IA 32 and Asbury Road Turn Land Imrpovements AcceptanceMasterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: IA 32 and Asbury Road Turn Lane Improvements
(Iowa DOT Project No. STP -32- 1(30)-- 2C -31)
(CIPs 2501815, 3002029)
DATE: August 10, 2011
Dubuque
All-America City
f 1 if
m
2007
Assistant City Engineer Bob Schiesl is recommending acceptance of the construction
contract for the IA 32 and Asbury Road Turn Lane Improvements Project, as completed
by Eastern Iowa Excavating and Concrete, LLC, in the final contract amount of
$436,288.34, which is a 6.31% increase from the original contract in the amount of
$410,312.15. This increase was due to additional subgrade stabilization, subdrain and
pavement markings. During the initial design, pavement markings were included but
were later removed prior to the bidding because of a nation -wide shortage of reflective
paint. During the construction of this project, paint became available, so the pavement
markings were added back into the project, for an increased cost of $18,307.77.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
L__--....„...,„
Mi aeI C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
Robert Schiesl, Assistant City Engineer
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
Gus Psihoyos, City Engineer
FROM: Robert Schiesl, Assistant City Engineer RD5
SUBJECT: IA 32 and Asbury Road Turn Lane Improvements
(Iowa DOT Project No. STP -32- 1(30)-- 2C -31)
(CIPs 2501815, 3002029)
DATE: August 8, 2011
INTRODUCTION
Dubuque
braid
All-America City
2007
The enclosed resolution provides for the acceptance of the construction contract for the
IA 32 and Asbury Road Turn Lane Improvements Project, Iowa DOT Project No. STP -
32- 1(30)-- 2C -31.
BACKGROUND
The IA 32 and Asbury Road Turn Lane Improvements Project provided for the following
improvements at the Asbury Road and IA 32 intersection:
— Southbound dual left -turn lane construction: Existing pavement removal; and
replacement with HMA along with PCC curb and gutter installation.
— Northbound PCC dual left -turn lane construction: PCC median; PCC sidewalks; fl-
inch surface course on the entire southbound corridor from access road north of
Asbury to Holliday Drive; pavement marking.
DISCUSSION
The IA 32 and Asbury Road Turn Lane Improvements Project, Iowa DOT Project No.
STP -32- 1(30)-- 2C -31, was completed by Eastern Iowa Excavating and Concrete, LLC
of Cascade, Iowa in the final contract amount of $436,228.34, which is a 6.31%
increase from the original contract amount of $410,312.15. The increase is due to
additional subgrade stabilization, subdrain and pavement markings. During the initial
design, pavement markings were included but were later removed prior to the bidding
because of a nation -wide shortage of reflective paint. During the construction of this
1
project, paint became available so the pavement markings where added back into the
project. The pavement markings increased the cost of the project by $18,307.77.
RECOMMENDATION
I recommend that the City Council accept the improvements and establish the final
contract at $436,228.34 for the IA 32 and Asbury Road Turn Lane Improvements
Project, Iowa DOT Project No. STP -32- 1(30)-- 2C -31.
BUDGET IMPACT
The summary of project costs is as follows:::
Award Final
Construction Contract $ 410,312.15 $436,228.34
Contingency 100,000.00 0
Engineering /Contract Administration 98,700.00 103,500.49
Total Project Cost $609,012.15 $539,728.83
The project funding summary is as follows:
CIP Available Funding Source Amount
3002029 STP Funding $356,930.58
3002029 NW Arterial TSF Capacity Improvements 79,297.76
2501814 NW Arterial Capacity Improvements 35,461.74
2501815 Traffic Consultant Services 68,038.75
Total Project Funding $539,728.83
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $436,228.34 to
Eastern Iowa Excavating and Concrete, LLC for the IA 32 and Asbury Road Turn Lane
Improvements Project, Iowa DOT Project No. STP -32- 1(30)-- 2C -31.
Prepared by David Ness, Civil Engineer II
cc: Julie Neebel, IIW Engineers & Surveyors, PC
Jenny Larson, Budget Director
Bob Schiesl, Assistant City Engineer
2
RESOLUTION NO. 264 -11
ACCEPTING THE IA 32 AND ASBURY ROAD TURN LANE IMPROVEMENTS
PROJECT, IOWA DOT PROJECT NO. STP- 32- 1(30)- -2C -31 AND AUTHORIZING
THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR
Whereas, the Public Improvement Contract for the IA 32 and Asbury Road Turn
Lane Improvements Project - Iowa DOT Project No. STP-32-1(30)---2C-31 (the Project)
has been completed and the City Engineer has examined the work and filed a certificate
stating that the Project has been completed according to the terms of the Public
Improvement Contract and that the City Engineer recommends that the Project be
accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
STP Funding, Northwest Arterial TSF Capacity Improvements, Northwest Arterial
Capacity Improvements, and Traffic Consultant Services appropriations for the contract
amount of $436,228.34 less any retained percentage provided for therein as provided in
Iowa Code chapter 573, and to pay such retainage only in accordance with the
provisions of Iowa Code chapter 573.
Passed, approved and adopted this 15 thday of August , 2011.
Attest:
Ke n S. Firns
hl, Acting Ci y Cler
Roy D. Buol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE IA 32 AND
ASBURY ROAD TURN LANE IMPROVEMENTS PROJECT, IOWA DOT PROJECT
NO. STP -32- 1(30)- -2C -31
The undersigned City Engineer of th'e`City of Dubuque, Iowa, hereby certifies that
he has inspected the IA 32 and Asbury Road Turn Lane Improvements Project - Iowa
DOT Project No. STP -32- 1(30)- 2C -31, that the Project has been performed in
compliance with the terms of the Public Improvement Contract, and that the total cost of
the completed work is $539,728.83.
Dated this IO114 day of AUGUST , 2011.
`Paii4A GiAm,J
Filed in the office of the City Clerk on the /1' day of , 2011.
City Engineer
Kev S. Firnstahl, Acting City Clerk
CONTRACTOR'S PAYMENT FORM
CONTRACT PAYMENT NO.
3 Final
OWNER:
City of Dubuque
PROJECT:
IA 32/ASBURY ROAD TURN LANE IMPROVEMENTS
IDOT PROJECT NO:
STP -32- 1(30) -2C -31
IIW PROJECT NO:
09192 -05
WORKING DAYS:
CONTRACT SPECIFIED START DATE:
ACTUAL START DATE:
30
August 23, 2010
August 25, 2010
PREPARED BY: IIW ENGINEERS & SURVEYORS, P.C.
PAGE 1/2
CONTRACTOR: Eastern Iowa Excavating and Concrete, LLC
ADDRESS:
P.O. Box 189
Cascade, IA 52033
PHONE: 1563- 852 -5120
FAX: [563- 852 -6020
AMOUNT OF CONTRACT
ORIGINAL: $410,312.15
REVISED: $424,633.33
DETAILED ESTIMATE OF CONTRACT WORK COMPLETED TO DATE
DATES OF PAYMENT
FROM: April 1, 2011
TO: Completion
ITEM
NO.
ITEM
CODE
CONTRACT ITEM DESCRIPTION
CONTRACT ITEM
PREVIOUS TOTAL
THIS PERIOD
TOTAL TO DATE
PERCENT
QUANTITY
UNIT
UNIT COST
QUANTITY
AMOUNT
QUANTITY
AMOUNT
QUANTITY
AMOUNT
0010
2102 -0425070
SPECIAL BACKFILL
26
TON
$17.00
14.5
$246.50
0
$0.00
14.5
$246.50
56%
0020
2102 - 2710070
EXCAVATION, CLASS 10, ROADWAY AND BORROW '
820.93
CY
$10.50
820.93
$8,619.77
0
$0.00
820.93
$8,619.77
100%
0030
2105 -8425005
TOPSOIL, FURNISH AND SPREAD
139
CY
$26.25
139
$3,648.75
0
$0.00
139
$3,648.75
100%
0040
2115 - 0100000
MODIFIED SUBBASE '
494.93
CY
$29.00
494.93
$14,352.97
0
$0.00
494.93
$14,352.97
100%
0050
2121 - 7425020
GRANULAR SHOULDERS TYPE B
600
TON
$16.50
621.69
$10,257.89
-0.1
($1.65)
621.59
$10,256.23
104%
0060
2301 - 1033085
STANDARD OR SLIP FORM PORTLAND CEMENT
CONCRETE PAVEMENT, CLASS C, CLASS 3
DURABILITY, 8.5 IN
1194
SY
$43.50
1245.2
$54,166.20
2.78
$120.93
1247.98
$54,287.13
105%
0070
2301 - 4874500
MEDIAN, P.C. CONCRETE, AS PER PLAN
30
SY
$60.50
30
$1,815.00
. 0
$0.00
30
$1,815.00
100%
0080
2301 - 4875006
MEDIAN, P.C. CONCRETE, 6 IN
344
SY
$36.25
312
$11,310.00
0
$0.00
312
$11,310.00
91%
0090
2303 -0041750
HOT MIX ASPHALT MIXTURE (3,000,000 ESAL, BASE
COURSE, 3/4 IN MIX
710
TON
$43.50
765
$33,277.50
0
$0.00
765
$33,277.50
108%
0100
2303 -0042500
HOT MIX ASPHALT MIXTURE (3,000,000 ESAL,
INTERMEDIATE COURSE, 1/2 IN MIX
910
TON
$43.50
890.6
$38,741.10
0
$0.00
890.6
$38,741.10
98%
0110
2303 -0043500
HOT MIX ASPHALT MIXTURE (3,000,000 ESAL,
SURFACE COURSE, 1/2 IN MIX, NO SPECIAL
FRICTION REQUIREMENT
930
TON
$43.50
918
$39,933.00
0
$0.00
918
$39,933.00
99%
0120
2303 -0246428
ASPHALT BINDER, PG 64 -28
153
TON
$600.00
148.5
$89,100.00
0
$0.00
148.5
$89,100.00
97%
0130
2303 - 6911000
HMA SAMPLES
1
LS
$1,100.00
1
$1,100.00
0
$0.00
1
$1,100.00
100%
0140
2507 - 3250005
ENGINEERING FABRIC
11
SY
$6.25
17
$106.25
0
$0.00
17
$106.25
155%
0150
2507 -8029000
EROSION STONE
9
TON
$34.35
10.9
$374.42
0
$0.00
10.9
$374.41
121%
0160
2510 - 6745850
REMOVAL OF PAVEMENT
2735
SY
$9.25
3565
$32,976.25
0
$0.00
3565
$32,976.25
130%
0170
2511- 7526004
SIDEWALK, P.C. CONCRETE, 4 IN.
18
SY
$37.00
18
$666.00
0
$0.00
18
$666.00
100%
0180
2511- 7526006
SIDEWALK, P.C. CONCRETE, 6 IN.
35
SY
$46.25
35
$1,618.75
0
$0.00
35
$1,618.75
100%
0190
2511 - 7528100
DETECTABLE WARNINGS FOR CURB RAMPS
68
SF
$25.50
68
$1,734.00
0
$0.00
68
$1,734.00
100%
0200
2512 - 1725306
CURB AND GUTTER, P.C. CONCRETE, 3.0 FT.
1168
LF
$16.25
1199
$19,483.75
0
$0.00
1199
$19,483.75
103%
0210
2524- 6765010
REMOVE AND REINSTALL SIGN
2
EA
$110.00
2
$220.00
0
$0.00
2
$220.00
100%
0220
2524- 9275100
WOOD POSTS FOR TYPE A OR B SIGNS, 4 IN X 4 IN
28
LF
$9.00
0
$0.00
0
$0.00
0
$0.00
0%
0230
2526 - 8285000
CONSTRUCTION SURVEY
1
LS
$9,000.00
1
$9,000.00
0
$0.00
1
$9,000.00
100%
0260
2527- 9263180
PAVEMENT MARKINGS REMOVED
9.9
STA
$65.00
6
$390.00
0
$0.00
6
$390.00
61%
0270
2528 -8445110
TRAFFIC CONTROL
1
LS
$13,500.00
1
$13,500.00
0
$0.00
1
$13,500.00
100%
SUBTOTAL WORK COMPLETED - PAGE 1
$119.28
$386,757.36
CONTRACT PAYMENT NO.
3 Final
CONTRACT WORK COMPLETED - CONTINUED
PAGE 2/3
ITEM
NO.
ITEM
CODE
CONTRACT ITEM DESCRIPTION
CONTRACT ITEM
PREVIOUS TOTAL
THIS PERIOD
TOTAL TO DATE
$19,700.00
QUANTITY) UNIT I UNIT COST
QUANTITY I AMOUNT
QUANTITY I AMOUNT
QUANTITY I AMOUNT
PERCENT
0280
2533-4980005
MOBILIZATION
1
LS
$19,700.00
1
$19,700.00
0
$0.00
1
$19,700.00
100%
0290
2599 - 9999010
REMOVE REMOVABLE TAPE MARKINGS
1
LS
$12.00
1
$12.00
0
$0.00
1
$12.00
100%
0300
2601 - 2634100
MULCH
0.2
ACRE
$700.00
0.2
$140.00
0
$0.00
0.2
$140.00
100%
0310
2601- 2636044
SEED & FERTILIZE (URBAN)
0.2
ACRE
$9,250.00
0.2
$1,850.00
0
$0.00
0.2
$1,850.00
100%
0320
2602 -0000060
REMOVE SILT FENCE
1660
LF
$0.85
1437.5
$1,221.88
0
$0.00
1437.5
$1.221.88
87%
0330
2602 -0000070
REMOVE SILT FENCE FOR DITCH CHECK
50
LF
$2.00
10
$20.00
0
$0.00
10
$20.00
20%
0340
2602 -0000090
CLEAN OUT OF SILT FENCE
600
LF
$1.10
0
$0.00
0
$0.00
0
$0.00
0%
0350
2602 -0000100
CLEAN OUT OF SILT FENCE FOR DITCH CHECK
50
LF
$1.25
0
$0.00
0
$0.00
0
$0.00
0%
SUBTOTAL WORK COMPLETED - PAGE 2
TOTAL WORK COMPLETED TO DATE
DETAILED ESTIMATE OF CHANGE ORDER WORK COMPLt I tU TO DATE
$0.00
$119.28
$22,943.88
$409,701.24
CH. ORD.
NO.
CHANGE ORDER ITEM DESCRIPTION
CHANGE ORDER ITEM
PREVIOUS TOTAL
THIS PERIOD
TOTAL TO DATE
PERCENT
QUANTITY
UNIT
UNIT COST
QUANTITY
AMOUNT
QUANTITY
AMOUNT
QUANTITY
AMOUNT
1
2502 - 8212034
8001Subdrain, Longitudinal (Shoulder). 4lnch
176
LF
$10.60
176
$1,865.60
0
$0.00
176
$1,865.60
100%
1
2599 - 9999020
8002-Subgrade Stabilization
248.74
TON
$19.25
248.7
$4,787.48
0
$0.00
248.7
$4,787.48
100%
1
2599- 9999009
8003 -Full Depth Pavement Saw Cut
432
LF
$2.75
447
$1,229.25
0
$0.00
447
$1,229.25
103%
1
2303 - 3400000
8004-Adjustment of Fixtures
1
EA
$400.00
1
$400.00
0
$0.00
1
$400.00
100%
1
2527- 9263109
8005- Painted Pavement Markings. Waterborne or
Solvent -Based
129.3
STA
$87.00
190.21
$16,548.27
0
$0.00
190.21
$16,548.27
147%
1
2527 - 9263137
8006- Painted Symbols and Legends, Waterborne or
Solvent -Based
19
EA
$103.50
17
$1,759.50
0
$0.00
17
$1,759.50
89%
2
-
No Cost Change Order
-
-
-
-
-
-
-
-
-
-
3
2102- 2710070
0020 - Excavation, C110, Roadway and Borrow *
- 179.07
CY
$10.50
-
-
-
-
-
-
-
3
2115-0100000
0040 - Modified Subbase *
- 179.07
CY
$29.00
-
-
-
-
-
-
-
4
2599- 9999005
8007 - (Price Adjustment) Mulch, Material Only
-5
EA
$12.60
0
$0.00
-5
($63.00)
-5
($63.00)
100%
- Adjusted in above bid items
TOTAL CHANGE ORDER WORK
TOTAL CONTRACT AND CHANGE ORDER WORK PERFORMED TO DATE
Less: Amount Retained Per Contract 3%
Value of Stored Materials (See Attached List)
Less: Stored Materials Amount Retained Per Contract 5%
Net Amount Earned to Date
Less: Previous Amount Earned
BALANCE DUE TO CONTRACTOR THIS PAYMENT Eastern Iowa Excavating and Concrete, LLC
$26,527.10
$436.228.34
$0.00
$0.00
$0.00
$436,228.34
$423,086.92
$13,141.42
CONTRACT PAYMENT NO.
3 Final
CERTIFICATION OF CONTRACTOR: The undersigned contractor certifies that to the best of his knowledge, information and belief the work covered by this Contract Payment has been completed in
accordance with the Contract Documents for this project: that this Contract Payment is a true and correct statement of the amount of the work completed to the date of this Contract Payment and
that the amounts/paid to the contractorwlll be utilized by him to pay for labor, materials, equipment and subcontracts involved in the performance of this contract.
COAPrRA =OR: Eastern IokExcavating and Concrete, LLC
'7
PAGE 3/3
DATE: /
RECOMMENDATION OF ENGINEER: In accordance with the Contract Documents for this project, the undersigned Engineer recommends payment to the Contractor of the balance due this payment as
shown.
11W ENGINEERS & SURVEYORS, P.C.
BY:
Julie P. NeebeI, P.E
TITLE: Project Manager
DATE: -7141//
APPROVAL OF OWNER: City of Dubuque
BY:
TITLE: 6'0; I rri7yilcdl v
AMOUNT PAID 13, (
DATE: 7fz1f
I hereby certify that the above sta ows in detail the correct amount of all work required to complete the above improvements.
APPROVED:
Michael C. Va Milligen, City Manager
City of Dubaarye, I
APPROVED:
Gus Psihoyos, City Engineer
City of Dubuque, Iowa