Signed Contracts_Miron Construction Change Order No. 12Cl RAN September 28, 2011 CHANGE ORDER NO. 12 PROJECT: Water Pollution Control Plant Modifications OWNER: City of Dubuque CONTRACT: 1 -2010 CONTRACTOR: Miron Construction Co., Inc. Strand Assocates, hie 910 West Wingra Drive Madison, WI 53715 (P) 608- 251 -4843 (F) 608 -251 -8655 Description of Change 12a Revise grading east of the UV Building (Structure 62) in ADD $0 accordance with drawing 05 -C1.10 attached to this Change Order. 12b The receptacles located on the south and west walls of ADD $0 Passage Way 7524 shall be powered from circuit 4 located in LP- 75 -01. The tag names for the centrate pumps located in Pump Room 7523 shall be changed from "CNTP -75 -04 and CNTP- 75 -05" to "CNTP -75 -01 and CNTP- 75 -02." 12c Provide boiler instrumentation work in accordance with ADD $0 attached WCD No. 23. 12d Provide modifications to MCC Room 7004 in the Anaerobic ADD $15,116 Digestion Building (Structure 70) in accordance with attached Cost Proposal Request (CPR) item 030 -01 and WCD No. 27. 12e Provide modifications to MCC Room 7004 HVAC in ADD $37,350 accordance with attached CPR item 030 -03 and WCD No. 27. 12f Provide rebar at digester wall 36-inch openings in ADD $544 accordance with attached CPR No. 32 and WCD No. 27. 12g Remove existing vents in Electrical Control Room 1004. ADD $802 Patch all holes to match existing surfaces. Piping associated with the Electrical Control Room floor drains shall be removed. Provide PVC caps on removed piping at east wall in Blower Room 1001. Delete painting of demolished vents and pipes. Work shall be as described in RFT 188 response dated May 5, 2011, and WCD No. 27. 12h Demolish existing concrete pad on south side of HPO ADD $2,427 Control Building to allow installation of new radiator foundation as described in RFI 216 response dated May 9, 2011, and WCD No. 27. 12i Delete SCADA control of UV gates in accordance with ADD $392 attached CPR No. 38 and WCD No. 27. RAW:GWT:dIh \SSMAD \1100 -1199 \1159 \023 \Wrd \Change Orders \CO 12.doex Arizona I Illinois Indiana I Kentucky Ohio I \n/isconsin Strand Associay'S , City of Dubuque - -Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 12 Page 2 September 28, 2011 Description of Change 12j Reinstall and paint Owner - modified tees at grit pump suction ADD $0 piping in accordance with attached Work Change Directive (WCD) No. 27. 12k Provide modifications to aeration tanks (Structure 40) to ADD $36,154 install structure around 30 -inch PRE at bottom of each tank in accordance with attached CPR item 033 -01. This cost includes a not -to- exceed amount of $1,074 to provide shoring on a time and materials basis. If shoring is not required, Contractor shall provide credit to Owner in a future change order. 121 For door 7510A into the Biogas Co- generation Room, ADD $953 provide Sargent 8813 or equal exit device in accordance with the specifications instead of the specified Group 1 lockset 10G05 in accordance with attached CPR item 033 -03. 12m Add butterfly and balancing valves to heating hot water ADD $14,145 loops in Structures 70 and 75 and change HWP -75 -06 and HWP -75 -07 from 25 hp to 15 hp along with associated electrical changes in accordance with attached CPR 34 and WCD No. 30. 12n Change Administration Building (Structure 80) HVAC ADD $13,880 pumps and add valves in accordance with attached CPR No. 42 and WCD No. 30. 12o Provide modifications in accordance with attached CPR ADD $28,970 No. 35. Provide plumbing modifications in Septage /Hauled Waste Receiving Station (Structure 92) in accordance with attached drawing 92- PH1.01. 12p Install door jambs on new exterior doors in accordance with ADD $1,734 attached CPR No. 36. Exterior doors installed by Contractor prior to May 20, 2011, do not need to be retrofitted to comply with CPR No. 36. 12q Provide electric water heater at Excess Flow Drainage Pump DEDUCT ($1,255) Station (Structure 35) in accordance with attached CPR No. 40. 12r Provide modifications to Administration Building (Structure ADD $1,994 80) vestibule and delete bonze plaque in accordance with CPR No. 41. 12s Provide spray insulation on interior face of west wall from ADD $3,780 floor to roof in Men's Restroom 7504 and Locker Room 7505 in Solids Processing Building in accordance with CPR No. 44 items 044 -01 and 044 -2 and WCD No. 31. 12t Provide manual aeration tank purge blower isolation valves DEDUCT ($1,635) in accordance with attached CPR No. 45. 12u Provide handrail and modifications around opening at ADD $3,587 Centrifuge Room 7513 in accordance with CPR item 046-02. RAW:G\VT:dlh\S:AMAD \1100 -- 11990154 \023 \Wrd \Change Orders \CO 12.docx 1(t(c..c `., xt,anid.com City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 12 Page 3 September 28, 2011 Description of Change 12v Replace DEW piping inside Solids Processing Building ADD $9,801 (Structure 75) in accordance with attached CPR No. 47. 12w Provide floor drains and waste piping in Solids Processing ADD $3,726 Building (Structure 75) in accordance with attached CPR No. 48. 12x Provide riprap at ash pond in accordance with attached ADD $571 CPR No. 49 and WCD No. 28. 12y Provide modifications to motor control centers and ADD $6,139 conductors that power digester hot water supply and heat exchanger hot water pumps in accordance with attached CPR51. 12z For the roof additions on the north and south end of the DEDUCT ($1,523) existing Maintenance Building (Structure 90), match the existing roof level at these locations as described in RFI 76 response dated January 13, 2011. 12aa Provide a credit to busy a bar every 8 feet in the digester base DEDUCT ($1,402) slab reinforcing mats as described in RFI 120 response dated February 24, 2011. 12bb For doors 2002B and 2003A, provide a Type 3 FRP frame ADD $928 similar to the one shown on 99- AS6.01 for both doors. Instead of a louver above the door, provide 1 -inch thick insulating glass in the exterior window as specified in Section 08800. Work shall be as described in RFI 207 response dated April 28, 2011. 12cc Provide new floor drain in Men's Restroom 7504 and ADD $782 connect to new drain as described in RFI 240 response dated May 25, 2011. 12dd Provide ADA-compliant layout for Women's Restroom 7507 ADD $299 in accordance with drawing attached to this Change Order as described in RFI 244 response dated 6/6/11. 12ee Relocate hose bibb at Administration Building as described ADD $962 in RFI 261 response dated 6/27/11. 12ff Provide 6 -inch PVC storm from ST MH 1 -4 to ST MH 1 -2. ADD $1,239 Route storm below wall connecting Digester No. 2 to Solids Processing Building as described in RFI 269 response dated July 6, 2011. 12gg At Administration Building, provide DX -210x ties between ADD $709 the ELFI wall panels and the brick veneer as described in RFI 298 response dated September 6, 2011. 12hh Resurface 439 square feet of Primary Clarifier No. 1 with an ADD $10,060 epoxy filler in accordance with WCD No. 29 attached to this Change Order. TOTAL VALUE OF THIS CHANGE ORDER. RAW:GWT:dlh \S:AMAD \I 100 -- 1199 \1154 \023 \Wrd \Change Orders \CO 12.docx ADD $191,229 ®� r RANDALL A. -La: WIRTZ e�z. 16137 °Rrz $11 ■EER— Strand Associate 'AOS °. ° °. ° °•`mom APPROV City of Dubuque —Miron Construction Co., Inc. Contract 1 -2010, Change Order No. 12 Page 4 September 28, 2011 Contract Price Adjustment Original Contract Price Previous Change Order Adjustments Adjustment in Contract Price this Change Order Current Contract Price including this Change Order Contract Completion Date Adjustment Original Contract Completion Date Contract Completion Date Adjustments due to previous Change Orders Contract Completion Date Adjustments due to this Change Order Current Contract Completion Date including all Change Orders `_ i nd Assoc, $49,750,000 $ 4,098,657 $ 191,229 $54,039,886 August 31, 2013 None None August 31, 2013 �o����� ©��i document shall become a supplement to the Contract and all provisions will apply hereto. \ �o • ,oaf �� • Q ,• .0° s MMENDED 9,4972.0 Date CONTRACTOR —Mixon Const tion Co., Inc. Date David G. Voss Jr., Presid APPROVED OWNER —City of Dubuque RAW:GWT:d1h \S:AMAD \1100 -- 1199 \1154V023 \Wrd \Change Orders \CO 12.docx //4( i( Date 80. CO 3. ,M010billNO3 ,3100 10 001140110 000010 moo 'nonsno anonsno AO /1/13 snouvoaaloow 11101i 1011400 Hournioa 1310M aPIP , . , >0 i , WT1d UNiavuo 2119 Gar01 g 1..C, z 0 ' Z . f li F; Coa-OZ Aine 'MO EMI 0.3. 001d 030SM e ENV eJ th.01:C.A Nun Nclf;l0 S30 0 02 1.1.,2. V01,930CIPO 3C1011014I S0NEMV1:40 3S3JBL ,,,,, SIJOISIAM •ON 80. CO 3. Wiigg4m, STRAt "..cv ork Ch Directive Directive No.: 23 . .. Contract: 4.2010 Owner: Clivof.DUbudue By: ... . .. , ., Contractor: Miron Construdiort.Gthi- -Inc.. Date: .: -. 0P-4/41... - . . Desbription-ofWork .04 Dedatidri &et .. AdditlOrt . . .. ... Dia Wing. 75411::05.-(Sheet116) . .. REPLACE: key-Note 7 With the- ft:glowing. (TIT15,25, TIT-75- by the bolter Coordinate tap sizes provide wiring from Associated Ses detail A199-H7 02 (TIT:15-24 fide gas piping. 02 manufacturer and size and location with device to control Division 15 Contractor. entering water flow [shed by the bolter Coordinate tap 8.12"8 Contractor shall provide bailer (b-L.R45-01), T1T-75-29, and TIT- TIT-75-29, and T1T-76- shall be wired by DiVision t5 With Division 16 pnwer and 2'4-10,n Install tap in heating :hOtwater:piping for thermocouples 29, and TIT-75-30). TherthOOOPlee than be furnished manufacturer and 'n*1104-14! Division 1-5 Contractor. with. boner rnanOraOktrer..-Divigion. 1$'090trabtcr shall each thermocouple to the control 1.)ettetet the boiler (B1A-76-.01). conduit sheii . be provided -:.6y,bOlgan 16 Contractor fOrTurther informatiCh. DELETE tap for hot Water dc.40TOP temperature tfensinitter Thl6tranSrnitterte being, pitiVided-VIth the. boiler (BLR-15,01). ADD tap for L)2 -SehseriArialy4er 4avibe .oh the boiler Sensor/Analyzer device ebaitibe:fdthished by the toiler installed by :fAlielon 16- aiittiotor. Coordinate tap boiler manUfactiker. Contrbi:Wii100 frorn4 aene:erlAnelyzer panel at boiler :(plig-76401l,ahall be provided by AsecOiated CondUlt shell Vided by DiViefori 1.0 Oentractor, ADD tap for digester g ae Tow' pressure switch' and Wier sWitch. Pressure switch and flow switch etion be 'turn. manufacturer and InStalled. WDIVidlOr115 Contractor and locations with boiler thatikifeOthrer, Division 15 wiring from each deViCe to the ooiltroi pane! at the Associated condukenall be *Med by tiVisien 16 Contractor. Deaw75E1„04 (Shebt 263) DELETE temperature transmitters TIT-15-25, TIT-76-26, 76.30. ADD 3/4-inch conduit fror4tivitidcoupies TIT-7525, 30 to the control ponoi:ottho: bailer -(0....R45,01). Thermocouples furnished by the boiler manufacturer -and instalJed and COnt(ogtor, Coordinate idoattien of the thOftii-Ogaupies Ogntitttog A0p:2#12ying ground ift.d.t4.7(non :conduit for 120 InithalsVS:WEA \ 1 100-.1199't.1154 \ 023 11A/Ork Change DirectIves1DIreclive No 23Cieaveri3rccs E3oller,doe SVAAND F. Work Change Directive Li 2_21 bPrc/Lift for control Wititiq fivq. 02 6rio-0iAriglyzOr-dqvice on the boiler flue ... . gag piping, to the control pane l :at the b011er.,(131R-75-01). 02 Sensor/Analyer device shall be furn1hed by the boiler thanUfabturer and installed by DivigiOn 15 COntreetor., Controt Wrin§i•fibrO tlg :etiSori.Arialyzer device to the control panel at the Voller shall be •OtOVided by .DiVigiOn 15 •COntraOtor. Coordinate location ethe 02:SensOrAtialYzer devico with tiviloh 15 'eontraCtOr. Apr.) 314-1nch conduit froth 4100Ster Oag low pressure switch and -boiler entering water flOW:Wftelie to the control panel at the boiler -(8(A;I5 01). prd$40tohh and ttoWsW4Of.1 :OW :to furnished by the boiler tnanufacturef and by Division 15 COntraotot, Coordinate location of the devices With iliVWOn- it Contractor. Specific-atiottiSil90 :-.SCCF:154)1110 LIS:tihg: CARIFICATIQN: trot Wgor teMperature (TIT75-25), outlet water temperature '011-4646), hot *tor return loop temperature (TIT-75-29.). and boifor ..oy$torn supply water temperature shall be received froth thetellet (81.A.75-01):COntibiPaheiViattheenet. DELETE SH. Pli, from teMpeeatbi'e transmitters TIT-75-25, TIT-75-26, and TIV75L29,t6 SCC.275-01, Total .. . . Reentts: this Work thbhge DitedVe Shbit te-gult in no change to project dtkation and is riot bedetialieri. _ . . Change in .Contract Price by: 0 Supplemental Unit Price Li Uriii Price Lump sum Requested by: StrarktAssociates, In, , litOffil._ Date Recommended by: ,...tlitirvy,.. -: ,,(1-7,4,,k..0_,, . (tir .05/25/11. tiate Accepted by: ,.,..— bate ( — rait�r) - - —7 ----7 Approved by: - - - ------- .,.._ Date ---t 6-w 0 e 0 , THIS FORM IS NOT A:SUBSTITUTE- -FOR-A PROPERLY PREPARED AND EXECUTED CI-TANGE "I DER- \ S;IIVAD\ i 100-1 199ki I 50k023 \VrIrdMork- Cha ne, DirectWS1Di(ec0c, No n.Cleaver Brooks BON21.110,:,- STS ASSOCIATES, F of (4 1 \I F F R- i 12d, 12e, 12f, 12g, 12h, 121, 12j Work Change Directive Directive No.: 27 Contract: 1 -2010 Owner: City of Dubuque By: GWT Contractor: Miron Construction Co., Inc. Date: 819/11 Description of Work Cost Deduction Cost Addition Provide modifications to increase the size of MCC Room 7004 and modifications to electrical components as described in CPR item 030 -01 issued on 4/1/2011. Provide modifications to the HVAC system in MCC Room 7004 as described in CPR item 030 -03 issued on 4/1/2011. At all four digesters, provide wall reinforcing around the 36 -inch manway openings and draft tube openings as described in CPR No, 32 issued on 4/8/2011. Remove the vent and drains in Electrical Control Room 1004 and Blower Room 1001 of the Screening Building as described in Engineer's response to Contractor RFI 188 attached to this Work Change Directive. Remove the portion of the existing concrete slab at HPO Control Building (Structure 45) that is in conflict with the new radiator slab and footing wall as described in Miron RFI 216. Delete SCADA control of UV gates and remove associated wiring as described in CPR No. 38 issued on 5/26/2011. Reinstall the two existing Owner modified tees on the suction side of the grit pumps in Grit Facilities (Structure 10). Install these two tees instead of the new tees shown on the Contract drawings. These existing tees shall be prepared, primed, and painted as specified for existing piping in Division 9. $15,116 $37,350 $544 $802 $2,427 snFR_ 1$392 $0 I$56 631 Total $56 ;60 Remarks: This Work Change Directive shall result in no change to project duration and is not subject to negotiation. initials \S:AMAD\1100 -- 1199 \11541023 \WrdMoth Change Directives \Directive No 27.MCC Rm 7004.Dig Reinfr.V &D at Sir 10.SCADA at UV Gates .Gtit Tees.doc STRAND AS OCIATES, INC' 112d, 12e, 12f, 12g, 12h, 12i, 121 Work Change Directive Change in Contract Price by: I Supplemental Unit Price ❑ Unit Price ® Lump Sum Requested by: Strand Associates, Inc. 8/9/11 Date r 1, -- — f_01.A.Pa Recommended by: ' " 8/9/11 (Engineer) Date Accepted by: (Contractor) Date Approved by: (Owner) Date - -THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER -- Initials \S :A MADV9100 -- 1199 \1154 \023\Wrd \Work Change Dire ctivesVDirective No 27.MCC Rrn 7004_Dig Reinfr.V &D at Str 1 O.SCADA at UV Gates.Grit Tees.doc No 030 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 April 1, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer 12d Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. Pricing shall be submitted individually for each of the three items (030 -01, 030 -02 and 030 -03) listed below. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Item 030-01 (Increase MCC Room 7004 Size for Future Electrical) Drawing 70- ASM1.05 (Sheet 147) CHANGE the east -west wall lengths from 21' -4" to 23' -4" and from 11 " -4" to 13' -4" in MCC Room 7004. CHANGE the location of the 8" DSL piping directly west of MCC Room 7004 by shifting it 1'- 0" to the west as indicated on JF Ahern's drawing 70 -MP -108 in Miron Submittal 274-0. ._,. ns talHou v er- - [0- -1-in- 'l C- oom "( 04 dii L tl a -ov c 00`01 / UCJ f2 . f10 V iuc -iypc t1-L 0111c lel ',a LUn L! % / -I 1LJ .J .IJ✓ LLllt:l ""UJ Jr)lJ Lill lei \l. Drawing 70 -E.103 (Sheet 177) CLARIFICATION With the increase in the east /west dimension of MCC Room 7004 in the area of the MCC, the MCC mounting pad should still extend to the location shown on the BId nitials \S:A=4ADAl 100 - -t 199A1154V033 \WrdVCost Proposal RequestsVCPR.30.VED for Gas Conditioning Blo ser.docs STRAND ASSOCIATES, INC. Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 April 1, 2011 drawings for the MCC sections along the north wall of this area. This will allow for the future installation of a high pressure gas conditioning system blower VFD MCC section. The mounting location for the Low Pressure Gas Conditioning Control Panel (LPGCP- 70 -01) and the FACP and pull station shall be switched. LPGCP -70 -01 shall be located flush with the inner corner of MCC Room 7004. Drawing 99 -E6.17 (Sheet 416) REPLACE the Low Pressure Gas Conditioning Blower (GCBLWR- 70 -01) FVNR starter with a normal duty VFD. The motor information shall be changed as follows; Motor Horsepower from "15" to "20 ", FLI In Amps from "21" to "24.1 ", Breaker Amps from "45" to "60 ", Remarks from "R= Starter Overload" to "R =VFD Fault ". Drawing 99 -E6.18 (Sheet 417) DELETE GCBLWR -70 -01 FVNR starter bucket. ADD a new full height MCC section for the GCBLWR -70 -01 VFD starter bucket between the MCC section housing starters for HWP- 70 -01, 02, 03, and 04 and the corner section. Specification Section 16940, 3.06.B REPLACE paragraph 3.06.B.I.a in its entirety with the following: "With the H-0-A selector switch in the "Hand" position, the motor shall start and run at the speed set on the drive HIM. Hand position shall be hard -wired and not through DeviceNet or the PLC." SCC -70 -01 I/O Listing: Specification Section 16990 ADD the following 1/0 to this SCC: Analog Inputs - VFD Speed Indication (GCBLWR- 70 -01) DNET Analog Outputs - VFD Speed Control (GCBLWR- 70 -01) DNET CLARIFICATION The digital input for Starter Overload should be changed to "VFD Fault ". Initials \S:AA4-\DA1100-- 1199AI 154V023 \WrdVCost Proposal RequestsVCPR._0.V0D for Gas Condiuonina Blower -docx ASSOCIATES, ANC 1 2e Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 5 April 1, 2011 7 �, !i C -F k.,1.,,,.....,..t - L. t . _ t 7.,1,. -.l a r� 7 n._. it r,.czxin 2rarl- u- 1t,,,9— c:rrri�,°', t'rtC-°�,a Ic, ri..r"`s�""i'ct'e�°YaGi i°LiLiiiiL U1w✓ult2i v Li e[ IaCYG1Ci1 AI'iG1iZ= "I-CJ- 1 D-T T',-.'TT �F cc., >' t(,( -G- t- r h .or.,.7_,..l.f._J1.4i1�(..' l,.n fir, th�i seekae ..s. _ a1-1- a_ _r o in iii,Lr.ix.. �p'ziL °'e"'tTVt<,�. SGCu'iiri zc� �ii^c°°'�.ria vz xvi�.� %�. ir�.°p-u"-.'� ro,�- �xar�:��;.,�s�,Ii �h�caxx r.i:��i�,.r ailrr`bi -ex te- rd ed--ar it ana 5- inCrsAs f rr-'ePt°xF't3 tur c 2-".5-ineh` 'i 11 keigx '' v G-seetl'o i. Speeif eatiori- Section 16940 J.UU.I) 1-1 R_ 1� fv}l2`v9it' I \LJL Lam" >i li lA-i iA t'T'l,� Y� ✓.1/G:L.l.U. x 1 rLJ <. cS_T_ 1 ,_.�.L- . T_1-=O......A _ ... 7.. _ -t�r- -s._� « .a 9'2 --p- f..a.ki..�i..r"....._. 1. w.meft .r-......n._h-all --s nrt �.x r- ».... -at-t e- VVitTi L11G 1Z-V-!'`;" 3e1eL Cllx JVV`fie"xi 311`LT1G""""'ll�7ll t`lVJtllVxx, �lx7t� YY111C01 olxulx �crx� %iriu r�kix cc� �r,.> .1 h T LIt.. T H v:lm_>_ '!i o s l...al lam" . 1:+:_.a.r d . Ems... « ea..e..... k.. 1. « a_ _gh -Demic t nr thet speed-gut "oll`lri zriTVG ni vY. rL Tx j/vJ1LIUli Jlxc' Yr u2 uax[x wucd`uxru Yivx t1lrv�i a x�� vii livc� vx xrir PLC." c,r•■ 77n nn? Tire r �'_ .mac. _ r r_, c t 000 l- / U-1/1 1.P LO 1016Llllg. O pee-111Lattun ot% cfo 1'77 r� Luc f� iv w ilig iv `iu [i ?i� 5 i • TT D 'rl'L CJ r.iJe l. T. "' 'llll`l fll .( J ' -17 INTTI �— J ' - 1f \ 1Analvg tuptrts .- v r�Jpee ccni rei tio .cpc_- JiVV lX- u- o, ,- __ - _JNV — - T (Ur,P YTx 1uJ I \ "L1 L 1 1i11S108 J — Cp l 'P\�Y ''sc�"."- i" vi\V'r ii�.""'ii'i iui` i% C'tL iOi""•Ci' `t� LL,1 -v v`l% iv (Ad -J xvuiu ve -exl c�`ii" \.'tlJ °�c`V 1'D x�'`C1a1 ��. Item 030 -03 (Increase HVAC in MCC Room to Cool Future Electrical Loads) Drawing 70- ASMVI1.04 (Sheet 142) Provide 20" x 20" roof penetration for GRV- 70 -01. Locate center of opening minimum 12 feet west of inside face of east exterior wall of MCC Room 7004 and such that center of GRV -70 -01 is approximately halfway between the north and south walls of MCC Room 7004. Coordinate location with precast manufacturer. Drawing 70- ASML05 (Sheet 147) Install louver L -70 -01 in MCC Room 7004 directly above door 7004A. Provide type A -2 lintel per detail B/99- AS5.03 and as specified above louver. Initials \S:AVIADA1100-- 1199VI 154 \023AVrdVCost Proposal RequestsVCPR30.VFD for Gas Contlitionine Bloscerdocx STRAND aSSOCUar =_s, INC.- =h7C nl E E F?S Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 6 April 1, 2011 Drawing 70 -E1.02 (Sheet 176) DELETE the two pole, 35 amp circuit breaker from Lighting Panel LP -70 -02 circuits 1 and 3 and the associated 2090 VA from the schedule, and all associated conduit and wiring. Provide two 20 amp single pole "SPARE" circuit breakers in LP -70 -02 circuits 1 and 3. CLARIFICATION If the size of MCC Room 7004 is not increased, LP -70 -01 and XFMR -70 -01 will be relocated to the east wall of MCC Room 7004 and the two pole, 35 amp circuit breaker for SS -70 -01 will be deleted from LP -70 -01 and replaced with two single pole, 20 amp circuit breakers. Drawing 70 -E1.03 (Sheet 177) DELETE the split system SS -70 -01 indoor fan unit from MCC Room 7004, the associated indoor circuit breaker disconnect, and all associated conduit and wiring. The split system thermostat junction box on the east wall near the doorway shall remain for the new fan coil unit wall mounted programmable controller. ADD a 480 volt power connection at the ceiling in MCC Room 7004 between the northeast and northwest walls for the new fan coil unit FCU- 70 -01. FCU -70 -01 shall be powered from the new "FCU- 70 -01" circuit breaker in MCC -70. The junction box for the split system thermostat on the east wall near the doorway shall remain for the Division 15 provided programmable thermostat. ADD one 3/4 -inch conduit from the programmable controller junction box to FCU- 70 -01, and one 3/4 -inch conduit from FCU -70 -01 to ACCU- 70 -01. ADD 3/4 -inch conduits from FCU -70 -01 to the associated mixing box damper at the ceiling and to the damper above the doorway in MCC Room 7004 for wiring by Division 15. ADD a NEMA 12, 480 volt, three phase, 30 amp manual motor switch type disconnect at the ceiling for power conduit and wiring to FCU- 70 -01. Drawing 70 -E1.05 (Sheet 179) DELETE split system SS -70 -01 condenser from the roof above MCC Room 7004 and all associated conduit and wiring. The 30 amp NEMA 4X disconnect shall remain for the new air cooled condensing unit ACCU- 70 -01. nitials \ SAM ADAt 100- -1199\l 15d \023 AWrdVCost Proposal Requests \CPR_ 3O.VFD for Gas Conditioning B oseer.docx STRAND ASSOCIATES, INC. - rl Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 7 April 1, 2011 ADD a 480 volt power connection on the roof above MCC Room 7004 between the northeast and northwest walls for ACCU- 70 -01. ACCU -70 -01 shall be powered from the new "ACCU -70- 01" circuit breaker in MCC -70, through the 30 amp NEMA 4X disconnect for the split system condenser being deleted. Drawing 99 -H.601 (Sheet 383) DELETE "SS- 70 -01" from the Split System schedule. ADD "ACCU- 70 -01" to the Air Cooled Condensing Unit schedule as follows: Location: Digester Gas Building Service: FCU -70 -01 Model No.: CBB Nominal Capacity (Tons): 5 No. of Compressors: 1 Compressor Type: Scroll No. of Coils: 1 Face Area (SQ. FT.): - No. of Rows: 1 No. of Circuits: 1 Refrigerant Type: R -410a Operating Charge (oz.): - Suction Line Size (in.): 7/8 Liquid Line Size (in.): 3/8 Voltage: 460 Phase: 3 FLA: 12 MOP: 20 Disconnect By: Div 16 SEER: 11.6 Operating Weight (LBs.): 281 Remarks: 1 -Model Number is for AAON. Provide dual stage compressor. Initials \S:VAIADA1100-1199\1154 \023 Wrd \Cost Proposal RequestslCPR30.VFD for Gas Condiuonina Blower.docx STRAND ASSOCIATES, INC. „1 F1 E Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 8 April 1, 2011 Drawing 99 -H6.02 (Sheet 384) ADD "FCU- 70 -01" to the Fan Coil schedule as follows: Service: MCC Room Model No.: H3 -C Supply Air (CFM): 2,000 Outside Air (CFM): 0 Quantity: 1 Motor Size (HP): 1 Capacity (kW): Ext. S.P. (in. W.C.): - EAT ( °F): LAT ( °F): Stages: - Sensible Capacity (MBH): 47.7 Total Capacity (MBH): 59.9 EAT DB/WB ( °F): 80/67 LAT DB/WB ( °F): 57.5/57.2 Refrigerant: R -410a Rows: 4 No. of Circuits: 1 Volts: 460 Phase: 3 FLA: 2.1 Starter By: Manufacturer Disconnect By: Division 16 Remarks: 1 - Unit Model Number Refers to AAON ADD "GRV- 70 -01" to the Gravity Roof Ventilation schedule as follows: Location: Digester Gas Building Service: FCU -70 -01 Greenheck Model No.: GRSR -20 Airflow (CFM): 2,000 Static Pressure (in. W.C.): 0.097 Throat Velocity (FPM): 889 Throat Area (SQ. FT): 2.25 Overall Height (in.): 13 Initials \S.AA -1ADA1100-- 1199VI 154V023VWrdyCost Proposal Requests \CPR30.VFD or Gas- Conditioning Blower.docx STRAND ASSOCIATES, INC. E N E r. 9 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 9 April 1, 2011 Drawing 99 -H6.03 (Sheet 385) ADD "L- 70 -01" to the Louver schedule as follows: Digester Gas Building FCU -70 -01 ESD -635 2,000 40 24 6 0.059 627 3.19 Insect Inside 652.50 Location: Service: Greenheck Model No.: Airflow (CFM): Width (in.): Height (in.): Blade Depth (in.): Max. APD (in. WG): Max. Face Vel. (FPM): Free Area (SQ. F1'.): Screen Type: Screen Location: Top Elevation: Drawing 99 -E6.17 (Sheet 416) ADD circuit breaker "ACCU -70 -01 Equipment Number: First Line of Label: Second Line of Label: Equipment Location: Panel MCC: HP /kW: Volts: F.L.I in Amps: RPM: Size: Type: Breaker Type: Breaker Amps: Control Device: C & I Description: C & I Furnished By: C & I Wired By: Conduit and Wire: BREAKER" to the MCC schedule as follows: ACCU -70 -01 BREAKER MCC ROOM CONDENSING UNIT ROOF ABOVE MCC RM 7004 MCC -70 480 12 A 20 3—#12, 3/4 "C. Initials \S:AMADA1100-- 1199A1154 \023 \WrdVCost Proposal RequestsVCPR30.VFD [or Gas Conditioning Blower.docx STRAND ASSOCIATES, INC,' E G ri E F4 12e Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 10 April 1, 2011 ADD circuit breaker "FCU -70 -01 BREAKER" to the MCC schedule as follows: Equipment Number: FCU -70 -01 BREAKER First Line of Label: MCC ROOM Second Line of Label: FAN COIL UNIT Equipment Location: MCC RM 7004 Panel MCC: MCC -70 HP/kW: - Volts: 480 F.L.I in Amps: 2.1 RPM: Size: - Type: Breaker Type: A Breaker Amps: 15 Control Device: C & I Description: - C & I Furnished By: C &I Wired By: Conduit and Wire: 3—#12, 3/4 "C. Drawing 99 -E6.18 (Sheet 417) ADD one 0.5 space factor circuit breaker bucket in the space at the right end of MCC -70 for ACCU- 70 -01. ADD one 0.5 space factor circuit breaker bucket in the space at the right end of MCC -70 for FCU- 70 -01. Specification Section 15855 - Air Handling Units ADD 2.O1.H as follows: 1. Provide AAON model H3 fan coil unit. Unit shall be certified in accordance with UL Standard 1995, Safety Standard for Heating and Cooling Equipment. Unit and refrigeration system shall comply with ASHRAE 15, Safety Standard for Mechanical Refrigeration. Unit shall include filters, supply fans, DX evaporator coil, and mixing box. Unit shall have a draw - through supply fan configuration and horizontal discharge. Unit shall be factory assembled and tested including leak testing of the coils and run testing of the supply fans and factory wired electrical system. Unit components shall be labeled, including pipe stub outs, refrigeration system components and electrical and controls components. Electrical Initials \SAMIDA7100 — 1199AI154V023AWrdVCost Proposal RequestsVCPR.30_VFD for Gas Conditioning Blower.docx STRAND ASSOCIATES, ING EiI I SI E L2e Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 11 April 1, 2011 components shall be labeled on the control compartment back -panel and not on the device or wire -way. 2. All cabinet walls and access doors shall be fabricated of G90 galvanized double wall, impact resistant, rigid polyurethane foam panels. Unit insulation shall have an R -value of 6.25, and a density of 2 pounds /cubic foot and shall be tested in accordance with ASTM D -1929. Unit shall have hinged access doors with stainless steel hinges. Unit shall include top- mounted threaded steel retainers to allow horizontal installation. 3. Unit shall include a 304 stainless steel sloped drain pan. Coil shall be designed for use with R -410A refrigerant and constructed of copper tubes with aluminum fins mechanically bonded to the tubes and galvanized steel end casings. Coil shall have 4 rows and 10 fins per inch. Coil shall be helium leak tested. Coil shall be furnished with a factory installed thermostatic expansion valves with sensing bulb field installed on the suction line immediately outside the cabinet. Liquid and suction connections shall be sweat connection. 4. Unit shall include direct drive supply fans, with variable frequency drive. Drive shall be factory wired and mounted in the control compartment. Fan motor shall be premium efficiency with 200,000 hour bearings. Blower and motor assembly shall be dynamically balanced and mounted on rubber isolators. Unit shall include 2 inch thick, pleated panel pre filters with an ASHRAE efficiency of 30% and MERV rating of 7. 5. Unit shall contain a mixing box with top return air opening and front outside air opening. Return air opening shall contain an adjustable, motor operated outside air damper assembly constructed of extruded aluminum, hollow core, airfoil blades with rubber edge seals and aluminum end seals. Damper blades shall be gear driven. Damper shall be controlled by a fully modulating actuator. Outside air opening shall contain an adjustable, motor operated outside air damper assembly constructed of extruded aluminum, hollow core, airfoil blades with rubber edge seals and aluminum end seals. Damper blades shall be gear driven. Damper shall be controlled by a fully modulating actuator. Damper actuator shall be powered from the unit and shall accept a 0 -10 VDC or 4 -20 mA control signal from the wall mounted programmable controller. 6. The unit shall be provided with standard power block for connecting power to the unit. Unit shall include a factory installed 24 VAC control circuit transformer. Control power transformer shall be extra capacity as required to power the relief air damper, mixing box modulating damper, programmable controller, and all other unit controls. All power and control wiring shall be factory pre -wired to terminal blocks as required to terminate field wiring. Unit shall be wired for a 480 volt single point power connection. Disconnect shall be provided by Division 16. loitials \S.A IADV1100-- 1199A1 I54V023AWr!Cost Proposal RequestsVCPR.30.VFD for Gas Conditioning Blower_docx ST RAN ASSOCIATES, INC. S hl G r r-1 = E R s Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 12 April 1, 2011 Specification Section 15980 - TC& I - Structure 70 MCC FCU Thermostat E12e1 ADD 2.25 as follows: A. Thermostat shall be a low voltage Viconics VT7600 series, or equal thermostat provided by the Temperature Controls Contractor. Thermostat shall have two digital inputs, a SPST auxiliary switch, three remote sensor inputs, and shall have the ability to economize from a dry bulb only input. Specification Section 15980 - TC & I - Sequence of Operations, Structure 70 MCC FCU ADD 3.02.P as follows: 1. Supply fan shall run continuously unless shut down on safeties. Relief air damper and outside air damper shall be closed. ACCU -70 -01 shall operate anytime the space temperature is above the room temperature setpoint as dictated by the thermostat. 2. The unit controller shall allow for a fully modulating dry bulb only economizer mode. In economizer mode, the outside air damper shall modulate open to allow for mixed air temperature to maintain room temperature setpoint. An end switch on the outside air damper shall signal the relief air damper to open, once the outside air damper switch is 25% open. lmuals\ S:AN ADA1100- 1I99A1154V023VAVrdACost Proposal Requests VCPR.30.VFD for Gas Conditioning Blower.docs STRAPJD ASSOCIATES, INC.' EXCeli. ce CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 12f JOB #:103400 MOD #: 0054 -00 DATED: 6/06/1 1 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with digester wall opening rebar, per Cost Proposal Request #032 dated 4/8/11. REQUESTED BY: Strand Associates Inc DATE: 4/08/11 SUBCONTRACTOR AMOUNT Ambassador Steel Corp $510.00 Miron Management Fee 5.00 0 - Subs $25.50 Subtotal $535.50 Performance Bond 1.50 % $8.03 TOTAL AMOUNT OF THIS MODIFICATION: $543.53 CHANGE ORDER AMOUNT REQUESTED: $544.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Shedule Impact t f) " � -1 Miron Representative ± 00/14/1() . ;`I� (Li v e ) Date 6/06/11 ( Jonathan Daniels. Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920/969 -7000 Fax: 9201969 -7399 www.miron-construction.com Owner City of Dubuque Project Dubuque WPCP Project No 103400 Title Cost Proposal Request Documentation Computed by JCD Date 6 -Jun Verified by Date Page 1 of Revision 0 11 1 Modification Quote Number: 054 -00 Description of Modification: CPR -032 Items included in this proposal: 032 -01 Item 032 -01 Ambassador /Interstate 1.0 Revise Reinforcing per CPR 032 Contract Times 1.0 No Change Material Labor $ $ 510.00 $ $ * ** Note: None Subtotal: $ - $ 510.00 Miron Markup @ 5 % $ - $ 25.50 Bond & Insurance @ 1.5 %: $ 8.03 TOTAL - CPR 032 -00: $ 543.53 12d, 12e Owner City of Dubuque Computed by JCD Project Dubuque WPCP Date 21- Jul -11 Project No 103400 Verified by Title Cost Pro osal Re uest Documentation Date Page 1 of 1 Revision 0 Modification Quote Number: 051 -00 Description of Modification: CPR 030 Items included in this proposal: 030 -01, 030 -02, 030 -03 Items 030 -01, 030 -02, 030 -03 Breuer 1.0 Add A -2 Lintel over door 7004A 2.0 Direct Markup Miron Ahern Monona Omni Faith SCR 1.0 Equipment Pad (1 Carp, 1 Lab, 1 Fin 2 Hours) 2.0 Cut Opening in Precast (1 Ironworker 1 Day) 3.0 Direct Markup 1.0 See Attached Quote 1.0 Extend Masonry Walls 1.0 Additional Painting 1.0 See Attached Quote 1.0 Add bona! Roof Penetration Contract Times 1.0 No Change Note: Please see attached quotes and clarifications Material Labor 436.0 72624- X030 -03 15.00 $ 174.34 [030 -03 k s 3o,13L000) 1030 -01 s 214.00 $ 706.00) 1030 -01 iuo.00 g�� 350 00, —30775+35- 5:; 05- 1030 $7,--;;;,-._ 50,00 $ 250.00.,, Subtotal: $ ""uru >2W0 -___,..____,:�.rpww2- u••._• Markup @5 %: 5 Bond & Insurance @ 1.5%; $ —014:91- TOTAL - CPR 030 -00: $ 5 S3 °7 -19— ;030 -01 ;;Subtotal: $14,212.78 Markup @ 5 %: $679.82 ;Bond & Insurance @1.5 %: $223.39 ;Total Item 030 -01: $15,115.99 :030 -03 ;Subtotal: $35,110.34 ;Markup @ 5%: $1,687.37 `Bond & Insurance @1.5 %: $551.97 Total Item 030-03: $37,349.67 No. 032 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 April 8, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. At all four digesters, provide wall reinforcing around the 36 -inch manway openings per the attached drawings instead of the reinforcing shown on Add'l Wall Reinf. @ 36" Dia Manway Opening detail A /70- ASM5.02 (Sheet 161). At all four digesters, provide wall reinforcing around the draft tube openings per the attached drawings instead of the reinforcing shown on Reinforcement at Concrete Openings detail C/99- AS5.01 (Sheet 364). Contractor shall cut the 8A52 bars shown on Miron Submittal No. 258-1 (Ambassador Drawings Nos. R -1.4 and R -1.5). These bars shall be cut in half and used in accordance with the attached drawings. Initials \S:A.ALADAI 100-- 1199VI154V023AWrdACost Proposal RequestsVCPR32.Dieester Wall 36 -inch Openin,1 Rebardocs STRAND ASSOCIATES, INC. E hl G f f -1 E E S ENGINEERS SHEET OF "2- PROJECT P - e 70 BY DATE - 0 — f JOB NO. 1154 3 6 ADD‘1,_ TZEI.."/F, p-Ra 4 A ct-I F,tCAT s 62, C. :I .1.• I ?e',v-r- p mAY 74 f-f "f; 1 , "P'Rout (>61' f f c AF AT" ef.4.6:4,141, ef4-1, F 42J 4V 7, a:EYNAL, 1/6•W-cf CAL Tka-(AfF, /14 „tit,t, A.V" pt--16--,t/tAY65 e& Aiv &,111; Ativi) PTA &412-3-6, (TV? teRe. 'F 16, -sc,,PE.-:,iitr6.2f.'), /47,ff,f-,f1 y 5 6:31,6 v r> FI-eArr A--T 4_ /IA A Av ?a 134 1— A/ 70 6 g ASSOCIATES,IN1C eNGINEERS' SHEET 2.- OF PROJECT - BY DATE JOB NO 2 5 -o AT PI 6-1.,--TE-VAS , 3'2 PI g 3 / \ ADD, IT I °AMC- t A (7 434,1,4 L v ;IL q -/A63-, (Tr? 3& /AV -4Y /Y RAF I tt e C-Ail/t) S I/ I 1,5-1`0 AT. 3 2 APV' L RE-1,4,1", P t V? 62 A H I , I VF- -dc AT P.E.-,s IL-12 wl I /l) • E' TZ, «r 1-plc.Ac. F (A T1, F,Suilding CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 112f JOB 4:103400 MOD a: 0054 -00 DATED: 6 /06 /11 FAX: 608 -251 -8655 PHONE: 608- 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with digester wall opening rebar, per Cost Proposal Request #032 dated 4/8/11. REQUESTED BY: Strand Associates Inc DATE: 4/08/11 SUBCONTRACTOR AMOUNT Ambassador Steel Corp Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % Subtotal $510.00 $25.50 $535.50 $8.03 TOTAL AMOUNT OF THIS MODIFICATION: $543.53 CHANGE ORDER AMOUNT REQUESTED: $544.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost hedule Impact Mir-on Representative•.... 't.� (0_ 1 {� (I ,� (fi "'�° 1 Date 6/06/11 t Jgnathan Daniels_ Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, 'J911 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920/969 -7000 Fax: 920/969 -7399 www.wiron-construction.com Owner City of Dubuque Project Dubuque WPCP Project No. 103400 Title Cost Proposal Request Documentation Computed by )CD Date 6- Jun -11 Verified by Date Page 1 of 1 Revision 0 Modification Quote Number: 059-00 Description of Modification: CPR -032 Items included in this proposal: 032 -01 Item 032 -01 Material Labor Ambassador /Interstate 1.0 Revise Reinforcing per CPR 032 $ - $ 510.00 Contract Times 1.0 No Change * ** Note: None Subtotal: $ - $ 510.00 Miron Markup © 5010 $ - $ 25.50 Bond & Insurance @ 1.5%: $ 8.03 TOTAL - CPR 032 -00: $ 543.53 Screening Building Vent Piping - dubuquewpcp Page 1 of 1 112gi flocs. Public Places Files Travis Anderson I Help ! Log Out Places Public Places Search in this place ninlifiran Sturrice Excel: =.:_. Go Up RFI (Enter Question) RFIs (Unanswered) '. RFI Log (Completed) Room Index Place Tools Advanced Search Work Oftline You are in: DubuqueWPCP >RFIs >RFI Log (Completed) Screening Building Vent Piping Created By: Dawn M Floriano 04/15/2011 04:13 PM Updated By: Dawn M Floriano 05/05/2011 10:25 AM Check Out and Edit Complete ; More Actions '• Project Name & Number. Dubuque Water Pollution Controls #103400 Miron RFI # 188 Subcontractor RFI 9 N/A Date Created 04/15/2011 Specification /Drawing Reference Sheets 52, 54 Cost Effect Possible Cost Impact RFI Status Status: Incomplete Due Date: 04/19/2011 Priority: Normal Submit RFI To Glenn Tranowski Review Status Assigned To: Dawn M Floriano Who can edit this task? All Members Miron Posted Enter Question The existing vent to remain as shown on note 6 on sheet 54 will be in conflict with new door 10O4A. Please advise how you would like us to proceed. Also on drawing 52 note (I states that floor drains should be removed and patched. What is supposed to happen to the associated piping below the floor? Please advise. Respond No Later Than 0409/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation / Response 1. Remove existing vent in Electrical Control Room 1004 and associated roof vent. Patch all holes to match existing surfaces. Provide credit to delete painting of vent. 2. Piping associated with Floor drains should be removed. Provide PVC caps on removed piping at east wall in Blower Room 1001. Provide credit to delete painting pipes. Additional Cements. Copies to Jobsite; File, JF Ahem, Omni Paint Lotus Quickr Help Home Help Select Time Zone Technical Content Best Practices Wiki Quickr Connectors Connect Lotus Ouickr to the desktop applications that you use everyday. Dwmloud the connectors now Learn More About About Lotus Quickr on item corn http: / /projects.miron- construction. com/ LotusQuickr/ dubuquewpcp /PageLibrary8625770000... 8/4/2011 L xcceilesc9' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 12g JOB #:103400 MOD #: 0064 -00 DATED: 8 /01/11 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost to remove vent in Electrical Control Room 1004 and associated roof vent, floor drain piping to be removed and delete painting of vent and pipes, per the response to RFI #188. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT JF Ahern Company $554.00 Miron Construction Co., Inc $341.96 Omni Glass & Paint Inc ( $177.00) Subtotal $718.96 Miron Management Fee - Subs $20.29 Miron Management Fee 15.00 0 - Miron Work $51.29 Subtotal $790.54 Performance Bond $11.86 TOTAL AMOUNT OF THIS MODIFICATION: $802.40 CHANGE ORDER AMOUNT REQUESTED: $802.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost . / S hdule Impact 1 1 ' , r O i [ I / ^�n�? r j K Miron Representative ). J'onatNaU Daniels \_ i i Owner Representative • . Date 8/01/11 Date Corporate Office P.O. Box 509 Neenah, 991 54957-0509 1471 Mc[vlahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron- construction.corn 12g Owner City of Dubuque Computed by 3CD Project Dubuque WPCP Date 1 Auq 11 Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modification quote Number: 064 -00 Description of Modification: RFI 188 Items included in this proposal: 064-01 Item 064 -01 Ahern Omni Miron 1.0 Demo Piping 1.0 Delete Painting Piping 1,0 Patch Roof Plank 1 Finisher 4 hours 2.0 Direct Markup 15% Contract Times 1.0 No Change pit* Note: None Material Labor $ 554.00 (177.00) 5 25.00 $ 316.96 $ 3.75 $ 47.54 Subtotal $ Niron Markup @ 5% $ Bond & Insurance @ 1.5%: $ TOTAL - Mod 064 -00: $ 405,75 $ 20.29 11.86 802.40 364.50 Existing Foundation Radiator Pad Conflict - dubuquewpcp Ouk:kr Places Page 1 of 2 Public Places I Files Travis Anderson Help Log Out f— 1 Search in this placei14.;1 Public Places inifilipars Bu Ming celkaca Go Up RFI (Enter Question) RFIs (Unanswered) RFI Log (Completed) Room Index Place Tools Advanced Search Work Offline You are in: DubuqueWPCP >RFIs 'RFI Log (Completed) Existing Foundation Radiator Pad Conflict Created By: Dawn M Florian 05/05/2011 07:22 PM Updated By: Dawn M Florian° 05/10/2011 01:08 PM Check Out and Edit I Complete More Actions Project Name & Number. Dubuque Water Pollution Controls #103400 Miron RFI # 216 Subcontractor RFI # N/A Date Created 05/05/2011 Specification/Drawing Reference N/A Cost Effect Possible Cost Impact RFI Status Status: Incomplete Due Date: 05/09/2011 Priority: Normal Submit RFI To Glenn Tranowski Review Status Miron Posted Enter Question Assigned To: Dawn M Floriano Wno can edit this task'? All Members On the South side of Structure 45, there is an existing 13'x13'x4' deep concrete pad that is in conflict with the new radiator foundation. The pad conflicts with 12 of the new West wall, and 12' of the new South wall. Please advise if the pad is to be removed or if the foundation is to be modified. Respond No Later Than 05/09/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation / Response Remove only the portion of the concrete pad that is M conflict with the new radiator foundation 8-inch thick concrete slab. No clear crushed stone is required between the new stab and existing concrete pad. Where new foundation wall conflicts with the existing 13' x 13' x 4' deep concrete pad, connect new wall to existing pad by drilling and dowelling #4 rebar @ 8-inches into the existing concrete pad with minimum 4-inch embedment Alternatively, Contractor may remove portions of the existing concrete pad where it conflicts with the new radiator foundation walls. VVork associated with demolition of the existing concrete pad above and beyond that required for removal of the existing pavement shown on the Contract drawings should be tracked on a time and materials basis with timesheets delivered to the RRIR onsite daily. Additional Coments Copies to: Jobsite; File, Tschiggfrie (11 art,- 1",.Innof nec http ://projects.m iron-construction .com/LotusQuickr/dubuquewpep/PageL ibrary8625770000... 9/7/2011 Building E?e£,`,eaence CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 J03 #:103400 MOD #: 0078 -00 DATED: 7/28/1 1 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with existing foundation radiator pad conflict, per the response to RFI #216. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Tschiggfrie Excavating Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % Subtotal $2,277.50 $113.88 $2,391.38 $35.87 TOTAL AMOUNT OF THIS MODIFICATION: $2,427.25 CHANGE ORDER AMOUNT REQUESTED: $2,427.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost - S{' Miron Representative``. Date 7/28/11 f.TE5- athan D`anie s Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN edule Impact Corporate Office P.O. Box 509 Neenah, WI 54957-0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www. miron -cons truc lion. corn Owner City of Dubuque Computed by ]CD Project Dubuque WPCP Date 28- Jul -11 Project I4o. 103400 Verified by Title Cost Proposal Request Documentation Date Page l of l Revision 0 Modification Quote Number: 078 -00 Description of Modification: RFI -216 Items included in this proposal: Demo of Foundation South of Structure 45 in Conflict with Radiator Foundations Item 009 -01 Tschiwfrie 1.0 Demo Foundation per T &M Tickets Contract Times 1.0 No Change Material labor 2,277.50 * ** Note: None Subtotal: $ - $ 2,277.50 Miron Markup @ 5% $ - $ 113.88 Bond & Insurance @ 1.5 %: $ 35.87 TOTAL - Mod 078 -00: $ 2,427.25 No. 038 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 May 26, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Specification Section 16940 - 3.17 Supervisory Control Center (SCC- 62 -01, UV Disinfection Building) DELETE paragraph G in its entirety. Inia- k \S:AYIADV1100- -1199A 154V023VWrdVCost Proposal RequestsVCPR3S.Delete SCADA Control of UV Gates.doux STRAND ASSOCIATES, INC- it PI - E F-: Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 May 26, 2011 Specification Section 16990 - SCC -62 -01 1/0 Listing DELETE the following UO signals from the SCC -62 -01 UO Listing in their entirety. All wiring for 1/0 listed below shall be removed from the SCC -62 -01 terminal strips to the actuators. Unused wiring shall not remain in the conduits. Wiring between PLC 110 cards and terminal strips shall remain and be labeled as "SPARE." Record drawings and O &M manuals shall be updated accordingly. Digital Outputs UV Channel No. 1 Inlet Gate Call to Open (SG- 60 -01) 2 - #14 Call to Close (SG- 60 -01) 2 - #14 Call to Stop (SG- 60 -01) 2 - #14 UV Channel No. 1 Outlet Gate Call to Open (SG- 60 -04) 2 - #14 Call to Close (SG- 60 -04) 2-#14 Call to Stop (SG- 60 -04) 2 - #14 UV Channel No. 2 Inlet Gate Call to Open (SG- 60 -02) 2-#14 Call to Close (SG- 60 -02) 2-#14 Call to Stop (SG- 60 -02) 2- #14 UV Channel No. 2 Outlet Gate Call to Open (SG- 60 -05) 2 - #14 Call to Close (SG- 60 -05) 2-#14 Call to Stop (SG- 60 -05) 2-#14 nitials \SAMADAt 100 -- 1199V1 I5A023 \WrdVCost Propo,snl RequestsVCPR33.Delete SCADA Control of UV Gtes.docx STRAND ASSOCIATES, INC. Wii iidin xcer esc6 CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB #: [ 03400 MOD #: 0074 -00 DATED: 7/27/1 I FAX: 608 -251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with deleting SCADA control of UV gates, per Cost Proposal Request #38 dated 5/26/11. REQUESTED BY: Strand Associates Inc DATE: 5/26/11 SUBCONTRACTOR AMOUNT Faith Technologies, Inc. Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % Subtotal $368.00 $18.40 $386.40 $5.80 TOTAL AMOUNT OF THIS MODIFICATION: $392.20 CHANGE ORDER AMOUNT REQUESTED: $392.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Schedule Impact ( () \ l ' :' Date 7/27/11 Miron Representative � 6),W t 4' �/� (( �' I�<<, Je tti n Daniels`-' Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, 0/1 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron -cons trL1 ctiOrt. con) Modification Quote Number; 074-00 Description of Modification: CPR-038 Items included in this proposal: 038 -01 Owner City of Dubuq ue Computed by JCD Project Dubuque WPCP Date 27- Jul -11 Project No 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Item 038 -01 Faith Material labor 1.0 Delete SCADA Control of UV Gates $ $ 368.00 Contract Times 1.0 No Change $ $ * ** Note: Please see the qualifications in Faith's attached quote Subtotal: $ Miron Markup @ 5 °J $ Bond & Insurance @ 1.5 %: $ TOTAL - CPR 038 -00: $ 5.80 392.20 368.00 18.40 No. 033 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 May 3, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. Owner may select either item 033 -01 or 033 -02, not both. THIS IS NOT A CHANGE ORDER NOR A LI L ! Y! 11i mO PROCEED CEED WITH THE WORK DESCRIBED HEREIN. Drawing 40- ASM3.01 (Sheet 104) 033 -01 Provide a proposal to construct a drop box around the existing 30 -inch PRE at the aeration tanks at three locations per the attached drawing 40- ASM3.01 dated 4/28/11. Install gates SLG- 40 -01, SLG- 40 -04, and SLG -40 -06 at the location of the existing 30 -inch PRE pipe at the bottom of each drop box. Contractor shall include an itemized credit for the 30 -inch Class III reinforced concrete pipe required by the Contract drawings at three locations adjacent to the new aeration tank boxes. Drawing 40- ASM3.01 (Sheet 104) 033-02' Provide a proposal to construct a cfrop box around- ire existing 3 -iffel PRL at the 1-.. at-t ree _ , n n .,-, 31V13 . A 1 u __. � 1_ Ael'QCl V'il"lallll QC llll Ge 1171,aC1 Vi1J Jt111110.1 iV CllG �cLlial,lle(1 C1I i1W lll�g = FV`I -1J 1V1J.V1 11ALCC1 4/!,1_(7 Di T.e _.F «hat thc_..gatcs- :lt be- ,st.,ll r1 a -a di fferp t 1ocatien 2. rl he.. exit 'x-ug '1 GiS711, l.n1i v:.1Vt teat Lt ll. Y�at�..J VV1ll"`"VG 1110 tu11vU 111 u uit "1 Vt�u� unu"t 30 =incf PRE piipes Wl'1r e ugg d°ai lhe-ex stir - "aclatio is k - w-aPs: Initials \S:AMADV1100-- 1199AI 154V033AAVrdACost Proposal Requests VCPR 33.Aeration Tank.Coeen Rill Door Panic Hardware.doc T RA 12k Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 May 3, 2011 1 �. e�JLIJ =�fl7 U JLl7 -L10=04; l "fCl -Sa 0=B6 t �= `�fO- VLi°di°°°C rl°�"' laic', � `i`iriii�r�3v'v'�ii-�ir`°'rrri, Ciii irc°i�i viii �vetm e`frt —s Pr�c�e� ct cr ii vi iii Av iv °ii 3V Vii DD i ' ipe- s- `v`t"atert- ight-vv`her e" "there iteY -the a-iati fir- tmTs: Pro - vide- 1 -2-fir ir-tl rcit reinfore -ed- ; nmt witiirr4-@e'eat"h-way c-en erect -n of # 4-1� e ' l L O +? d Ul'"Ji`V`+ ClLI e yre d-dVwels- ente ed-in ` igi th 4- irrch-e-nrb d-, -ant -cordrrn-ous- hydrupn•itic watersto -p t a°rourrd R- orrghe -fr- i 'rii g -Contractor s lalf it elude an itemized Cre(r1L f0T-th-e- . 0=th h gs I11 reiTtorced" cenefet"i pi'Ye -ft hreeiv.,a - ie,n- s°auj —aee t-te he,-t e` v ae -- tie r a-nk- b,9,xes- Drawing 75- ASM6.01 (Sheet 224) 033 -03 For door 7510A into the Biogas Co- generation Room , provide Sargent 8813 or equal exit device in accordance with the specifications instead of the specified Group 1 lockset 10G05. [n dials \S:ANIADA1100— 1199V1 I541\023\\Vrd \Cos[ Proposal Reques[s \CPR.33..Aeration Tank.Coaen Rrn Door Punic Hard e.docs o -03 klror `018 3111. 01140141d O3nSS1 E ONV Z' 3 1,70N300v 3O n,JNo SOMME90 3SM1.1 aN OLOtla1NO3 31tl0 A9 DNIMYtla CHOa3 MV8 AS NHO SN1-19 s3a 0 la 11.1V.31,1 viol `anonana anonnnn 3O A119 SN011tl91.001N 1NVid 1O111N09 NO81nl3Odd aa.LVNI. I. •SNOILO S S)INtl1 NOIStla317 Building Excellence . CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 12k,1211 JOB #:103400 MOD #: 0063 -01 DATED: 9/21/11 FAX: 608 - 251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Revised cost associated with changes to aeration tanks PRE and adjustment to door 7510A, per Cost Proposal Request #033 dated 5/3/11. REQUESTED BY: Strand Associates Inc DATE: 5/03/11 AMOUNT SUBCONTRACTOR JF Ahern Company $1,465.00 Ambassador Steel Corp $2,452.95 Doors Inc Davenport $939.04 Interstate Reinforcing Steel $1,300.00 Miron Construction Co., Inc $20,191.00 Tschiggfrie Excavating $6,708.00 gg Subtotal $33,055.99 Miron Management Fee - Subs $473.65 Miron Management Fee 15.00 % - Miron Work $3,028.65 Subtotal $36,558.29 Performance Bond $548.37 TOTAL AMOUNT OF THIS MODIFICATION: $37,106.66 CHANGE ORDER AMOUNT REQUESTED: $37,107.00 Please find back up materials enclosed regarding this modification. Corporate Office P.O. Box 509 Neenah, 'NI 54957 -0509 1471 McMahon Drive Neenah, 491 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron-construction. com 12Ir Owner at of Dubuque Project Dubuque WPCP Project No 103400 Title Cost Pro osal Request Documentation Modification Quote Number: 063-00 Description of Modification: CPR-033-01 Items included in this proposal: 033-01, 033-03, Computed by JCD Date 21-Sep-i1 Verified by Date Page 1 of 1 Revision 0 Item 033-01 Ahern 1.0 See attached quote Miron 1.0 Change in concrete work (2 carp 1 Lab 1 Fin 2.5 days each location) 2.0 Direct Markup Ambassador 1.0 Supply additional concrete reinforcing 2.0 Direct Markup Interstate 1.0 Install additional reinforcing $0.50 per pound (1.3 tons) Material Labor $ 1,465.00 $ $ 2,500.00 $ 17,691.00 375.00 $ 2,653.65 $ 2,133.00 $ 319,95 $ $ 1,300.00 Tschiggfrie 1.0 Excavate, Shore, and Backfill 3 Areas 6,708.00 Contract Times 1.0 No Change Item 033-03 Doors Inc 1.0 Change Lockset 7510A to Exit Device 2.0 Direct Markup Contract Times 1.0 No Change Material Labor 790,00 $ 76.56 111.00 $ 11.48 *** Note: None Subtotal: $ 14,351.95 $ 21,732.69 Miron Markup @ 5% $ 408.65 $ 65,00 Bond & Insurance @ 1.5%: $ 548.37 TOTAL - CPR 033-00: $ 37,106.67 !Item 033-01 !Subtotal: $35,145.60 IMiron Markup. 5%: $473.65 !Bond & Insurance @1.5%: $534.291 !Total: $36,153.54 !Item 033-03 Subtotal: $939.04 Miron Markup (6).; 5°/0: $0 & Insurance (@1.5%; $14.09 Total: $953.13 STRAND ASSOCIATES INC.- ENGINEERS 12m, 12n Work Change Directive Directive No.: 30 Contract: 1 -2010 Owner: City of Dubuque By: GWT Contractor: Miron Construction Co., Inc. Date: 8/31/11 tion of Work Description Cost Deduction Cost Addition Provide work as described in CPR 34 issued on 5/10/11. Provide work as described in CPR 42 issued on 6/29/11. In addition, provide the following changes to HVAC pumps: 1. Change the motor horsepower for HWP -70 -01 through HWP -70 -08 from 3/4 HP to 1 HP. 2. Change the motor horsepower for HWP -75 -01 through 03 motors from 10 HP to 15 HP. 3. Change the impeller size from 8.25 inches to 8.375 inches for HWP - 75-04 & HWP- 75 -05. 4. Change the motor horsepower for P -75 -01 & 02 motors from 7.5 HP to 10 HP. $14,145 $13,880 Total $28,025 Remarks: This Work Change Directive shall result in no change to project duration and is not subject to negotiation. Change in Contract Price by: ❑ Supplemental Unit Price ❑ Unit Price I1 Lump Sum Requested by: Miron Construction 8/31/11 Date by:PA C 8/31/11 Recommended (Engineer) Date Accepted by: (Contractor) Date Approved by (Owner) Date - -THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER,- Initials \S: \MAD \1100 -- 1199 \1154 \023 \Wrd \Work Change Directives \Directive No 30.1iot Water System at Str 70 and Str 80.doc No. 034 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 May 10, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawings 70 -H1.01 and 75 -1-11.14 (Sheets 171 and 248) 034 -01 ADD three butterfly valves and two balancing valves as shown on the attached drawings and described below. Balancing valves shall be a 4 -inch and a 6 -inch flanged Circuit Setter Plus calibrated balancing valve by Bell & Gossett, Models CB -4F and CB-6F, with integral read -out valve ports, memory stop indicator, and position indicator ring. Valve shall be cast iron, 125 psi ANSI flanged, bronze seat, replaceable bronze disc with EPDM seal insert, and stainless steel stem. Design pressure shall be 175 psig at 250 degrees F. Provide pressure gauges, circuit setter balance valve calculator, and fittings to measure flow across each valve. Drawing 99 -H6.07 (Sheet 389) 034 -02 CHANGE HWP -75 -06 and HWP -75 -07 motors from 25 HP to 15 HP. Intl aIsyS:utt; ,1100 -- 1199 +1154VC23' +WrdtCost Proposal RequCStsACJ R.31 VAC: Pumps and Vah•esdosz STRAND ASSOCIATES, INC. Cost Proposal Request No. 034 Water Pollution Control Plant Modifications City o[Dubuque Contract 1'2010 Page 2 May lO'2011 Drawing 99-E6.20 (Sheet 419) 034-03 CHANGE the boiler secondary loop hot water pump Nos. HWP-75-06 and HWP-75- 07 MCC schedule information as follows; Change the Motor Horsepower from "25" to `^15'`, Motor FLI In Amps from ^^34`^ to "21", VFD Circuit Breaker Amps from MAPAI 00-1199'd 15,1 \023 Wrd\Cost Proposal Requests\CPR.34_11VAC Pumps nnd Valves.docx W7Tirfiffigr.,t, STRAK ^C-eoc^reo..�� ; ,m"°"s [ 0acc SA1 01E0E911d umnsm c am z= ucogolaav aamono S01,211M930 35gi-0.1 mum ol.oz Airar MN III. MIII IIIIIE' '■Il MI MIMI VIM 0.I 1=11 liM01 'nnonsoo 3nonana do MHO SHOLLVOMICIOW Iona 107i/M00 NOUM11Od 43.I.VAA 'nrld IN31113SVO H.LON OVAH Nou.snnie oitaotlaimv 11 F0'1°01 / 2 ! • , -5•••;.;\ / I \ • </" , ■1! ! — 2 „ I . 47— / .. 4% ° tt-co ! • 0103 X9F3£' ° ®IS GN101Imam 38aSS0 E 1N`6 Z`@ VIIN3°GCV 3II81110I,0 Asa �a ra ®GSGH1 ,aoi0m1uro0 3<va t9 3NIMAla aNOa3il /. J.O NNO PM'A9 530 vmol'3nonana 3nbfana 30.1930 S1.10111V0931QOLM SNV'Id'10131100 NO'JSI'110■ 83101 3LV S1,1OI51/30 9 - Ntlld JOO1 ISHII :Itlfl§3 9NIo ima 9NISS30da SaflOS L 0919999 090 101901 2.9 CHANGE ORDER REQUEST JOB #:103400 MOD #: 0067 -01 DATED: 8/31/11 TO: Mr Glenn W. Tranowski, P.E. FAX: 608-251-8655 Strand Associates Inc PHONE: 608-251-4843 910 W Wingra Dr Madison WI 53715 12m RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003-7996 DESCRIPTION OF MODIFICATION: Revised cost associated with HVAC pumps and valves, per Cost Proposal Request #034 dated 5/10/11. REQUESTED BY: Strand Associates Inc DATE: 5/10/11 SUBCONTRACTOR AMOUNT JF Ahern Company $13,125.00 Faith Technologies, Inc. $113.14) Omni Glass & Paint Inc $260.70 Subtotal $13,272.56 Miron Management Fee 5.00 % - Subs $663.63 Subtotal $13,936.19 Performance Bond 1.50 % $209.04 TOTAL AMOUNT OF THIS MODIFICATION: $14,145.23 CHANGE ORDER AMOUNT REQUESTED: $14,145.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Sc edule Impact Miron Representative ( f k CLH,Lr Date 8/31/11 ph-4tHan Daniels Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, WI 54957-0509 1471 McMahon Drive Neenah, WI 54956 Building 1-_xcenence Phone: 920/969-7000 Fax: 920/969-7399 wwwinfron-construction.coin c Project Owner City of Dubuque Computed by JCD Project Dubuque WPCP Date 31 Aug 11 Verified by No. 103400 r t� � � ! Title Cost Proposal Request Documentation Date Page loft Revision 0 Modification Quote Number: 067 -01 Description of Modification: CPR -034 Items included in this proposal: 034 -01, 034 -02, 034 -03 Item 034 -01 Ahern Valves *** Nlaterial Labor $ 13,125.00 $ 260.70 $ - $ - 1.0 Add 3 Butterfly Valves and 2 Balancing Omni 1.0 Addition of 5 Valves Contract Times 1.0 No Change Item 034 -02 Ahern Material Labor $ - $ - 1.0 See Attached Breakdown*** Contract Times 1.0 No Change Item 034 -03 Faith 1.0 Change Power Conduit and Wire Contract Tirnes Material Labor $ (45.94) 5 - $ (67.20) $ 1.0 No Change *_t Note: See attached breakdown for Ahern work. and note that motor chanoes are oendino approval of CPR 042 oricino. Subtotal: Miron Markup @ 5% Bond & Insurance @ 1.5 %: TOTAL - CPR 034 -00: $ 13,339.76 $ 666.99 $ 209.04 $ 14,145.23 8 (67.20) $ (3.36) No. 042 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL, REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 June 29, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. 112717 Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Specification Section 16940.3.08.B - Administration Building (Structure 80) Starters CHANGE the VFD in paragraph 1 from a "3 HP normal duty VFD" to a "5HP noiuial duty VFD." Drawing 80 -H1.04 (Sheet 306) Provide a balancing valve as described below. Balancing valve shall be a 2 1/2 -inch flanged Circuit Setter Plus calibrated balancing valve by Bell & Gossett, Model CB -2 1 /2F, with integral read -out valve ports, memory stop indicator, and position indicator ring. Valve shall be cast iron, 125 psi ANSI flanged. Design pressure shall be 175 psig at 250 degrees F. Valve shall have a brass ball with glass and carbon filled TFE seat rings. Provide pressure gauges, circuit setter balance valve calculator, and fittings to measure flow across valve. Install balancing valve in Parts Storage Room 8009 on 2 1/2 -inch HPS feeding WWHP- 80 -01. T RA InitialsASivN -lADVI I00-- 1199V11514V023AAVrdACost Proposal Requests \CPR:Y2.Adrnin Building HV,AC Pumps and Valve.docx 0 u • 0 4-a O C � O ag 99-I-16 M7 (Sheet 389) Electrical a) C o 0 Lo O co r > ❑ O r > ❑ CO r > ❑ CO r > ❑ CO r > ❑ CO r > ❑ O r > ❑ ZO a T 1 ❑ > ❑ > ZZ LL Z Z LL. Z Z LL CO CO ❑ O ❑ CO ❑ CO ❑ CO ❑ CO ❑ CO ❑ o 0 d 0 CL 0 d 0 a. 0 CL 0 a 0 O N o co (0 rte- in r co N. In ,N- co N 0 co O co CO 2 <<7 O r N> N> N u) t6 E co co co co r r r u.. O > O d- O d- O d- O d' O r co *- co r Triple Duty Valve N > N } a) } N > N } N >- N } Discharge Size (in.) CO CO N r N r r N r CO . U N U) CO CO CO N r r N r r r N r r M Total Head (FT. of water) d dd- CO O C N r a) Q- O O — LL r r O O O N N _ co Bet & Gossett Model No. Series 80 3x3x7B Series 80 3x3x7B O T- O N O N X N (I1 0) r Series 60 1 1/2x6 1/4 NRF -33 NRF -36 NRF -36 a) p_, a) C C N C c N _C c N C C N C C Q) C C N C Service HHW Secondary HHW Secondary HHW Tertiary HHW Tertiary O O co c5 1 N 0 O co 6 1 MFLD-80 -01 Unit No. Location p) E-o < CO < P -80 -02 Admin. Building 0 E'a E co 0 6 CO pi P-80-04 Admin. Building P -80 -05 Admin. Building . 0) E a <L C3 O 0 0 CO ± CD E. CD I� a 6 CO 6 0 c CJ ± ng HVAC Pump 1199 VI 154V023 \W :l a.l,i.7ding Exi.-:~-llanc CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 12^n a JOB #:103400 MOD #: 0090 -00 DATED: 71121( t FAX: 608 -251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with changes to Administration Building HVAC valves and pumps, per Cost Proposal Request #042 dated 6/29/11. REQUESTED BY: Strand Associates Inc DATE: 6/29/11 SUBCONTRACTOR AMOUNT JF Ahern Company Faith Technologies, Inc. Wunderlich -Malec Environmental Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $12,499.00 $25.00 $500.00 Subtotal $13,024.00 $651.20 Subtotal $13,675.20 $205.13 $13,880.33 $13,880.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Schedule Impact /' k Miron Representative;, { .Z! t 'E> ri)lr Date 7/12/11 rpoihan Daniels lJ Owner Representative ` Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, 06 54957 -0509 1471 McMahon Drive Neenah, 0» 54955 Phone: 920/969 -7000 Fax: 920/969 -7399 www.miron- construction.corn Modification Quote Number: 090-00 Description of Modification: CPR-042 Items included in this proposal: 042 -01 Item 042 -01 Ahern 1.0 Add Valve and Changes per Submittal 60 -1 Faith/Wunderlich 1.0 Change Size of VFDs (Per Attached Quote) Contract Times 1,0 No Change Owner City of Dubuque Computed by )CD Project Dubuque WPCP Date 12- Jul -11 Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Lumo Sum $ 12,499.00 $ 525.00 "" Note: None Subtotal: $ 13,024.00 Miron Markup @ 5% $ 651.20 Bond & Insurance @ 1.5 %: $ 205.13 TOTAL - CPR 042 -00: $ 13,880.33 No. 035 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 May 17, 2011(rev 5/17/11) Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer 11201 Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 035 -01 Digester Gas Flow Meters Specification Section 16940 -2.09 Gas Flow Meters REPLACE the gas flow meter model manufactured by Fluid Components, Inc. from "Model ST98" to "Model ST100." ADD the following paragraph: "G. The gas flow meter shall have a 2 -year extended warranty. The warranty shall include all associated gas flow meter components including but not limited to, transmitter, packing gland assembly, and flow sensor probe." Drawing 10 -E1.02 (Sheet 67) CLARIFICATION: Install FIT -70 -02 approximately eleven feet west of the downstream shut off valve to avoid conflict with the southwest corner of Stairwell 7003. Initials \S:AMADV1100- -1199\l 154V0133VWrdVCost Proposal Rego ests \CPR35_ lisc Electrical lihcations No.Irevlalms STRAND ASSOCIATES. INC. Erl :ri EEr Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 May 17, 2011 035 -02 Rotary Lobe Pumps in Digester Building Basement - Intrinsic Safety Barriers Specification Section 16940 -3.18 Supervisory Control Center SCC -70 -01 ADD the following text to the end of paragraph T: "Intrinsic safety barriers shall be provided for motor winding theiuiostats for pumps DSLTP -70 -01 thru 04 and CENTP -70 -01 and 02." Drawing 99 -E6.16 (Sheet 415) CLARIFICATION: The motor winding thermostat wiring for DSLTP -70 -01 thru 04 and CENTP -70 -01 and 02 shall be circuited through intrinsic safety barriers in SCC - 70-01. 035 -03 Sodium Hypochlorite Feed Pumps - I/O Wiring Specification Section 16990 - SCC -45 -01 I/O Listing Based on the chemical feed pump shop drawing submittal, the following I/O should be deleted from SCC- 45 -01: Digital Inputs Sodium Hypochlorite Feed Pump No. 1 (SHP- 45 -01) In Auto 2 — #14 Sodium Hypochlorite Feed Pump No. 2 (SHP- 45 -02) In Auto 2 — #14 035 -04 Grit Washer Hatch Limit Switches Drawing 10 -E1.02 (Sheet 67) CLARIFICATION: The Grit Washer hatch limit switches (ZS -10 -05 and ZS- 10 -06) shall be mounted at the hatch on top of the grit washing chambers. 035 -05 HVAC Modifications - Split Systems Drawing 20 -E1.02 (Sheet 83) ADD a two -pole disconnect switch in MCC Room 2003 for the split system (SS -20- 01) indoor fan unit for power wiring from the outdoor condensing unit. Initials \S:0AtADVI 100 - -1 I99Al t54 \023AWrdVCost Proposal Requests VCPR 35.NIisc Electrical iotli0cations No3.rzcl_docx ASSOCIATES, ENC. - 120 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 3 May 17, 2011 Drawing 70 -E1.03 (Sheet 177) CHANGE the two -pole disconnect switch in MCC Room 7004 for the split system (SS- 70 -01) indoor fan unit for power wiring from the outdoor condensing unit to a 15 amp 2 -pole circuit breaker type disconnect. Drawing 70 -E1.O5 (Sheet 179) REPLACE Key Note No. 13 with the following: "Provide 2 - #12, 2-#14, and #12 ground conductors in 3/4" conduit for power and control wiring from outdoor split system condensing unit to indoor fan unit. Provide a 15 amp, 2 -pole, circuit breaker type disconnect in MCC Room 7004 to disconnect power to indoor fan unit." 035 -06 Administration Building Uninterruptable Power Supply Drawing 80 -E1.O1 (Sheet 308) CHANGE the circuit breaker type disconnect south of UPS -80 -01 in Part Storage Room 8001 from a "60 amp, three - pole" circuit breaker type disconnect to a "110 amp, three - pole" circuit breaker type disconnect. Drawing 99 -E6.O2 (Sheet 401) CHANGE the circuit breaker in DP -80 -01 powering UPS -80 -01 from a "60 amp, three - pole" circuit breaker to a "125 amp, three- pole" circuit breaker. CHANGE the circuit breaker type disconnect between UPS -80 -01 and LP -80 -02 from a "60 amp, three -pole" circuit breaker type disconnect to a "110 amp, three- pole" circuit breaker type disconnect. CHANGE the conductors and conduit between DP -80 -01 and UPS -80 -01 from "4 - #4, 1 - #10 GND, 1 1 /4 "C." to "4- #1, 1- #6 GND, 1 1 /2 "C." CHANGE the conductors and conduit between UPS -80 -01 and the UPS -80 -01 circuit breaker type disconnect, and between the UPS -80 -01 circuit breaker type disconnect and LP -80 -02 from "4 - #4, 1-#10 GND, 1 1 /4 "C." to "4- #2, 1 - #6 GND, 1 1 /4 "C." Initials \S:AMADA1100-1199\1154 \023\Wrd\C Proposal Requests VCPR. 5 Mac Electrical Y1odi6cationss No.2.revLdoc.e STRAND SSOCIATES. INC. O Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 4 May 17, 2011 Drawing 99 -E6.24 (Sheet 423) CHANGE the main circuit breaker in lighting panel LP -80 -02 from "60A M.C.B" to "100A M.C.B." 035 -07 Septage/Hauled Water Receiving Station Electrical Modifications Drawing 92- PH1.01 (Sheet 350) MOVE the three north most instantaneous gas fired water heaters WH- 92 -01, WH- 92-02, and WH -92 -03 south on the west wall of Mechanical Room 9202 and mount directly above the south most water heaters WH- 92 -04, WH- 92 -05, and WH- 92 -06. Drawing 92 -E1.01 (Sheet 351) MOVE the fixed power connection for WH- 92 -01, lighting panel LP -92 -01 circuit 12, from the south wall in Mechanical Room 9202 to the south side of the west wall in Mechanical Room 9202. ADD five fixed power connections at the south side of the west wall in Mechanical Room 9202 powered from lighting panel LP -92 -01 circuit 12 for instantaneous gas fired water heaters WH- 92 -02, WH- 92 -03, WH- 92 -04, WH- 92 -05, and WH- 92 -06. CLARIFICATION: The instantaneous gas fired water heater manufacturer furnished remote controller shall be mounted on the west wall of Mechanical Room 9202; directly north of the water heaters. ADD 314 -inch conduit from the wall mounted instantaneous gas fired water heater remote controller on the west wall of Mechanical Room 9202 to water heater WH -92- 01, from WH -92 -01 to WH- 92 -02, from WH -92 -02 to WH- 92 -03, from WH -92 -03 to WH- 92 -04, from WH -92 -04 to WH- 92 -05, and from WH -92 -05 to WH- 92 -06, for the manufacturer furnished remote control cords. MOVE the Septage Equipment Control Panel (MCP- 92 -01), the equipment pad, and the associated data/phone jack north on the west wall in Mechanical Room 9202 such that the north side of the control panel is located 30- inches south of the north wall in Mechanical Room 9202. Initials \S:AMADAl 100-- 1199\I 154\033 AWrdACos[ Proposal Requests VCPR35.N1ise Electrical ,biodificutions No3.revl_ does ASSOCIATES, INC. 11201 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 5 May 17, 2011 MOVE the Data/Phone Communications Cabinet on the north wall of Mechanical Room 9202 and the two duplex receptacles on each side of the cabinet two feet to the east. Drawing 99 -E6.20 (Sheet 419) CHANGE the label for the 20 amp single pole circuit breaker in the LP -92 -01 panel schedule for circuit number 12 from "WH- 92 -01" to "WH -92- 01/02/03/04/05/06." CHANGE the VA listed for the 20 amp single pole circuit breaker in the LP -92 -01 panel schedule for circuit number 12 from "400" to "850." 035 -08 Rotary Drum Thickener Safety Switch Drawing 75 -E1.11 (Sheet 260) CLARIFICATION: Safety switch HS -75 -01 for RDTD- 75- 01/RTDBP -75 -01 /RTDF- 75-01 shall be changed to HS -75 -08 and safety switch HS -75 -02 for RDTD -75- 02 /RTDBP -75 -02 /RTDF -75 -02 shall be changed to HS- 75 -09. ADD safety switch HS -75 -10 for RDTD -75 -01 /RTDBP -75 -01 /RTDF -75 -01 and add safety switch HS -75 -11 for RDTD -75 -02 /RTDBP -75 -02 /RTDF- 75 -02. Each new safety switch shall be added at the same location as the existing safety switch, but on the east side of the unit. Safety switch shall be provided by Division 11 equipment manufacturer and installed by Division 16. ADD wiring associated with safety switch HS -75 -08 and HS -75 -10 such that safety switches are wired in series at the unit, but wired to MCC -75B with 2 -14 AWG. ADD wiring associated with safety switch HS -75 -09 and HS -75 -11 such that safety switches are wired in series at the unit, but wired to MCC -75B with 2 -14 AWG. Drawing 99 -E6.20 (Sheet 419) CHANGE controls and interlocks "HS- 75 -08" to "HS- 75- 08/HS- 75 -10" for RDTD- 75-01 /RTDBP -75 -01 /RTDF- 75 -01. CHANGE controls and interlocks "HS- 75 -09" to "HS- 75- 09/HS- 75 -11" for RDTD- 75-02 /RTDBP -75 -02 /RTDF- 75 -02. Inmah\S:LV-IUDAt 100-1 1991115-E 023 \WEI\Cost Proposal Rego esisVCPR.35.ildise Electrical Modifications No.2.rec1 docx STRAND ASSOCIATE.--S, pJ G f• E E P 120 Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 6 May 17, 2011 035 -09 Rotary Drum Thickener Electrical Modifications Drawing 99 -E6.20 (Sheet 419) CHANGE the motor starter type from "ND /VFD" to "HD/VFD" and motor horsepower from "5" to "3" for RDTD -75 -01 and RDTD- 75 -02. Also change motor full load amps from "7.6" to "3.8 ". CLARIFICATION: Controls and interlocks label "SV- 70 -01" shall be changed to "SV- 75 -01" and "SV- 70 -02" shall be changed to "SV- 75 -02" for RDTBP -75 -01 and RDTBP -75 -02 respectively. CHANGE conduit and wire for RDTD- 75 -01, RDTF- 75 -01, RDTD- 75 -02, and RDTF -75 -02 from 6- #14, 3- #12, 3/4" C to 6- #14, 3/4" C and 3 - #12, 3/4" C. 035 -10 Boiler Room Entrance E -Stop Drawing 75 -E1.04 (Sheet 253) ADD a control station with an E -stop pushbutton (HS- 75 -12) on the west side of door 7518D in Passageway 7524 for shutdown of the boiler (BLR- 75 -01) when the E- stop is engaged. E -stop pushbutton shall be momentary type. Provide 2 - #14 in 3/4- inch conduit from the control station to the control panel on the boiler. ADD a control station with an E -stop (HS- 75 -13) pushbutton on the north side of door 7518A in Boiler Room 7518 for shutdown of the boiler (BLR- 75 -01) when the E -stop is engaged. E -stop pushbutton shall be momentary type. Provide 2- #14 in 3/4- inch conduit from the control station to the control panel on the boiler. Specification Section 16990 - SCC -75 -01 I/O Listing: ADD the following 110 to SCC- 75 -01: SCC EQUIPMENT NAME NUMBER HS -75 -12 HS -75 -13 DI 1 DO 0 Al 0 A01 0 WIRE ENET COMMENTS FROM BOILER CONTROL PANEL IN RM 7518 75 -01 BOILER ROOM ENTRANCE E -STOP ENGAGED Initials \S:WI;ADVI 100-1 199 11 154V023AWrdVCost Proposal RequestsVCPR 35.MIsc Electrical Modifications :vlo2.revldoct STRAND ASSOCIATES, INC." __ r a E E Fri s Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 7 May 17, 2011 035 -11 Generator Engine Jacket Heater Circuit Breakers Drawing 99A -E6.01 (Sheet 426) CHANGE the circuit breakers in MCC -45A serving EJH -45 -01 and EJH -45 -02 from "20 amp three - pole" to "35 amp two - pole ". Conduit and wire shall be "2- #8 in 3/4- inch C." Initials \S:A I ALE 100 - -I I99 I 1 54V023 \\Vrd \Cost Proposal Requests VCPR 35Mist Electrical ;Modifications No.2-reVl.docx ASSOCIATES, INC. =_rlc r1 =Er :-, clog A'IP1C C_I S °a8S a111 Os E1Onid aansm amv Z`6 VaN3aan acPfoN9 SONEMVLia 353111 Idva .Aa NrYJ M17U9 SO OIOZ 1iaaveiva ma!'3nOnanQ 3nonana sO A110 SNOI1V0y101O1N 1NVSd iOtl1NO3 NO1111i1Od M31.1 SOI1VIN31I3S ONV NVld 3VAF1 aNV ON18W0111d NOI.LVIS ONIAI30321 31SVM a3,P1VH /3`.JV1d3S 3 7 I TPEOTE:111:1Illifild k alin4Tg CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB #:103400 MOD #: 0069 -01 DATED: 8/31/11 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 Revised cost associated with miscellaneous electrical per Cost Proposal Request #035 dated 5/17/11. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR JF Ahern Company Faith Technologies, Inc. Wunderlich -Malec Environmental Miron Management Performance Bond TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Please find back up materials enclosed Fee - Subs modifications, Subtotal Subtotal regarding this Contractor is (not) to proceed with the work as noted with the Owner is adjusted as follows: Approved Cost y Miron Representative; Joria Owner Representative DATE: 5/17/11 AMOUNT $899.00 $17,652.96 $8,631.00 $27,182.96 $1,359.15 $28,542.11 $428.13 $28,970.24 $28,970.00 modification. above. The contract chedule Impact THIS PRICE IS VALID FOR Date 8/31/11 Date 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron- construction.com 'Or - Building CHANGE ORDER ORDER REQUEST Mr Glenn W. Tranowski, P.E. Page# 2 Copy: File / dmf Jobsite Buiffelin; 71r C c JOB #:103400 MOD #: 0069 -01 DATED: 8/31/11 Corporate Office P.O. Box 509 Neenah, WI 54957-0500 1471 McMahon Drive Neenah, WI 54956 Phone: 920/969-7000 Fax: 920/969-7399 www.ipiron-construction,C0111 Owner City of Dubuque Computed by JCD Project Dubuque WPCP Date 31 -Auq- Project No 103400 Verified by Title Cost Pro osal Re nest Documentation Date Page l of l Revision 0 Modification Quote Number: 069 -01 Description of Modification CPR -035 Items included in this proposal: 035 -01, 035 -02, 035 -03, 035 -04, 035 -05, 035-06, 035 -07, 035 -08, 035 -09, 035 -10, 035 -11 Item 035-01 Ahern 1.0 Digester Gas Flow Meters * ** Contract Times 1.0 No Change Material $ 899.00 $ $ Labor Item 035-02 Faith 1.0 Rotary Lobe Pump in Digester Building Basement - Intrinsic Safety Barriers Contract Times 1.0 No Change $ Material Labor Item 035 -03 Material Faith 1.0 Sodium Hypochlorite Feed Pumps 1/0 Wiring Contract Times 1.0 No Change $ Laof Item 035 -04 Faith 1.0 Grit Washer Hatch Limit Switches Contract Times 1,0 No Change Item 035 -05 Faith Material Labor $ 1.0 HVAC Modifications Split Systems Contract Times 1.0 No Change Material Labor $ 98.59 $ 245.50 Item 035 -06 Faith 1,0 Administration Building UPS Contract Times 1.0 No Change Item 035 -07 Material Labor $ 521.14 $ 514.40 Material Ahern 1.0 Septage /Hauled Water Receiving Station Electrical Modifications *'* Faith Labor Owner City of Dubuque Computed by JCD 1-Aug- Project Dubuque WPCP Date 311 Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page l of Revision 0 1.0 Septage /Hauled Water Receiving Station Electrical Modifications * ** $ 448.57 $ 3,693.5 Contract Times 1.0 No Change $ - $ Item 035 -08 1.0 Rotary Drum Thickener Safety Switch Contract Times 1.0 No Change Material Labor 588.12 $ 2,501,40 Item 035 -09 Material Labor Faith 1.0 Rotary Drum Thickener Electrical Modifications Contract Times 1.0 No Change $ - $ Item 035 -10 Material Labor Faith 1.0 Boiler Room Entrance E Stop $ 218.17 $ 1,110.40 Contract Times 1.0 No Change $ - $ Item 035 -11 Faith 1.0 Generator Engine Jacket Heater Circuit Breakers Contract Times 1.0 No Change $ Material Labor 71.72 $ 108.00 Item 035 Faith 1.0 CPR 035 Costs In addition to items noted above Foreman Labor Distribution of Materials Intergrator (Wunderlich) Faith Direct Markup 15% Faith Markup 5% $ $ $ 2,800.00 8,631.00 704.44 431.55 $ 2,043.10 1,604.40 * ** Note: Please see attached quote for auafifications and drawinas received. Also note that Ahern's quote includes items 1 and 7. Subtotal: $ 15,362.25 Miron Markup @ 5% $ 768.11 Bond & Insurance @ 1.5 %: $ 428.13 TOTAL - CPR 035 -00: $ 28,970.24 11,820.71 591.04 No. 036 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 May 20, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. V23 Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawings 99- AS5.03 (Sheets 366) Provide a proposal to install Door Jambs on new exterior doors to be installed as part of the Contract per attached detail. Doors already installed to date by Contractor do not need to be retrofitted to comply with this detail. Initials \SAMADV1100-1199 \I 154\ 023 \Wrd \Cost Proposal Requests \CPR.36.Exterior Door Jarnb.docx STRAND ASSOCIATES, INC. ErIE Ir. STRAND ASSOCIATES, INC. E N S I N E E R S•: PROJECT Dubuque WPCP Modifications BY SGH 1 12p 1 SHEET OF DATE 5/20/11 JOB NO. 1154.023 Building s`lding "; ce llesr;& CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB #:103400 MOD #:0071 -00 DATED: 8/24/11 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 ata Cost associated with door jamb detail, per Cost Proposal Request #036 dated 5/20/11. REQUESTED BY: Strand Associates Inc DATE: 5/20/11 AMOUNT SUBCONTRACTOR Monona Masonry Inc Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: $1,627.00 $81.35 Subtotal $1,708.35 $25.63 $1,733.98 CHANGE ORDER AMOUNT REQUESTED: $1,734.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Srl edule Impact Jo57atBad Miron Representative Owner Representative THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Date 8/24/11 Date Corporate Office P.O. Box 509 Neenah, 011 54957 -0509 1471 McMahon Drive Neenah, VVI 54956 Phone: 9201969 -7000 Fax: 920/969-7399 www.rniron-construction . cor Modification Quote Number: 071 -00 Description of Modification: CPR -036 Items included in this proposal: 036-01 Item 036 -01 Monona 1.0 Change Dccr Detail Contract Times 1.0 No Change . ** Note: None Owner Cit of Dubu ue Computed by ]CD Project Dubu ue VdPCP Date 24- Au.-11 Project No, 103400 Verified by Title Cost Proposal Request Documentation Date Page 1of1 Revision 0 Material Labor 39.00 $ 1,588.00 Subtotal: $ 39.00 $ Miron Markup @ 5% $ 1.95 $ bond &Insurance @ 1.5 %: $ 25.63 TOTAL - CPR 03G -00: $ 1,733.98 1,583.00 79.40 2p No. 040 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 June 22, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Please provide a breakdown for changing WH -35 -01 from an instantaneous gas type water heater to an electric point of use. The scope is as follows: 1. Delete the proposed gas instantaneous water heater WH -35- and provide a credit. 2. Add a AO Smith EJC -2 electric point of use water heater and locate it below the lavatory in the Excess Flow Drainage Pump Station. 3. Relocate the GFI receptacle in Unisex Toilet RM 3504 to be below the bathroom sink. This receptacle shall be used to power the new electric instantaneous water heater. 4. The receptacle for WH -35 -01 located in the hallway shall remain as is and used as a general convenience receptacle. 5. Delete the gas service piping, valves, and appurtenances to the gas instantaneous water heater and provide credit. 6. Delete the instantaneous gas vent piping and provide credit. 7. Delete the hot and cold water piping to the gas instantaneous water heater and provide credit. Initials1S:AM1AD \1100 - 1199A1134 \023 \Wrd \Cost Proposal Requests ACPR.40.AH -33 -01 changes.docx 1 2q CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 12q JOB #:103400 MOD 6: 0088 -00 DATED: 8/24/11 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Credit associated with the water heater at Structure 35, per Cost Proposal Request #040 dated 6/22/11. REQUESTED BY: Strand Associates Inc DATE: 6/22/11 SUBCONTRACTOR AMOUNT JF Ahern Company Faith Technologies, Inc. ( $1,236.00) $.00 Subtotal ( $1,236.00) Performance Bond ( $18.54) TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: ( $1,254.54) ( $1,255.00) Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost ;(s chedule Impact Miron Representatives -.om; ; � �1 Y�,�i ���;�... � � ,. `�`� -�; Date 8/24/11 aont"han Danie1st -- Owner Representative 'f Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, 01 54957 -0509 1471 McMahon Drive Neenah, VVI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron- construction. corn 1 Owner City of Dubuque Project Dubu ue WPCP Project No. 103400 Title Cost Proposal Request Documentation Modification Quote Number: 088 -00 Description of Modification: CPR -040 Items included in this proposal: 040 -01 Computed by 3CD Date Z4 Auq-11 Verified by Date Page i of l Revision 0 Item 040 -01 Ahem 1.0 Change water heaters from as to instantaneous. Faith 1.0 Charge water heater receptacles. Contract Times 1.0 No Change Material Labor $ (1,236.00) s * ** Note: None Subtotal: $ (1,236.00) $ Bond & Insurance @ 1.5%: $ (18.54) TOTAL - CPR 040 -00: $ (1,254.54) No. 041 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL, REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 June 22, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer [12r Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 80- ASM1.02 (sheet 280) 041 -01 Provide a cost proposal for the following changes in Vestibule 8101 of the Administration Building as shown in the attached drawing CPR 041 -01. • Provide a credit to delete the epoxy terrazzo flooring. e Provide insert entry mat RG- 300 -BF as manufactured by Pawling Corporation. Color of metal shall be Mill Finish aluminum with charcoal inserts. • Provide Heuga entry carpet tile as manufactured by Heuga Home Flooring. Color shall be green. • Locate the bronze manhole cover centered and 1 foot in front of the reception window. Verify bronze manhole cover location with Owner. 041 -02 Provide credit to delete the bronze plaque specified in Section 10441. mitt S ADA1100 1199.1154'.023 rd' Cost Proposal Rtgnrsts',.CPR 41.Administration Building Vestibule.docx STRAND ASE3CDC AT ES, INC.. VAR03 tnonsna y 0 Su-led..7.,:t, )12 ,-,419 rik JO IS ryq v,r hify OulffdngE,svelience— CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB # :103400 MOD #: 0089 -00 DATED: 8/16/11 FAX: 608 - 251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with changes to administration building vestibule, per Cost Proposal Request #41 dated 6/22/11. REQUESTED BY: Strand Associates Inc DATE: 6/22/11 SUBCONTRACTOR AMOUNT Epco Ltd Inc $1,904.40 Hawkeye Flooring Company ( $1,550.00) Hughes Flooring Inc $684.00 Miron Construction Co., Inc $1,479.60 Sign Elements ( $775.00) Subtotal $1,743.00 Miron Management Fee 15.00 % - Miron Work $221.94 Subtotal $1,964.94 $29.47 Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: $1,994.41 $1,994.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative \_...5 (ll .( \J( K....!\ 1f Jb4lathan Daniels Owner Representative \ Schedule Impact r i l Date 8/16/11 Date Corporate Office P.O. Box 509 Neenah, 211 54957 - 0509 1471 McMahen Drive Neenah, '/ /1 54956 Phone: 920/969 -7000 Fax: 920/969 -7399 www.miron- construction com Owner Ci of Dubu ue Project Dub ue WPCP Project No. Title Cost Proposal Request Documentation Computed by JCD Date 16-Auq-11 Verified by Date Page 1of1 Revision 0 Modification Quote Number: 089 -00 Description of Modification: CPR -041 Items included in this proposal: 041-01, 041 -02 Item 041 -01 Hawkeye Hughes EPCO Miron 1.0 Delete Terrazzo Flooring in Vestibule (Lump Sum Quote) 1.0 Install Carpet Tile in Vestibule (Lump Sum Quote) 1.0 Provide Recessed Floor Mat 2.0 Direct Markup 1.0 Install Recessd Floor Mat Net Add ( 2 Carp 1 Day) 2.0 Direct Markup Contract Times 1.0 No Change Material Labor $ (1,550.00) $ 684.00 $ 1,656.00 $ 248.40 $ 250.00 $ 1,229.60 $ 3750 $ 184.44 Item 041 -02 Sign Elements 1.0 Delete Bronze Plaque Contract Times 1.0 No Change Material Labor (715.00) $ (60.00) $ - ,: Note: None Subtotal: $ 610.90 $ Bend & Insurance a 1.5 % : $ 29.47 TOTAL - CPR 041 -00: $ 1,994.41 1,354.04 Goo itract: ` 1 id f •M- CSs ed :0 it ha frpobyG h -ll r crlt 111:6.0 r heogb to'projece dtittO R.e.qwwd bY: qec.-oreab.vi&ti by, Ir rtlats J PR A MOPE RL.Y PREPARED -A D- tirO,-(r rlo ai:l i ul t= oi No 044 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 July 18, 2011 (Revised 9/8/11) Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 044 -01 Provide Spray -In insulation as specified in Section 07213 in the wall cavities between the gypsum board and the exterior walls of the Mens Restroom (7504) and Locker Room (7505) . - . - - - - ' -. - - - '. . It is acceptable to use the product included in Miron shop drawing submittal 139 -0 for this application. 044 -02 Provide Spray -In insulation as specified in Section 07213 on the interior face of the exterior walls of the Mens Restroom (7504) and Locker Room (7505) Womens Restroom (7507) from the top of the gypsum board shown on the Contract drawings to below the roof. Spray -In insulation shall be the same thickness as the insulation applied to the wall cavity between the new gypsum board and the exterior wall. It is acceptable to use the product included in Miron shop drawing submittal 139 -0 for this application. Provide fire barrier coating over foam insulation where exposed. Coating shall be rated for a minimum 15 minute Flame spread and 250 Smoke Development per ASTM E -84. x'4'4 ¢Y2ie -s. .+ ,T;e4Y° -1,1e - l--h and d---t' : ` * tat µ1-c o f the n -Rr t d-t iii n ri cr° �- `�cliLL ra^r-`u�v l� the �i°�^� �cr9�`�'r 50 tt kc I:eoif .A D r-rca Initials\S:11∎1AD11 1 00-1199 \1 154V023 \l'a'rd \Cost Proposal Requests \CPR.44.I11sulation at Str 75 Restrooms and Locker Room.docx TRANI D INEEP 12s Building =xce a '. CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB #:103400 MOD #: 0096 -01 DATED: 9/08/11 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Revised cost associated with insulation in wall cavities in Structure 75, per Cost Proposal Request #44 dated 9/8/11. REQUESTED BY: Strand Associates Inc DATE: 9/08/11 SUBCONTRACTOR AMOUNT Southern Minnesota Urethanes Wall -Tech Inc Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: $3,780.22 CHANGE ORDER AMOUNT REQUESTED: $3,780.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost , �S hedule Impact Subtotal Subtotal $2,893.00 $654.00 $3,547.00 $177.35 $3,724.35 $55.87 Miron Representat iv ?., _ I AIL 0 ��� v UUs % Date 9/08/11 1'c a "h" n `Dan I e 1 Owner Representative - -� Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, 891 5495 7 -0509 1471 McMahon Drive (Neenah, WI 54956 Phone: 920/969 -7000 Fax: 920/969-7399 www,rniron- construciion.corn 12s Owner City of Dubuque Computed by JCD Project Dubuque WPCP Date ,8- Sep -11 Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modification Quote Number: 096 -01 Description of Modification: CPR -044 Items included in this proposal: 044 -01, 044 -02 Item 044 -01 Southern MN 1.0 Provide Spray Insulation Behind Gypsum Board Walltech 1.0 Reframe locker room with 2.5" studs Contract Times 1.0 No Change Material Labor 1,693.00 58.00 $ 596.00 Item 044 -02 Southern MN 1.0 Provide Spray Insulation to Bottom of Roof * -Y= Contract Times 1.0 No Change Material $ 1,200,00 Labor, * ** Note: See attached quote for thermal barrier product data Subtotal: $ 2,951.00 $ Miron Markup @ 5% $ 147.55 $ Bond & insurance @ 1.5%; $ 55.87 TOTAL - CPR 044 -01: $ 3,780.22 596.00 29.80 No. 045 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 July 27, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Specification Section 11379B (Kruger Oases High Purity Oxygen System) CLARIFICATION: It is acceptable to provide manually actuated butterfly valves to isolate the six purge blowers (PBLWR -40- Al /A2 /B1/B2 /C1 /C2) from the aeration tanks. CHANGE paragraph 11379B- 2.11.I. to the following: "2. In 01P Auto, each LEL Purge Blower shall be interlocked with the associated train headspace gas analyzer. If the headspace gas analyzer detects a volatile hydrocarbon concentration of 25% or more of LEL, the associated purge blower shall start, the oxygen flow control valve shall close, and the vent stack valve shall modulate to 100% open. The LEL Purge Blower shall remain running until the LEL falls below the safe level setpoint at which time the blower shall be shut down and the flow control valve and vent stack valve shall return to normal operation as described above." Specification Section 16940 -3,04 MCC -45 (HPO Control Building Delete paragraphs 16940- 3.04.C.3 and 16940- 3.04.D.3. Initials \S:AMAD \1100-1199 \I l54\ 023 \Wrd\Cost Proposal Requests \CPR:15.Str lc_ u re 40 Valves.docx 'TAD . -_ Ip Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 July 27, 2011 Drawings 40A -E1.01 and 40A -E1.02 (Sheets 108 and 109) Delete the six solenoid valves (SV- 40- Al /A2 /B1 /B2 /C1 /C2) shown on these drawings. Drawings 99 -E6.12 (Sheet 411) Provide a credit to delete the 2 — #14 wiring associated with the six solenoid valves (SV -40- A1 /A2 /B1B2 /C1 /C2) associated with the six purge blowers (PBLWR- 40- Al /A2B1 /B2 /C1 /C2). °.APJO nitiaIs \S:AIAD \1100- 1199A7 154V023VWrdA Cost Proposal Redoests \CPR.45.Stmeture 40 Valves.docx 12t CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB #: 1 03'100 MOD 6: 0099 -00 DATED: 8/19/11 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 Cost associated with aeration tank purge blower isolation valves, per Cost Proposal Request #45 dated 7/27/11. REQUESTED BY: Strand Associates Inc DATE: 7/27/11 AMOUNT SUBCONTRACTOR JF Ahern Company $.00 ( $1,610.98) Subtotal ( $1,610.98) Performance Bond ( $24.16) TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Faith Technologies, Inc. ( $1,635.14) ( $1,635.00) Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost "schedule Impact Miron Representative /(Y honh.an - Ianielb-' Owner Representative THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Date 8/19/11 Date Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron- construction.com -s Owner �...ty of Dubliuue Computed by lCD Project i ibu u , 1,W/PCP Date 19 vR -i1 Project No. 103400 Verified by r- r L r S }� / Title Ccs, Proposal Rcuucst Doci. z,:t ■Lion Date .7. Page 1 of i Revision u Modification Quote Number: Description of Modification: Items included in this proposal: 099 -00 CPR -045 045 -01 Item 045 -01 Ahern valves Material Labor $ - $ (350.98) $ - $ - $ (1,260.00) $ - 1.0 No Change Faith 1.0 Credit wiring associated with solenoid Contract Times 1.0 No Change * ** Note: None Subtotal: Bond & Insurance @ 1.5 %: TOTAL - CPR 045 -00: $ (350.98) $ (24.16) $ (1,635,14) $ (1,260.00) 112u1 No. 046 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 August 2, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. Please submit a separate quote for each item. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 75- ASM1.14 (Sheet 207) ve -e- dGlnoli- shed-pe- -ate 046 -02 In Centrifuge Room 7513, provide side mounted aluminum railing per details C/99- AS5.03 and F/99- AS5.03 around opening where grease tanks were demolished. Provide concrete repair topping per Specification Section 03350 over area where curb is to be demolished as shown on drawing 75 -D1.03 (Sheet 184). STRAND ini6,ls C :',I sersaravisr AppData •Locale 4icrosoff \inflows Temporary Internet Fi les .Content.OthIook'SJCTF73Y°CPR. 46 Grease Tank_ Open ' Building Excellence CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB #:103400 MOD #: 0100 -00 DATBD: 8/25/11 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with changes to grease tank opening, per Cost Proposal Request' #46 dated 8/2/11. • REQUESTED BY: Strand Associates Inc DATE: 8/02/11 AMOUNT SUBCONTRACTOR Breuer Metal Craftsmen, Inc. Miron Construction Co., Inc Omni Glass & Paint Inc St rongwel 1 Subtotal Miron Management Fee - Subs Miron Management Fee 15.00 % - Miron Work Subtotal Performance Bond 1 -50 % TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: $3,621.35 $6,088.40 $155.00 $7.75 $913 -.26 YY $11,698.8 $11,874.,4 Approved Cost Miron Representative u Impact Owner Representative -la an t €. O 1 .3 . __ 1 00., INC. Ilenc Date 8/25/11 Date Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, 191 54956 Phone: 920/969 -7000 Fax: 9201969 -7399 iwww.miron- construction.com Modification Quote Number: 100 -00 Description of Modification: CPR -046 Items included in this proposal: 046 -01, 046-02 Item 046 -01 Owner City of Dubuque Computed by JCD Project Dubuque WPCP Date 25- Auq -11 Project No. 103400 Verified by Title Cost Request Documentation Date Page 1 of 1 Revision 0 Material Labor Stronewell 1.0 Provide FRP Plank 2.0 Direct Markup 1.0 Install FRP Plank (1 Ironworker 0.5 Day) 2.0 Install Steel/ Aluminum (2 Ironworkers 2 Day) 3.0 Concrete Repair (1 Finisher 1 day) 4.0 Direct Markup Breuer 1.0 Provide Steel( Aluminum 2.0 Direct Markup 1.0 Painting Steel Contract Times 1.0 No Change Item 046 -02 Material Labor Breuer 1.0 Provide Handrail 2.0 Direct Markup Nikon $ 1,300.00 $ 195.00 $ 1.0 Concrete Repair (1 Finisher 1 Day) 2.0 Install Handrail (2 Ironworker 0.75 Day) 3.0 Direct Markup Contract Times 50,00 $ 633.92 $ 1,089.36 $ 7.50 $ 258.49 1.0 No Change * ** Note: None Subtotal. .. , -'5- Miron Markup @ 5% . &" Bond & Insurance @ 1.5 %: TOTAL - CPR 046 -00: Item 046 -02 Subtotal: $3,534.27 Mixon Markup © 5 %: $0 Bond & Insurance ©1.5 %: $53.01 Total: $3,587.28 No 047 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 August 2, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Florian. Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 75- ASM1.06 (sheet 199) Provide a cost demolish existing plant effluent plant effluent piping and replace it with new DEW piping in Conveyor Room 7521 and Basement 7519 as shown in the attached drawing. This work may be done when the north incinerator is taken out of service. Provide a credit to delete painting the existing hose bibb and small diameter piping north of door 7521A. Initials \S:AMADVI!00 - -1 [99AI 154V 023 \Wrd \Cost Proposal Requests \CPR.47.DEW Piping Replacem nLdocx 12v 0454 1.1405 '015 5144 01 001148 03!8254 5 0041 Z' 6 v000004 30611304 SJ14M4100 040694 :3140 SNOIS1/3a .MOVOIN00 3140 OMMbtlO 0800311 MVMA6 NHS SINN AS S30 MOS OOM,31V0 51401 `0500200 an0nan0 30 4110 SN01A501310010 ANV'. 1004000 004451104 031503 S • Ntlld 11431P➢:IS1/6 0NIO,Il9 ONISS30O111d SOBlOS ® O O 000 O ®® © 000 000 90,WW- S ONMVaO 335 NOLLVONON09 310.1 - 13_s. St-9-SL -r 60 -SIBS. 01.13 -SO ii L°—•ild 1 hI� FEc 2 SO'lWSV -9L 9MMVe0 335 NOLLtll1NLLN00 310.3 Building E cseile n y6" CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB 4.103400 MOD : 0101 -00 DATED: 8//22/11 FAX: 608 - 251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with DEW piping replacement at Structure 75, per Cost Proposal Request #047 dated 8/2/11. REQUESTED BY: Strand Associates Inc DATE: 8/02/11 SUBCONTRACTOR JF Ahern Company Omni Glass & Paint Inc Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % Subtotal Subtotal AMOUNT $9,293.00 $96.20) $9,196.80 $459.84 $9,656.64 $144.85 TOTAL AMOUNT OF THIS MODIFICATION: $9,801.49 CHANGE ORDER AMOUNT REQUESTED: $9,801.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost / ;S'ch'edule Impact z , J Miron Representative ( -`f� 1 Date 8/22/11 Jonathan Daniels- - Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.G. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron- construclion.com 1 2v Owner City of Dubuque Computed by JCD Project Dubuque WPCP Date 22- Aug -I1 Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modification Quote Number: 101 -00 Description of Modification: CPR -047 Items included in this proposal: 047-01 Item 009 -01 Ahern 1.0 Add new DEW Piping 1.0 Credit hose bib & piping Contract Times 1.0 No Change Material tatxlr $ 9,293.00 $ (96,20) i'** Note: None Subtotal: $ Miron Markup @ 5% $ Bond & Insurance @ 1.5%; $ TOTAL - CPR 047 -00: $ 9,293.00 $ 464.65 $ 144.85 9,801.49 (96.20) (4.81) COST PROPOSAL REQUEST No, 048 (Revised) ISSUED BY: Glenn W. Tranowski CLIENT NAME: City of Dubuque PROJECT NAME: WPCP Modifications CONTRACT: 1 -2010 DATE: August 9, 2011 (Revised August 29, 2011) TO: Miron Construction Co., Inc. Distribution Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc_ City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. 12w Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. Please submit a separate quote for each item. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 75 -P1.04 (Sheet 228) In Basement Room 7519, provide a cost proposal to make the following modifications to the 4" waste pipe as shown in the attached drawing. ® Install 4" waste pipe, extend to wall as indicated and terminate with stub up 6" AFT. ® All waste piping shown bubbled shall be cast iron. O Delete the floor cleanout. Drawing 75 -P1.08 (Sheet 232) Contractor shall provide cost to install five additional floor drains model FD -2 with cast iron grate as specified_ See attached revised drawing for floor drain locations. Floor drains shall be set 1/2" below existing floor elevation. Slope the finished floor elevation adjacent to these floor drains toward these new floor drains approximately 4 -feet in all directions. ninals SSM D'1100-- 1199,1 1 54'02 1'Wrd'Cost Proposal Reque,ts'CPR.4B.Structure 75 Waste Pipe docx STRAND .�E;OCIAT ES, 4NC. 050Z1,151," 'OS SaL 01310104 conss E GNV 11,62N3100,7 EGS110till SONININEIG ,01.03 11E, liba ./),11.0 ,2.13 Dt,11M1,210 CM0038 ?3 AB NH3 ,OVAEI 530 VMOI.ononanta anonona do 1L1.10 SHO11V013,1C1011,111Trid 10111,400 NO9119110,2 11.1.1.W1 IN3IN3SVEI UNIC11111119 3IVISS330tid satios ,,,,,. 51';',. ,•,,,,,' 1,, , ,i., L: , , :, / , 1: ' ''',:::' '' ' 2 r''''''. l' , -' , /'' ' - '' irr,.,•,%- ..., ,., 235 1,101.M.t100 tO-tri-OZ,.,1TRM OSOZ Alfr 'a19 ETAS OE 30BEld a3PLSSi E OW/ VI yammer: Ead113M SONOMVEG 353635 INIEL vmol'3non9na 3nOfE11a aO A119 V • Im SWOIIVOIS1UOIN 1NVld 13NANO3 Mo13^110d 113d47m SNind 1:1O01d 1Sli ONITERId11d 9Nicruna 9NISS30Oild SQ91OS z n fU SUPPLY PLAN LO'ld -SG NNIMVN4 33S NOI1tlf1NI1N0., ilOj z ri z z Q 'm z Qo Building gf.xceliencd CHANGE ORDER REQUEST JOB #:103400 MOD #: 0102 -02 DATED: 9/02/11 TO: Mr Glenn W. Tranowski, P.E. FAX: 608 -251 -8655 Strand Associates Inc PHONE: 608 - 251 -4843 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost associated with Solids Processing Building Waste Pipe Mods, per Cost Proposal Request #048R dated 8/29/11. REQUESTED BY: Strand Associates Inc SUBCONTRACTOR DATE: 8/29/11 AMOUNT JF Ahern Company $3,496.00 Miron Management Fee 5.00 % - Subs $174.80 Subtotal $3,670.80 Performance Bond 1.50 % $55.06 TOTAL AMOUNT OF THIS MODIFICATION: $3,725.86 CHANGE ORDER AMOUNT REQUESTED: $3,726.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost t {\'s? 1 Miron Representative \ { Q JeS n £� :— Daniel s ,;Sch d) ---\le Impact t i ? n ''; i �: Ii1r;A i Date 9/02/11 Owner Representative , ./ Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron- constrttction:com Owner City of Dubuque Computed by 3CD Project Dubu ue WPCP Date 2-5ep 11 Project No. 103400 Verified by Title Cost Proposal Request Documentation Date Page l of l Revision 0 Modification Quote Number: 102 -01 Description of Modification: CPR-048 Items included in this proposal: 048 -01 Item 009 -01 Ahern 1.0 Install cast Iron Pipe and Drains Contract Times 1.0 No Chance Lump Sum $ 3,496.00 "" Note: None Subtotal: $ Miron Markup @ 5% $ Bond & Insurance (4) 1.555: $ TOTAL - CPR 048 -00: $ 3,496.00 174.80 55.06 3,725.86 or :ii Change Direttive 12x Diredivb 28 Contract: Owoor: C't :of Du AA- COMOOtOr: Miron 03:1)-§tiftdtiOli:no, Ino Desert-peon of Work ADD the wotki40001-Ak with itaI1ing frP. rap at the north ash .00q;:po teR40441-bBfittaabeV prOpa611WetilAtigu8t 17, 2011 nosed with this Die.0.66/0, ot Cost p_ 671 TOtA Reiiityk8; This Work, eMhad, OtedtiVe 644 re§uit In ntithiinOe to project du-r01600 not subject tnotWort, Requestedb1': Ctv of•Dubudue_ 'El Unit Pre t*: -THIS FORM- iS NOr A-SUBSTITUTE FOR A PROPERLY PREPARED AND- EXECUTED6HANGE OFZDEI3,•-• I 151S 1AD\ I 100,-11D0\ 1154102'3 \il1VO4k C116ftge Difeci[voF,\DireciN No 2.'6'1i-ponc3 rilOOs:OVo No 049 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 August 12, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and/or Time incidental to proposed modifications to the Contract Documents described herein. Please submit a separate quote for each item. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 05 -C1.10 (Sheet 26) After the ash pond grades are restored to the condition the grade was in prior to the July 28, 2011 flood with a beuii elevation of approximately 632.5, provide rip rap over filter cloth on the north ash pond berm top and on the inside slope of the berm to elevation 630 for the area where the north ash pond washout occurred. Contractor shall verify area for rip rap placement with Engineer and Owner in the field. Rip rap shall meet the requirements of Iowa DOT Class E Revetment, nominal maximum size 250 pounds. Filter cloth shall meet the requirements of Iowa DOT Sec. 4196.01 -B -3 (Geotex 601 or equal). Only the cost for rip rap and filter cloth shall be included in this proposal. Initials S AD 1100-11991154 \02 Mr Cost Proposal Requests`CPR. 49 ash Pond Riprap -does STRAND AsscI f INC.- o loz agar 'UM 3f4i ®a "a00 Hd ®3n85a a ®NV e' VeN3COCV aarliONH SONIAMVLI® 3S3&l1 VMOI'3nonend ononeno do uIO SNOIIVOi4IOON! 1NV9A 1O111NOO NOfdnllOd 1.11312VM 8 • NV1d ONIOVIi9 311S O31 VINO PER EPECTICATON 0 0 E O _0 0 O U N U > 0 N 0 > O 0 a-0 • 0 .o 0 O 0 • -U (CI • c Building Exceilenc,4- CHANGE ORDER REQUEST JOB 0:103400 MOD #: 0103 -00 DATED: 8/17/11 TO: Mr Glenn W. Tranowski, P.E. FAX: 608-251-8655 Strand Associates Inc PHONE: 608-251-4843 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPC') Modification 795 Julien Dubuque Dr Dubuque IA 52003-7996 DESCRIPTION OF MODIFICATION: Cost associated with ash pond modifications, per Cost Proposal Request 049 dated 8/12/11. REQUESTED BY: Strand Associates Inc DATE: 8/12/11 SUECONTRACTOR AMOUNT Tschiggfrie Excavating $536.00 Miran Management Fee 5.00 % - Subs $26.80 Subtotal $562.80 Performance Bond 1.50 % $8.44 TOTAL AMOUNT OF THIS MODIFICATION: $571.24 CHANGE ORDER AMOUNT REQUESTED: $571.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost (A Schedule Impact Moron Representative (.,(1 Date 3/17/1 Jarathan Daniels " Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM TI-IF DATE SHOWN fOuilhollylay Extypiliene:6-5-D Corporate Office P.O. Box 509 Neenah, WI 54957-0509 1471 Mckl,ahon Drive Neenah, WI 54955 Phone: 920/969-7M10 Pox: 9204109-7399 www.miron-consiruction. 9 00/ Owner C)ty of pubtiane Computed by 3CD Project Enibutitia WPCP Date 17 Au0-i:i Project No 103100 Verified by Title Cot Iropolttl Request. Do. m ntotion Date Pane 1 of t Revision 0 loctifiCafion no f?umbe;: 103-00 Description of Modification: CPR ..049 included in this proposal; 049-01 Item 049 -01 ISCh.199f ee 1.0 Instal One 28'42' section of fabric and r*.j> rap at the i o th ash contract Imes 1.0 No Change. 3 536.00 .r* Note: A specific size vras not noted on the CPR if a larger size is required there mill be additional cost Subtotal: $ biiron markup @ 5% $ Bond & Insurance © 1.5 %: $ TOTAL - CPA 040-00: 536.00 26.80 8.-14 571,24 No. 051 ISSUED BY: CLIENT NAME: PROJECT NAME: CONTRACT: DATE: TO: Distribution COST PROPOSAL REQUEST Glenn W. Tranowski City of Dubuque WPCP Modifications 1 -2010 September 1, 2011 Miron Construction Co., Inc. Jonathan Daniels, Josh Michalkiewicz, Dawn Floriano Steve Sampson Brown, Jonathan Brown Randy Wirtz, Larry Solchenberger Stuart Summer 12y Miron Construction Co., Inc. City of Dubuque Strand Associates, Inc IIW Engineers and Surveyors, P.C. Please submit an itemized quotation for changes in the Contract Price and /or Time incidental to proposed modifications to the Contract Documents described herein. Please submit a separate quote for each item. THIS IS NOT A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. Drawing 99 -E6.16 (Sheet 415) CHANGE the motor horsepower in the MCC -70 MCC Schedule for digester hot water supply pumps (HWP -70 -01 through HWP- 70 -08) from "3/4" horsepower to "1" horsepower. CHANGE the motor F.L.I in the MCC -70 MCC Schedule for digester hot water supply pumps (HWP -70 -01 through HWP- 70 -08) from "1.6" amps to "1.8" amps. Drawing 99 -E6.19 (Sheet 418) CHANGE the motor horsepower in the MCC -75A MCC Schedule for heat exchanger hot water pumps (HWP -75 -01 through HWP- 75 -03) from "10" horsepower to "15" horsepower. CHANGE the motor F.L.I in the MCC -75A MCC Schedule for heat exchanger hot water pumps (HWP -75 -01 through HWP- 75 -03) from "14" amps to "17.5" amps. CHANGE the circuit breaker in the MCC -75A MCC Schedule for heat exchanger hot water pumps (HWP -75 -01 through HWP- 75 -03) from "35" amps to "45" amps. Cnida(s \S :AivtAD \11GO -1 199\1 15,1V023 \WrdACost Proposal Requests \CPR.5I.HVAC Pump Electrical Mods.docs Cost Proposal Request Water Pollution Control Plant Modifications City of Dubuque Contract 1 -2010 Page 2 September 1, 2011 12y CHANGE the motor power conductors in the MCC -75A MCC Schedule for heat exchanger hot water pumps (HWP -75 -01 through HWP- 75 -03) from "3 — #12, 3/4 "C." to "3 — #10, 3/4 "C." Drawing 99 -E6.20 (Sheet 419) CHANGE the motor horsepower in the MCC -75B MCC Schedule for heat exchanger process water pumps (P -75 -01 and P- 75 -02) from "7.5" horsepower to "10" horsepower. CHANGE the motor F.L.I in the MCC -75B MCC Schedule for heat exchanger process water pumps (P -75 -01 and P- 75 -02) from "11" amps to "11.8" amps. CHANGE the circuit breaker in the MCC -75B MCC Schedule for heat exchanger process water pumps (P -75 -01 and P- 75 -02) from "20" amps to "35" amps. nitials\S:AMADV1100-119911154\023\ \\0-(1\Cost Proposal Requests vCPR 51.I-1VAC Pomp Electrical Mods.docl STRAND E N 1 rl �.I!d Exc lance. CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: JOB #:103400 MOD #:0112 -01 DATED: 9;22/11 FAX: 608 - 251 -8655 PHONE: 608 - 251 -4843 Revised cost associated with HVAC electrical modifications, per Cost Proposal Request #51 dated 9/1/11. REQUESTED BY: Strand Associates Inc DATE: 9/01/11 AMOUNT SUBCONTRACTOR Faith Technologies, Inc. $1,458.45 Wunderlich -Malec Environmental $4,302.00 Subtotal $5,760.45 Miron Management Fee 5.00 % - Subs $288.02 Subtotal $6,048.47 Performance Bond 1.50 % $90.73 TOTAL AMOUNT OF THIS MODIFICATION: $6,139.20 CHANGE ORDER AMOUNT REQUESTED: $6,139.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Sche u e Impact )r l its Miron Representative -��i��)�r \jQ, i �i Date 9/22/11 J,dfiat11r Daniels Owner Representative L7/ Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.C. Box 509 Neenah, VVI 51957 -0509 1471 McMahon Drive Neenah. VVI 54956 Phone: 920 /969 -7000 Fax: 920/969-7399 www.miron- construction. coin Owner City of Dubuque Project Dubu ue WPCP Project No. 103400 Title Cost Proposal Request Documentation Modification Quote Number: 112 -01 Description of Modification: CPR -051 Items included in this proposal: 051 -01 Computed by 3CD Date 22- Se2-11 Verified by Date Page 1of1 Revision 0 Item 051 -01 Material Labor Faith 1,0 Electrical modifications per CPR 051 $ 697.15 $ 384.00 2.0 Wunderlich $ 4,302.00 3.0 Markup $ 319.67 $ 57.63 Contract Times 1.0 No Change $ $ * ** Note: None Subtotal: $ Miron Markup @ 5% $ Bond & Insurance @ 1.5 %: $ TOTAL - CPR 051 -00: $ 5,318.82 $ 265.94 $ 90.73 6,139.20 441.63 22.08 Maintenance Building Roof Elevations - dubuquewpcp Public Places f Files Places MOW Go Up RFI (Enter Question) RFIs (Unanswered) RFI Log (Completed) Room index Place Tools Advanced Search Work O i;re Public Places You are in: DubuqueWPCP >RFIs >RFI Log (Completed) Maintenance Building Roof Elevations Created By: Gail Ferrell 01/04/2011 02:49 PM Updated By: Dawn M Foriano 01/17/2011 04:17 PM Check Out and 549 Complete Project Name & Number: Dubuque Water Pollution Controls #103400 Miron RFI 9 076 Subcontractor RFI 6 30 Date Created 01/10/2011 Specification /Drawing Reference Section 1 /90- ASM3.01, 10 /ASM3.02, 90- ASM5.01 Cost Effect Possible Cost impact RFI Status AcEi Jrts Status: Incomplete Due Date: 01/13/2011 Priority: Normal Submit RFI To Glenn Tranowski Review Status Miron Posted Enter Question Assigned To: Davin M Florian Who can edit this task? Alf Members Page 1 of 2 Travis Anderson ( Help I Log Out Search in this place Section I /90- ASM3.01 shows the new roof above the Tool Storage 9002 at the same elevation of the existing roof above Wash Bay 9003. Section 101AS13.02 shows the new roof above the Lunch Room 9007 at the same elevation of the existing roof above Shop 9004. From a field survey, the top ofjoists are I4' -9 '/" AFF at the east wall and 14' -1 Y" AFF at the west wall. Using the top of joists elevations noted on drawings 90 AS1\43.01, 90- ASM3.02 and 90 AS X15.01. the top ofjoists will be 16' -4" AFF at the east wall and 15' -8" AFF at the west wall. Will the roof of the additions on the north and south ends of the building be 1' -6 %" higher than the existing roof? Please confirm and advise the intended roof elevations. Respond No Later Than 01/13/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation / Response The roof additions on the north and south end of the existing Maintenance Building should not be constructed to be 1' -6 1/2' higher than the existing roof. The design intent is to match the existing roof level at these locations. All wall height dimensions, top of panel elevations, and top of joist elevations shown on sheets 336, 337, 338, and 339 for the lunch room /office area addition and the tool storage addition should be lowered by 1'-6 -. The precast shop drawing (Miron submittal 111 -0) was marked up to reflect this change. Contractor to provide a credit for decreased material required to manufacturer the precast mall panels and reduced painting area Additional Cements. http: // projects. miron - construction .cone /LotusQuickr/ dubuquewpcp /PageLibrary8625770000... 9 /7/2011 G1vra3 s i Excellence, CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E Strand Associates Inc 910 W Wingra Dr Madison WI 53715 12z JOB 4:103400 MOD #: 0080 -00 DATED: 8/24/11 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Credit for maintenance building roof elevations, per the response to RFI #076. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR Omni Glass & Paint Inc Spancrete Inc Performance Bond TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Subtotal ( ( AMOUNT $.00 $1,500.00) $1,500.00) ( $22.50) ( $1,522.50) ( $1,523.00) Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost edule Impact Mixon Representative � , ' Date 8/24/11 ;Yontian Danie s Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, 97I549:56 Phone: 920/969-7000 Fax: 920/969 -7399 www.miron-constructioo.com 12z r *7 Project Owner City of Dubuque Computed by )CD Project Dubuque WPCP Date 24- Aug-1.1 No. 103400 Verified by Title Cost Pro osal Recuest Documentation Date Page 1 of 1 Revision 0 Modification Quote Number: 080 -00 Description of Modification: RFI -076 Items included in this proposal: 080 -01 Item 080 -01 Soancrete to match existing roof elevation lowering Material Labor $ (1,500.00) $ - $ - $ $ 1.0 Lower elevation of precast panels Omni 1.0 Delete painting of area from roof fgntract Times. 1,0 No Change x =x Note: None Subtotal: Bond & Insurance $i 1.5 °h: TOTAL - Mod 080 -00: $ (1,500.00) $ (22.50) $ (1,522.50) $ - Digester Base Mat Reinforcing - dubuquewpcp Places Public Places 1 Files Public Places Page 1 of 1 Travis Anderson Help E Log Out Search in this place 12aa Go Up RFI (Enter Question) RFIs (Unanswered) You are in: DubuqueW?CP >RFIs ,RFI Log (Completed) Digester Base Mat Reinforcing Created By: Dawn M Florian° 02/22/2011 04:02 PM RFI Log (Completed) Updated By: Dave M Florie.no 02/24/2011 02:37 PM Room Index Place Tools Advanced Searui Work Ot*ine Cheek Out and Edit E Complete More Actions- Project Name & Number. Dubuque VVater Pollution Controls 0103400 Miron RFI 0 120 Subcontractor RFI # N/A Date Created 02/22/2011 Specification!Drawing Reference Cost Effect Clarification Only RFI Status Status: incomplete Due Date: 02/2512011 Priority: Normal Submit RFI To Glenn Tranowski Review Status Posted to Engineer Enter Question Assigned To: Davin M Floriano Who can edit this task? All Members The reinforcing installer would like to "bury" a bar every 8' in the digester mats in order to set the elevation of the radial reinforcing evenly. Please confirm that this is acceptable. Respond No Later Than 02/25/2011 Probably Effect Cost Impact Project Impact No Time Impact RFI Recommendation / Response It is acceptable to "bury' a bar every 8 -feet in the digester mats in order to set the elevation of the radial reinforcing evenly. These buried bars serve as carrier bars- According to specification section 0322- 3.02.A.10, if carrier bars are to be used, Contractor shall provide reinforcing bars for this purpose in addition to the reinforcing called for by the drawings. Contractor shall provide a credit for using these buried bars as carrier bars in the digesters. Additional Coments. Copies to: Jobsite; File, Interstate Lotus Quickr Help Home Help S_.eo. Time 'Zone Technic,: Coot_ent Best Practices 4viki Quickr Connectors Connect Lotus Quickr to the desktop applications that you use everyday. Dourb;ad the connectors no-.c. Learn Mor_ About About Lotus Qu c=a ;n i0m. http : / /projects.miron- constrtiuction_ Coln /Lotu sQuickr/ dubuquewpcp /PageLibrary8625770000... 9/7/2011 Euilding E:gce ieJlc s. CHANGE ORDER REQUEST 12aa JOB :`:103400 MOD 4: 0082 -00 DATED: 8/22/11 TO: Mr Glenn W. Tranowski, P.E FAX: 608 - 251 -8655 Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Credit carrier bars in concrete reinforcing, per the response to RFI $120. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR Miron Construction Co., Inc ( $1,381.00) Subtotal ( $1,381.00) Performance Bond ( $20.72) TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Miron Representative �i ( (' G' { �! : i � ��._ Date 8/ 22/11 on AMOUNT ( $1,401.72) ( $1,402.00) Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Copy: File / dmf Jobsite Ordae Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, 02 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 vnvw.miron- construction, corn Owner City of Dubuque Project Dubu ue WPCP Project No. 103400 Title Cost Pro Modification Quote Number: 082 -00 Description of Modification: RFI 120 Items included in this proposal: Bury Concrete Reinforcing Computed by JCD Date 22- Auq -11 Verified by Date Page 1 of 1 Revision 0 osai Re nest Documentation Interstate 1.0 Bury Bar Ambassador 1.0 Bury Bar Contract Tar.-es 1.0 No Change Material Labor $ $ (390.00) $ (991.00) $ $ - $ * ** Note: Per Ambassador & fnterstate: Digester I did not replace bury bars, while digesters 2, 3, and 4 did. Attached is documentation of digester bury bar being delivered to site, and photos of installation. Credit is based on bury bars for digesters 2, 3, and 4 equaling that of I. Subtotal: .$ (991.00) $ Bond & insurance @ 1.591: $ (20.72) TOTAL - Mod 082 -00: $ (1,401.72) (390.00) 12aa Doors 2002B and 2003A Height - dubuquewpcp 0 Places Public Places 1 Files Public Places Page 1 of 1 Travis Anderson ( Help ( Log Out ISearch in this place I1iwM1P411 Go Up RFI (Enter Question) RFIs (Unanswered) RFI Log (Completed) Room Index Place Tools Advanced Search Week Oiline You are in: Dubuque.WPCP >RFis 087/ Log (Completed) Doors 2002B and 2003A Height Created 8y: Dawn M Fioriano 04 /27!2011 03:33 PM Updated By: Davin /4 Florian 04/28/2011 06:27 PM Check Out and Edit Complete j More e a r n Project Name & Number. Dubuque Water Pollution Controls 8103400 Miron RFI 207 Subcontractor RFI 11 N/A Date Created 04/27/2011 Specification /Drawing Reference Cost Effect Possible Cost Impact RFI Status Status: Incomplete Due Date: 05/03 /2011 Priority: Normal Submit RFI To Glenn Tranowski Review Status Miron Posted Enter Question Assigned To: Dawn M Florian Who can edit this task? All Members The door schedule shows that door 2002E and 2003A are a type 2 frame which is a 7'4" high. The existing opening is 9`-4 ! _" tall. Please advise if the Owner would like the door ordered larger, or if the opening should he filled somehow. Please show a detail of how the opening is to be filled if selected. There will be additional cost for this modification. Respond No Later Than 05/03/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation: Response Provide a proposal for Engineer and Owner review to use a Type 3 FRP frame similar to the one shown on 59- AS6.01 for both doors. Instead of e louver above the door, provide 1 -inch thick insulating glass in the exterior window as specified in Section 08800. Additional Convents. Copies `.o: Jobsite; File, Doors Inc.. Zephyr Lotus Quickr }iolp tame steep Select Time Zcnr T_.....__t Cont=nt Best Practices Ltllki Quickr Connectors Connect Lotus °Mello. to the desktop applications that you use ever/day. Do::$osd the connectors now. Les More About About Loice Cu on Of 12bb http: // projects. miron- constnlction. coin/ LotusQuickr/ dubuquewpcp /PageLibrary8625770000... 9/7/2011 CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 12bb JOB #:103400 MOD #: 0060 -00 DATED: 8/17/11 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 DESCRIPTION OF MODIFICATION: Cost associated with changes to doors 2002B and 2003A, per the response to RFI ##207. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR Doors Inc Davenport Miron Construction Co., Inc Zephyr Aluminum Products, Inc. Miron Management Fee - Subs Performance Bond 1.50 TOTAL AMOUNT OF THIS MODIFICATION: CHANGE ORDER AMOUNT REQUESTED: Subtotal Subtotal AMOUNT $521.00 $78.15 $300.00 $899.15 $15.00 $914.15 $13.71 $927.86 $928.00 Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost - - _ , ` chedule Impact t Miron Representative\• �,'- '� {t�;J, vtifl ) Date 8/17/11 jo Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920/969 -7000 Fax: 920/969 -7399 www.miron- ccnstruction.com 12bb Owner City of Dubuque Project Dubu ue WPCP Project No. 103400 Title Cost Proposal Reques Documentation Computed by ICD Date 171ug -il Verified by Date Page l of l Revision 0 Modification Quote Number: 060 -00 Description of Modification: RFI-207 Items included in this proposal: 060 -01 Item 060 -01 Door, Inc 1.0 Change Door and Frame Size to 9' 4.5" Tall Miron 1.0 Install Larger Door and Frame 2.0 Direct markup IS Zephyr 1.0 Install Glazing in Tops of Two Doors Contract Times 1.0 No Change Material $ 521.00 78.15 $ Labor 150.00 $ 150.00 Note: None Subtotal: $ Miron Markup @ 5% $ Bond & Insurance @ 1.5 %: $ TOTAL - Mod 060 -00: $ 749.15 $ 150.00 7.50 $ 7.50 13,71 927.86 Men's Restroom Floor Drain - dubuquewpcp Places Page 1 of 1 Public Places I Files Travis Anderson I Help I Log Out Public Places Search in this place 12cc Oullsirng Excellen. Go Up RFI (Enter Question) RFIs (Unanswered) RFI Log (Completed) Room Index Place Tools Advanced Search Work Chline You are in: DubuqueWPCP >RFIs >RFI Log (Completed) Men's Restroom Floor Drain Created By: Dawn M Florian° 05/24/2011 08:35 PM Updated By: Dawn M Florian 05/25/2011 10:27 AM check Out and Edit 1 t Complete 11 More Actions vt' Project Name & Number: Dubuque Water Pollution Controls 4103400 Miron RFI 5 240 Subcontractor RFI N/A Date Created 05/24/2011 Specification/Drawing Reference Sheet 205 Cost Effect Possible Cost Impact RFI Status Status: Incomplete Due Date: 05/24/2011 Priority: Normal Submit RFI To Assigned To: Dawn M Floriano Who can edit this task? All Members Glenn Tranowski Review Status Miron Posted Enter Question There is no floor drain shown in the Men's Room 7504. Does code require a floor draM in each restroom? Respond No Later Than 05)24/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation Response Re-use existing floor drain in Men's Room 7504. Connect floor drain piping to new 4" waste piping. Additional Coments. Copies to: Jobsite; File Lotus Quieltr Help Horne Hefp Select Tins one Technical Content Senn! ?radices Wik: Quids' Connectors Connect Lotus Ouickr to the desktop applications that you use everyday. Do,nload the connectors now About About Lotus Quichr ITR.00,1 http://projects.miron-construction.corn/LotusQuickr/dubuquewpcp/PageLibrary8625770000... 9/7/2011 CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E Strand Associates Inc 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 JOB x1:103400 MOD 8: 0075 -00 DATED: 8/18/11 FAX: 608 -251 -8655 PHONE: 608 - 251 -4843 DESCRIPTION OF MODIFICATION: Cost to connect the existing floor drain to new drain in Room 7504, per the response to RFI #240. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR JF Ahern Company Miron Management Fee 5.00 % - Subs Performance Bond 1.50 o TOTAL AMOUNT OF THIS MODIFICATION.: CHANGE ORDER AMOUNT REQUESTED: Please find back up materials enclosed regarding Contractor is (not) to proceed with the with the Owner is adjusted as follows: Approved Cost Miron Representative Owner Representative Jondtan Daniels / Subtotal AMOUNT $734.00 $36.70 $770.70 $11.56 $782.26 $782.00 this modification. work as noted above. The contract 1Sd 1 edule Impact 1 THIS PRICE IS VALID FOR 15 DAYS FROM THE Date 8/18/11 Date DATE SHOWN Corporate Office P.O. box 509 Neenah, WI 54957 -0509 1471 Mcivlahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969 -7399 www.miron- construction .con 12cc 7 Owner City of Dubuque Project Dubuque WPC? Project No. 103400 Title Cost Proposal Request Documenta Computed by JCD Date 18-Au-11 Verified by Date Page 1 of I. Revision 0 on Modification Quote Number: 075 -00 Description of Modification: RFI -240 Items included in this proposal: 075 -01 Item 075 -01 Ahern 1.0 Add floor drain in room 7504 Contract Times 1.0 No Change Material Labor $ 734.00 * ** Note: None Subtotal: $ Miron Markup @ 5% $ Bond & Insurance @ 1.5%: $ TOTAL - Mod 075 -00: $ 734.00 36.70 11.56 782.26 Women's Restroom 7507 ADA Compliance - dubuquewpcp Otfrelie. Places Page 1 of 2 �12dd Public Places Files Travis Anderson Help Log Out Public Places Search in this place Mgr Go Up RFI (Enter Question) RFIs (Unanswered) RFI Log (Completed) Room index Place Tools Advanced Search Work Ofi;ne You are in: DubuqueWPCP >RFIS >P.FI Log (Completed) Women's Restroom 7507 ADA Compliance Created By: Dawn M Floriano 06/03/2011 10:17 AM Updated By: Dawn M Florian 06/06/2011 10:45 AM 1 Check Out and Edit 1 1 Complete 1' Mare Acucns Project Name & Number: Dubuque Water Pollution Controls #103400 Miron RFI # 244 Subcontractor RFI # WA Date Created 06/03/2011 SpecificationiDrawing Reference Sheets 205, 221 Cost Effect Possible Cost Impact. RFI Status Status: Incomplete Due Date: 06/06/2011 Priority: Normal Submit RFI To Glenn Tranowski Review Status Miron Posted Enter Question Assigned To: Dawn M Floriano Who can edit this task? AR Members The women's restroom #7507 does not demonstrate a compliant toilet stall for accessibility. The minimum acceptable width for an accessible toilet stall is 5' -0" for width, the stall portrayed on sheet 205 and 211 are noted as 4' -0" wide and it is deemed as non compliant with the Americans with Disabilities Act. PIease revie',s• and resubmit with an acceptable toilet stall layout. Respond No Later Than 06/06/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation / Response Provide ADA compliant layout for Womens Restroom 7507 per drawing attached to this RFI response. Revise Toilet Partitions shop drawing (Miron Submittal No. 93 -0) per this layout. Provide four foot grab bar in shower stall and American Specialties Model 8203 or equal compact folding shower seat instead of the five foot grab bar and shower seat proposed in Toilet and Bath Accessories shop drawing (Miron Submittal No. 97 -0). Additional Cements. Copies to Jobsite; File, Floor Show, JF Ahern, EPCO You can download any of the files below by dragging them to your Windows desktop. To open a file for reading, double - click it. http: / /projects. miron - construction. cow/ LotusQuickr/ dubuquewpcp /PageLibrary8625770000... 9/7/2011 Exile CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 12dd JOB #:103400 MOD #: 0076 -00 DATED: 8/26111 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost to provide ADA compliant layout for women's restroom 7507, per the response to RFI #244. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR JF Ahern Company Epco Ltd Inc Floor Show Furniture &Flooring Wall -Tech Inc Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % Subtotal Subtotal AMOUNT $.00 $281.00 $.00 $.00 $281.00 $14.05 $295.05 $4.43 TOTAL AMOUNT OF THIS MODIFICATION: $299.48 CHANGE ORDER AMOUNT REQUESTED: $299.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost Sc ,dule Impact '�.. Miron Representative �_- ._�L�b�i.;t � = �/ f \ (IA-- >- Date 8/26/11 on4tnan Daniels Owner Representative Date Corporate Office P.O. Box 509 Neenah, WI 54957-0509 1471 McMahon Drive Neenah, WI 54956 Phone: 925/969 -7000 Fax, 920/969 -7399 vrww.miron- construction. com EICE , 1 Owner Ci of Dubu ue Computed by JCD Project Dubu ue WPCP Date 26-A2111 Project No, 103400 Verified b Y Title Cost Proposal Request Documentation Date ''- Page 1 of 1 Revision 0 Modification Quote Number: Description of Modification: Items included in this proposal: 076 -00 RFI 244 Revise Restroom Layout per RFI 244 Item 076 -01 Ahern Material $ $ $ $ $ Labor $ $ 281.00 $ - $ $ - - - - 1.0 Revise Plumbing Layout EPCO 1.0 Revise Restroom Accessories Floor Show 1.0 Revise Tile SF Walltech 1.0 Revise Wall Layout Contract Times 1.0 No Change ** Note: None Subtotal: $ 281.00 Miron Markup @ 5% $ 14.05 Bond & Insurance @ 1.5 %: $ 4.43 TOTAL - Mod 076 -00: $ 299.48 $ $ - Structure 80 Hose Bibb - dubuquewpcp Quick- Public Places Files Places Public Places Page 1 of 1 Travis Anderson Help Log Gut Search in this place :011Mittrizi Dgalan9 Ex-MI.4w° Go Lip RFI (Enter Question) RRs (Unanswered) RFI Log (Completed) Room index Place Tools Advanced Search Llificek 0:kin° You are in: DubuqueWPCP ›RFis ,RFI Log /Completed) Structure 80 Hose Bibb Created By: Gail Ferrall 06/23/2011 04:19 PM Updated By: Dawn Flohano 06/27/2011 11:05 AM Check Out arid Edit l Complete Piero Project Name & Number: Dubuque Water Pollution Controls #103400 Miron RFI 261 Subcontractor RFI 78 Date Created 06123/2011 Specification/Drawing Reference Sheet 299 Cost Effect Possible Cost Impact RFI Status Status: Incomplete Due Date: 06/30/2011 Priority: Norma! Submit RFI To Glenn Tranowski Review Status Miron Posted Enter Question Assigned To: Dawn M Flohano Who can edit this task? All Members On Sheet No. 299 in Building 80, there is a hose bib in the southeast comer of the building that appears to be roughly 9' above the around level where it penetrates the exterior. Please verify that this location is correct. Respond No Later Than 06/30/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation Response Engineer proposes to delete the hose bibb in the southeast corner of the Administration Building that appears to be roughly 9 above the ground level where it penetrates the exterior of Garage 8125. Provide a proposal for Owner and Engineer review to delete the hose bibb at the location shown on the Contract drawings and install the hose bibb centered on the exterior face of the north east wall of Parts Storage Room 8011. Additional Coments. Copies to: Jobsite: File. JF Ahem Lotus Quickr hh,jp Home Help Select Time Zone, Technics: Cchten: Best Psactics, Oulokr Connacto Connect Lotus Quickr to the desktop applications that you use everyday. Dcsvnhsad the connectors POW. Leam MC,re About About- Lotus ■.7suBBS, ur brs.corn 1 2ee http://projects.miron-construction.comfLotusQuickr/dubuquewpcp/PageLibrary8625770000... 9/7/2011 BuilcHn el/once ° CHANGE ORDER REQUEST 12ee JOB 0;103400 MOD #: 0091 -00 DATED: 8/18/11 TO: Mr Glenn W. Tranowski, P.E. FAX: 608- 251 -8655 Strand Associates Inc PHONE: 608 - 251 -4843 910 W Wingra Dr Madison WI 53715 RE: Dubuque WPCP Modification 795.Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost to relocate a hose bibb in Structure 80, per the response to RFI #261. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR JF Ahern Company Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: Subtotal AMOUNT $903.00 $45.15 $948.15 $14.22 $962.37 CHANGE ORDER AMOUNT REQUESTED: $962.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost ,'Schedule Impact Miron Representative ,<' t /j`\ oriaffhan Daniel'' ,.;` ; Date 8/18/11 Owner Representative Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, WI 54957 -0509 1471 McMahon Drive Neenah, WI 54956 Phone: 920 /969 -7000 Fax: 920/969-7399 www.mfron- cOf75trLGtion oom 12ee Owner City of Dtibucne_ Computed by ;CD Project Dubuque WPCP Date 1.8- Auo -1i Project No 103400 Verified by Title Cost Proposal Request Documentation Date Page 1 of 1 Revision 0 Modification Quote Number: 091 -00 Description of Modification: RFI -261 Items included in this proposal: 091-01 Item 091 -01 Ahem Material LO Move Hose Bib $ 903.00 Contract Times 1.0 No Change $ * ** Note: None Subtotal $ Mlron Markup @ 5% $ Bond &Insurance @ 1.5 %: $ TOTAL- Mod 091 -00: $ 903.00 45.15 14.22 962.37 Structure 70 Retaining Wall Drain - dubuquewpcp Places nizrItli IIu7rdln9 Public Places i Files Public Places Page 1 of 2 Travis Andersen Help I Log Out Search in this place 1 2ff Go Up RFI (Enter Question) RFIs (Unanswered) (F RF1 Log (Completed) Room Index Place Tools Advanced Search Work Oflire You are in: DubuqueWPCP >RFIs >RFI Log (Completed) Structure 70 Retaining Wall Drain Created By: Dawn M Floriano 07/06/2011 08:34 AM Updated By: Davin M Florian° 07/06/2011 08:54 AM Check Out and Edit , % Camyfeta , More Actions Y Project Name & Number: Dubuque Water Pollution Controls 4103400 Miron RFI # 269 Subcontractor RFI # N/A Date Created 07/06/2011 Specification /Drawing Reference Sheet 33 Cost Effect Possible Cost Impact RFI Status Status: Incomplete Due Date: 07/08/2011 Priority: Normal Submit RFI To Glenn Trano.vski Review Status Miron Posted Enter Question Assigned To: Dawn M Floriano Who can edit this task? All Members Sheet 33 calls for a 6" stonn line to run through the retaining wall on the Southwest side of structure 70. Contractor suggests connecting this drain to the storm manhole next to the outlet. Please advise. Respond No Later Than 07/08/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation /Response Additional Coments. Provide a proposal to route this 6 -inch storm to ST MH 1 -2 for Owner and Engineer review. GWT 7 /6/11. Copies to: Jobsite. File, JF Ahern httpJl projects. miron - construction _ com /LotusQuickr/ dubuquewpcp /PageLibrary8625770000... 9/7/2011 Olul ihsg Excellesce' CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 12ff J013 x:103400 MOD #: 0106 -00 DATED: 5118111 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost to extend the storm drain to MH under the digester retaining wall, per the response to RFI #269. REOUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT JF Ahern Company Miron Management Fee 5.00 % - Subs Performance Bond 1.50 % TOTAL AMOUNT OF THIS MODIFICATION: Subtotal $1,163.00 $58.15 $1,221.15 $18.32 $1,239.47 CHANGE ORDER AMOUNT REQUESTED: $1,239.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost S \hedule Impact `. i4 `//\ `y ° ;j, ' i\ // �'` ?i }; �J Date 8/18/11 Miron Representative -.%_. (f .f \ I (: ,, C/ J6nfathan Daniel / Owner Representative f Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Sox 509 Neenah, Wi 54957 -0509 !NC 1471 McMahon Drive Neenah, 591 54956 Phone: 920/969 -7000 Fax: 920/969 -7399 www.miron- construction.com Owner City of Dubuque Project Dubuque WPCP Project No. 103400 Title Cost Proposal Request Documentation Computed by JCD Date 113- Auc1-11. Verified by Date Page 1of1 Revision 0 Modification Quote Number: 106 -00 Description of Modification: RFI -269 Items included in this proposal: 106 -01 12f Item 106 -01 Lumo Sum Ahern 1.0 Extend storm drain to MH under digester retaining wall $ 1,163.00 Contract Times 1.0 No Change $ - * ** Note: None Subtotal: $ Miron Markup @ 5% $ Bond & Insurance @ 1.5 %: $ TOTAL - Mod 106 -00: $ 1,163.00 58.15 18.32 1,239.47 Veneer Attachment at ELFI Wall Panel - dubuquewpcp Places ifingivitit Go Up RFI :Enter Question) RFIs (Unanswered) I RFI Log (Completed) Room Index Place Tools Advenxd Search P:o?k Ofr ne Public Places I Files Public Places Travis Anderson Page 1 of 1 Log Out Search in this place You are in: Dubuque4 +WPCP >RFis >RR Log ( Completed) Veneer Attachment at ELFI Wall Panel Created By: Dawn 14 Florian 08(2412011 10:53 AM Updated By: Darren M Florano 08/25/2011 01:34 PM Check Out and argil t Comp`:ete Mors Actfens Project Name & Number. Dubuque Water Pollution Controls 5103400 Miron RFI 298 Subcontractor RFI 5 N/A Date Created 08/24/2011 Specification /Drawing Reference Cost Effect Possible Cost Impact RFI Status Status: Incomplete Due Date: 00/26/2011 Priority: Normal Submit RFI To Glenn Tranowski Review Status Miron Posted Enter Question Assigned To: Dawn M Florian Who can edit this task? All Members lvlasonry contractor noted that the specified ties (DA-210) between the ELFI wall panels and the brick veneer are not recommended due to the 1" of foam on the outside of the stud attachment. Masonry contractor suggest the use of DA 210x ties in lieu of the specified ties, but also notes that these ties are more expensive. Please advise. Respond No Later Than 08126/2011 Probably Effect Possible Cost Impact Project Impact Impact Unknown at this time RFI Recommendation / Response The use of the DA -210x in place of the DA -210 where we have brick over the ELFI system is acceptable. Any cost changes should be submitted and approved before proceeding with this change. Additional Coments. Copies to: Jobsite; File, Monona Masonry Lotus Ooickr Help Home Help Select `me Zane Technical Content Best ?tact :0,54 ? &i Guickr Connectors Connect Lotus Ouickr to the desktop applications that you use everyday. Doe,,load the connectors now. Leam More About ....»9 Lotus ! cl:r ibrn.corn 12gg http: // projects. miron- constrl.? ction. com/ LotusQuickr/ dubuquewpcp /PageLibrary8625770000... 9/7/2011 CHANGE ORDER REQUEST TO: Mr Glenn W. Tranowski, P.E. Strand Associates Inc 910 W Wingra Dr Madison WI 53715 1 2gg 3013-.': 103400 MOD #: 0109 -00 DATED: 8 /25/1 1 FAX: 608 -251 -8655 PHONE: 608 -251 -4843 RE: Dubuque WPCP Modification 795 Julien Dubuque Dr Dubuque IA 52003 -7996 DESCRIPTION OF MODIFICATION: Cost to change veneer ties at ELFI wall panels, per the response to RFI #298. REQUESTED BY: Strand Associates Inc DATE: SUBCONTRACTOR AMOUNT Monona Masonry Inc $665.00 Miron Management Fee 5.00 0 - Subs $33.25 Subtotal $698.25 Performance Bond 1.50 0 $10 -47 TOTAL AMOUNT OF THIS MODIFICATION: $708.72 CHANGE ORDER AMOUNT REQUESTED: $709.00 Please find back up materials enclosed regarding this modification. Contractor is (not) to proceed with the work as noted above. The contract with the Owner is adjusted as follows: Approved Cost 11. Srl?-Aule Impact Miron Representative f ,Irl I Date 8/25/11 J,cn4tIran Daniels Owner Representative \ / Date THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN Corporate Office P.O. Box 509 Neenah, W154957-0509 1471 McMahon Drive Neenah, VVI 54956 Phone: 920/969 -7000 Fax: 920/969 -7399 www.miron-coristruction.com 12gg sy Modification Quote Number: 109 -00 Description of Modification: RFI -298 Items included in this proposal: 109 -01 Owner City of Dobuq:!e Project Dubuoue''v"r'CP Project No. 103400 Title Cost Proposal Request Docomentatiop Computed by Date 25-Au Verified by Date Page Revision 0 1.1 Item 109 -01 Monona 1.0 Change veneer ties at ELFI wall panels Contract Times 1.0 No Change Material $ 665.00 $ * ** Note: None Subtotal: $ Miron Markup @ 5% $ Bond & Insurance @ 1.5 %: $ TOTAL - Mod 109 -00: $ 665.00 33.25 10.47 708.72 W Chan e Di rective 1 2h h Dire-Mile, tqb-:: 29 Contract: 1-2Crti ., . .. -- ' OWner-. -..616i .of bubutve -..• , .• . _. . ... . . _ Cont.-maga . . . won tonstrittlOW-C69. FAO.: ., botel. . : . : Apil 1 - , - ..,..... ._,.... ... •-- - ,,- • o_o_04..tton •". - ",-, .- ,..Ajpoil 1:16gbd- &fir ofWorit . . _ ADD the 'WOW :6-e‘tOdiet'4 -Mil fe$:grfepina-..-to top 18 14919g (±). of the Ox4-ng -three 1.111thrSt Wiltete,--.064ifiltei -(BlIenivIn'AN1iitatte .s.foor$0.4m FT -0-14 'T. f4: Oft 1540 iry010(04 ObgiT 10.00 JO 1.tiOtofirai-, labor incidentals. POI: '11 i40TititY 1#6* Wiii PitailtIO-Vbk :WI :bes not 1nolutre Ooritradtbr8 iiierktp:Thr safeonfegotors,6f.1-Ohde. The beloglef.ed surface titte -1&.Optogiiiietely:- 04 ft2 per piim:A-. . oteriffer and ine-.:entfotita:piefreg:e 0441-01ii-OlKnetV6 3/4". The actual etitretereona c361-:n otfif6kiie rii"4 be tfilfite•:Ot;teee than ffil. iNir:opty Clarifier N0,1 has . been itekpil -04 of service 040 Wm be toted fifk Kibt to coating kilter,/ diet:100 No 2 arid No ,8 tontra-dtor, 'Owner --and :BiAgineee-g-ell observe -ifige'6-goWO:1-b tet6Milie'ctifiethetiftrifter'Wetk irequited, _ . - - - " Totel . • T81) ker.herke: This Work Chang e Direetiveliell result in no 'chbrigo to pfbioadtirPtiPm The work ePet410teci With thitiWOD.'Was'intendbatbiLtiojilaidgd within a Contract AlibWbhde as Odbifiddiri 'daibti• 03560; Haviiever, based bh.fteid bbeehletioti end trodornmomtabll$ from the opetjhg: ettboOntfet0-4:the ifidloated poxsi--ntrof material w4§;:$01.4.0t0-4,0 be:aged-1h :Ilektel the '.o15:6e1fieci.YN4i1 repeir rottet. Ifv.,•-o4:asqgoieled with-trirINCIY-Will-f16tte:'epitite4 to the..eonfre#_:ellowehoo repealed 1h Section 03560 Meilie wok is complete, a celottletedlifigffi -tat -Webb 'faitided in "er'futgre,ofiene orcler: .. , :Cheki&in Ciiint-teOt Pate by: 1:1 :$uppieibehtei Unit:Pilte -Onit..koo- 1 EJ Luny' - -8Lipli " - -- • . ._ Requested •by: ivfirorfeonefruction .845/11 bate ---- Reo-ommended. by - ---,, . 8/1-8/11 _ . . (e.o.dtoo) . . Date /1 Aotjeoted by: Date - 1-?8f.6i. . _ Approved by: (6w11-6) ... .. Date --THIS !OPT S NorA SUE'STITLITEPOR A F,R0I5ERLY PPEPARED-AND_EXECUTE0 CHANGE ORDER4- Primary SF x $21.50/sf x 1.05 MU 1.015 B&I = $100160 Clarifier No. 1 _ „ sV8:\tv1466 160,-11901154 \023WVRAVVrerie Oilaticp