Manson Road Bidge & Watermain Emergency RepairMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Manson Road Bridge & Watermain Emergency Repair DATE: September 14, 2011 Dubuque ketil AA- AmedcaCity 1111 I 2007 As a result of the severe storm event that occurred on July 27 and 28, the existing bridge and watermain along Manson Road sustained significant damages due to the historic flooding conditions that occurred. Various portions of the bridge substructure and approaches have been undermined as a result of the high velocity floodwaters. The upstream and downstream embankments on both sides of the bridge have been severely eroded. The velocity of the floodwaters also created a scour hole 14 feet deep on the south side of the bridge which impacted the watermain creek crossing, causing the 8 -inch ductile iron pipe waterline to fail. As of this time, a detailed cost estimate has not been developed for the bridge and watermain repairs. Initial projections are that repair costs could range in the magnitude of $300,000 to $400,000. As a result of the Presidential Declaration (DR- 4018 -IA) for public assistance, FEMA will participate in 75% of the eligible permanent repair work. The City will be responsible for 15% of the cost and the State will be responsible for 10% in funding assistance. In the interest of public safety and welfare, City Engineer Gus Psihoyos recommends City Council approval to initiate an emergency repair project so that the necessary bridge repairs can be made and that the watermain be reconstructed to restore water service and fire protection. Since IIW Engineers & Surveyors are the engineer's of record for both the existing watermain and bridge that were constructed in 2003, it is recommended that IIW be retained to provide consultant engineering design and construction services for the emergency repair project, for an anticipated cost of $50,000. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer 2 Masterpiece on the Mississippi TO: FROM: SUBJECT: DATE: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer Manson Road Bridge & Watermain Emergency Repair September 13, 2011 INTRODUCTION Dubuque katil All - America City 2007 This memo requests the City Council to approve the attached resolution authorizing emergency repairs to the bridge and watermain along Manson Road. BACKGROUND As a result of the severe storm event that occurred on July 27 -28, the existing bridge and watermain along Manson Road sustained significant damages due to the historic flooding conditions that occurred. Various portions of the bridge substructure and approaches have been undermined as a result of the high velocity flood waters. The upstream and downstream embankments on both sides of the bridge have been severely eroded. The velocity of the flood waters also created a scour hole 14 feet deep on the south side of the bridge which impacted the watermain creek crossing, causing the 8 inch ductile iron pipe waterline to fail. DISCUSSION As a result of the damages sustained by the bridge and watermain along Manson Road, emergency repairs are required to repair the bridge and reconstruct the watermain to restore fire protection services to the Manson Road and Tymber Hyrst subdivision area. Currently, there is a temporary water service in -place which provides potable drinking water to the impacted area; however the fire hydrants are not in service. The existing bridge has been reduced to one lane of traffic. On August 30, 2011, the City of Dubuque and Dubuque County received a Presidential Declaration (DR- 4018 -IA) for public assistance. The City has retained the services of IIW Engineers & Surveyors to provide preliminary damage assessments and to advise the City on recommended repair alternatives. RECOMMENDATION City staff recommends that an emergency repair project be initiated so that the necessary bridge repairs can be made and that the watermain be reconstructed to restore water service and fire protection. Additionally, since IIW Engineers & Surveyors are the engineer's of record for both the existing watermain and bridge that were constructed in 2003, city staff is recommending that IIW be retained to provide consultant engineering design and construction services for the emergency repair project. BUDGET IMPACT As a result of the Presidential Declaration (DR- 4018 -IA) for public assistance, FEMA will participate in 75% of the eligible permanent repair work. The City will be responsible for 15% of the cost and the State will 10% in funding assistance. As of this time a detailed cost estimate has not been developed for the bridge and watermain repairs along Manson Road. Initial projections are that repair costs could range in the magnitude of $300,000 - $400,000. The consultant engineering design and construction services is anticipated to be in the range of $50,000 based on a preliminary scope of services. ACTION TO BE TAKEN The Engineering Department requests approval of the attached resolution by the City Council in the interest of public safety and welfare so that emergency repairs can be made to the bridge and watermain along Manson Road through adoption of the attached resolution. Prepared by Robert Schiesl, Assistant City Engineer cc: Barry Lindahl, City Attorney Bob Green, Water Department Manager Don Vogt, Public Works Director RESOLUTION NO. 314 -11 RESOLUTION AUTHORIZING EMERGENCY REPAIRS TO THE BRIDGE AND WATERMAIN ON MANSON ROAD AND TO RETAIN THE SERVICES OF IIW ENGINEERS & SURVEYORS, PC TO PROVIDE ENGINEERING CONSULTANT SERVICES Whereas, the Manson Road bridge and watermain are need of repair due to the July 27- 28, 2011 severe storm event; and Whereas, Iowa Code § 384.103 provides that when emergency repair of a public improvement is necessary and the delay of advertising and a public letting might cause serious Toss or injury to the city, the governing body shall, by resolution, make a finding of the necessity to institute emergency proceedings and shall procure a certificate from a competent registered professional engineer or architect, not in the regular employ of the city, certifying that emergency repairs are necessary, and that in that event the governing body may contract for emergency repairs without holding a public hearing and advertising for bids; and Whereas, the City Council finds that the damaged condition of the watermain and bridge along Manson Road constitutes an emergency and that an emergency repair is in the best interest of public welfare and safety and the delay of advertising and a public letting might cause serious loss or injury to the city; and Whereas, the City has procured a ,certificate from IIW Engineers & Surveyors, PC, a competent professional engineer registered in the State of Iowa, not in the regular employ of the City, certifying that emergency repairs to the bridge and watermain are necessary. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The City Council finds that it is necessary to institute emergency proceedings to repair the bridge and watermain along Manson Road. Section 2. The City Manager is hereby authorized to proceed with instituting such emergency repairs as provided by law. Section 3. The City Council approves that IIW Engineers & Surveyors, PC be retained to provide the consultant engineering services for Manson Road Bridge and Watermain Repairs Emergency Repair Project. Passed, adopted and approved this 19th day of September , 2011. Kevin ' Firnsta I, City Clerk 47, Ly/in V. Sutton, Mayor Pro -Tem