Signed Contracts_Miron Construction Change Order No. 11404AI
STRAND
ASSOCIATES®
September 19, 2011
CHANGE ORDER NO. 11
PROJECT: Water Pollution Control Plant Modifications
OWNER: City of Dubuque
CONTRACT: 1 -2010
CONTRACTOR: Miron Construction Co., Inc.
Description of Change
Strand Associates, Inc?
910 West Wingra Drive
Madison, WI 53715
(P) 608 - 251 -4843
(F) 608- 251 -8655
11 a Coordinate and conduct two site visits by ultraviolet disinfection ADD $ 12,939
manufacturer to assess impact of the flood event which occurred
on July 28, 2011. Provide recommendations to restore equipment
to preflood event condition.
l lb Remove and reinstall ultraviolet disinfection equipment impacted ADD $545,149
by the July 28 flood event according to equipment manufacturer
recommendations. Provide eight new 3X lamp modules, 288 new
3X lamps, 24 new power cables, 16 new data cables, and eight
new UV intensity sensors to replace the equipment impacted by
the flood event. Remove insulation inside power supply units and
reinstall new insulation. Rewire UV modules to Power Supply
Units. Provide field service trip by equipment manufacturer for
equipment start-up. Provide warranty according to Contract
1 -2010 from date of start-up of reinstalled system. Provide
replacement parts as described in Ozonia quote dated
September 9, 2011.
This work shall be performed on a time and materials basis.
Contractor provided a budgetary proposal (enclosed) to perform
this work for the amount listed on this Change Order.
1 lc Coordinate and conduct site visit by in -plant waste pump ADD $ 9,442
manufacturer (Gorman Rupp) representative to assess impact of
the July 28 flood event. Provide recommendations to restore
equipment to preflood event condition. Repair in -plant waste
pumps (PRFP -20 -01 and PRFP- 20 -02) according to equipment
manufacturer recommendations.
This work shall be performed on a time and materials basis.
Contractor provided a budgetary proposal (enclosed) to perform
this work for the amount listed on this Change Order.
RAW:GWT:dl11\S:\MAD \1100 - -1199\1 154 \023 \Wrd \Change Orders \CO 11.docx
Arizona I Illinois I Indiana I Kentucky I Ohio I Wisconsin www.strand.com
Strand Associates, Inc
City of Dubuque —Miron Construction Co., Inc.
Contract 1 -2010, Change Order No. 11
Page 2
September 19, 2011
l l d Coordinate and conduct site visit by scum pump manufacturer ADD $ 27,141
(Borger) to assess impact of the July 28 flood event. Repair scum
pumps (SCMP -20 -01 to SCMP- 20 -04) according to equipment
manufacturer recommendations.
This work shall be performed on a time and materials basis.
Contractor provided a budgetary proposal (enclosed) to perform
this work for the amount listed on this Change Order.
11 e Coordinate and conduct site visit by plug valve manufacturer ADD $ 5,354
(Dezurik) representative to assess impact of the July 28 flood
event. Repair plug valves according to equipment manufacturer
recommendations.
This work shall be performed on a time and materials basis.
Contractor provided a budgetary proposal (enclosed) to perform
this work for the amount listed on this Change Order.
TOTAL VALUE OF THIS CHANGE ORDER:
Contract Price Adjustment
ADD $600,025
Original Contract Price $49,750,000
Previous Change Order Adjustments $ 3,498,632
Adjustment in Contract Price this Change Order $ 600,025
Current Contract Price including this Change Order $53,848,657
Contract Completion Date Adjustment
Original Contract Completion Date August 31, 2013
Contract Completion Date Adjustments due to previous Change
Orders
Contract Completion Date Adjustments due to this Change Order
None
None
Current Contract Completion Date including all Change Orders August 31, 2013
RAW:GWT:dlh \S:\MAD \1100 -- 1199 \1154 \023 \Wrd \Change Orders \CO 11.docx
www.strand.com
Strand Associates, Inc?
City of Dubuque —Miron Construction Co., Inc.
Contract 1 -2010, Change Order No. 11
Page 3
September 19, 2011
This document shall become a supplement to the Contract and all provisions will apply hereto.
Owner has filed or will file an insurance claim for this work. All documentation required by
Owner's insurance to support the claim shall be provided by Contractor. The total cost of this work
is undefined at this time. The costs included herein will be modified after the work is complete and
final invoices for the work are received and approved. Approval of this Change Order or payment
by Owner of any claim by Contractor pursuant to this Change Order does not waive Owner's right
to dispute such claim as provided in the Contract.
•Zs is 10�!oi,
'OMMENDED
tee,,: RAIsIDA1-1° A.
=z : 16I EI IEER Strand Asso
aw;
.
ill'OesiincArrPRPVED
Tn9 i-to l
Date
CONTRACTOR —Miron Construct, Co., Inc.
David G. Voss Jr., President
APPROVED
OWNER —City of Dubuque
RAW:GWT:dlh \S:\MAD \1100 - -1199\1 154 \023 \Wrd \Change Orders \CO 11.docx
Date
-A? (///
Date
www.strand.com
---,--77-F---
IIIIIINIVER-
Owner City of Dubuque Computed by JCD
Project Dubuque WPCP Date 15-Sep-11
Project No. 103400 Verified by
Title Cost Proposal Request Documentation Date
Page 1 of 1
Revision 0
Modification Quote Number: 113-00
Description of Modification: UV & Equipment Flooding 7-28-11
Items included in this proposal: 113-01, 113-02, 113-03, 113-04, 113-05
Item 113-01
11a
Material Labor
Ahern
1.0 Ozonia Site Inspection After Flooding $ 6,787.30 $ 494.50
2.0 Ozonia Site Visit 2 $ 4,858.75
Item 113-02
At_lerm
11b
Material Labor
1.0 Replace
2.0 Install
3.0 Repair
4.0 Replace
5.0 Replace
Faith
1.0 Rewire
UV
New
PSUs
Spare
Parts
UV
Modules Impacted by Flooding $ 421,185.20
UV Modules $ 15,941.51
Insulation Impacted by Flooding $ 9,430.00
Parts Used to Keep UV System Running $ 21,077.79
in PSU Impacted by Flooding $ 37,107.67
Modules to PLCs $ 500.00 $ 6,275.00
Item 113-03
11c
Material Labor
Ahern
1.0 Repair Go man Rupp Pumps After Flooding $ 8,784.28 $ 74.75
113-04
Item
11d
Material Labor
Ahern
1.0 Repair Rotary Lobe Pumps After Flooding $ 25,392.00 $ 74.75
Item 113-05
Ahern
1.0
4 .4 ,...
i 1
Repair Electronic
1,.■11a Labor
Plug Valves After Flooding $ 4,873.93 $ 149.50
*** Note: Schedule impact is not vet known.
Subtotal: $ 539,996.92 $ 23,010.01
Miron Markup @ 5% $ 26,999.85 $ 1,150.50
Bond & Insurance @ 1.5%: $ 8,867.36
TOTAL - Mod 113-00: $ 600,024.64
Building Excellence"
CHANGE ORDER REQUEST
TO: Mr Glenn W. Tranowski, P.E.
Strand Associates Inc
910 W Wingra Dr
Madison W,I 53715
RE:
Dubuque WPCP Modification
795 Julien Dubuque Dr
Dubuque IA 52003 -7996
JOB #:103400
MOD #: 0113 -00
DATED: 9/15/11
FAX: 608 - 251 -8655
PHONE: 608 - 251 -4843
DESCRIPTION OF MODIFICATION:
Cost associated with UV and equipment flooding on 7- 28 -11.
REQUESTED BY: Strand Associates Inc DATE:
SUBCONTRACTOR
JF Ahern Company
Faith Technologies, Inc.
Miron Management Fee 5.00 % - Subs
Performance Bond 1.50 %
TOTAL AMOUNT OF THIS MODIFICATION:
CHANGE ORDER AMOUNT REQUESTED:
AMOUNT
$556,231.93
$6,775.00
Subtotal $563,006.93
$28,150.35
Subtotal $591,157.28
$8,867.36
$600,024.64
$600,025.00
Please find back up materials enclosed regarding this modification.
Contractor is (not) to proceed with the work as noted above. The contract
with the Owner is adjusted as follows:
Approved Cost ‘chedule Impact
Miron Representative rI A 1 41.441 Date 9/15/11
Jo : "an Danf-59111 -'—"r
Owner Representative Date
THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN
MIRON CON }TRUC (I )N GO.; INC.
Building Excellence
Corporate Office
P.O. Box 509 Neenah, WI 54957 -0509
1471 McMahon Drive Neenah, WI 54956
Phone: 920 /969 -7000
Fax: 920/969 -7399
www.miron-construction.com
A"6"....11ERN SIryCE1880
�1a
Incident Cost Tracking Form I No. 1 -1 I
Project Name: Dubuque WPCP Modifications
Address: 795 Julien Dubuque Drive
City /State: Dubuque, IA
Prepard By: Tim Schneider
Date: Friday, August 05, 2011
Submitted To: Miron Construction
Incident: Dubuque WPCP - Site Flooding Event Incident Date: Thursday, July 28, 2011
Subject: Ozonia North America - UV System Evaluation
Work Description:
Site visit and association coordiation by UV manufacturer and J. F. Ahern Co. to assess equipment and prepare
recommendations for repair to restore equipment to pre -flood conditions as directed by Glenn Tranowski of Strand
Associates, Inc. via e-mail on Thursday, July 28, 2011.
Labor:
Description
Date
Hours
Unit Rate ($ /HR)
Total. Cost
Tim Schneider (J. F. Ahern Co.)
Jason Talbot (J. F. Ahern Co.)
7/28/11- 8/4/11
2
$85.00
8/2/11- 8/3/11
$65.00
$170.00
$260.00
Material /Supplier:
Description
Date
Hours,
Unit Rate,($ /HR)..
Total Cost
Ozonia North America
8/2/11- 8/4/11
see attached
$5,902.00
Equiprnent:
Description
N/A
Date
Hours
Unit Rate ($ /HR)
Total Cost
•
JUL/LA/11U Gl.I.or.
Name
Pate ,
Costs..
Notes
N/A
$430.00
15%
$494.50
Mat. /Supplier
$5,902.00
15%
$6,787.30
Equipment
$0.00
15%
$0.00
•
~. ~N.
Total$
OH & P %`,-
Total $'with OH & P
Labor
$430.00
15%
$494.50
Mat. /Supplier
$5,902.00
15%
$6,787.30
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Authorized Signature:
Total Costs.
$7,281.80
Date:
pNIA
azUi IA NORTH AMERICA, LLC
600 WILLOW TREE ROAD
LEONIA, NJ 07605 USA
TEL 201 676 -2525 I FAX 201 346 -5460
Site Survey Irllspection and Report Invoice
Attention: Jason Talbot Date 8/4/2011
To: Dubuque WWTP
c[o JF Ahern
795 Julien Dubuque Drive
Dubuque, IA 52003
Invoice 18207DUB080411
Billing -t Dubuque WWTP
c%Ji= Ahem -
795 Julien Dubuque Drive •
Dubuque, IA 52003
Phone. 920- 948 -0710 FAX
Phone: 920- 948 -0710
FAX
PART
DESCRIPTION
UNIT
TOTAL COST
Line#
QTY
NUMBER
..
COST
$2,528.00
1
2
LABOR
2 Days Field Service
$1,264.00
2
1
Travel
1 Day Travel
$1,264.00
$1,264.00.
$0.00
3
$0.00
4
Expenses
5
1
AIRFARE
Round Trip Airfare
$1,212.00
$1,212.00
6
3
AP -PARK
Airport Parking
$28,00
$8400
2
LODGE
Two days Lodging
$125.00
$250.00
8
3
CRENTAL
3 Days Car Rental
$105,00
$315.00
9
150
MILE
Mileage To and From Jobsite (To and from Airport)
$0:58
$87.00
10
3
MEAL
Meal Allowance
$50.00
$150.00
$12.00
11
1
TOLL
Tolls
$12.00.
$0.00'
12
$0:00
13
$0.00
14
$0.00
15
$0,00
16
$0.00
17
$0.00
18
$0.00
19
$0.00
21
: _ ,
NOTE: Unless
stated in writing to,
SUB
$5,902.00
7%
the contrary, this quotation is
Sales Tax: (AZ,CA, FL, IL, ICY, LA, NJ, NC, OH, TX, VA. WA, WI)
subject to Ozonia usual terms and
conditions of sale. This quotation
may be withdrawn at any time prior
' PrOdtit
TOTAL
$5,902.00
-
Shipping (FOB :Leonia, NJ; Prepay and Add)
to acceptance and unless
accepted within 60 daysof our date
x FedEx Ground Others (Specify)
shown above shall cease to be in
UPS Ground Collect Account #
force. All payment Terms are
based on approved credit by
Overnight Schedule 1-2 Days
Terms: 100% Net 30 days
Credit Card:
Name on Card
Card Number
Card Type*
Expiration Date
Po# GLINTS
Quoted By: Craig Zamtioni
Email:
craiq.zamboni(cilozonia.com
'All American Express orders will recieve a 1.25% Surcharge on the total invoice
Phone:
201 - 676 -2492
HER/ Y SINCE 188.0
11a
Incident Cost Tracking Form No. 1 -3
Project Name: Dubuque WPCP Modifications
Address: 795 Julien Dubuque Drive
City /State: Dubuque, IA
Prepard By: Tim Schneider
Date: Monday, September 12, 2011
Submitted To: Miron Construction
Incident: Dubuque WPCP - Site Flooding Event Incident Date: Thursday, July 28, 2011
Subject: Ozonia North America - Inspection Visit (August 30, 2011)
Work Description:
Included in this proposal are the costs associated with a second inspection visit and review with the Owner, Engineer
and Insurance Agency.
Labor:
Description
N/A
Date
Hours
Unit Rate ($ /HR)
Total Cost
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
Ozonia North America
8/30/2011
$0.00
see attached
$4,225.00
15%
$4,858.75
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
N/A
15%
$0.00
Mat. /Supplier
$4,225.00
15%
$4,858.75
Equipment
$0.00
15%
Subcontractor:
Name
Date
Costs
Notes
N/A
eakdown:
Authorized Signature:
Total Costs
$4,858.75
Date:
Total $
OH & P %
Total $ with OH & P
Labor
$0.00
15%
$0.00
Mat. /Supplier
$4,225.00
15%
$4,858.75
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Authorized Signature:
Total Costs
$4,858.75
Date:
CONIA
OZONIA NORTH AMERICA, LLC
600 WILLOW TREE ROAD
LEONIA, NJ 07605 USA
TEL 201 676 -2525 1 FAX 201 346 -5460
ev. Inspection and Report Invoice
Attention: Jason Talbot Date 8/30/2011
To: Dubuque WWTP
c/o JF Ahern
795 Julien Dubuque Drive
Dubuque, IA 52003
Phone: 920 - 948 -0710 FAX:
Invoice #: 18207DUB080411
Billing : Dubuque WWTP
c/o JF Ahern
795 Julien Dubuque Drive
Dubuque, IA 52003
Phone: 920 -948 -0710 FAX:
Line #
QTY
PART
NUMBER
DESCRIPTION
UNIT
COST
TOTAL COST
1
1
LABOR
1 Day Field Service
$1,264.00
$1,264.00
2
1
Travel
1 Day Travel
$1,264.00
$1,264.00
$0.00
3
4
Expenses
$0.00
5
1
AIRFARE
Round Trip Airfare
$1,212.00
$1,212.00
6
2
AP -PARK
Airport Parking
$28.00
$56.00
7
1
LODGE
One day Lodging
$125.00
$125.00
8
1
CRENTAL
1 Day Car Rental
$105.00
$105.00
9
150
MILE
Mileage To and From Jobsite (To and from Airport)
$0.58
$87.00
10
2
MEAL
Meal Allowance
$50.00
$100.00
11
1
TOLL
Tolls
$12.00
$12.00
$0.00
12
13
$0.00
14
$0.00
15
$0.00
16
$0.00
17
$0.00
18
$0.00
19
$0.00
21
$0.00
NOTE: Unless stated in writing to
SUB
$4,225.00
the contrary, thls quotation is
Sales Tax: (AZ,CA, FL, IL, KY, LA, NJ, NC, OH, TX, VA. WA, WI)
7%
subject to Ozonia usual terms and
Freight
conditions of sale. This quotation
may be withdrawn at any time prior
TOTAL
$4,225.00
to acceptance and unless
Shipping (FOB:Leonia, NJ; Prepay and Add)
accepted within 60 daysof our date
x FedEx Ground Others (Specify)
shown above shall cease to be in
UPS Ground Collect Account #
force. All payment Terms are
based on approved credit by
Overnight Schedule 1 -2 Days
Terms: 100% Net 30 days
Credit Card:
Name on Card
Card Number
Card Type''
Expiration Date
PO# CLINTS
Quoted By: Craig Zamboni
Email:
craiq.zamboni cr.ozonia.com
*All American Express orders will recieve a 1.25% Surcharge on the total invoice
Phone:
201- 676 -2492
111b 1
Incident Cost Tracking Form I No. 1 -2 I
Project Name: Dubuque WPCP Modifications
Address: 795 Julien Dubuque Drive
City /State: Dubuque, IA
Prepard By: Tim Schneider
Date: Thursday, August 25, 2011
Submitted To: Miron Construction
Incident: Dubuque WPCP - Site Flooding Event Incident Date: Thursday, July 28, 2011
Subject: Ozonia North America - UV Equipment Replacement Costs
Work Description:
Included in this proposal are the costs to replace portions of the UV equipment as detailed in the attached proposal
from Ozonia NA. This proposal does not include any associated labor to remove and replace the affected equipment.
Labor:
Descri _tram:::
N/A
Date:
Noun
Unit kite, ($•,
Total : Cost'=
•
• i rr
IDesctiption
Date
Hours
Unit; Rate,($ /HR) `.,:
Total Cost;:
Ozonic North America
8/25/2011
$0.00
see attached
$366,248.00
15%
$421,185.20
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
•
D'eschptron:'
Date
Hours
Unit Rate_ ($ /HR)
Total Cost:
N/A
15%
$0.00
Mat. /Supplier
$366,248.00
15%
$421,185.20
Equipment
$0.00
15%
•
Name
Date
Costs
Notes
...... _
N/A
$0.00
15%
$0.00
Mat. /Supplier
$366,248.00
15%
$421,185.20
Equipment
$0.00
15%
$0.00
Breakdown:
Authorized Signature:
Total Costs
$421,185.20
Date:
Total $
OH & P %
Total $ with OH & P
Labor
$0.00
15%
$0.00
Mat. /Supplier
$366,248.00
15%
$421,185.20
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Authorized Signature:
Total Costs
$421,185.20
Date:
03ONIA
OZONIA NORTH AMERICA, LLC
600 WILLOW TREE ROAD
LEONIA, NJ 07605 USA
TEL 201. 676 -2525 1 FAX 201 346 -5460
August 24, 2011
J.F. Ahern Co.
855 Morris Street
P.O. Box 1316
Fond du Lac, WI 54936 -1316
Attn: Timothy Schneider
Re: Dubuque WWTP — Post -Flood Replacement Quote — UV Equipment
JF Ahern PO #00400794
Ozonia North America Contract No. 31810207
Dear Mr. Schneider,
This quote is in response to the request to bring the UV system, in its entirety, to a state where it
can be fully warranted by Ozonia. This request was made after the most recent flooding of the
plant in late July.
Ozonia was requested to visit the site to perform a post flood inspection. Ozonia's field
technician, Mr. Noel Cezar, performed that inspection (report previously submitted). Basically,
Noel identified parts that needed to be replaced immediately but noted that other failures could
continue to occur.
As part of this quote, Ozonia will provide the following equipment and services (all other UV
equipment will be re- used):
EQUIPMENT
Number of 3X Lamp modules 8
Number of 3X Lamps 288
Number of Power Cables 24
Number of Data Cables... 16
Number of UV Intensity Sensors 8
FIELD SERVICE
The services of a fully qualified Service Engineer will be provided for installation
supervision and startup for one trip, five days (eight hour man- days). A quote for
additional time, if requested, can be provided.
NOTES AND CLARIFICATIONS:
1) Installation of the equipment described above would be by others.
2) On -site performance testing including collection, transport and laboratory analysis of
effluent samples taken would be the responsibility of the Owner /Contractor.
3)Any other items not specifically listed in this proposal are to be provided by others:
Www.DEGREMONT- TECHNOLOGIES.COM HEADWORKS 1 BIOLOGICAL I SEPARATIONS I MEMBRANES i OXIDATION - DISINFECTION I BIOSOLIDS 1 INDUSTRIAL SYSTEMS
1
HER/ SINCE MO
lib
Incident Cost Tracking Form No. 1 -6
Project Name: Dubuque WPCP Modifications Prepard By: Tim Schneider
Address: 795 Julien Dubuque Drive Date: Wednesday, September 14, 2011
City /State: Dubuque, IA Submitted To: Miron Construction
Incident: Dubuque WPCP - Site Flooding Event Incident Date: Thursday, July 28, 2011
Subject: Ozonia North America - PSU Replacement Parts
Work Description:
Included in this proposal are the costs associated with the replacement parts recommended for the PSUs affected by the
flood event. In addition, a field report for the August 30, 2011, inspection is included.
vapor:
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
N/A
15%
$0.00
Mat. /Supplier
$32,267.54
15%
$37,107.67
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Material /Supplier:
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
Ozonia North America
9/14/2011
see attached
$32,267.54
tquipmeni:
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
N/A
15%
$0.00
Mat. /Supplier
$32,267.54
15%
$37,107.67
Equipment
$0.00
15%
Subcontractor:
Name
N/A
Date
Costs
Notes
•
y—p `~v`.
Total $
OH & P %
Total $ with OH & P
Labor
$0.00
15%
$0.00
Mat. /Supplier
$32,267.54
15%
$37,107.67
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Authorized Signature:
Total Costs
$37,107.67
Date:
Timoth Schneider
From: Eric.VITALE @ozonia.com
Sent: Wednesday, September 14, 2011 12:08 PM
To: Timothy Schneider
Subject: FW: Remaining items to be added to the Dubuque Flood Proposal
Attachments: ATT00001..jpg; ATT00002..jpg; Dubuque PSU Insulation quote 09_14_11.pdf; 18 -207
Additional Replacement Parts Quote 09142011.pdf; 18 -207 Dubuque Service Report 830_
11.pdf
Hi Tim,
Please find attached our proposals for the replacement of the insulation of the 2 PSUs as well as the additional equipment
identified by Noel as potentially having a problem. Tim, the issue with the quote for additional hardware is that we do not
know at this point if all of the hardware needs to be replaced. Once the modules are replaced along with the cables that
will tell us if there actually are issues with the ethernet cards, rectifier cards and ballast cards. So the hardware quote is
he worst case.
`ve also included Noel's report from the second inspection visit. ,Here are additional notes on Noel's report:
tem 1 - based on discussions with you, ONA did not submit the proposal to only change the bad components.
tem 2a - this will be incorporated in the replacement modules.
tem 2b - quote provided below.
tem 2c - this will be incorporated in the replacement modules.
tem 2d - no additional comments.
tem 2e - quote previously provided.
tem 2f & g - this is what I was trying to describe to you above. Until the modules and cables: are replaced, we won't know
just how many boards need to be replaced which is why I provided the entire amount (less the 4 ethernet and rectifier
boards already replaced). Please let me know if you would like me to adjust this quote in any way.
Thanks,
Eric VITALE
Manager Project Management
OZONIA NORTH AMERICA LLC
600 Willow Tree Road
LEONIA - NEW JERSEY - 07605 - UNITED STATES
DL : +201 676 -2437
FAX : +201 346 -5460
MOB : +201 238 -5422
www.degremont-technologies.com
Imprimer cet email est -il vralment necessaire ?
Do you really have to print this email ?
1
0,50NIA
OZONIA NORTH AMERICA, LLC
600 WILLOW TREE ROAD
LEONIA, NJ 07605 USA
TEL 201 676 -2525 1 FAX 201 346 -5460
Ozonia Replacement Parts Quote of Aquaray 3X Unit
Attention: Craig Jerabek Date
To: Dubuque WWTP
c/o JF Ahern
795 Julien Dubuque Drive
Dubuque, IA 52003
920 - 948 -0710 FAX:
Phone:
Line #
9/14/2011
Billing : Dubuque WWTP
c/o JF Ahern
795 Julien Dubuque Drive
Dubuque, IA 52003
Phone: 920-948-0710 FAX:
QTY
PART NUMBER
DESCRIPTION
UNIT
COST
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
12
12
144
MATERIAL
X0075 -G02
X0075 -G03
X0075 -G01
Rectifier Card
Ethernet Card
Ballast Cards
Replacement Parts
LABOR
Travel
1 AIRFARE
2 AP -PARK
1 LODGE
2 CRENTAL
150 MILE
2 MEAL
1 TOLL
1 Day Field Service for Installation & Testing
1 Day Travel
Expenses
Round Trip Airfare
Airport Parking
One day Lodging
1 Day Car Rental
Mileage To and From Jobsite (To and from Airport)
Meal Allowance
Tolls
$834.48
$528.96
$70.22
$1,264.00
$1,264.00
$1.212.00
$28.00
$125.00
$105.00
$0.58
$50.00
$12.00
NOTE: Unless stated in writing to
the contrary, this quotation is subject
to Ozonia usual terms and conditions
of sale. Thls quotation may be
withdrawn at any time prior to
acceptance and unless accepted
within 60 daysof our date shown
above shall cease to be in force. All
payment Terms are based on
approved credit by Ozonla.
Sales Tax: (AZ,CA, FL, IL, KY, LA, NJ, NC, OH, TX, VA. WA, WI)
SUB
7V
Freight
TOTAL
TOTAL COST
$0.00
$10,013.76
$6,347.52
$10,112.26
$0.00
$2,528.00
$1,264.00
$0.00
$0.00
$1,212.00
$56.00
$125.00
$210.00
$87.00
$100.00
$12.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$32,067.54
$200.00
$32,267:54
Shipping (FOB:Leonia, NJ; Prepay and Add)
x FedEx Ground
UPS Ground
Overnight
Others (Specify)
Collect Account #
Schedule 1 -2 Days
Terms: 100% Net 30 days
Credit Card:
Name on Card
Card Type'
Card Number
Expiration Date
Pock
CLINTS
'All American Express orders will recleve a 1.26% Surcharge on the total invoice
Quoted By: Craig Zamboni
Email: crala.zambonif@bzonla.com
Phone: 201- 676 -2492.
050NIA
OZONIA NORTFI AMERICA, LLC
600 WILLOW TREE ROAD
LEONIA, NJ 07605 USA
TEL 201 676 -2525 I FAX 201 346 -5460
Project: Dubuque WWTP, (Dubuque, Iowa)
Job no: 18-207
Date: August 30, 2011
Prepared by: Noel Cezar
Field Service Department
Evaluation of Dubuque WWTP On -site Tuesday August 30, 2011
Arrived at site 6:45 AM
I had a meeting with the following personnel.
Jonathan Mattson - J.C. Melee & Associates,LP
Glenn Tranowskl - Strand Associates
Jonathan Brown — City of Dubuque
1, We discussed the status of the UV system and the evaluation that I did last August 3, 2011. Ozonla
has two proposals one that will changed only the bad components and the other Is changed all the
modules and cables,
2. We did a walk through and listed below are the comments and evaluations.
a. The lock on the Ild is falling apart. They want a new robust design.
b. The Insulation on both PSU went under water and it is still wet. They want it replace but we
did not have it in our proposal, They want it to be incorporated.
W W W.0EGREMONT,THCIiNOI;OGIES.COM
c. The clamp retaining ring on the limit switches for the Wiper Plate keeps on breaking.
Ozonia will provide a much thicker clamp ring and reinforced with set screw,
d. The Electricians already installed 4 new Rectifier Boards and 4 new Ethernet Boards and 2
main contactors.
e. They want to replenish all spare parts that they used. They want the UV lamps first as soon
as possible because they used all their spare lamps.
f. The Insurance consultant agreed that all modules will be replaced and all the cables. We
still do not know yet how many Rectifier Boards, Ethernet Boards and Ballast Boards are
bad. This will be only known when we have a static new modules and cables installed.
g. While we are doing the walk through one of the main contactor started chattering ON /OFF.
I told the Electrician to bypass the TSH -01 which is the temperature switch on the Ethernet
Board and it works. There are two possible bad components it is either the Rectifier Board
or the Ethernet Board.
W W WDGREMONT +TECHNOLOGIES.COM
HERNSINCE 18130
11b
Incident Cost Tracking Form
No. 1-4
Project Name: Dubuque WPCP Modifications
Address: 795 Juen Dubuque Drive
City/State: Dubuque, IA
Incident:
Prepard By: Tim Schneider
Date: Monday, September 12, 2011
Submitted To: Miron Construction
Dubuque WPCP -Site Flooding Event Incident Date:
Ozonia North America - Replacement Parts Provided To-date
Thursday, July 28, 2011
Work Description:
Included in this proposal are the costs associated with the replacement parts recommended and provided to-date to
make the UV system operatonaI.
Labor:
Description
Date
Hours
Unit Rate ($/HR)
Total Cost
N/A
•
--_—,_.'
Description
Date
Hours
Unit Rate ($/HR)
Total Cost
Ozonia North America
9/9/2011
$0.00
see attached
$18,328.51
15%
$22,077J9
Equipment
$0.00
1596
S0.00
Subcontractor
$O.00
5%
�
$0.00
Equipment:
Description
Hours
Unit Rate ($/HR)
Total Cost
N/A
Subcontractor:
Name
Date
Costs
Notes
N/A
Authorized Signature:
Total Costs
$21,077.79
Date:
Total $
OH&PV6
Total $ withOH&P
Labor
$0.00
15%
$0.00
Mat./Supplier
$18,328.51
15%
$22,077J9
Equipment
$0.00
1596
S0.00
Subcontractor
$O.00
5%
�
$0.00
Authorized Signature:
Total Costs
$21,077.79
Date:
0 50 ttS ,1 A
OZ NIA NORTH AMERICA, LLC
600 WILLOW TREE ROAD
LEONIA, NJ 07605 USA
TEL 201 676 -2525 1 FAX 201 346 -5460
uote of Aquaray 3X Unit
Attention: Craig Jerabeck Date 9/9/2011
To: Dubuque WWTP
c/o JF Ahern
795 Julien Dubuque Drive
Dubuque, IA 52003
Phone: 920 - 948 -0710 FAX:
Billing : Dubuque WWTP
c/o JF Ahern
795 Julien Dubuque Drive
Dubuque, IA 52003
Phone: 920 - 948 -0710 FAX:
PART NUMBER
UNIT
TOTAL COST
Line #
QTY
DESCRIPTION
COST
Replacement Parts
$0.00
1
2
4
ABB NEMA rated CONTACTOR, 3 poles, 90 AMP,
240 VAC Coil
$383.00
$1,532.00
A75N3- 30 -00 -80
3
4
CAL5 -11
ABB Side Mount Auxiliary Contact
$25.00
$100.00
4
4
X0075 -G02
Rectifier Card
$834.48
$3,337.92
5
4
X0075 -G03
Ethernet Card
$528.96
$2,115.84
6
29
X0016H10
UV 3X Lamp Spec
$296.00
$8,584.00
7
20
X0015H14
Quartz Jacket
$112.40
$2,248.08
8
3
X0075 -G01
Ballast Cards
$70.22
$210.67
$0.00
9
$0.00
10
$0.00
11
$0.00
12
$0.00
13
$0.00
14
$0.00
15
$0.00
16
$0.00
17
$0.00
18
$0.00
19
20
1
$0.00
$0.00
21
22
1
$0.00
$0.00
23
$0.00
24
$0.00
NOTE: Unless stated in writing to
SUB
$18,128.51
the contrary, this quotation Is subject
Sales Tax: (AZ,CA, FL, IL, KY, LA, NJ, NC, OH, TX, VA. WA, WI)
70/
to Ozonla usual terms and conditions
Freight
$200.00
of sale. This quotation may be
TOTAL
$1.8,328.51
withdrawn at any time prior to
Shipping (FOB:Leonia, NM Prepay and Add)
acceptance and unless accepted
within 60 daysof our date shown
x FedEx Ground Others (Specify)
above shall cease to be in force. All
UPS Ground Collect Account #
payment Terms are based on
approved credit by Ozonia.
Overnight Schedule 1 -2 Days
Terms: 100% Net 30 days
Credit Card:
Name on Card
Card Number
Card Type*
Expiration Date
Eo# GLINTS
Quoted By: Craig Zambonl
Email:
cralqzamboni c(ilozonla.com
'All American Express orders will recieve a 1.25% Surcharge on the total Invoice
Phone:
201- 676 -2492_
HERNSINCE 1880
11c
Incident Cost Tracking Form I No. 2 -1
Project Name: Dubuque WPCP Modifications
Address: 795 Julien Dubuque Drive
City /State: Dubuque, IA
Prepard By: Tim Schneider
Date: Friday, September 02, 2011
Submitted To: Miron Construction
Incident: Dubuque WPCP - Site Flooding Event Incident Date: Thursday, July 28, 2011
Subject: Crane Engineering Sales Inc - Gorman -Rupp Pump Evaluation and Repair Recommendations
Work Description:
Site visit and associated review by Crane Engineering Sales Inc. to assess the condition of the two (2) Gorman -Rupp
pumps affected by the flood event and the associated costs to restore equipment to pre -flood conditions as directed by
Glenn Tranowski of Strand Associates, Inc. via e-mail on Thursday, July 28, 2011.
Larjur;
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
Jason Talbot (J. F. Ahern Co.)
8/17/2011
1
$65.00
$65.00
Crane Engineering - Repair Recom.
N/A
Equipment
see attached
$5,482.00
•
Subcontractor
$0.00
5%
$0.00
I V Id LW I !d i/ JU IJIJI ICI •
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
Crane Engineering - Site Visit
8/17/2011
$74.75
see attached
$2,156.50
Crane Engineering - Repair Recom.
N/A
Equipment
see attached
$5,482.00
$0.00
Subcontractor
$0.00
5%
$0.00
•
CLIu11J11ICI it.
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
N/A
15%
$74.75
Mat. /Supplier
$7,638.50
15%
$8,784.28
Equipment
$0.00
15%
Subcontractor:
Name
N/A
Date
Costs
Notes
•
Authorized Signature:
Total Costs
$8,859.03
Date:
Total$
OH &P%
Total$withOH &P
Labor
$65.00
15%
$74.75
Mat. /Supplier
$7,638.50
15%
$8,784.28
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Authorized Signature:
Total Costs
$8,859.03
Date:
-�__ CRANE
lir ENCINEFRING
Optimizing Fluid System Performance
SOLD TO: JF Ahern Company
Accounts Payable
PO Box 1316
Fond Du Lac, WI 54936 -1316
SHIP TO: JF Ahern
c/o Dubuqe VVWTP
795 Julien Dubuque Drive
Dubuque, IA 52003 -7996
CRANE ENGINEERING SALES INC
PO BOX 38
KIMBERLY, WI 54136
920 - 257 -0109
Fax: 920- 257 -0209
Invoice
Invoice: 246465
PO: V tim- Dubuque
Date: 8/25/2011
Cust# 45700
Quantity
8
5
425
Description
Unit Price
Inspection of Damage to Gorman pumps and motors due to flood waters
not to exceed $2200.00
Outside Mechanical hours
Overtime outside mechanical hours
Miles - Boom
$ 98.00
$ 147.00
1.50
Amount
$ 784.00
$
$ 735.00
$
$ 637.50
$
TOTAL
IF YOU HAVE ANY QUESTIONS FREIGHT
REGARDING THIS INVOICE PLEASE
CONTACT DAWN DRAEGER TAX
920 - 257 -0109
d .draegerMcraneengineerinq.net TOTAL DUE
$ 2,156.50
2,156.50
1r CRANL'
'LNG /NEL/r�fNG
Optimizing Fluid System Performance
To: Tim Schneider
P. 0. Box 1316
Fond Du Lac, WI 54936
Phone: 920 - 907 -5561
Fax: 920 - 929 -8825
E -mail: tschneider @jfahem.com
Desc: Dubuque WWTP Gorman Rupp Pump Repair
707 Ford Street
Kimberly, WI 54136
Phone: 920 - 733 -4425
Fax: 920- 733 -0211
www.craneengineering.net
Quotation #: BP1067
Customer RFQ #: Verbal
Crane Job #:
Today's Date: 8/23/2011
Quote Expiration 9/22/2011
Date:
i
The Gorman Rupp pumps Baldor electric motors were inspected to determine any damaged caused from
the flooding of the room that the pumps were located in.
Upon inspection of the pumps, water was found in the oil cavity in the bearing housing. Since water was
found in the bearing housing Gorman Rupp instructed us to replace the items noted in Item 1 below.
Upon inspection of the motors by the Baldor warranty repair shop, the motor connections were all tested
and found to be in working order. The motors will have to be steamed, backed, and re- insulated to be
brought back up to factory standards since they were immersed in water.
Item
Description
Qty
Unit Price
Subtotal
1.00
Gorman Rupp Pump and Baldor Motor Repair
Estimated cost to repair each of the (2) Gorman Rupp
self priming pumps and (2) Baldor electric motors
back to pre -flood condition.
Pump repair includes replacing gaskets, o- rings, lip
seals, and bearings.
Motor repair includes replacing bearings and steam,
clean, and re- insulate the stator.
1 LS
$2,982.00
$2,982.00
2.00
Retum and Re- Install Pumps and Motors on -site.
1 LS
$2,500.00
$2,500.00
Thank you for the opportunity to provide you this proposal. Please do not hesitate to contact me if you
have any questions or require any additional information.
Sincerely,
Brad Parkhurst
Application Engineer II / Project Lead
Ph: 920 - 257 -0132
Fax: 920 - 257 -0232
b .parkhurst @craneengineering.net
Mike Baxter
Field Sales Manager
Ph: 920 - 257 -0115
Fax: 920 - 257 -0215
m.baxter @craneengineering.net
Page 1 of 2
1
HERNSINCE 1880
1 1 d
Incident Cost Tracking Form I No. 3 -1
Project Name: Dubuque WPCP Modifications Prepard By:
Address: 795 Julien Dubuque Drive Date:
City /State: Dubuque, IA Submitted To:
Tim Schneider
Miron Construction
Incident: Dubuque WPCP - Site Flooding Event Incident Date: Thursday, July 28, 2011
Subject: Boerger, LLC - Rotary Lobe Pump Evaluation and Repair Recommendations
Work Description:
Site visit and associated review by Boerger, LLC to assess the condition of the four (4) rotary lobe pumps affected by the
flood event and the associated costs to restore equipment to pre -flood conditions as directed by Glenn Tranowski of
Strand Associates, Inc. via e-mail on Thursday, July 28, 2011.
Labor:
Descri`ption;; ;`
Date''
I- tours;_.
Unit Rate ($ /HR);_
Total Cost`:
Jason Talbot (J. F. Ahern Co.)
8/17/2011
1
$65.00
$65.00
• i rr
Description -; ~
Date ,,:
Hours
Unit Rate ($ /HR)
Total Cost_
Boerger - Site Visit
8/17/2011
see attached
$3,416.00
Boerger - Replacement Motors
N/A
see attached
$8,120.00
Boerger - Repair Option No. 2
N/A
see attached
$10,544.00
•
Description
Date , •
Hours .
Unit, Rate ($ /HR)
Total Cost':
N/A
Subcontractor:
Name-
.
N/A
Date
Costs. •
Notes :`
Breakdown:
Total $
:Total $;with OH & P::.
Labor
$65.00
15%
$74.75
Mat. /Supplier
$22,080.00
• 15%
$25,392.00
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Authorized Signature:
Total Costs.:
$25,466.75
Date:
Boerger, LLC
740 NE Harding Street
Minneapolis, MN 55413
Name / Address
Dubuque WPCP
795 Julien Dubuque Dr.
Dubuque, IA 52003 -7996
Sales Order
Date
S.O. No.
8/23/2011
32216
Ship To
Dubuque WPCP
795 Julien Dubuque Dr.
Dubuque, IA 52003 -7996
P.O. No.
Due Date
Rep
Quote
Project
Project Name
9/22/2011
JSP
22676
Dubuque
Item
Description
Ordered
Rate
Date Ordered
Date Recei...
Amount
Post Flood Inspection and Repairs:
Sales Descrip...
Hotel
1
276.00
276.00
Sales Descrip...
Oils & Disposal
1
93.00
93.00
Sales Descrip...
Labor
1
2,438.00
2,438.00
Sales Descrip...
Mileage
1
445.00
445.00
Sales Descrip...
Expenses
1
164.00
164.00
•
Total USD 3,416.00
Rotary Lobe Pumps
Macerating Technology
Quote /Estimate Number: Q009512
Attn: J.F. Ahern Co
Tim Schneider
855 Morris St
Fond du Lac, WI 54936
Re: Dubuque Flood Repair
BbRGERm
Outside Sales:
Inside Sales:
Pricing: Repair of four (4) PL 200 pumps after flood
August 26, 2011
Boerger, LLC
(612) 435-7300
america @boerger.com
Kelly Barnes
(612) 435 -7337
kba @boerger.com
Replacement Motors:
New motor Baldor CECP83770T -4, 7.5 hp,
with M23A thermostat, NC, 1 per phase
Total for four (4) pumps
Repair Option 1:
r w u.. -... a.. ,a. fre
- �'c��v�����r-rrv�ril- �lat�F�'
ici n yv . s
remove- and-retaimmJ otors -f� ,w. , ip. -9ea .
-redueeFs-pre-paid dJlectly to N fei--�pe� ten
in- W seonsin- per -Nefd- Nerd will
-0 i6 -r • .
-
US $ 8,120.00 quote
-Beer wiII -da} a +aCement
metor3 Sit -i-irr ` I- pniva-and- r it i taip:
(4) p i 6 0�� __�- .
Total for four 4 u ��,��� -�� `�•�
Repair Option 2:
Boerger to travel to site to remove gear reducers from
pumps, remove and retain motors for Owner, and ship gear
reducers to Nord Gear Corporation. Nord will
return refurbished gear reducers to Boerger, LLC.
Boerger will deliver gear reducers and new replacement
motors to site, install on pumps and prep units for start-up.
Total for four (4) pumps US $10,544.00 estimate
Pricing: firm for 60 days Delivery: 1 -10 wks ARO /after approval Freight: FOB Minneapolis, MN Taxes: Not Included
Notes
1. BOERGER, LLC's standard Terms and Conditions apply and are an integral part of this quotation unless specifically noted
otherwise in this proposal.
2. Installation, wiring, field painting, start-up and instructional services are not included unless specifically noted otherwise in this
proposal.
3. Anchor bolts, pressure gauges, valves, drainage piping, starters, variable frequency drives and control equipment or any other
items are not included unless specifically noted otherwise in this proposal.
BOERGER, LLC
740 Harding Street NE p 612.435.7300 america @boerger.com
Minneapolis, MN 55413 f 612.435.7301 www.boerger.com
11e
Incident Cost Tracking Form I No. 4 -1
Project Name: Dubuque WPCP Modifications
Address: 795 Julien Dubuque Drive
City /State: Dubuque, IA
Prepard By:
Date:
Submitted To:
Tim Schneider
Friday, September 02, 2011
Miron Construction
Incident: Dubuque WPCP - Site Flooding Event Incident Date: Thursday, July 28, 2011
Subject: Dorner Company - Plug Valve Evaluation and Repair Recommendations
Work Description:
Site visit and associated review by Dorner Company to assess the condition of the plug valves submerged in Structure 20
during the flood event and the associated costs to restore equipment to pre -flood conditions as directed by Glenn
Tranowski of Strand Associates, Inc. via e-mail on Thursday, July 28, 2011.
IauvI
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
Jason Talbot (J. F. Ahern Co.)
8/16/2011
2 '
$65.00
$130.00
Dorner Company - Repair Proposal
N/A
Equipment
see attached
$3,215.00
$0.00
Subcontractor
$0.00
5%
$0.00
•
IVIdLeI Iai/ JUIJIJII I •
Description
Date
Hours
Unit Rate ($ /HR)
Total Cost
Dorner Company - Site Visit
8/16/2011
$149.50
see attached
$1,023.20
Dorner Company - Repair Proposal
N/A
Equipment
see attached
$3,215.00
$0.00
Subcontractor
$0.00
5%
$0.00
• •
Lquipmen t .
Description Date Hours Unit Rate ($ /HR) Total Cost
N/A
Subcontractor:
Name
Date
Costs
Notes
N/A
•
Total$
OH &P%
Total$withOH &P
Labor
$130.00
15%
$149.50
Mat. /Supplier
$4,238.20
15%
$4,873.93
Equipment
$0.00
15%
Subcontractor:
Name
Date
Costs
Notes
N/A
•
Authorized Signature:
Total Costs
$5,023.43
Date:
Total$
OH &P%
Total$withOH &P
Labor
$130.00
15%
$149.50
Mat. /Supplier
$4,238.20
15%
$4,873.93
Equipment
$0.00
15%
$0.00
Subcontractor
$0.00
5%
$0.00
Authorized Signature:
Total Costs
$5,023.43
Date:
VALVES&AUTOMA c Einke
TION '
www.dornerco.com
DORNER COMPANY
8585 W. BRADLEY RD.
MILWAUKEE, WI 53224
Phone: (414) 355.8685
Fax: (414) 355 -3556
Sold To:
J F AHERN COMPANY
PO BOX 1316
FOND DU LAC, WI 54936 -1316
apinv @jfahern.com
Invoice
Invoice Number: 109892 -IN
Invoice Date: 8/29/2011
Order Number: 0059185
Order Date 8/29/2011
Satesperson: GRK
Customer Number: AHE001
Ship To:
DUBUQUE WWTP
795 JULIEN DUBUQUE DRIVE
DUBUQUE, IA 52001
Attn: TIMOTHY SCHNEIDER
Page: 1
Customer P.O.
403262
Ship VIA
Frt Terms
Frt Acct
Terms Job #
NET 30 DAYS 2754
Item Number
Whse
Ordered Shipped Back Ordered
Price
Amount
/SERVICE
. SERVICE
FIELD SERVICE INSPECTION FOR FLOOD EVENT
/MILEAGE
MILEAGE FOR SERVICE
BHR
1 -ROUND TRIP FIELD SERVICE
INTERNAL ONLY
Trackipg number
DC
1.00
1.00 0.00
MI 172.00 172.00 0.00
EACH 8.50
8.50 0.00
920.00
Net Invoice:
Less Discount:
Freight:
Sales Tax:
Invoice Total:
0.60
920.00
103.20
0.00 0.00
1,023.20
0.00
0.00
0.00
1,023.20
Sorvico Report
JDs
REPORT
PROJECT
JOB TYPE
2754
1314612039
AHERN J F MECHANICAL CONTRAC
CUSTOMER-INVOICE
UCSCHIPTION OF SERVICE PERFORMED:
On Site lime = 10:00am to 12 :30pm = 2.5 hrs
Travel Time = 6 hrs
Mileage = 172 miles
DATE
TIME IN
TIME OUT
PRISONS
MANHDDRS
8/16/2011
7:00:00 AM
3:30:00 PM
1
8.5
Traveled to site. Found 17 -6" plug valves with nut operators with no work needed. Also 13 -6" and 1 -8"
chain wheel operated plug valves that need to have the covers removed and re- greased. Last is two plug
valves 1 -6" and 1 -8" plug valve with gear operators, and with limit switches (S.E.H, 90) mounted to the gear
box.
Everett
Wednesday, August 31. 2011
Page 1 of 1
1 OUYEARS
Quality. Service. Commitmeht
DORNER QUOTATION �►
To: J.F.Ahern Company
Attn: Tim Schneider
Ref: Dubuque WPCP -Flood Event -Valve Repairs
FOB: Factory
Terms: N30
Delivery: 1 Week
Make Order To:
Date: August 31, 2011
Proposal No. Q602dzdu.xls
Page: one of one
Industry Code: 4952
Dorner Company
8585 W. Bradley Road
Milwaukee, WI. 53224
Phone No: (414) 355 -8685
By: Everett Russell
Item
Quan.
Description
Unit Price
Total
1
1
Repair and Recondition of (1) 6" & (1) 8" DeZURIK Plug
Valves to include (2) SEH90 Limit Switches, Mounting, (1)
Day for Labor, and Travel Expenses.
$ 3,215
$ 3,215
Total
$ 3,215
Page 1