deed, to any
right of way necessary for the primary road crossing, all at no cost to the DOT.
However, the DOT shall prepare detailed legal descriptions and plats. The
general configuration of the right of way to be conveyed shall be agreed to by the
Recipient and the DOT prior to the survey.
The Recipient shall submit six copies of plans for all primary road system
crossings to the DOT contact person for review and approval by the District
Offices for necessary permits, Offices of Road Design and Maintenance with
regard to crossing design and location, signing, fencing, safety, maintenance,
compliance with access control policy, etc. Said approval shall be obtained
before the Recipient proceeds with the construction of any primary road system
crossing.
c.
The use of primary highway right of way for this projects' purpose shall be
subject to any rights enjoyed by any existing utility lines presently within the right
of way. If excavation of a utility line over which this project has been placed is
necessary for any reason, the utility shall be responsible for proper backfilling of
said excavation to ground level. The Recipient shall be responsible for any
necessary resurfacing or restoration.
The use of primary highway right of way for this projects' purposes shall be
subject to any future plans for reconstruction, improvement, maintenance, and/or
relocation of the highway by the DOT. Any relocation of this project necessary
because of said plans shall be at the expense of the Recipient, all at no cost to the
DOT.
18.
19.
20.
21.
22.
23.
The Recipient shall acquire the project right of way, whether by lease, easement or fee
title and shall provide relocation assistance benefits and payments in accordance with the
procedures set forth in the DOT's Right of Way manual. The Recipient shall contact the
DOT for assistance, as necessary, to ensure compliance with the required procedures,
even if no federal funds in the right of way purchase are involved. The Recipient will
need to get environmental concurrence before acquiring any needed right of way. With
prior approval, hardship and protective buying is possible. If the Recipient requests
Federal-aid participation for right of way acquisition, the Recipient will need to get
environmental concurrence and Federal Highway Administration (FHW A) authorization
before purchasing any needed right of way.
The Recipient shall comply with the Policy for Accommodating Utilities on City and
County Federal-aid Highways Right of Way and the Policy for Accommodating Utilities
on Primary Road system when on the DOT's right of way. Certain utility relocation,
alteration, adjustment, or removal costs to the Recipient for the project may be eligible
for Federal-aid reimbursement in accordance with the FHW A rules applicable to the type
of utility involved and Iowa Code Chapter 306A.
The Recipient shall be responsible for obtaining any permits, such as the Right to Occupy
and/or Perform Work Within the Right of Way, Permit of Access, Utility
Accommodation, Right to Install and Maintain Traffic Control Devices, and/or other
construction permits required for the project prior to the start of construction.
In addition, the Recipient shall certify to the DOT's contact person that all known
required environmental permits have been received and that all environmental regulations
have been complied with before funds are reimbursed or credited.
Neither the approval of the project application for funding nor the signing of this
agreement shall be construed as approval of any required permit from DOT.
Traffic control devices, signing, or pavement markings installed within the limits of this
project shall conform to the "Manual on Uniform Traffic Control Devices for Streets and
Highways" per 761 Iowa Administrative Code Chapter (lAC) 130. The safety of the
general public shall be assured through the use of proper protective measures and devices
such as fences, barricades, signs, flood lighting, and warning lights as necessary.
In the event that right of way is required for the project, said right of way will be acquired
in accordance with 761 lAC Chapter 111, Real Property Acquisition and Relocation
Assistance, and the Federal Uniform Relocation Assistance and Real Property
Acquisition Policies Act of 1970, as amended.
The project plans, specifications and cost estimate shall be prepared and certified by a
professional engineer, architect and or landscape architect (whichever applies), licensed
to practice in the State of Iowa. The Recipient shall submit the plans, specifications and
other agreement documents to the DOT for review. This submittal may be in divisions
24.
25.
26.
27.
28.
and in the order of preference as determined by the Recipient. However, the plans,
specifications and other agreement documents for each division must be submitted at
least thirty (30) days prior to the project letting of each division. The DOT shall review
said submittal(s) recognizing the Recipient's development schedule and shall, after
satisfactory review, authorize in writing the Recipient to proceed with implementation of
the project. The work on this project shall be in accordance with the survey, plans, and
specifications on file. Any modification of these plans and specifications must be
approved by the DOT prior to the modification being put into effect.
The recipient shall be responsible for the daily inspection of the project. For projects let
to contract, the Recipient shall compile a daily log of materials and quantities. For
projects constructed with local forces, the Recipient shall compile a daily log of
materials, equipment and labor on the project. The DOT reserves the right to inspect
project activities and to audit claims for funding reimbursement. The purpose of the
inspection or audit is to determine substantial compliance with the terms of this
agreement.
The Recipient shall maintain all books, documents, papers, accounting records, reports
and other evidence pertaining to costs incurred for the project. The Recipient shall also
make such materials available at all reasonable times during the construction period and
for three years from the date of final reimbursement, for inspection by the DOT, FHW A,
or any authorized representatives of the Federal government. Copies of said materials
shall be furnished by the Recipient if requested.
The Recipient may submit to the DOT periodic itemized claims for reimbursement for
eligible project costs. Reimbursement claims shall include certification that all eligible
project costs, for which reimbursement is requested, have been completed in substantial
compliance with the terms of this agreement.
The DOT shall reimburse the Recipient for properly documented and certified claims for
eligible project activity costs less a retainage of not more than ten percent, either by state
warrant, or by crediting other accounts from which payment may have been made
initially. If, upon audits of contracts, the DOT determines the Recipient is overpaid, the
Recipient shall reimburse the overpaid amount to the DOT.
Upon completion of the project described in this agreement, a professional engineer,
architect and or landscape architect (whichever applies), licensed to practice in the State
of Iowa, shall certify in writing to the DOT that the project activities were completed in
substantial compliance with the plans and specifications set out in this agreement.
In addition, prior to final reimbursement for the project the Recipient shall furnish three
sets of "as-built" plans of the project to the DOT.
Final reimbursement of funds, including retainage, shall be made only after the DOT
accepts the project as complete.
29.
30.
31.
32.
33.
34.
If, in the opinion of the Recipient, the specific provisions of this agreement requiring the
services of a professional engineer, architect and or landscape architect (whichever
applies), licensed to practice in the State of Iowa, prove to be burdensome to the
Recipient or otherwise not in the public interest, and if the Recipient decides that the
provisions of this agreement can be otherwise complied with without endangering public
safety, the Recipient may request that said provisions be waived on all or specific parts of
the project identified by the Recipient. Such request shall be made in writing to the
DOT's contact person who shall, after consultation with other DOT staff, as necessary,
make the final determination concerning said waiver. If said waiver is granted, all
provisions of this agreement requiring the services of a professional engineer, architect
and or landscape architect (whichever applies), licensed to practice in the State of Iowa,
shall be performed by the Recipient's contact person or designee.
The Recipient agrees to indemnify, defend and hold the DOT harmless from any action
or liability arising out of the design, construction, maintenance, placement of traffic
control devices, inspection or use of this project. This agreement to indemnify, defend
and hold harmless applies to all aspects of the DOT's application review and approval
process, plan and construction reviews and funding participation.
This agreement may be declared to be in default by the DOT if the DOT determines that
the Recipient's application for funding contained inaccuracies, omissions, errors or
misrepresentations; or if the DOT determines that the project is not developed as
described in the application.
If the Recipient fails to perform any obligation under this agreement, the DOT shall have
the right, after first giving thirty (30) days written notice to the Recipient by certified mail
return receipt requested, to declare any part or all of this agreement in default. The
Recipient shall have thirty (30) days from date of mailing of the notice to cure the
default. If the Recipient cures the default, the Recipient shall notify DOT no later than
five (5) days after cure or before the end of said thirty (30) day period given to cure the
default. Within ten (10) working days of receipt of Recipient's notice of cure, the DOT
shall issue either a notice of acceptance of cure or a notice of continued default.
In the event a default is not cured the DOT may revoke funding commitments and/or seek
repayment of funds loaned or granted by this agreement. By signing this agreement the
Recipient agrees to repay said funding if they are found to be in default. Repayment
methods must be approved by the DOT Commission and may include cash repayment,
installment repayments with negotiable interest rates, charges against the Recipient's
share of road use tax funds, or other methods as approved by the Commission.
In case of dispute concerning the terms of this agreement, the parties shall submit the
matter to arbitration pursuant to lAC 679A (2003). Either party has the right to submit
the matter to arbitration after ten (10) days notice to the other party of their intent to seek
arbitration. The written notice must include a precise statement of the disputed question.
DOT and the Recipient agree to be bound by the decision of the appointed arbitrator.
35.
36.
37.
38.
39.
40.
Neither party may seek any remedy with the state or federal courts absent exhaustion of
the provisions of this section for arbitration.
The Recipient shall maintain, or cause to be maintained for the intended public use, the
improvement for twenty (20) years from the completion date in a manner acceptable to
the DOT. Failure to comply with this provision may be considered a default of this
agreement.
The Recipient shall comply with all provisions of the equal employment opportunity
requirements prohibiting discrimination and requiring affirmative action to assure equal
employment opportunity as required by the lAC 216 (2003). No person shall, on the
grounds of age, race, creed, sex, color, national origin, religion, or disability, be excluded
from participation in, be denied the benefits of, or be otherwise subjected to
discrimination under any program or activity for which the Recipient receives state funds
from the DOT.
The Recipient shall use positive efforts to solicit bids from and to utilize Targeted Small
Business (TSB) enterprises as contractors and ensure that the contractors make positive
efforts to utilize these enterprises as subcontractors, suppliers or participants in the work
covered by this agreement. Efforts shall be made and documented in accordance with
Exhibit E which is attached hereto and by this reference incorporated into this agreement.
The Recipient shall conduct the project development and implementation in compliance
with applicable laws, ordinances and administrative rules. For portions of the project let
to bid, the Recipient shall advertise for bidders, make a good faith effort to get at least
three bidders and hold a public letting for the project work. Prior to awarding the
contract, the Recipient shall provide the DOT file copies of project letting documents
within five (5) working days after the letting. The Recipient must wait for DOT
concurrence before making the final award.
If the Recipient lets the project locally then it must be completed exempt from tax as
provided by Iowa Code Sections 422.42(16), 422.42(17) & 422.47(5). The recipient
shall comply with these requirements.
The Recipient shall notify the DOT's contact person within 30 days of the date the RISE
project was constructed and open to traffic. The Recipient shall certify to the DOT's
contact person within two years of the date the RISE project is constructed and open to
traffic any associated economic development which has resulted from the project,
including infrastructure improvements, capital investment, and/or job creation. This
certification by the Recipient is subject to review by the DOT.
The DOT shall monitor the progress of the associated economic development following
the construction of the RISE project. Failure to certify the associated economic
development shall be considered a default under this agreement.
41.
This agreement as set forth in sections 1 through 41 herein, including referenced exhibits,
constitutes the entire agreement between the DOT and the Recipient concerning this
project. Representations made before the signing of this agreement are not binding, and
neither party has relied upon conflicting representations in entering into this agreement.
Any change or alteration to the terms of this agreement must be made in the form of an
addendum to this agreement. Said addendum shall become effective only upon written
approval of the DOT and Recipient.
IN WITNESS WHEREOF, each of the parties hereto has executed Agreement No.
2005-R-016 as of the date shown opposite its signature below.
RECIPIENT:
By:
Title:
Date:
_,20-
I,
, certify that I am
, and that , who
signed said Agreement for and on behalf of was duly
authorized to execute the same by virtue of a formal Resolution duly passed and adopted
by , on the day of
,20_.
Signed:
Date:
_,20-
Address:
lOW A DEPARTMENT OF TRANSPORTATION
Planning and Programming Division
800 Lincoln Way, Ames, Iowa 50010
By:
Date
_,20-
Stuart P. Anderson
Director
Office of Systems Planning
Exhibit A
Project Site MaJ>.
Exhibit B
Project activities or costs eligible for RISE funding include only the following:
a.
Roadway resurfacing, rehabilitation, modernization, upgrading, reconstruction or initial
construction, including grading and drainage, paving, erosion control, pavement overlays
and shoulder widening and stabilization.
b.
Bridge and culvert repair, modernization, replacement or initial construction.
c.
Roadway intersection and interchange improvements including warranted traffic
signalization when it is integral to the improvement.
d.
Right of way purchase.
e.
Construction or improvement of motorist rest areas, welcome centers and information
centers.
f.
Design engineering costs and construction inspection costs associated with RISE-
financed projects.
g.
County and City bond principal and interest payments associated with RISE projects. No
financing expenses incurred prior to funding commitment shall be eligible.
h.
Storm drainage and storm sewer costs to the extent needed for draining the roadway.
Exhibit C
Activities or costs ineligible for RISE funding include but are not limited to the
following:
a.
Any and all costs incurred prior to a funding commitment by the Transportation
Commission except advance right of way costs to protect or preserve a project corridor.
(1) If there is an extreme urgency involving right of way acquisition, a potential applicant
may formally request from the department a written waiver which, if granted, will permit
the applicant to acquire the right of way immediately without jeopardizing the eligibility
of the acquisition costs for future RISE funding. Granting of the waiver shall not imply
or guarantee that a subsequent application which includes the acquisition costs will be
funded. The request for the advance eligibility must include justification regarding the
urgency of the acquisition, a description of the land to be acquired, and a map showing its
location.
(2) The advance eligibility waiver must be requested and approved prior to the applicant's
acquisition of the land in question, and the RISE application which included the
acquisition costs must be received by the DOT within two years following the granting of
the waiver, or the waiver is not valid.
b.
Routine roadway, bridge and culvert maintenance, including pothole filling, crack
sealing, seal coating, patching, shoulder maintenance, gravel or earth roadway
maintenance, and bridge painting.
c.
Winter roadway and bridge maintenance, including snow plowing, sanding and salting.
d.
Overhead and operating costs associated with eligible project activities, including
auditing.
e.
Expenses associated with the preparation and submission of applications for RISE
funding.
f.
Pre-design engineering expenses.
g.
Traffic signalization, except as an integral part of a roadway project.
h.
Pavement marking and traffic signs, except as an integral part of a roadway project.
i.
Electric, water, natural gas, telephone and other utility construction, reconstruction or
adjustment except when utilities located on private property are replaced or relocated for
project construction.
j.
Safety appurtenances, except as an integral part of a roadway project.
k.
Lighting, except as an integral part of a roadway project.
I.
Lighting energy and maintenance costs.
m.
Sidewalks, bicycle paths and railroad-highway crossings, except when replacing those
facilities in service and affected by the project, or as an integral part of a roadway project.
n.
Parking expenditures, including those for structure, lots, meters and marking.
o.
Non-roadway transportation expenditures, including those for railway, aviation, public
transportation and inland waterway facilities and equipment.
p.
Purchase of furnishings, construction equipment and personal property.
q.
General government expenses and expenses associated with the provision of any public
service which are not eligible for RISE program assistance.
r. Sanitary sewers.
s. Water mains.
t. Donated right of way.
Project Implementation Schedule.
Commission Approval Date
Bidding and Contract A ward
Start of Construction
Substantial Completion
Exhibit D
December 14, 2004
January 15,2005
April 1,2005
September 1, 2005
Exhibit E
CONTRACT PROVISION
Targeted Small Business (TSB)
Affmnative Action Responsibilities
on
Non-Federal Aid Projects (Third-Party State-Assisted Projects)
June 2004
June 2004
TSB AFFIRMATIVE ACTION RESPONSffiILITIES
ON
NON-FEDERAL AID PROJECTS (THIRD-PARTY STATE-ASSISTED PROJECTS)
1.
TARGETED SMALL BUSINESS (TSB) DEFINITION
A TSB is a small business, as defined by Iowa Code Section 15.102(5), which is 51 % or
more owned, operated and actively managed by one or more women, minority persons or
persons with a disability. Generally this is a for-profit small business enterprise under
single management, is located in Iowa and has an annual gross income of less than 3
million dollars computed as an average of the three preceding fiscal years.
2.
TSB REQUIREMENTS
In all state-assisted projects made available through the Iowa Department of
Transportation, local governments have certain affirmative action requirements to
encourage and increase participation of disadvantaged individuals in business enterprises.
These requirements are based on Iowa Code Section 19B.7 and 541 Iowa Administrative
Code Chapter 4. These requirements supersede all existing TSB regulations, orders,
circulars and administrative requirements.
3.
TSB DIRECTORY INFORMATION
Available from:
Iowa Department of Inspections and Appeals
Targeted Small Business
Lucas Building
Des Moines, IA 50319
Phone: 515-281-7357
Website: www.iowai.netliowaldialtsb
4.
THE CONTRACTOR'S TSB POLICY
The contractor is expected to promote participation of disadvantaged business enterprises
as suppliers, manufactures and subcontractors through a continuous, positive, result-
oriented program. Therefore the contractor's TSB policy shall be:
It is the policy of this firm that Targeted Small Business (TSB) concerns shall
have the maximum practical opportunity to participate in contracts funded with
state-assisted funds which are administered by this firm (e.g. suppliers,
manufactures and subcontractors). The purpose of our policy is to encourage and
increase the TSB participation in contracting opportunities made available by
state-assisted programs.
5.
CONTRACTOR SHALL APPOINT An EQUAL EMPLOYMENT OPPORTUNITY
(EEO) OFFICER
The contractor shall designate a responsible person to serve as TSB officer to fulfill the
contractors affirmative action responsibilities. This person shall have the necessary
statistics, funding, authority and responsibility to carry out and enforce the firm's EEO
policy. The EEO officer shall be responsible for developing, managing and
implementing the program on a day-to-day basis. The officer shall also:
A.
B.
6.
For current TSB information, contact the Iowa Department of Inspections and
Appeals (515-281-7357) to identify potential material suppliers, manufactures and
contractors.
Make every reasonable effort to involve TSBs by soliciting quotations from them
and incorporating them into the firm's bid.
C.
Make every reasonable effort to establish systematic written and verbal contact
with those TSBs having the materials or expertise to perform the work to be
subcontracted, at least two weeks prior to the time quotations are to be submitted.
Maintain complete records of negotiation efforts.
D.
Provide or arrange for assistance to TSBs in seeking bonding, analyzing
plans/specifications or other actions that can be viewed as technical assistance.
E.
Ensure the scheduled progress payments are made to TSBs as agreed in
subcontract agreements.
F.
Require all subcontractors and material suppliers to comply with all contract
equal opportunity and affirmative action provisions.
COUNTING TSBs PARTICIPATION ON A PROJECT
TSBs are to assume actual and contractual responsibilities for provision of
materials/supplies, subcontracted work or other commercially useful function.
A.
The bidder may count:
(1)
Planned expenditures for materials/supplies to be obtained from TSB
suppliers and manufacturers; or
Work to be subcontracted to a TSB; or
Any other commercially useful function.
(2)
(3)
B.
The contractor may count:
(1)
(2)
(3)
(4)
100% of an expenditure to a TSB manufacturer that produces/supplies
goods manufactured from raw materials.
60% of an expenditure to TSB suppliers that are not manufacturers;
provided the suppliers perform a commercially useful function in the
supply process.
Only those expenditures to TSBs that perform a commercially useful
function in the work of a contract, including those as a subcontractor.
Work the Contracting Authority has determined that it involves a
commercially useful function. The TSB must have a necessary and useful
role in the transaction of a kind for which there is a market outside the
context of the TSB program. For example, leasing equipment or
purchasing materials from the prime contractor would not count.
7.
REQUIRED DATA, DOCUMENTS AND CONTRACT AWARD PROCEDURES
FROM BIDDERS/CONTRACTORS FOR PROJECTS WITH ASSIGNED GOALS
A.
Bidders
Bidders who fail to demonstrate reasonable positive efforts may be declared
ineligible to be awarded the contract. Bidders shall complete the bidding
documents plus a separate form called "TSB Pre-Bid Contact Information". This
form includes:
(1) Name(s) of the TSB(s) contacted regarding subcontractable items.
(2) Date of the contract.
(3) Whether or not a TSB bid/quotation was received.
(4) Whether or not the TSB's bid/quotation was used.
(5) The dollar amount proposed to be subcontracted.
B.
Contractors Using Quotes From TSBs
Use those TSBs whose quotes are listed in the "Quotation Used in Bid" column
along with a "yes" indicated on the Pre-bid Contact Information form.
C.
Contractors NOT Using Quotes From TSBs
If there are no TSBs listed on the Pre-bid Contract Information form, then the
contractor shall document all efforts made to include TSB participation in this
project by documenting the following:
(1)
(2)
What pre-solicitation or pre-bid meetings scheduled by the contracting
authority were attended?
Which general news circulation, trade associations and/or minority-
focused media were advertised concerning the subcontracting
opportunities?
(3)
(4)
(5)
(6)
(7)
(8)
Were written notices sent to TSBs that TSBs were being solicited and was
sufficient time allowed for the TSBs to participate effectively?
Were initial solicitations of interested TSBs followed up?
Were TSBs provided with adequate information about the plans,
specifications and requirements of the contract?
Were interested TSBs negotiated with in good faith? If a TSB was
rejected as unqualified, was the decision based on an investigation of their
capabilities?
Were interested TSBs assisted in obtaining bonding, lines of credit or
insurance required by the contractor?
Were services used of minority community organization, minority
contractors groups; local, state and federal minority business assistance
offices or any other organization providing such assistance.
The above documentation shall remain in the contractor's files for a period of three (3)
years after the completion of the project and be available for examination by the Iowa
Department of Inspections and Appeals.
8.
POSITIVE EFFORT DOCUMENTATION WHEN NO GOALS ARE ASSIGNED
Contractors are also required to make positive efforts in utilizing TSBs on all state-
assisted projects which are not assigned goals. Form "TSB Pre-bid Contact Information"
is required to be submitted with bids on all projects. If there is no TSB participation, then
the contractor shall comply with section 7C. of this document prior to the contract award.
Form 730007WP 7-97
Cootractor
Page#.
Projectif
TARGETED SMALL BUSINESS (TSB)
PRE-BID CONTACT INFORMATION
County
City
(To Be Completed By All Bidders Per The Current Cootract Provisioo)
In order for your bid 10 be coosidered respoosive. yoo are required to provide infoonatioo 00 this form showing your Targeted Small Business cootacts made with your bid submissioo. This inrormatioo is subject to verificatioo and
coofirmatioo.
In the event it is determined that the Targeted Small Business goals are not me~ then before awarding the cootract. the Cootracting Authority will make a determinatioo as 10 whether or not the apparent succossfullow bidder made good
faith efforts 10 meet the goals.
NOTE: Every effort sball be made to solicit quotes or bids 00 as many subcootractable items as necessary 10 achieve the established goals. If a 1'8B's quote is used in the bid. it is assumed that the firm listed will be used as a
subcootractor.
TABLE OF INFORMATION SHOWING BIDDERS PRE-BID
,^"u"",uom'U.LDUOU'"",,O"OD ~v,,'~~'o
SUBCONIRACI'OR 1'8B DATES OUOTES RECEIVED QUOTATION USED IN BID
CONTACfED
YESI DATES YES! DOLLAR AMT. PROPOSED
NO CONTACfED NO TO BE SUBCONIRACfED
Total dollar amoont proposed 10 be subcootracted to 1'8B 00 this project $
list items by name to be subcootracted:
June 2004
UTILIZATION
OF
TARGETED SMALL BUSINESS (TSB) ENTERPRISES
ON
NON-FEDERAL AID PROJECTS
(THIRD-PARTY STATE-ASSISTED PROJECTS)
In accordance with Iowa Code Section 19B.7 and 541 Iowa Administrative Code
Chapter 4, it is the policy of the Iowa Department of Transportation (Iowa DOT) that
Targeted Small Business (TSB) enterprises shall have the maximum practicable
opportunity to participate in the performance of contracts financed in whole or part
with state funds.
Under this policy it is the responsibility of the recipients of state funds to help
finance projects to make a positive effort to solicit bids from and to utilize TSBs as
contractors and ensure that the contractors make positive efforts to utilize these
enterprises as subcontractors, suppliers or participants in the work covered by this
agreement.
The Recipient's "positive efforts" should include, but not be limited to:
1. Obtaining the names of qualified TSB contractors from the Iowa Department
ofInspections and Appeals (515-281-7357) or from its website:
www.iowai.netliowaldialtsb.
2. Notifying qualified TSBs of proposed projects involving state-assisted
funding. Notification should be made in sufficient time to allow the TSBs to
participate effectively in the bidding process.
3. Soliciting bids from qualified TSBs on each project, and identifying for TSBs
the availability of subcontract work.
4. Including in the bid proposals for state-assisted projects, a contract provision
titled "TSB Affirmative Action Responsibilities on Non-Federal Aid Projects
(Third-Party State-Assisted Projects)", or a similar document developed by the
Recipient.
5. Ensuring that the awarded contractor has and shall follow the contract
provisions. The Recipient is encouraged to establish goals or percentages to
achieve TSB participation in these projects. Contract goals may vary
depending on the type of project, the projects sub-contractible items, the type
of service or supplies needed for the project, and the availability of qualified
TSBs in the area.
The Recipient shall agree to provide the Iowa DOT the following documentation:
1. Copies of correspondence and replies, and written notes of personal and/or telephone contacts
with any TSBs. Such documentation can be used to demonstrate the Recipient's positive efforts
and it should be placed in the general project file.
2. Bidding proposals noting established TSB goals, if any.
3. The dollar amount contracted to, subcontracted to, or supplied by qualified TSBs for the project
or projects covered by this agreement.
4. The attached "Checklist and Certification" form shall be filled out upon completion of each
project and forwarded to the Iowa DOT's EEO Administrator, Office of Contracts, 800 Lincoln
Way, Ames, Iowa 50010.
" .' .
une 2004 CHECKLIST AND CERTIFICATION
OF THE UTILIZATION OF
TARGETED SMALL BUSINESS (TSB)
ON NON-FEDERAL AID PROJECTS (THIRD-PARTY STATE-ASSISTED PROJECTS)
CITY:
PROJECT NUMBER:
COUNTY:
AGREEMENT NUMBER:
1. Were qualified TSB names obtained from the Iowa Department of Inspections and Appeals?
YES-
NO-
If no, explain
If yes, by letter
, telephone
YES - NO -
, personal contact , other
YES - NO -
YES - NO -
2. Were qualified TSBs notified of project?
If no, explain
3. Were bids solicited from qualified TSBs?
If no, explain
4. Was a goal or percentage (%) established
forTSB participation?
If yes, what was the goal or percentage (%)
If no, explain why not
5. Did the prime contractor use positive efforts to
utilize TSBs on subcontracts?
YES-
NO-
If no, what action was taken by County/City
Is documentation in files?
YES-
NO-
6. What was the dollar amount reimbursed to the City/County
from the Iowa Department of Transportation? $
What was the final project cost? $
What was the dollar amount performed by TSBs? $
Was the goal or percentage (%) achieved?
If no, explain
YES-
NO-
I certify that the COUNTY/CITY (circle one) used positive efforts to utilize TSBs as participants in this project.
PROJECT ENGINEERIMANAGER
DATE