Chestnut St Recon Prel Final Assess D~~~E ~<k~ MEMORANDUM January 28, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Chestnut Street Reconstruction Project CIP No. 300281 City Engineer Gus Psihoyos is recommending the acceptance of the construction contract for the Chestnut Street Reconstruction Project, as completed by WC Stewart Construction Co., in the final amount of $480,605.23. The total amount of special assessments for associated improvements is reduced by $50,979.03, a 36% reduction. Special Assessments for street-related improvements have been reduced $8,690.52, or 11.2% I concur with the recommendation and respectfully request Mayor and City Council approval. fYli<ll ~(/AL Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psi hoyos, City Engineer D~~~E ~~~ MEMORANDUM January 31, 2005 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer ~ SUBJECT: Chestnut Street Reconstruction Project CIP No. 300281 FROM: INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Chestnut Street Reconstruction Project. BACKGROUND The Chestnut Street paving project provided for the complete reconstruction of the roadway sub-base and pavement, between Highland and Cox Street which provided a 29-foot wide concrete roadway between Highland and Walnut Street, and a 20-foot wide concrete roadway between Walnut and Cox Street. The project included new concrete curb and gutter and sidewalks on both sides from Highland to Walnut. The area from Walnut to Cox has sidewalks only on the north side due to the minimal width of right-of-way available. Per City Council directive, the sidewalk on the southeast corner of Chestnut and Highland was eliminated from the scope of the project. The project also incorporated: storm sewer improvements; the replacement of 6 brick sanitary manholes; approximately 726 lineal feet of sanitary sewer main line repairs; water main system and valve improvements; the replacement of 13 lead residential water services; and 12 sanitary sewer lateral replacements. DISCUSSION The Chestnut Street Reconstruction Project has been completed by WC Stewart Construction Co. of Dubuque, Iowa, in the final contract amount of $480,605.23, which is a 1.9% increase from the original contract in the amount of $471 ,823.09. Based upon final construction costs, the total amount of special assessments for all associated improvement (including street pavement, water services and sanitary sewer laterals) have been reduced by $50,979.03, which is 36% below the preliminary special assessments estimates that were presented to the property owners and approved at the project public hearing. The reason for the reduction in the total amount of special assessment was a result of decreased work required to private water services and sanitary sewer laterals as was initially anticipated in the preliminary cost opinion. Additionally, based upon final construction costs, the total amount of special assessments for the street related improvements have been reduced by $8,690.52, which is 11.2% below the preliminary special assessments estimates that were presented to the property owners and approved at the project public hearing. RECOMMENDATION I recommend that the City Council accept the improvements, establish the final contract at $480,605.23, and adopt the preliminary schedule of final assessments. BUDGET IMPACT The project cost summary for the Chestnut Street Reconstruction Project is as follows: Construction Contract Contingency Engineering Estimate $482,611.70 48,261.17 79,630.93 $610,503.80 Total Project Cost The project funding summary is as follows: Street Construction Fund Local Option Sales Tax Fund Special Assessment - Street Improvement, Private Properties Special Assessment - Street Improvement, City Properties Special Assessment - Water Services, Private Properties Special Assessment - Sanitary Sewer Laterals, Private Prop. Special Assessment - Sidewalk City Paid Deficiency - Watermain Depreciation Fund Sanitary Sewer Construction Fund Total Project Funding Bid Final $471,823.09 $480,605.23 48,261.17 79.630.93 57,025.09 $599,715.19 $537,630.32 Bid Final $108,166.42 $ 231,383.35 77,127.79 o 14,440.80 38,534.33 o 90,887.15 39.175.35 98,670.02 210,358.95 68,612.07 1,507.58 9,639.94 10,929.70 o 97,565.97 40.346.09 $599. 715.19 ~537 .630.32 The project will be funded through the Fiscal Year 2004 CIP appropriation of City funds in the amount of $446,941.03, which will include allocations from the Street Construction Fund, Local Option Sales Tax Fund, Watermain Depreciation Fund and the Sanitary Sewer Construction Fund. The remaining funds, $90,689.29, will be secured through the special assessment process. FINANCIAL ASSISTANCE A portion of the residential assessments related to the street improvement costs may qualify for the City's low and moderate income special assessments assistance program. Local Option Sales Tax funds will provide 20% to 100% of the street assessments for eligible owner-occupied property. To allow sufficient administrative time to process financial assistance payments for low- to moderate-income families, the adoption of the schedule of final assessments will be delayed approximately 45 days. In its place is a resolution adopting a preliminary schedule of final assessments. Property owners may use this period to apply for financial assistance that may reduce the amount of the assessment payable by the property owner. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement, establishing the final contract amount, and approving the preliminary schedule of final assessments. Prepared by Robert Schiesl, PE cc: Dawn Lang, Budget Director Ken TeKippe, Finance Director Bob Green, Water Plant Manager Don Vogt, Public Works Director Kelly Ambrosy, Engineering Assistant Todd Irwin, Engineering Assistant RESOLUTION NO. 30-05 ACCEPTING IMPROVEMENT Whereas, the contract for the Chestnut Street Reconstruction Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Street Construction Fund, Local Option Sales Tax Fund, Watermain Depreciation Fund, and Sanitary Sewer Construction Fund in amounts equal to the amount of his contract, less any retained percentage provided for therein. Passed, approved and adopted this 7th day of February, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 31-05 FINAL ESTIMATE Whereas, the contract for the Chestnut Street Reconstruction Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $537,630.32 and the said amount shall be paid from the Street Construction Fund, Local Option Sales Tax Fund, Watermain Depreciation Fund, and Sanitary Sewer Construction Fund of the City of Dubuque, Iowa. Section 2. That $90,689.29 of the cost thereof shall be assessable upon private property and $446,941.03 shall be paid from the Street Construction Fund, Local Option Sales Tax Fund, Watermain Depreciation Fund, and Sanitary Sewer Construction Fund. Passed, approved and adopted this 7th day of February, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CIty Clerk City of Dubuque - Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: Chestnut Street Reconstruction DATE: January 7. 2005 Cox Street to Highland Place CONTRACTOR: we Stewart Construction. Inc. CONTRACT AMOUNT: $471,823.09 BID ITEM DESCRIPTION II UNIT II UNIT COST I QUANTI1Y AMOUNT EARNED TO DATE TO DATE 1 1101.0109 Clearing & GrubbinQ g" to 12" Each $ 250.00 1 $ 250.00 2 1101.0118 Clearing & Grubb;n!:! 18" to 24" Each $ 650.00 2 $ 1,300.00 3 1101.0130 Clearing & GrubbinQ 30" to 36" Each $ 1,300.00 1 $ 1,300.00 4 1103.0200 Excavation, Unclassified CY $ 3.65 4817 $ 17,582.05 5 1103.0213 Excavation, Rock CY $ 7.00 31.93 $ 223.51 6 1105.0100 Backfill Limestone Ton $ 4.73 5735.34 $ 27,128.16 7 1105.0103 Backfill Topsoil SY $ 9.00 1350 $ 12.150.00 8 1201.0100 Graded Stone Base Ton $ 8.50 866.16 $ 7,362.36 9 1202.0100 Granular Subbase Ton $ 9.23 3542.93 $ 32,701.24 10 1203.0100 3M Crushed Stone Base Ton $ 8.50 3096.66 $ 26,321.61 11 1301.0500 Removal of Pavement SY $ 2.50 5826.58 $ 14,566.45 12 1301.1302 ACC Surface Course (Headers) Ton $ 86.90 296.87 $ 25,798.00 13 1402.0162 PC Concrete Pavement, (7") wi Integral Curb, Class 6C" SY $ 25.50 4590.01 $ 117,045.26- 14 1402.0700 Adjustment of Fixture in Concrete Pavement Each $ 175.00 17 $ 2,975.00 15 1403.0301 Remove and Replacement of PC Concrete Curb & Gutter IF $ 13.00 155.2 $ 2,017.60 16 1404.0134 pec Handicapped Ramp, 6M SF $ 6.45 580.98 $ 3,747.32 17 1404.0546 PCC Driveway, 6", Remove and Construct SY $ 32.50 287.31 $ 9,337.58 18 1404.0554 PCC Sidewalk:, 4n, Remove and Construct SF $ 3.50 8929.86 $ 31,254.51 19 1501.1010 Sanitary Sewer Pipe, 8" PVC SDR 26 wi Bedding IF $ 23.50 726 $ 17,061.00 20 1501.2390 SanitClll)' Sewer Manhole Complete Each $ 1,250.00 6 $ 7,500.00 21 1501.2802 Sanitary Sewer, Wye 86 x 4W Each $ 75.00 15 $ 1,125.00 22 1501.2910 Sanitary Sewer, 4" PVC SRD 26 IF $ 19.50 288.5 $ 5,625.75 23 1502.2115 RCP Storm Sewer 15M IF $ 29.50 4 $ 118.00 24 1502.2510 Storm Sewer, Intake 101-8 Each $ 1,200.00 $ 25 1502.256 Storm Water Curb Opening Neenah R-3262-3 Each $ 78.80 4 $ 315.20 26 1503.1261 Watermain 6M DIP, Push on Joint wI Polywarp, Class 52 LF $ 26.97 1725 $ 46.523.25 27 1503.2636 Filtin~ 6x6 MJ Cross Each $ 132.00 1 $ 132.00 28 1503.2646 FitlinQ 6x6x6 Anchor Tee Each $ 115.50 7 $ 808.50 29 1503.2660 Bend 6M (45 deg) MJ Each $ 71.50 5 $ 357.50 30 1503.2662 Reducer 6Mx46 MJ PE Each $ 60.50 1 $ 60.50 31 1503.2670 Plug 6" MJ Each $ 22.00 1 $ 22.00 32 1503.2672 Mega Lug 6- Each $ 22.00 35 $ 770.00 33 1503.2700 Vahle. Gate (€t) RS "0" RIng MJ Each $ 416.90 12 $ 5,002.80 34 1503.2718 Water Valve Box Adjustment, Repair and Clean Each $ 110.00 12 $ 1.320.00 35 1503.2900 Hydrants MJ Each $ 1,210.00 4 $ 4,840.00 36 Special Reconnect ~istil"lQ Water Service Each $ 175.00 5 $ 875.00 37 1503.4256 Sleeve 4M Each $ 97.90 $ 38 1503.4258 Sleeve 6- Each $ 108.90 2 $ 217.80 39 1503.7006 Water Service Line, 3/4" Copper Pipe IF $ 14.50 380 $ 5,510.00 40 1503.7008 Water Service Lines stop Box, 3/4- Tap Installation Each $ 425.00 19 $ 8,075.00 41 1506.0282 Removal Intakes and Manholes Each $ 150.00 2 $ :\00.00 42 1602.01 Sodding SY $ 5.00 1318.07 $ 6,590.35 43 1703.011 Subdrain, Perforated Plastic Pipe 6- dia IF $ 7.50 3275.3 $ 24,564.75 44 1705.01 Sawcut Concrete IF $ 3.25 126.2 $ 410.15 45 1705.02 Asphalt Sawcut IF $ 1.75 643.2 $ 1,125.60 46 2000 Traffic Control lS $ 5,120.00 1 $ 5,120.00 TOTAL AMOUNT EARNED TO DATE - BASE BID: 1$ 477,430.80 I 47 ~-1 Water Service Lines Stop Box, 1-1/4- Tap Installation lS $ 775.00 1 $ 775.00 48 ~-2 Water Service Lines Stop Box. 1-1/2" Tap Value & Box Installation lS $ 800.00 1 $ 800.00 49 E-3 Exploratory Dig for Lateral @ 655 Chestnut, Date 3-1 ~2004 lS $ 440.00 1 $ 440.00 50 E-4 Exploratory Dig for Lateral @ 653 Chestnut, Date 3-10-2004 lS $ 1.090.00 1 $ 1,090.00 51 E-5 Sewer Lateral Connection Out of MH No.7 lS $ 285.00 1.00 $ 285.00 52 ~-O Drain Tile Under Driveway on Cox Street lS $ 191.25 1 $ 191.25 53 ~-B Intake 101-8 Special lS $ 1,750.00 1 $ 1.750.00 54 ~-7 15- RCP \0 yard. 24- lS $ 430.08 1 $ 430.08 55 E-9 Tak.e Down Tree on 4-15--2004 LS $ 275.00 1 $ 275.00 56 E-10 Deduct - Milling of Concrete Surface LS $ (1.00) 10035 $ (10,035,00) 57 E~11 PVC3" LF $ 5,00 24.6 $ 123.00 58 E-12 PC Concrete Steps LF $ 10.00 33,5 $ 335,00 59 E-13 PC Concrete Curb and Gutter LF $ 13.80 82,5 $ 1,138.50 60 E-14 Water Service, Replace Corp LS $ 45.00 1 $ 45.00 61 E-15 Seeding LS $ 411.60 1 $ 411.60 62 E-16 Segmental Block Wall, Intersection of Walnut & Chestnut LS $ 5,120.00 1 $ 5,120.00 TOTAL AMOUNT EARNED TO DATE. CHANGE ORDERS: Is 3,174,43 I TOTAL AMOUNT EARNED TO DATE: Is 480,605,23 , TOTAL DUE CONTRACTOR: Is 480,605,23 I ENGINEERING: Is 57,025,09 I TOTAL CONSTRUCTION COST: Is 537,630,32 I CERTIFICATE OF THE CITY MANAGER: hereby certify that the above statement shows in detail the correct amount of all work required to complete the abOve improvement. APPROVED: APPROVED: Gus Pslhoyos. Acting Public Works Director City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, we Stewart Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for aU claims for said improvement. BY: WC Stewart Construction, Inc. -r:;::, ;C:z -" .fJ ~~':-:>(,~}Jn- CONTRACTOR: TITLE: DATE: / - 7 - 05 RESOLUTION NO. 32-05 RESOLUTION APPROVING PRELIMINARY SCHEDULE OF FINAL ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheet, 1 to 2 inclusive, is hereby determined to be the preliminary schedule of final assessments for the Chestnut Street Reconstruction Project and the valuations set out herein are hereby approved. Passed, approved and adopted this 7th day of February ,2005. Attest: ---~ a / {/// ~ "// r/ anne F. Schneider, CMC, City Clerk CITY OF DUBUQUE. lOW A CHESTNUT STREET (HIGHLAND TO COX STREET) PRELlMINARY FINAL SCHEDULE OF VALUATlON AND PROPOSED ASSESSMENTS The follo",ing schedule is hereby detennined to show each lot proposed to be assessed for the Improvement shown in the title togethel with the amount proposed to be assessed against each lot and the nluations ~ho"'n opposite each lot are hereby fixed as the!JUe valuations of such lots by the City Council of the City of Dubuque 01/2512005 "nnn__' ._____nnn___ n.nn_n____nnn__._nn____.nnn' ___n_nn_..n_n_.____ n_n"_.n_____n_ ...nn__n__ nnn __n__ __n_nn_ _ ,nn. ____non ___n_n_n '_nnn ___nn_n,_n_nn_ n __nn_nn nnn___n_ .___nnn _.. n_nn.._______n O\VNER LOT DESCRIPTION PARCEL NO VALlIATION \II NET PAVING SIDEWALK IMPROVEMENT ASSESSMENT ASSESSMENT DEFICJENCY ASSESSMENT BRADfORD, PAMELA K 8: MUELLER- DONALD PLOT 784 &: 2,7~6 A MCDANIEL'S SUR 10,24.378 ()?2 O'DONNELL. JOSEPH l, 8: KEllY K lOT I W 14'3 OF 786 AND ALL OF LOT 7~7 A MCDANIEL'S S 10 '4 ~78020 O'OONNELL JOSEPH L &: KELl'l K HESS OWEN C &. SIISAN K HESS, OWEN L 8: SUSAN K YIINK-GAII A SHELDON THOMAS l "'- JANA R \\'HALEoN MD JOHN E & NORBY ANTHON.... \H-t.t.,LE-N MD JOHN F & NORBY ANTHONY SHEETS. JEFFREY T 8: rAROL L D..t.,VIS STEVEN AL..t.,N C1NGILLI. MUSTUA &: MESUDE MOORE KENNETH JOHN MOORE KENNETH JOHN nApAlO. ROMAN I' &: NANCY B HAIIGEN BRUCEI' 8:lINDAJ HAUGEN BRtlCE P 8: UNDA J RICHARDSON JOHN r & SHII-lA 1 A MIRIAM A lAMPE l YNN DEMELLO.MAKOVEC PARTNERSHIP FREEOOM PROPERTIES L.L., SCHIESL JOlIN R &: MARY ANN ALT. CYNTHIA L JURISIC. SARA L PETERSON. CHARLES E LYONS JYMIE M ALT. l PETER &: CYNTH!,.t., UNDLE ALT. L PETER &. CYNTl-IIA llNDlE LOT J VI' In or 786 AND ALL OF 787 A MCDANIEL'S SlIB LOT 2-78~ IN A MCDANIEL'S SllB LOT 1788 A MCDANIEL'S SIIIl LOT 2. E 50' - 789 A MCDANIEL'S SlIB S 87'(, OF I OT I OF E 5()' OF l.OT 78Q A MCDANIEL'S SllB A MCDANIEVS SUB S 87" or VI' ,'(, 789 A MCDANIEl.'S SllB SQ2'(, OF LOT 791 LOT 1 OF 792 &: LOT 2 OF 7Q3 A MCDANJEL'S SUB A MCDANIEL'S SUB LOTS 7Q.j &: 1Q~ E 4,',S In 79~ A MCD..t.,NIEL'S SllB A MCDANIEL'S SUB WI" 51/2 LOT 7Q6 ,.t., MCOANIEl'S SUB VI 45' SIll LOT 797 lOT 830 A MCDANIEl'S SUB N 1/1 or lOT 82Q A MCDANIEL'S SUB S 112 OF LOT lQ<l A M(DAN1El,'S SUB lOl828 A MCDANIEL'S SllB LOT 1M" MCDANIEL'S S\.IB rOTS:1 &: 3 A MCDANIEL'S SUB LOT 4 M A MCDANIEL'S SUB LOT 5 M A MCDANIEL'S SlIB LOTS 1 :1 &: ~ OF PT Of 82; 8: 824 A MCDANIEL'S SlIB lOT" H M KINGMAN SUB E R 1/2' LOTS 1&.2 H M KINGMAN SUB W H )' LOT t H M KINGMAN SUB LOT 5 H M !-,:rNGMAN SUB LOT 6 II M KINGMAN SUB CmofDubuque JOHNSON ROBERT L. &: (iOLOMBESKl BETl-IANY A lOT 780 &: 781 A MCDANIEL'S SUB BREITBACH. ROBERT L &. CATHERINE R lOTS 778 &: 779 A MCDANIEL'S SUB BONIFAlt. ARTHUR W ETAL CONNOLLY_JOHN M. &:JUDYM NI/2 _14 &: LOT 15 BISSElLS DlIBUQllE BISSELLS DUB LOT 13 BlSSELlS DUB SJ/2 1024,78019 1014378018 In2.U78017 IOJ4;7801(, 102-1,78015 I01437ROl4 101-13781113 111.2078012 10 2437S[III IOJ437811111 1014 HR {)()9 HJ1437800S I0243821XIl 10 '.j1R2001 11l2~ ;~21l\i3 1U14,382IXI.j HI.2nSI\l\\8 IOJ4.381W7 lnHWI{106 I01438tOO5 IO.2438J I~J4 IO.20SI001 1014.381.002 10 '4 ~81()01 10 14 ~8 I ul4 III 24 ~8 I 015 102-1376006 Jn243801l0! 10.24 35~.1I1" 1014354017 $262.518J2 $(,1,0fi45 $621170.61 $31..,4,17 $4'i(l7494 147<1)755 Ht11U9 $10.41116 SlI6.1.;;7<n $71UJ3996 $17.281111 $72.13!IXI S709IU~ $55.62627 \17;\.7H'iQ $(,(,J4780 :'>t6 l\l"~" Sl21.,61<)6 $1H31F $74,t1422 $828111.08 $<)3, IJ<) U8 $232.1164<) $59610'\4 $6S.02054 $81%766 $IIJ6229.03 S92M.38 S229.4J8'11 S35-1.008<11 S65()758 S-I'I24182 S57.83955 $'71822 $711645 S77062 SMi)7 $;7494 S(275) $5425<1 S1.4n16 SU,H~ $',43996 $2'80.31 S1113100 S711'5 11.0'(,17 $,,483 ~9 $(,47.80 S~\\'i 5f. $3l\lQ6 S<H7F S1874.22 S<lOUJ8 S'IOtOR S77J(,4Q 1<12054 S9,054 S136766 S32<103 1164.38 $6.208'<1 $6.20R9t $1'0758 S41.81 B1Q~5 GROSS ASSESSMENT $27t8n $7Uf>4i $770.62 $1\-1517 $'17494 $L41U6 Sr.V;7<), S2.4,<I'<(, $2.180 ~) SI031ml $71\5, SI.02627 S3.4.n,<j S..47 ~(l $-<<\,5(, $3..2<16 SQ1?!5 SI.RHJ1 $llOtU8 $1101.08 S7,716A9 S'<20.'\4 $<l20'i4 SI.)67 (,6 Sn90, IIM,8 S610891 S6208.91 I 1.~07 'i8 I-IJS' 532955 WATER SERVICE SEWER LATERAL TOTAL NET ASSESSMENT ASSE~SMENT ASSES~MENI $1\275'i $54159 $8711.13 56 71 7~ S67:U8 $870 I ~ $89937 \~~4 7, Sf>)~ <I' $621f.1 $88550 $6U700 $;9"8 S51111(,9 $8;4'1(1 $87778 $644.62 s<nfi.P7 $87718 S382.3' 1182.n S8J949 11.460.67 $\;\18% St (,116 ~o $1227'i1 S]9570 $3596110 S1.35[07 $170609 $2 19~ 07 $574'14 $1.682.64 SI'<l7M S141,16 $217741 $1.4311% nI50.--J-l. S3.3910' St,w..W $IIP6J7 'i.5h31n $64780 ~1\5~" S~6J 96 $<117" $1.49'iK3 SL78~.58 $1'i118118 $77l64<1 $3 I III ~ I $17477J $!.'i614' $329('; SI6438 $6.20~91 $7,04381 51'i07'8 S418J $329.55 ~ ;;:: .... ;;1; .,., '" ;:: ~ , c , '" ~ ~ ~ '" ;;;i ~ o. o. - " - ::> ~ ",", : ~ ... ::> 0 ~ 'g , c ~ ~ N ~ w ~ ~ W ~ _ 0 m ~ ;:: ~ ~ ~ ~ c < < < z;:..,......... "" "";;;; "'~:::o ;;;; ;;;; " - ;;1; .~, 0- 0- O. ~ < , ... I : '" : 0- N ::> 0 _ ~ I ;;;; ... ... : o . ~ "" N o :il C '" ::> 8 ~ ~ ... "" I ... ~ ~ ... ... "" ... ~ "" ... ... : 0 ;:.:: 0-;' 0<..... , ,:c; '" - - :; '" _ _ C ::> g _ 8 c 8 g g _ N ~ ~ N ~ N ~ ~ N N N ~ ~ ~ ~ ~ N ~ _ c ~ ~ '" _ _ = ::> = ~ _ _ _ _ = = _ " o o w ..., ii5: o 0 0 ~ ;: g ~ :::> t- al j ~ S ~ ~ d ..., ::l '1C ..., ~ g ~ t- g Ei5 ~ '1C S ~ <;: Q 0- 0 0 o<l :3 o<l .z ..J ; ~ t- < ~ g '1C S g iti " . :::> ~ g Vl ~ j ~ ~ iti S . , - - " ~ z 5- & ~ =- ;:;, - al ",;:;, ;,:, ;:;, u o 0 " e j ..J 0 ~ ~ ..J ai iti z . , 'r, ":' e e S S " ~ ~ < 0 ..-: 5:~ t: G ~~ ~ ::!: u y, ii2 o<l..J o<l ~~ ~ ~ ..-:;;i..J~ ....~ ..-:0 o<l g~>-e tiJ g~~ co L<. ~~~~ 5 ~ ~ ..-: ~ ~ .z ~ t 6 ~ ~ ..J ~ Vl ~ ~ 0 o ~ ~ ~ ~ ~ Q ~ ~ ~ ~ g ~ ~ ~ j ~ ~ ~ : ~ ~ g ~ ~ : : : ~ ~ ~ ~ ~ 0 : ~ ~ ~ ~ ~ ~ 8 8 ~ ~ a ~ ~ ~ ~ ~ ~ ~ ~ " " ~ ~ " " z z " " " u " e ~ " z o " ~ " NOTICE OF FILING OF THE PRELIMINARY SCHEDULE OF FINAL ASSESSMENTS AGAINST BENEFITED PROPERTIES FOR THE CHESTNUT STREET RECONSTRUCTION PROJECT WITHIN THE CITY OF DUBUQUE, IOWA TO THE PERSONS OWNING LAND LOCATED WITHIN THE DESCRIBED AS THE CHESTNUT STREET RECONSTRUCTION PROJECT, WITHIN THE CITY OF DUBUQUE, IOWA: The improvement type(s) and the location(s) is (are) as follows: Chestnut Street Reconstruction Project Consisting of the properties which are described as follows: All property included with the areas described so as to include one-half of the privately-owned property between each such street to be improved and the next street, whether such privately-owned property situated more than 300 feet from the street to be improved be assessed. You are hereby notified that the final schedule of assessments against benefited properties within the District described as the Chestnut Street Reconstruction Project, as been adopted and assessments confirmed and levied by the City Council of Dubuque, Iowa, and that schedule of assessments has been certified to the County Treasurer of Dubuque County, Iowa. YOU ARE FURTHER NOTIFIED THAT ASSESSMENTS MAY BE PAID IN FULL OR IN PART WITHOUT INTEREST AT THE OFFICE OF THE CITY TREASURER, CITY HALL, 50 W. 13TH STREET, DUBUQUE, IOWA 52001 UNTIL After unpaid special assessments of $50.00 or more are payable in 10 annual installments and will draw annual interest at nine percent (9%) computed to the December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. Property owners may elect to pay any annual installment semiannually in advance. All properties located within the boundaries of the Chestnut Street Reconstruction Project above described have been assessed for the cost of making of said improvements, the amount of each assessment and the amount of any conditional deficiency assessment having been set out in the schedule of assessments accompanying the same, which are now on file in the office of the County Treasurer of Dubuque, Iowa. For further information you are referred to said schedule of assessments. This Notice given by direction of the City Council of the City of Dubuque, Iowa, as provided in Section 384.60 of the Code of Iowa. Jeanne F. Schneider, CMC, City Clerk