Samuel St Concrete Repair Pro i5U~~E ~ck~ MEMORANDUM January 10, 2005 TO: The Honorable Mayor and City Council Members ,,' FROM: Michael C. Van Milligen, City Manager SUBJECT: Samuel Street - Concrete Section Repair and Overlay Project Acting Public Works Director/City Engineer Gus Psihoyos is recommending acceptance of the Samuel Street - Concrete Section Repair and Overlay Project, as completed by River City Paving, a Division of Mathy Construction, in the final contract amount of $188,775.07, which is a 71.3% increase from the original contract in the amount of $110,204.20. The additional incurred cost of $78,571 was a result of severe subsurface base and pavement deterioration requiring additional full-depth concrete and asphalt section repair work; removal and replacement of an additional 760 lineal feet of concrete curb and gutter; improvements to both the storm sewer and sanitary sewer system and the installation of handicap accessible ramps. I concur with the recommendation and respectfully request Mayor and City Council approval. 11'.1 I' ,II i .L('L I!! 1/:((..", Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, Acting Public Works Director i5~ ~ck~ MEMORANDUM January 10, 2005 TO: Michael C. Van Milligen, City Manager CjQ FROM: Gus Psihoyos, Acting Public Works Director SUBJECT: Samuel Street - Concrete Section Repair and Overlay Project INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Samuel Street - Concrete Section Repair and Overlay Project. BACKGROUND The Concrete Section Repair and Overlay Project provided for street improvements and asphalt resurfacing on Samuel Street from Southern Avenue to Tressa Street. The project involved the removal and replacement of numerous deteriorated concrete pavement sections, including subgrade stabilization. The roadway pavement was then prepped to receive a complete asphalt resurfacing overlay. The project also included the removal and replacement of deteriorated concrete curb and gutter and associated residential driveway approaches as required to match the grade and profile of the improved roadway pavement. The project also included the replacement of five (5) sanitary sewer brick manholes and the construction of approximately 130 lineal feet of new storm sewer and catch basins to improve the storm water conveyance in the area. DISCUSSION The Samuel Street - Concrete Section Repair and Overlay Project has been completed by River City Paving, Division of Mathy Construction of Kieler, Wisconsin, in the final contract amount of $188,775.07, which is a 71.3% increase from the original contract in the amount of $110,204.20. The additional incurred cost of $78,571 was a result of severe subsurface base and pavement deterioration requiring additional full-depth concrete and asphalt section repair work; removal and replacement of an additional 760 lineal feet of concrete curb and gutter; improvements to both the storm sewer and sanitary sewer system; and the installation of handicap accessible ramps. RECOMMENDATION I recommend that the City Council accept the improvements and the final contract be established at $188,775.07. BUDGET IMPACT The project cost summary for the Samuel Street - Concrete Section Repair and Overlay Project is as follows: Engineering Estimate $100,402.00 10,040.20 5,522.11 Bid Final Construction Contract Contingency $110,204.20 $188,775.07 10,040.20 5,522.11 5,522.11 Total Project Cost $115.964.31 $125,766.51 $194.297.18 The project funding summary is as follows: Concrete Section Repair Program Curb Replacement Program Sanitary Manhole Replacement Program Storm Sewer - Catch Basin Maintenance FY 2005 Annual Street Paving Program CIP No. 300293 CIP No. 150051 CIP No. 310708 CIP No. 320624 CIP No. 300A74 $37,000.00 $18,748.00 $18,503.10 $12,646.70 $107,399.38 $194.297.18 Total Project Funding ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Robert Schiesl, PE cc: Dawn Lang, Budget Director Don Vogt, Operations & Maintenance John Klostermann, Operations & Maintenance RESOLUTION NO. 13-05 ACCEPTING IMPROVEMENT Whereas, the contract for the Samuel Street - Concrete Section Repair and Overlay Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Concrete Section Repair Program, Curb Replacement Program, Sanitary Manhole Replacement Program, Storm Sewer - Catch Basin Maintenance, and the FY2005 Annual Street Paving Program in amounts equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 17th day of January Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 14-05 FINAL ESTIMATE Whereas, the contract for the Samuel Street - Concrete Section Repair and Overlay Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $194,297.18 and the said amount shall be paid from the Concrete Section Repair Program, Curb Replacement Program, Sanitary Manhole Replacement Program, Storm Sewer - Catch Basin Maintenance, and the FY2005 Annual Street Paving Program of the City of Dubuque, Iowa. Passed, approved and adopted t his 17th day of January, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk City of Dubuque - Engineering Division Final Payment Form PAYMENT NO, COUNCIL FINAL PROJECT NAME, Samuel Street - Concrete Section Repairs and Ove~ay Project CONTRACTOR River City Paving- Dlv. Of Mathy Construction BID ITEM DESCRIPTION II II UNIT COST I UNIT DATE, CONTRACT AMOUNT, Jaoua" 7, 2005 $110,204.20 1 1105.0103 Backfill Topso;! 2 1201.0100 Graded Stone Base 3 1301.0925 ACC Full Depth Repair Patches 4 1301.1301 ACCSurfaceCourse 5 1301.1800 Adjustmeot of Fixture in Asphalt Pavement 6 1303.0102 Pavemeot Scarification 7 1403.0301 Remove and Replacement of PC Coocrete Curb & Gutter, 2.5' 8 1403.0302 Remove and Replacemeot of PC Coocrete Curb & Gutter. 3.5' 9 1404.0546 PCC Dnveway. 6- . Remove and Construct 10 1404.0554 PCC Sidewalk, 4", Remove and Construct 11 1405.0704 PCC Full Depth Repair Patch, 8" 12 1602.0100 Soddin9 13 1703.0110 Subdraio. Perforated Plastic Pipe 6" dia 14 1705.0100 Sawcut Concrete 15 1705.0200 Asphalt Sawcut 16 2000.0000 Traffic Cootrol SY Ton SY Ton Each SY LF LF SY SF SY SY LF LF LF LS 8.30 13.00 53.01 48.57 275.00 3.16 19.50 22.70 57.70 8.75 62.30 11.00 8.20 3.60 2.50 900.00 285.78 606.20 358.30 445.80 8.00 3741.00 1227.00 79.54 146.00 694.50 288.82 1006.00 40.00 125.00 5.00 TOTAL AMOUNT EARNED TO DATE - BASE BID: I $ 2,371.97 7,880.60 18,993.25 21,652.51 2,200.00 11.821.56 23.926.50 4,589.46 1,277.50 43,267.26 3.177.02 8.249.20 144.00 312.50 4.500.00 154,363.32 1 17 E-1 PC Concrete, Hoodicap Ramp 6" SF $ 24.75 45 $ 18 E-2 PC Concrete, Handicap Ramp, Detectable Warnin9 Each $ 372.90 1 $ 19 E-3 Storm Sewer, 24" RCP, New Construct LF $ 45.10 128 $ 20 E-4 Storm Sewer, 21" SDR 35 PVC LF $ 37.40 9 $ 21 E-5 Storm Sewer, Intake 1O1-B, New Construct Each $ 1,617.00 2.00 $ 22 E-6 Storm Sewer, Intake 101-B, Remove & Replace Each $ 2,002.00 1 $ 23 E-7 Storm Sewer, Concrete-Collar, Tie ioto Existin9 Each $ 247.50 1 $ 24 E-8 Storm Sewer, Lower Existing Sanita" & Water Service Lines LS $ 1,053.80 1 $ 25 E-9 Water Valve Box, Repair & Clean Each $ 170.50 3 $ 26 E-10 Water Valve Box, Bottom Section Replacement Each $ 471.90 2 $ 27 E-l1 Water Valve Box, Tops, New Replacament Each $ 80.00 4 $ 28 E-12 Sanitary, Drop Manhole #1, Remove & Replace LS $ 3,788.40 1 $ 29 E-13 Sanitary, Manhole #3, Remove & Replace LS $ 3,392.40 1 $ 30 E-14 Sanitary, Manhole #3, Pipe, Coocrete Encasement LS $ 2,794.00 1 $ 31 E-15 Sanitary, Maohole #4, Remove & Replace LS $ 2,390.30 1 $ 32 E-16 Sanitary, Drop Manhole #5, Remove & Replaca LS $ 5,038.00 1 $ 33 E-17 Sanitary, Maohole Ri09 & Cover, New Replacemeot Each $ 275.00 4 $ TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: 1$ TOTAL AMOUNT EARNED TO DATE: 1$ 1,113.75 372.90 5.772.80 336.60 3,234.00 2,00200 247.50 1,053.80 511.50 943.80 320.00 3,788.40 3,392.40 2,794.00 2,390.30 5,038.00 1,100.00 34,411.75 1 188,775.07 1 ENGINEERING: 1$ 188,775,07 I I $ 5,522,11 I I $ 194.297,18 I TOTAL DUE CONTRACTOR: TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statemeot shows io detaH the correct amouot Df all work required to complete the above improvemeot. APPROVED, APPROVED, Gus Psihoyos, Actiog Public Works Director City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The uodersigoed, River City Paviog- Div. Of Mathy Coostructioo cootractor for the above improvemeot, does hereby accept the above "Total Due Cootracto~, as full settlemeot for all claims for said improvemeot. CONTRACTOR RòV~;. ~;),o~struction BY -7/~~ ,tlA.&'» /;'7/-?../~'~ TITLE' DATE: /C) ....!?"r/V' ¿)':>'-