Loading...
US 52 Traffic Flow Enhancement Project AcceptanceMasterpiece on the Mississippi TO: FROM: SUBJECT: DATE: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager US 52 Traffic Flow Enhancement Project CIP 3002274 September 27, 2011 Dubuque Ai-America City 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the US 52 Traffic Flow Enhancement Project, as completed by Portzen Construction, Inc., in the final contract amount of $966,332.96, which is a .005% decrease from the original contract amount of $970,792.42. I concur with the recommendation and respectfully request Mayor and City Council approval. Michae C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: US 52 Traffic Flow Enhancement Project CIP 3002274 DATE: September 27, 2011 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the US 52 Traffic Flow Enhancement Project. BACKGROUND Dubuque hail AU- AmeiicaCity IIIII! 2007 The US 52 Traffic Flow Enhancement Project provided for the reconstruction of traffic signals along US 52 (Central Avenue) including 32 "d 22 "d 20th 17th and 14th Streets. New fiber optics conduit and cable were connected to the signalized intersections along Central Avenue between City Hall and IA 32 (NW Arterial). The reconstructed signals included the standard ITS components including battery back -up, pre - emption, PTZ cameras and network switches. These newly - rebuilt signals, along with the 9th and Central and the IA 32 signal, will tie into the City -wide traffic management software located in the traffic operations center at City Hall. DISCUSSION The U52 Traffic Flow Enhancement Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $966,332.96, which is a .005% decrease from the original contract amount of $970,792.42. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $966,332.96 for the US 52 Traffic Flow Enhancement Project. BUDGET IMPACT The summary of project cost for the US52 Traffic Flow Enhancement Project is as follows: Construction Contract Contingency Engineering /Contract Administration Equipment Pre - Purchase Total Project Cost The project funding summary is as follows: CIP 3002274 3002274 3002274 3002274 Award $ 970,792.42 102,372.00 125,000.00 170,000.00 $1,368,164.42 Funding Source Iowa Energy Efficiency and Conservation Block Grant US 52 Traffic Flow Enhancement Engineering /Contract Administration Traffic Consultant Services Total Project Funding ACTION TO BE TAKEN Final $966,332.96 0 118,870.23 166,748.00 $1,251,951.19 Amount $500,000.00 633,080.96 65,672.12 53,198.11 $1,251,951.19 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $966,332.96 to Portzen Construction, Inc. for the US 52 Traffic Flow Enhancement Project. Prepared by David Ness, Civil Engineer II cc: Julie Neebel, IIW Engineers & Surveyors, PC Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer 2 RESOLUTION NO. 326 -11 ACCEPTING THE US 52 TRAFFIC FLOW ENHANCEMENT PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the US 52 Traffic Flow Enhancement Project has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from US 52 Traffic Flow Enhancement Capital Improvement Project for the contract amount of $966,332.96 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attes Passed, approved and adopted this 3rd day of • .. -r , 2011. J Roy D. Buol, Mayor Ke n S. Fir stahl, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE US 52 TRAFFIC FLOW ENHANCEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the US 52 Traffic Flow Enhancement Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,251,951.19. Dated this arlh day ofSErtcpecR , 2011. Filed in the office of the City Clerk on the day of City Engineer Ke in Firnstahl, City Clerk Masterpiece on the Mississippi • PARTIAL PAYMENT NO: Council Final City of Dubuque - Engineering Division Partial Payment Form PROJECT NAME: US 52 Traffic Flow Enhancement Project CONTRACTOR: Portzen Construction BID ITEM DESCRIPTION 2 3 4 MOBILIZATION & MISCELLANEOUS REMOVE PAVEMENT OR DRIVEWAY REMOVAL OF SIDEWALK - REMOVAL OF CURB AND GUTTER REMOVE PCC WALL AND STEPS, 17TH STREET SW CORNER REMOVE PCC STEPS, 17TH STREET NW CORNER REMOVE PCC STEPS, 22ND STREET SE CORNER REMOVE EXISTING HANDHOLE BASE STONE UNIT PLAN QUANTITY DATE: September 22, 2011 CONTRACT AMOUNT: $970,792.42 CONTRACT UNIT COST SIDEWALK, P.C. CONCRETE, 4 IN. SIDEWALK, P.C. CONCRETE, 6 IN CURB & GUTTER P.C. CONCRETE, 2.5 FEET DETECTABLE WARNING -CURB RAMP RediMat SURFACE APPLIED DETECTABLE WARNING, 17TH STREET ARMOR -TILE SURFACE APPLIED DETECTABLE WARNING, 22ND STREET PCC PATCHES, FULL -DEPTH FINISH, BY AREA PCC PATCHES, FULL -DEPTH FINISH PCC STEPS PCC BARRIER CURB FCC WALL RAILING, 17TH STREET FLOWABLE MORTAR 8' PCC PAVEMENT WITH INTEGRAL CURB AND GUTTER HMA 300k SURFACE COURSE, 172' (PG64 -22) PAVEMENT PAINTED PAVEMENT MARKING, WATERBORNE OR SOLVENT -BASED TRAFFIC CONTROL FOUNDATION FOR TRAFFIC SIGNAL CONTROL CABINET & INSTALL CABINET FIBER OPTIC HUB CABINET AND FOUNDATION FOUNDATION FOR TESCO BATTERY BACKUP & INSTALL TESCO FIBER VAULT, 48' ROUND FIBER VAULT, SQUARE 24' ROUND HANDHOLES PRECAST HANDHOLE with NEENAH R6689 lid marked 'Traffic Signals' REMOVAL OF TRAFFIC SIGNALIZATION REMOVAL OF TRAFFIC SIGNALIZATION; 15TH STREET TRAFFIC SIGNALIZATION CORE DRILL FIBER VAULT OR HANDHOLE FIBER OPTIC CABLE; 48 SINGLE MODE AND 24 MULTIPLE MODE CONDUIT, HDPE, 2', PUSHED CONDUIT, HDPE, 4', PUSHED CONDUIT, HDPE, 4' WITH 4 -1' INNERDUCT CONDUITS, PUSHED CONDUIT, RIGID PVC, 2', TRENCHED CONDUIT, RIGID PVC, 4', TRENCHED CONDUIT, RIGID PVC, 4' WITH 4 -1' INNERDUCT CONDUITS, TRENCHED CLASS 12 EXCAVATION QUANTITY TO DATE AMOUNT EARNED TO DATE o� COMP. $ 53,000.00 1 $ 53,000.00 100.0% $ 15.00 143.39 $ 2,150.85 31.8% SY 633.3 $ 11.00 751.74 $ 8,269.14 118.7% LF 26 5 5.00 173.08 $ 865.40 665.7% LS 1 $ 750.00 1.5 $ 1,125.00 150.0% LS 1 $ 900.00 0 $ 0.0% LS 1 $ 600.00 0 $ 0.0% EA 9 $ 350.00 13 $ 4,550.00 144.4% TON 542 $ 17.00 271.99 $ 4,623.83 50.2% SY 482.8 $ 40.50 558.73 $ 22,628.57 115.7% SY 150.5 $ 54.00 198.32 $ 10,709.28 131.8% LF 25.6 $ 24.00 173.08 $ 4,153.92 676.1% SF 168 $ 40.00 144 $ 5,760.00 85.7% SF 16 $ 50.00 16 $ 800.00 100.0% SF 16 $ 50.00 0 $ 0.0% SF 1221 $ 10.50 740.07 $ 7,770.74 60.6% EA 4 $ 500.00 3 $ 1,500.00 75.0% LF 39 $ 50.00 34 . $ 1,700.00 87.2% LF 20.3 $ 70.00 48.09 $ 3,366.30 236.9% LF 11.5 $ 110.00 8.5 $ 935.00 73.9% LS 1 5 850.00 0 $ 0.0% CY 20 $ 150.00 0 $ 0.0% SY 316 $ 46.00 0 $ 0.0% TON 62 $ 132.00 30.3 $ 3,999.60 48.9% STA 40.3 $ 60.50 0 $ 0.0% LS 1 $ 15,250.00 1 $ 15,250.00 100.0% EA 5 $ 2,528.45 5 $ 12,642.25 100.0% EA 3 $ 6,465.05 3 $ 19,395.15 100.0% EA 5 S 2,053.65 5 $ 10,268.25 100.0% EA 1 $ 3,507.60 1 $ 3,507.60 100.0% EA 17 $ 3,303.75 18 $ 59,467.50 105.9% EA 12 $ 863.80 12 $ 10,365.60 100.0% EA 5 $ 2,031.80 5 $ 10,159.00 100.0% LS 1 $ 13,000.00 1 $ 13,000.00 100.0% LS 1 $ 3,000.00 0 $ - 0.0% LS 1 $ 395,494.50 1 $ 395,494.50 100.0% EA 129 $ 130.00 169 $ 21,970.00 131.0% LF 23153 $ 2.00 23153 $ 46,306.00 100.0% LF 632 $ 20.36 469 $ 9,548.84 74.2% LF 739 $ 26.80 310 $ 8,308.00 41.9% LF 5315 $ 18.59 4586 5 85,253.74 86.3% LF 677 $ 7.00 931.5 $ 6,520.50 137.6% LF 49 $ 13.00 572 5 7,436.00 1167.3% LF 4048 $ 11.50 5082 $ 58,443.00 125.5% LF 100 $ 85.00 55.85 $ 4,747.25 55.9% TOTAL AMOUNT EARNED TO DATE: $ 935,990.80 166,748.00 I I $ 1,251,951.19 I CHANGE ORDER - EXTRA WORK ITEMS El E2 E3 E4 E5 E7 E8 E9 El1 E12 E13 E14 E15 E16 E17 E18 E19 CO1 TORPEDO SAND SAWING FIXTURE ADJUSTMENT DIGGING FOR QWEST TO EXPOSE FIBER LINES EXPOSING GAS LINE THAT WAS POURED INTO OLD INTAKE BORING UNDERNEATH ARCH STORM SEWER MOVING WATER SERVICE @ KNICKERS FOR FOUNDATION SIGN FOUNDATION REMOVAL REMOVE & REINSTALL 15' STORM PIPE M-4 CONCRETE COLLARS SQUARE CURB & GUTTER 25' DEEP SET PED FOUNDATION SUPPLIED BY THE CITY SETTING FIBER VAULTS SUPPUED BY THE CITY M -4 CAP OVER QWEST VAULT 22ND & CENTRAL 17' THICK PAVING ON CENTRAL & 22ND THAT WASN'T COVERED BY WATER DEPT. 112 DAY BORING AT 17TH &CENTRAL SW SIDE, ENDED UP CUTTIN STREET BORING AT AQUIN STREET DUE TO UNMARK OLD STORM DRAIN STREET NAME SIGN CHANGE Ton 500.00 $ 16.50 LF 100.00 $ 3.50 704.30 EA 10.00 $ 175.00 3.00 LS 1.00 $ 1190.00 1.00 LS 1.00 $ 685.00 1.00 LS 1.00 $ 2 251.55 0.00 LS 1.00 S 209.70 1.00 S 209.70 EA 10.00 $ 100.00 6.00 $ 600.00 LF 10.00 S 60.00 9.00 5 540.00 CY 1.50 $ 150.00 1.50 $ 225.00 LF 18.00 $ 40.00 18.00 $ 720.00 EA 1.00 $ 400.00 1.00 $ 400.00 EA 10.00 $ 1,748.75 0.00 $ SF 48.00 $ 14.50 48.00 $ 696.00 EA 1.00 $ 6.431.70 1.00 $ 6,431.70 LS 1.00 5 500.00 1.00 $ 500.00 LS 1.00 $ 500.00 1.00 5 500.00 LS 1.00 5 1,591.82 1.00 $ 1,591.82 TOTAL AMOUNT EARNED TO DATE: I $ 30,342.16 791.69 5 $ S $ S $ 13,062.89 2,465.05 525.00 1,190.00 685.00 TOTAL AMOUNT EARNED TO DATE: PROJECT SUMMARY Total Due Contractor. IIW Construction Engineering. CTy Engineerarg Direct Material Purchases. Total Project Cost: Is 966,332.96 Is 53,198.11 �s 65,672.12 Is $ 966,332.96 I CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct arpyunt of all work required to complete the above improvement. APPROVED: APPROVED: Michael Van Milligen, City Manager City of Dubuque, Ipw Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: BY: TITLE: DATE: