Signed Contracts_Miron Construction Change Order No. 13Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
FROM: Steve Sampson Brown, Project Manager
SUBJECT: Water Pollution Control Plant Modifications
Miron Construction Co., Inc. — Change Order No. 13
Dubuque
bfrd
All-America City
1
n
2007
DATE: October 24, 2011
Attached is Change Order No. 13 for the June 30, 2010 agreement between Miron
Construction, Inc. and the City for the Water Pollution Control Plant (WPCP)
Modifications Project.
Change Order No. 13 in the amount of $427,475 is for flood recovery assistance due to
the July 28 flood event. This amount will be filed as part of the City's claim under the
Builders Risk insurance policy. Currently the Water Pollution Control Plant claims for the
July flood event total $1,516,465.
ACTION TO BE TAKEN
The execution of Change Order No. 13 of the Miron Construction, Inc. contract is
requested.
cc: Jenny Larson, Budget Director
Jonathan Brown, Water Pollution Control Plant Manager
Gus Psihoyos, City Engineer
Attachs.
K: \PROJECTS \Water Pollution Control Plant Replacement \_Construction Admin\ WCD's_CO's & _CCD's \Change
Orders\2011 10 -24 MVM Memo re Miron Change Order No. 13.doc
Page 1 of 1
STRAND
ASSOCIATES°
October 17, 2011
CHANGE ORDER NO. 13
PROJECT: Water Pollution Control Plant Modifications
OWNER: City of Dubuque
CONTRACT: 1 -2010
CONTRACTOR: Miron Construction Co., Inc.
Strand Associates, Inc
910 West Wingra Drive
Madison, WI 53715
(P) 608- 251 -4843
(F) 608-251-8655
Description of Change.
13a Add the area shown in attached Exhibit A to the "Area of Site" ADD $ 76,230
shown on drawings 05 -D1.01 and 05 -C1.01 according to Work
Change Directive (WCD) No. 33 enclosed with this Change
Order. Relocate digester covers and draft tubes according to
WCD No. 33.
13b Clean floor drains at the Digester Complex (Structure 70) to the ADD $ 5,580
pre -July 28, 2011, flood event condition.
13c Clean floor drains at the Solids Processing Building (Structure ADD $ 6,121
75) to the pre -July 28 flood event condition.
13d Clean floor drains at the Primary Sludge Pumps Station ADD $ 6,393
(Structure 20) to the pre -July 28 flood event condition.
13e Clean floor drains at the UV Building (Structure 62) to the ADD $ 1,714
pre -July 28 flood event condition.
13f Provide July 28 flood cleanup assistance. Work performed by ADD $131,428
Tschiggfrie Excavators from July 28 to September 14, 2011.
Scope of work is summarized in enclosed Exhibit B and enclosed
invoice.
13g Regrade area along west access road where digester cover parts ADD $ 5,755
were stored and repair west access road to the pre -July 29 flood
event condition.
This work shall be performed on a time and materials basis.
Contractor provided a budgetary proposal (enclosed) to perform
this work for the amount listed on this Change Order.
13h Provide July 28 flood event cleanup assistance. Work performed ADD $158,859
by Miron Construction Co., Inc. from July 28 to October 1, 2011.
Scope of work is summarized in enclosed Exhibit B and enclosed
invoices.
RAW:GWT:clm \ SWAG \I 100 - -1199\1 154 \023 \Wrd \Change Orders \CO 13.docx
Arizona I Illinois I Indiana I Kentucky I Ohio I Wisconsin www.strand.com
Strand Associates, Inc
City of Dubuque —Miron Construction Co., Inc.
Contract 1 -2010, Change Order No. 13
Page 2
October 17, 2011
13i Clean up primary clarifier equipment stored in existing south ADD $ 5,599
trickling filter to the pre -July 28 flood event condition to allow
the equipment to be finish- coated.
13j In response to the July 28 flood event, pump out flooded Primary ADD $ 3,956
Sludge Pump Station Structure 20 basement and provide cleanup
assistance to allow Owner to access Disinfection Structure 60.
Work performed by Miron Construction Co., Inc. between
July 28 and July 31, 2011.
13k Remove debris deposited in the Disinfection Structure 60 from ADD $ 10,757
the July 28 flood event. Reinstall fiberglass plank and panel
system impacted by the July 28 flood event to preflood
condition.
This work shall be performed on a time and materials basis.
Contractor provided a budgetary proposal (enclosed) to perform
this work for the amount listed on this Change Order.
131 In response to the July 28 flood event, provide flood cleanup ADD $ 3,693
work from July 28 to August 12, 2011. Scope of work is
provided in enclosed J.F. Ahern work descriptions.
13m In response to July 28 flood event, provide flood cleanup work ADD $ 11,390
from July 28 to August 18, 2011. Scope of work is described in
enclosed Faith Technologies job reports.
TOTAL VALUE OF THIS CHANGE ORDER:
Contract Price Adjustment
ADD $427,475
Original Contract Price $49,750,000
Previous Change Order Adjustments $ 4,289,886
Adjustment in Contract Price this Change Order $ 427,475
Current Contract Price including this Change Order $54,467,361
Contract Completion Date Adjustment
Original Contract Completion Date August 31, 2013
Contract Completion Date Adjustments due to previous Change Orders None
Contract Completion Date Adjustments due to this Change Order None
Current Contract Completion Date including all Change Orders August 31, 2013
RAW:GWT:chn\S:\MAD \1100 -- 1199 \I 154 \023 \Wrd \Change Orders \CO 13.docx
www.strand.com
Strand Associates, Inc.'
City of Dubuque —Miron Construction Co., Inc.
Contract 1 -2010, Change Order No. 13
Page 3
October 17, 2011
This document shall become a supplement to the Contract and all provisions will apply hereto.
Owner has filed or will file an insurance claim for this work. All documentation required by
Owner's insurance to support the claim shall be provided by Contractor. The total cost of this work
is undefined at this time. The costs included herein will be modified after the work is complete and
final invoices for the work are received and approved. Approval of this Change Order or payment
by Owner of any claim by Contractor pursuant to this Change Order does not waive Owner's right
®`e\ ks3golt,9'dispute such claim as provided in the Contract.
®• :���� ► MENDED
WOW°
°�• �U ! /
�m'• 6�13� ® Date
ENEER— Strand As . • 1 es, Inc.
/On lo nI0
APPROVED
CONTRACTOR —Miron Construc ;T•n Co., Inc.
David G. Voss Jr., President
APPROVED
Date
*A§
( 0/lr
OWNER —City of Dubuque Date
RAW:GWT:chn \S:\MAD\1 100 -- 1199 \1154 \023 \Wrd \Change Orders \CO 13.doex
www.strand.com
sa
STRAND
ABBOCIATE9, ING •
F'NCINFF ArS
13a
Work Change Directive
Directive No.: 33
Contract: 1 -2010
Owner: City of Dubuque
By: GWT
Contractor: Miron Construction Co., Inc.
Date: 9/28111
Description of Work
t
Deduction
Cast
Addition
Add the area shown in attached Exhibit A to the "Area of the Site' shown on
drawings 05 -D1.01 and 05- C1.01.
This area shall be available for Contractor construction activities until 11:59 PM on
November 15, 2012. The area shown on Exhibit A shall be restored to pre -
construction condition by this date.
All insurance and erosion control provisions of Contract 1 -2010 shall apply to the
area shown in Exhibit A.
Provide temporary orange construction fence along south and west borders of the
area shown in Exhibit A.
Digester Nos. 3 and 4 covers are currently onsite unassembled. Contractor shall
relocate Digester No. 3 cover parts to the area shown in Exhibit A. Contractor shall
relocate Digester No. 4 cover parts to the east side of the digester complex.
Contractor's crane time in the attached Cost Proposal Request Documentation only
Includes moving these two covers to the locations indicated above. Crane time for
moving the fully assembled digester covers onto the digesters is not Included.
Relocate unassembled draft tubes currently onsite to the Digester Complex.
$78,230
$76,230
Total
Remarks: Owner has filed or will file an Insurance claim for this work. All documentation required by Owner's insurance
to support the claim shall be provided by Contractor. The total cost of this work is undefined at this time. The costs
included herein will be modified after the work is complete and final invoices for the work are received and approved.
Approval of this Change Order or payment by Owner of any claim by Contractor pursuant to this Change Order does
not waive Owner's right to dispute such claim as provided in the Contract.
Change in Contract Price by:
• Supplemental Unit Price
■ Unit Price
I • Lump Sum
Requested by: Miron Construction
9/28/11
Date
Recommended by: ~
9/28/11
Date
( nglneer)
Accepted by:
q —.2 g - / i
ntractor)
Date
Approved by:
1 -z9 -
Date
ner)
- -THIS FORM IS NOT A SUBSTITUTE FOR A PROPERLY PREPARED AND EXECUTED CHANGE ORDER --
InitiaI 'iS:1MAO',1100..i liQ11 15 4102 1Mrd\Work Change DIrectiveelDirect ve No 33.Area of Site.doc
DUB E EXHIBIT A - Proposed Digester Cover Construction Location DAGIS
Masterpiece an the Mississipryi Inland Protein or.orafton
y `• _1 1130
jyS _ e • ■
Y [ r I
R 1Y-4V ., r � 1,1‘,7,0k-' • MC DOUGAL 121k, P
FLYNN ` • ( NCO PANYONg `• ®
Ccll � IJUBUQ E /' „ r '' _
--- - i i
! . -, -gin.:
t
I �',� /, C_� ' r:: 'r
7))1
Construction Area 0111 J• Wi r
CcIiN7wDUB000E '_f'' ....
• 7 )
- 1 x 4 ° , CITY OF' DUBUQUE (SEWER ° lam! ",, '� - .11
/ • , l PROTEIN CORPCRATK IN -1 1 -..'m - "�
11 . € . 1110
1 - 1 r - 35 FT MIN. j 1 !i
g
TS - HIGGFRI • EXCAVATING CO >` '
t., 11, .. - l .r� 1I * _ • ICI _ 1 ill
l
• •
ltl c - P'1♦.1r ,. ` . _ - CHICA GO CENTRAL (3 „rte' (gRI[d ¢ o ma Q (4
11" x 17" Page N
1 inch = 100 feet W E Site Access Area
00
_ 50 0 100 Feet
— ..,,,,..—...� e�,.. �..�o. a�,,..�, ,,.,.,,.,r s
Building Excellence
CHANGE ORDER REQUEST
TO: Mr Glenn W. Tranowski, P.E.
Strand Associates Inc
910 W Wingra Dr
Madison WI 53715
RE:
Dubuque WPCP Modification
795 Julien Dubuque Dr
Dubuque IA 52003 -7996
JOB #:103400
MOD #: 0128 -01
DATED: 9/28/11
FAX: 608 -251 -8655
PHONE: 608-251-4843
DESCRIPTION OF MODIFICATION:
Revised costs associated with Work Change Directive #33 dated 9/27/11.
REQUESTED BY: Strand Associates Inc DATE:
SUBCONTRACTOR AMOUNT
JF Ahern Company $10,800.00
Miron Construction Co., Inc $10,871.68
Tschiggfrie Excavating $48,820.00
Subtotal $70,491.68
Miron Management Fee 5.00 % - Subs $2,981.00
Miron Management Fee 15.00 % - Miron Work $1,630.75
Subtotal $75,103.43
$1,126.55
Performance Bond
1.50 %
TOTAL AMOUNT OF THIS MODIFICATION:
CHANGE ORDER AMOUNT REQUESTED:
$76,229.98
$76,230.00
Please find back up materials enclosed regarding this modification.
Contractor is (not) to proceed with the work as noted above. The contract
with the Owner is adjusted as follows:
Approved Cost
Miron Representative` ;,`��;j%
rJ�n itl an Danie -E071
l
Owner Representative
edule Impact
Date 9/28/11
Date
THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN
Building Excellence
Corporate Office
P.O. Box 509 Neenah, WI 54957 -0509
1471 McMahon Drive Neenah, WI 54956
Phone: 920/969 -7000
Fax: 920/969 -7399
www. miron- constructs on. corn
A
W,/ M Aran
Owner City of Dubuque
Computed by JCD
Project Dubuque WPCP
Date 28- Sep -11
Project No. 103400
Verified by
Title Cost Proposal Request Documentation
Date
Page 1 of 1
Revision 0
Modification Quote Number: 128 -01
Description of Modification: Landl;Nekt Door / Dlgesterliid Coatings on Ground c
Items included in this proposal: 128 -01
Item 128 -01
hern
Material
Labor
1.0 Moving Digester Lid to Land Next
Door
$ 7,000.00
2.0 Move Draft tubemixers from Structure 45
$ 3,800.00
Tschincifire
1.0 Strip 200x200' area and place
6" stone base
$ 29,320.00
2.0 Remove stone and restore 200x200' area
$ 11,100.00
3.0 Install and remove 800 LF of silt fence
$ 3,400.00
4.0 Maintain stone work area
$ 5,000.00
Miron
1.0 Snow fence approximately 500LF (2 Laborers 2 days to set 1 day down 48 hours total)
$ 2,500.00
$ 2,971.68
2.0 Crane for moving covers (Tower 8 Hr, LR 1250 8 Hr)
$ 5,400.00
3.0 Direct Markup
$ 375.00
$ 1,255.75
* ** Note: None
Subtotal:
$ 62,495.00
$ 9,627.43
Miron Markup @ 5%
$ 2,981.00
Bond & Insurance @ 1.5 %:
$ 1,126.55
TOTAL - Mod 128 -00:
$ 76,229.98
Building Excellence'
CHANGE ORDER REQUEST
TO: Mr Glenn W. Tranowski, P.E.
Strand Associates Inc
910 W Wingra Dr
Madison WI 53715
RE:
Dubuque WPCP Modification
795 Julien Dubuque Dr
Dubuque IA 52003 -7996
DESCRIPTION OF MODIFICATION:
Revised cost associated with flood work.
13b to 13m
JOB #:103400
Iv1OD #:0121 -01
DATED: 10/13/11
FAX: 608 - 251 -8655
PHONE: 608 -251 -4843
REQUESTED BY: Strand Associates Inc DATE:
SUBCONTRACTOR AMOUNT
JF Ahern Company $22,051.05
Faith Technologies, Inc. $10,687.27
Miron Construction Co., Inc $148,701.26
Omni Glass & Paint Inc $5,253.75
Tschiggfrie Excavating $128,719.60
Subtotal $315,412.93
Miron Management Fee - Subs $8,335.58
Miron Management Fee 15.00 % - Miron Work $22,305.19
Subtotal $346,053.70
Performance Bond 1.50 % $5,190.81
TOTAL AMOUNT OF THIS MODIFICATION: $351,244.51
CHANGE ORDER AMOUNT REQUESTED: $351,245.00
Please find back up materials enclosed regarding this modification.
i\AIF,UPJ (7,01 K.- TIC IJC f C N C;C )., INC.
Building Excellence
Corporate Office
P.O. Box 509 Neenah, WI 54957 -0509
1471 McMahon Drive Neenah, WI 54956
Phone: 920/969 -7000
Fax: 920/969 -7399
www.miron- construction.com
Building Excellence'
CHANGE ORDER REQUEST
Mr Glenn W. Tranowski, P.E.
Page# 2
JOB #:103400
MOD #: 0121 -01
DATED: 10/13/11
Contractor is (not) to proceed with the work as noted above. The contract
with the Owner is adjusted as follows:
Approved Cost
edule Impact
Miron Representative )� i !' ` Date 10/13/11
Joria oa i-1
Owner Representative Date
THIS PRICE IS VALID FOR 15 DAYS FROM THE DATE SHOWN
Copy: File / dmf
Jobsite
dviIF RON (;l.)NST ()C I I() N i, >O., NC.
Building Excellence
Corporate Office
P.O. Box 509 Neenah, WI 54957 -0509
1471 McMahon Drive Neenah, WI 54956
Phone: 920/969 -7000
Fax: 920/969 -7399
www.miron-construction.com
`'.,
�/yr �r
MO l 0
•
Owner City of Dubuque
Computed by )CD
Project Dubuque WPCP
Date 13- Oct -11
Project No. 103400
Verified by
Title Cost Proposal Request Documentation
Date
Page 1 of 1
Revision 0
Modification Quote Number: 121 -01
Description of Modification: Flood Work
Items included in this proposal: 121 -01, 121 -02, 121 -03, 121-04, 121-05, 121-06, 121 -07, 121 -08
Material
labor
Item 121-01 13b, 13c, 13d, 13e
$ 5,235.30
$ 5,743.50
$ 5,998.65
$ 1,608.60
hero
'
1.0 Clean Drains Structure 70
2.0 Clean Drains Structure 75
3.0 Clean Drains Structure 20
4.0 Clean Drains Structure 62
Item 121 -02
Material
Labor
$ 123,319.60
$ 5,400.00
Tschlaofrie
1.0 Flood Cleanup Costs 13f
2.0 Remaining Work Estimate
Regrade area where digester lid
was undermined, and repair road($450/ crew hr 1.5 days) 13g
Item 121 -03
Miron
1.0 Flood Cleanup Costs to date
3.0 Direct Markup
Material
Laho
$ 136,096.30
$ 20,414.45
1311
Item 121 -04
Material
Labor
$ 333.75
$ 4,920.00
Omni
1.0 Flood Cleanup Costs 1 3i
Item 121 -05
Miron
Material
Labor
$ 3,388.88
$ 508.33
1.0 Flood Cleanup /Keep Plant Running
2.0 Direct Markup
13j
Item 121 -06
Miron
Material
Labor
$ 4,400.00
$ 660.00
$ 4,816.08
$ 722.41
(Vacuum truck 3 days $3900, misc material $500 13k
1.0 Clean & Repair UV Structue Budget
2 laborers 3 days clean two carpenters
2.0 Direct Markup
1.5 days planking)
Item 121 -07
Ahern
Material
Labor
$ 3,465.00
1.0 Clean stored material after flood 131
Item 121 -08
Material
Labor
$ 2,893.28
$ 433.99
$ 6,400.00
$ 960.00
Faith
1.0 Flood Work 13m
2.0 Direct markup
* ** Note: Schedule impact not vet finalized.
Subtotal:
Mon Markup @ 5%
Bond & insurance @ 1.5 %:
rnrar - Mod 121 -01:
$ 150,626.67
$ 7,278.33
$ 5,190.81
$ 351,244.51
$ 187,091.45
$ 1,057.25
MECHANICAL CONTRACTORS
1 3b
4140 F AVENUE NW • CEDAR RAPIDS, IOWA 52405 • (319) 396 -7055 • (319) 396 -9390 FAX
www.brecke.com
August 4, 2011
J. F. Ahern Co.
Attn: Tim Scheider
201 Morris Court
PO Box 1316
Fond du Lac, WI 54936 -1316
RE: Dubuque WPCP Drain Cleaning After Storm
We are proposing to jet clean and televise all newly installed piping in building 70 down to the
pit. There are 50+ points of access. We are proposing to remove all debris from the piping and
provide a VCR tape showing pipe after cleaning. We then will wash down and clean pit in
building 70 after pipe cleaning is complete.
The price for this work is $4,986.00 (Four•Thousand Nine Hundred Eighty Six Dollars).
Steve Sweeney
Project Manager (/
sweenev @brecke.com
319- 396 -7055 ext.133
$4,986 x 1.05 (Ahern Sub - contractor Markup) = $5,235.30
HVAC PROCESS PIPING AUTHORIZED ASSOCIATIONS:
PLUMBING REFRIGERATION "R" STAMP NCPWB, MSCA
EXCAVATION BUILDING AUTOMATION AND MCAI, MCAA
MILLWRIGHT WATER TREATMENT "PP" STAMP HOLDER NBBI, AWS
MECHANICAL CONTRACTORS
13c
4140 F AVENUE NW • CEDAR RAPIDS, IOWA 52405 • (319) 396 -7055 • (319) 396 -9390 FAX
www.brecke.com
August 4, 2011
J. F. Ahern Co.
Attn: Tim Scheider
201 Morris Court
PO Box 1316
Fond du Lac, WI 54936 -1316
RE: Dubuque WPCP Drain Cleaning After Storm In Building 75
We are proposing to jet clean and televise drains and piping in building 75. We are proposing to
remove all debris from the piping and provide a VCR tape showing pipe after cleaning. We will
televise what we can but we may not be able to televise thru the existing p -traps in the floor
drains.
The price for this work is $5,470.00 (Five Thousand Four Hundred Seventy Dollars).
Steve Sweeney
Project Manager (/
sweeney @brecke.com
319 - 396 -7055 ext.133
$5,470 x 1.05 (Ahern Sub - contractor Markup) = $5,743.50
HVAC PROCESS PIPING AUTHORIZED ASSOCIATIONS:
PLUMBING REFRIGERATION "R" STAMP NCPWB, MSCA
EXCAVATION BUILDING AUTOMATION AND MCAI, MCAA
MILLWRIGHT WATER TREATMENT "PP" STAMP HOLDER NBBI, AWS
MECHANICAL CONTRACTORS
13d
4140 F AVENUE NW • CEDAR RAPIDS, IOWA 52405 • (319) 396 -7055 • (319) 396 -9390 FAX
www.brecke.com
August 25, 2011
J. F. Ahern Co.
Attn: Tim Scheider
201 Morris Court
PO Box 1316
Fond du Lac, WI 54936 -1316
RE: Dubuque WPCP Drain Cleaning After Storm In Building 20
We are proposing to jet clean and televise drains and piping in building 20. We are proposing to
jet clean floor drains and underfloor piping and provide a VCR tape showing pipe after
cleaning. We will clean 2 manholes and approx. 14 floor drains. Above work includes Vac truck
for pumping main exit point in tank.
The price for this work is $5,713.00 (Five Thousand Seven Hundred Thirteen Dollars).
Steve Sweeney
Project Manager
sweeney@brecke.com
319- 396 -7055 ext.133
$5,713 x 1.05 (Ahern Sub - contractor Markup) = $5,998.65
HVAC PROCESS PIPING AUTHORIZED ASSOCIATIONS:
PLUMBING REFRIGERATION "R" STAMP NCPWB, MSCA
EXCAVATION BUILDING AUTOMATION AND MCAI, MCAA
MILLWRIGHT WATER TREATMENT "PP" STAMP HOLDER NBBI, AWS
MECHANICAL CONTRACTORS
13e
4140 F AVENUE NW • CEDAR RAPIDS, IOWA 52405 • (319) 396 -7055 • (319) 396 -9390 FAX
www.brecke.com
September 15, 2011
J. F. Ahern Co.
Attn: Tim Scheider
201 Morris Court
PO Box 1316
Fond du Lac, WI 54936 -1316
RE: Dubuque WPCP Drain Cleaning After Storm In Building 62
We are proposing to jet clean and televise drains and piping in building 62. We are proposing to
jet clean floor drains and underfloor piping and provide a VCR tape showing pipe after
cleaning.
The price for this work is $1,532.00 (One Thousand Five Hundred Thirty Two Dollars).
Steve Sweeney
Project Manager (/
sweeney @brecke.com
319- 396 -7055 ext.133
$1,532 x 1.05 (Ahern Sub - contractor Markup) = $1,608.60
HVAC PROCESS PIPING AUTHORIZED ASSOCIATIONS:
PLUMBING REFRIGERATION "R" STAMP NCPWB, MSCA
EXCAVATION BUILDING AUTOMATION AND MCAT, MCAA
MILLWRIGHT WATER TREATMENT "PP" STAMP HOLDER NBBI, AWS
Exhibit B
Scope of Flooding Cleanup Work
ID No.
Area Description
Activity
005
Site
General drain and review of damage
Ash Ponds
Replace soils and regrade
Main Roads
Remove silt and debris
South Fence line
Remove silt and debris
Material Storage
Stabilize bearing locations, remove silt & debris
Job Offices
Stabilize locations, refill
Crane Pads
Geotechnical analysis of soil bearing capacity following
saturation
North Fence line
Fill areas where erosion occurred
010
Screening Building & Grit Facilities
No Flood Work
Scope of Flooding Cleanup Work
ID No.
Area Description
Activity
020
Primary Clarifier Complex
Primary Clarifier 4 - Drain, Clean, Reexcavate, Retest Soils
Primary Clarifier 1- Drain, Clean
Primary Clarifier Tunnel - Drain Clean, Review Equipment,
Check Drains
028
Primary Effluent Splitter Box
No Flood Work
030
Excess Flow Equalization
Drain, Clean (Remove Soils and Sludge)
035
Excess Flow Drainage Pump Station
Drain, Clean
037
Aeration Tank Splitter Box
No Flood Work
038
RAS Splitter Box & Excess Flow Junction Box
No Flood Work
040
Aeration Tanks
No Flood Work
045
HPO Control Building
No Flood Work
048
Mixed Liquor Splitter Box
No Flood Work
050
Final Clarifiers
No Flood Work
Scope of Flooding Cleanup Work
ID No.
Area Description
Activity
053
Final Clarifier Effluent Junction Box
'No
No Flood Work
_
055
RAS Pump Station
Flood Work
060
Disinfection
Drain Clean (Not Available Until 11/1/11)
Fix Replace FRP, Plywood for now
Flooded UV System Parts Replacement
062
UV Building
Drain, Clean
070
Anaerobic Digestion
Drain, Clean, Check Drains, Reslope and shape excavation
banks, reinstall erosion control
075
Solids Processing
Drain, Clean, Check Drains, Reform sludge load out walls
078
WAS Storage Tanks
No Flood Work
080
Administration Building
Drain, Clean, Replace SOG Fill
090
Maintenance Building
No Flood Work
092
Septage Receiving
No Flood Work
096
Transformer Containment
Drain, Fill voids underneath CT cabinet
13f
$123,319.60
w
a
cc (13
� a
O in
W 0
❑ M
u 0)
Z
w w .
0000
0U
❑ Z Q
m00
J Q ❑
W 0 Q
W Z • W co
Cr
J
= 0
w 0 W
LL
00• 0
• z
�0W
)- }
o d
IE W
O�
aNg
w - 7
cc nz
w 0<
M 0 2
Q
u)Ja
aaa°
0 C)
z
J F
0
O
w
• x
w
a
cri
co
7/28/:'011
7/29/;:011
8/1 ;2011
8/2;2011
8/3;2311
8/4/2011
8/5,'2011
Flood Damages - Miron
WWTP Dubuque
3.00 3400 Linkbelt $150.00 $ 450.00
12.50 Cat D -5 $140.00 $ 1,750.00
9.00 Cat 966 $145.00 $ 1,305.00
10.50 Cat 279 Skidloader $140.00 $ - 1,470.00
10.50 Labor $70.00 $ 735.00
9.50 DumpTruck $100.00 $ 950.00
9.00 DumpTruck $105.00 $ 945.00
45.30 3" Clean $9.10 $ 412.23
26.50 Base Stone $6.95 $ 184.18
28.43 1" Clean $9.10 $ 258.71
12.00 Clay Dirt 5100.00 $ 1,200.00
8.50 Cat 308 Excavator $140.00 $ 1,190.00
4.50 287 Skldloader $140.00 $ 630.00
4.50 Labor $70.00 $ 315.00
10.00 287 Skldloader $140.00 $ 1,400.00
10.00 Labor $70.00 $ 700.00
4.00 Cat 305 $130.00 $ 520.00
18.96 Base Stone $6.95 $ 131.77
3.00 279 Cat Skidloader $140.00 $ 420.00
8.00 Cat 0-5 $140.00 $ 1,120.00
10.00 279 Cat Skidloader $140.00 $ 1,400.00
5.00 Labor $70.00 $ 350.00
2.00 Cat 305 $140.00 $ 280.00
17.10 Fill Sand $6.75 $ 115.43
6.00 3400 Linkbelt $150.00 $ 900.00
2.00 Cat D -5 $140.00 $ 280.00
2.00 Cat 305 $140.00 $ 280.00
8.00 Cat 279 $140.00 $ 1,120.00
8.00 Labor $70.00 $ 560.00
10.00 Skidloader $140.00 $ 1,400.00
45.58 1" Clean Stone $8.80 $ 401.10
6.00 Fill Dirt $100.00 $ 600.00
2.00 Cat 305 $140.00 $ 280.00
8.00 Cat 279 $140.00 $ 1,120.00
4.00 Dump Truck $105.00 $ 420.00
8.00 Skldloader $140.00 $ 1,120.00
8.00 VacTron $265.00 $ 2,120.00
200.00 Silt Fence $0.42 $ 84.00
46.56 Base Stone $6.95 $ 323.59
6.00 Cat 279 $140.00 $ 840.00
8.00 Skldloader $140.00 $ 1,120.00
4.00 VacTron $265.00 $ 1,060.00
1.00 305 Cat $140.00 $ 140.00
1.00 Durnp Truck $105.00 $ 105.00
17.80 Base Stone $6.95 $ 123.71
$ 9,660.12
$ 2,135.00
$ 3,171.77
$ 3,265.43
$ 5,541.10
$ 5,467.59
$ 3,388.71
8/8% :011
8/9/::011
3/10/2011
8/1112011
8/12/2011
4.00 Walkbehind Skid $30.00 $ 120.00
4.00 Labor $70.00 $ 280.00
8.00 VacTron $265.00 $ 2,120.00
3.00 305 Cat $140.00 $ 420.00
8.00 3400 Linkbelt $150.00 $ 1,200.00
2.00 305 Cat $140.00 $ 280.00
2.00 Cat D -5 $140.00 $ 280.00
6.00 279 Cat $140.00 $ 840.00
48.62 3" Clean $9.10 $ 442.44
5.00 Dump Truck $105.00 $ 525.00
8.00 Labor $70.00 $ 560.00
6.00 3400 Linkbelt $150.00 $ 900.00
8.00 Vactron $265.00 $ 2,120.00
2.00 Cat D -5 $140.00 $ 280.00
8.00 279 Cat $140.00 $ 1,120.00
33.12 3" Clean $9.10 $ 301.39
17.02 314 Base $6.95 $ 118.29
5.00 Dump Truck $105.00 $ 525.00
8.00 Labor $70.00 $ 560.00
8.00 Vactron $265.00 $ 2,120.00
3.00 Skidloader $30.00 $ 90.00
5.00 279 Cat $140.00 $ 700.00
31.23 1" Clean $9.10 $ 284.19
3.00 Dump Truck $105.00 $ 315.00
8.00 Vactron $265.00 $ 2,120.00
3/1312.011
1.50 Case290 $175.00 $ 262.50
3.00 Cat 308 $150.00 $ 450.00
8/15/2011
8/16/.'011
8.00 Vactron $265.00 $ 2,120.00
5.00 290 Case $175.00 $ 875.00
3.00 Skidloader $30.00 $ 90.00
7.00 Cat 308 $150.00 $ 1,050.00
2.00 Cat 279 Skidloader $140.00 $ 280.00
10.00 Labor $70.00 $ 700.00
5.00 Vactron $265.00 $ 1,325.00
2.00 290 Case $175.00 $ 350.00
4.00 Skidloader $30.00 $ 120.00
8.00 Linkbelt 3400 $150.00 $ 1,200.00
2.00 Cal 966 $145.00 $ 290.00
4.00 Cat 279 Skidloader $140.00 $ 560.00
17.78 3/4" BaseStone $6.95 $ 123.57
8.00 Dump Truck $105.00 $ 840.00
$ 2,940.00
$ 4,127.44
$ 5,364.68
$ 4,069.19
$ 2,120.00
$ 712.50
$ 5,115.00
$ 4,808.57
8/17: !011
8/18.2011
8/19, 2011
8/22'2011
8/24.2011
8/25.2011
8/26.2011
8/30: 2011
8/30,2011
8.00 Vactron
8.00 Skidloader
4.50 Linkbelt 3400
1.03 Cat 966
4.00 Labor
3.00 308 Cat
4.50 Dump Truck
$265.00 $ 2,120.00
$30.00 $ 240.00
$150.00 $ 675.00
$145.00 $ 145.00
570.00 $ 280.00
5150.00 $ 450.00
$105.00 $ 472.50
1.50 3400 Linkbelt 5150.00 $ 225.00
8.00 Vactron $265.00 $ 2,12 0.00
10.50 Skidloader $30.00 $ 315.00
23.00 Labor $70.00 $ 1,610.00
4.00 Water Truck $130.00 $ 520.00
3.00 290 Case
5.00 Water Truck
1.50 Labor
8.00 Water Truck
$175.00 $ 525.00
$130.00 $ 650.00
570.00 $ 105.00
$130.00 $ 1,040.00
9.50 Skidloader $55.00 $ 522.50
20.50 Labor $70.00 $ 1,435.00
3.00 290 Case
4.50 Skidloader
3.00 Cat 279 Skidloader
16.50 Labor
4.50 290 Case
4.50 Durnp Truck
4.50 Labor
743.62 Landfill Charges
5175.00 $ 525.00
555.00 $ 247.50
$140.00 $ 420.00
$70.00 $ 1,155.00
$175.00 $ 787.50
$105.00 $ 472.50
570.00 $ 315.00
$1.15 $ 855.16
5.50 290 Case $175.00 $ 962.50
3.00 Linkbelt 3400 Compacto $150.00 $ 450.00
8.00 279 Skidloader 5140.00 $ 1,120.00
8.50 Labor $70.00 $ 595.00
5.50 Dump Truck $105.00 $ 577.50
2.50 Lowboy 5205.00 $ 512.50
4.00 Flagger 570.00 $ 280.00
1.00 2" Pump $40.00 $ n0.00
$ 4,382.50
$ 4,790.00
$ 1,280.00
$ 1,040.00
$ 1,957.50
$ 2,347.50
$ 1,575.00
$ 855.16
$ 4,537.50
8/31.2011
9/1/::011
9/1/.2011
9/22011
9/2 "2011
9/8/2011
9/9/2011
9/9/2011
23.50 Labor
7.50 305 Cat
1.00 2" Pump
1.00 Grass Seed
5.00 Eroision Mat
1.00 Staples for Matt
176.59 6" Base Stone
14.50 Dump Truck
4.00 Water Truck
3.00 Gat D-4
6.50 Cat 966
28.50 Labor
$70.00 $ 1.645.00
$140.00 $ 1,050.00
$40.00 $ 40.00
$30.00 $ 30.00
$350.00 $ 1,750.00
$70.00 $ 70.00
$8.80 $ 1,554.00
$105.00 $ 1,522.50
$130.00 $ 520.00
$135.00 $ 405.00
$145.00 $ 942.50
$70.00 $ 1,995.00
5.010.15 Landfill Charges $1.15 $ 5,761.67
9.00 Dump Truck
4.50 Water Truck
12.50 Labor
1.00 2" Pump
3.50 Cat 966
4.975.87 Landfill Charges
8.00 Vac Tron
15.00 Labor
2.00 Superintendent
1.00 Mobilization
8.00 Vac Tron
16.00 Labor
1.00 Superintendent
1.00 Mobilization
$105.00 $
$130.00 $
$70.00 $
$40.00 $
$145.00 $
945.00
585.00
875.00
40.00
507.50
$1.15 $ 5,722.25
$265.00 $ 2,120.00
$70.00 $ 1,050.00
$80.00 $ 160.00
$265.00 $ 265.00
$265.00 $ 2,120.00
$70.00 $ 1,120.00
$80.00 $ 80.00
$265.00 $ 265.00
3.50 290 Case $155.00 $ 542.50
4.50 Dump Truck $105.00 $ 472.50
$ 2,735.00
$ 8,789.00
$ 5,761.67
$ 2,952.50
$ 5,722.25
$ 3,595.00
$ 3,585.00
$ 1,015.00
9/122011
9/14 2011
7.50 VacTron S265.00 $ 1,987.50
15.50 Labor $70.00 $ 1,085.00
1.00 Superintendent $80.00 $ 80.00
1.00 Mobilization S265.00 $ 265.00
4.00 Water Truck S130.00 $ 520.00
$ 3,937.50
14.36 Unsuitable Material $40.00 $ 5'4.40
Structure #20
$ 574.40
$ ' 23, 319.6(1
ALLENDER BUTZKE ENGINEERS INC.
GEOTECHNICAL • ENVIRONMENTAL • CONSTRUCTION Q. C.
AR)
SPECIAL INSPECTOR DAILY REPORT
City of : Dubuque
Project: Dubuque WPCP Modifications
795 Julien Dubuque Drive
Inspection Date: 9/14/11 PN: 105309
Continuous X Periodic
Time Beginning Inspection: 9:30 am Time Ending Inspection:
FOUNDATION EXCAVATION OBSERVATIONS
Completed footing excavations at the above referenced project were observed for the purpose of identifying soil types and
conditions present just below footing level. These observations are restricted to soil materials providing support to the
foundation and do not pertain to the foundation as a structural element.
Soil strength was determined at the project site by calibrated static cone penetrometer. Appropriate hand - operated tools
were used to obtain samples of soils to depths 2 feet below bottom of excavation at the following locations:
Footing for structure #20 at bottom of rock elevation.
It is our opinion that the dark brown -gray silty clay and brown fine sand soils present
beneath bottom of test pit excavations have an allowable bearing value adequate for a design footing pressure of :
2,000 psf except areas noted below.
Our observations as reported represent soil conditions to the depths evaluated and locations within the excavations.
Conditions below these depths and outside of the area of construction are not addressed by this report.
Recommendations /Comments:
Areas of very moist, loose soils about 1' deep were found in the northeast quadrant approximately 25' x 10', and in the
east quadrant approximately 12' x 12'. I recommend contractor remove a minimum of 1' of loose soils in these two
areas and replace with compacted clean rock, which will then meet the bearing pressure of 2,000 psf.
To the best of my knowledge, work inspected was in accordance with the building department approved design drawings,
specifications and applicable workmanship provisions of the I.B.C. except as noted above.
Inspected by: Bryan Aleshire
Reviewed by: Harry L. Allender, P.E.
Report Date: 9/15/11
3660 109TH STREET • URBANDALE, IOWA 50322 • PHONE 515- 252 -1885 • FAX 515- 252 -1888
//iiiMiPan
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
* *PRELIMINARY **
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
Our Order No.
103400 -119
Your Order No.
13h
NO. 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305 -3910
Terms NET 10 DAYS
1 -1/2% per month (18% per annum)
Invoice Date
10/07/2011
DESCRIPTION
AMOUNT
PAY PERIOD(S) 7/25/2011 TO 10/01/2011
COST PERIOD(S) 7/25/2011 TO 10/01/2011
PROJECT: DUBUQUE WPCP ADDITIONS /RENOVATIONS
FLOODING ON 07/28/2011
OVERFLOW OF WASTEWATER AND STORMWATER
******************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Total Labor Costs:
Total Subsistence Costs:
Total Equipment Costs:
Total Material Costs:
Total Subcontract Costs:
Total General Costs:
TOTAL AMOUNT DUE:
Page 01 of 08
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
116,808.96
2,376.50
12,295.10
4,611.74
.00
.00
$136,092.30
/////Mi/•Of
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
* *PRELIMINARY **
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
NO. 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305-3910
Our Order No.
103400 -119
Your Order No.
Terms NET 10 DAYS
1 -112% per month (18% per annum)
Invoice Date
10/07/2011
PAY PERIOD(S)
DESCRIPTION
AMOUNT
7/25/2011 TO 10/01/2011
EMPLOYEE RG HRS
DAVE M CHERNEY 8.00
DAVE M CHERNEY 8.00
JONATHAN C DANIELS 16.00
BENJAMIN M BUNN 16.00
CHAD A SEBO 4.00
MICHAEL J HASS 6.00
BRIAN L MARTIN 16.00
RYAN C KELLY 16.00
BILLY L SWANSON 8.00
ANDREW J VOCKINGS 16.00
GREGORY A MARTIN 16.00
MATTHEW R KONRARDY 16.00
DANNY L RECTOR 15.00
GREGORY A ZIETLOW 8.00
JOHN H DHEIN 8.00
GERALD W DAVID 16.00
CRAIG A WELCH 14.00
BENJAMIN C FISCHER 16.00
THOMAS B HRUBES 16.00
BRIAN A VASKE 16.00
WAYNE A WIRKUTY 8.00
DAMIAN R WEYER 16.00
THOMAS B HRUBES 8.00
JONATHAN C DANIELS 17.00
ROBERT L DEICHSEL 36.00
GARY E SPRAGUE 20.00
MICHAEL J HASS 35.00
BRIAN L MARTIN 16.00
RG RTE
71.20
71.20
125.00
94.96
61.91
84.35
76.85
76.85
76.85
94.96
76.85
76.85
71.20
61.91
91.83
91.83
67.53
76.85
61.91
94.96
95.93
79.24
61.91
125.00
61.91
61.91
84.35
76.85
OT HRS OT RTE PT HRS PT RTE
.00 96.90 .00 122.57
.00 96.90 .00 122.57
.00 .00 .00 .00
.00 128.23 .00 161.50
.00 84.49 .00 107.04
.00 116.04 .00 147.73
.00 105.12 .00 133.38
. 00 105.12 .00 133.38
.00 105.12 .00 133.38
.00 128.23 .00 161.50
.00 105.12 .00 133.38
1.00 105.12 .00 133.38
. 00 96.90 .00 122.57
2.50 84.49 .00 107.04
.00 126.95 .00 162.04
.00 126.95 .00 162.04
.00 92.67 .00 117.79
.00 105.12 .00 133.38
. 50 84.49 .00 107.04
. 50128.23 1.00 161.50
.00 128.57 .00 161.19
1.50 108.18 .00 137.10
.00 84.49 .00 107.04
.00 .00 .00 .00
.00 84.49 .00 107.04
.00 84.49 .00 107.04
.00 116.04 .00 147.73
.00 105.12 .00 133.38
569.60
569.60
2,000.00
1,519.36
247.64
506.10
1,229.60
1,229.60
614.80
1,519.36
1,229.60
1,334.72
1,068.00
706.51
734.64
1,469.28
945.42
1,229.60
1,032.81
1,744.98
767.44
1,430.11
495.28
2,125.00
2,228.76
1,238.20
2,952.25
1,229.60
Page: 02
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
* *PRELIMINARY **
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
NO. 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305-3910
Our Order No.
103400 -119
Your Order No.
Terms NET 10 DAYS
1 -112 %a per month (18% per annum)
Invoice Date
10/07/2011
DESCRIPTION
PAY PERIOD(S) 7/25/2011 TO 10/01/2011
EMPLOYEE
RYAN C KELLY
BILLY L SWANSON
GREGORY A MARTIN
MATTHEW R KONRARDY
DANNY L RECTOR
JOHN H DHEIN
MARCEL W RUSCH
GERALD W DAVID
DONALD F GABRIEL
JOHN R BOLEYN
CRAIG A WELCH
BENJAMIN C FISCHER
THOMAS B HRUBES
BRIAN A VASKE
BRADLEY S MONTGOMERY
DAMIAN R WEYER
JEREMY J BURKART
DAVE M CHERNEY
FABIAN F BARRY
RICHARD E JAEGER
ROBERT L DEICHSEL
GARY E SPRAGUE
MICHAEL J HASS
MILTON P QUINN
RYAN C KELLY
JOHN H DHEIN
GERALD W DAVID
GARY L LOLWING
Page: 03
RG HRS
16.00
40.00
24.00
21.00
24.00
28.00
24.00
24.00
32.00
8.00
40.00
24.00
28.00
40.00
16.00
36.00
24.00
28.00
32.50
28.00
16.00
12.00
7.00
8.00
8.00
8.00
24.00
28.00
RG RTE
76.85
76.85
76.85
76.85
71.20
91.83
67.53
91.83
61.91
79.24
67.53
76.85
61.91
94.96
76.85
79.24
76.85
71.20
61.91
94.96
61.91
61.91
84.35
76.85
76.85
91.83
91.83
76.85
OT HRS
.00
.00
. 00
.00
.00
.00
.00
.00
.00
.00
. 00
.00
.00
1.00
. 00
1.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
. 00
3.00
OT RTE
105.12
105.12
105.12
105.12
96.90
126.95
92.67
126.95
84.49
108.18
92.67
105.12
84.49
128.23
105.12
108.18
105.12
96.90
84.49
128.23
84.49
84.49
116.04
105.12
105.12
126.95
126.95
105.12
PT HRS
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
. 00
. 00
2.50
.00
.00
.00
.00
.00
1.50
. 00
.00
.00
.00
.00
.00
.00
.00
PT RTE
133.38
133.38
133.38
133.38
122.57
162.04
117.79
162.04
107.04
137.10
117.79
133.38
107.04
161.50
133.38
137.10
133.38
122.57
107.04
161.50
107.04
107.04
147.73
133.38
133.38
162.04
162.04
133.38
AMOUNT
1,229.60
3,074.00
1,844.40
1,613.85
1,708.80
2,571.24
1,620.72
2,203.92
1,981.12
633.92
2,701.20
1,844.40
1,733.48
4,330.38
1,229.60
2,960.82
1,844.40
1,993.60
2,012.08
2,901.13
990.56
742.92
590.45
614.80
614.80
734.64
2,203.92
2,467.16
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
**PRELIMINARY**
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
NO 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305 -3910
Our Order No.
103400 -119
Your Order No.
Terms NET 10 DAYS
1 -112% per month (18% per annum)
Invoice Date
10/07/2011
PAY PERIOD(S)
EMPLOYEE
DONALD F GABRIEL
JOHN R BOLEYN
CRAIG A WELCH
BENJAMIN C FISCHER
THOMAS B HRUBES
BRIAN A VASKE
DAMIAN R WEYER
DAVE M CHERNEY
FABIAN F BARRY
RICHARD E JAEGER
JONATHAN C DANIELS
GREGORY A MARTIN
GERALD W DAVID
GARY L LOLWING
CRAIG A WELCH
THOMAS B HRUBES
BRIAN A VASKE
JONATHAN C DANIELS
ROBERT L DEICHSEL
GERALD W DAVID
THOMAS B HRUBES
DAVID H RATZLAFF
FABIAN F BARRY
GERALD W DAVID
FABIAN F BARRY
JONATHAN C DANIELS
FABIAN F BARRY
FABIAN F BARRY
DESCRIPTION
7/25/2011 TO 10/01/2011
RG HRS RG RTE OT HRS OT RTE
24.00 61.91 .50 84.49
11.00 79.24
36.00 67.53
8.00 76.85
32.00 61.91
23.00 94.96
30.50 79.24
4.00 71.20
15.00 61.91
4.00 94.96
5.00 125.00
4.00 76.85
9.00 91.83
12.00 76.85
40.00 67.53
32.00 61.91
14.00 94.96
9.00 125.00
8.00 61.91
5.00 91.83
32.00 61.91
4.00 61.91
8.00 61.91
3.00 91.83
6.00 61.91
4.00 125.00
16.00 61.91
4.00 61.91
.00 108.18
2.00 92.67
.00 105.12
.00 84.49
.00 128.23
1.00 108.18
.00 96.90
.00 84.49
.00 128.23
.00 .00
.00 105.12
.00 126.95
2.00 105.12
13.00 92.67
.00 84.49
1.50 128.23
.00 .00
.00 84.49
.00 126.95
.50 84.49
.00 84.49
.00 84.49
.00 126.95
.00 84.49
.00 .00
.00 84.49
.00 84.49
PT HRS PT RTE
.00 107.04
.00 137.10
. 00 117.79
. 00 133.38
.00 107.04
2.00 161.50
.00 137.10
.00 122.57
.00 107.04
.50 161.50
. 00 .00
.00 133.38
.00 162.04
.00 133.38
.00 117.79
.00 107.04
.00 161.50
.00 .00
.00 107.04
.00 162.04
.00 107.04
.00 107.04
.00 107.04
.00 162.04
.00 107.04
.00 .00
.00 107.04
.00 107.04
AMOUNT
1,528.09
871.64
2,616.42
614.80
1,981.12
2,507.08
2,525.00
284.80
928.65
460.59
625.00
307.40
826.47
1,132.44
3,905.91
1,981.12
1,521.79
1,125.00
495.28
459.15
2,023.37
247.64
495.28
275.49
371.46
500.00
990.56
247.64
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
aiiiMiran
* *PRELIMINARY **
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
NO. 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305-3910
Our Order No.
103400 -119
Your Order No.
Terms NET 10 DAYS
1 -1/2% per month (18% per annum)
Invoice Date
10/07/2011
DESCRIPTION
AMOUNT
PAY PERIOD(S) 7/25/2011 TO 10/01/2011
RG HRS RG RTE OT HRS OT RTE PT HRS PT RTE
EMPLOYEE
Page: 05
Total LABOR:
$116,808.96
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
uaiMiranr
**PRELIMINARY**
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
NO. 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305-3910
Our Order No.
103400 -119
Your Order No.
Terms NET 10 DAYS
1 -1/2% per month (18% per annum)
Invoice Date
10/07/2011
DESCRIPTION
AMOUNT
COST PERIOD(S) 7/25/2011
SUBSISTENCE PAY
JONATHAN C DANIELS
MICHAEL J HASS
DANNY L RECTOR
JOHN H DHEIN
GERALD W DAVID
CRAIG A WELCH
BENJAMIN C FISCHER
WAYNE A WIRKUTY
MICHAEL J HASS
JOHN H DHEIN
MARCEL W RUSCH
CRAIG A WELCH
BENJAMIN C FISCHER
DAVE M CHERNEY
MICHAEL J HASS
GERALD W DAVID
CRAIG A WELCH
JONATHAN C DANIELS
GERALD W DAVID
CRAIG A WELCH
JONATHAN C DANIELS
GERALD W DAVID
JONATHAN C DANIELS
GERALD W DAVID
JONATHAN C DANIELS
JOHN H DHEIN
Page: 06
TO 10/01/2011
Total SUBSISTENCE PAY:
90.00
34.00
45.00
45.00
90.00
90.00
90.00
21.00
135.00
225.00
135.00
225.00
135.00
157.50
45.00
135.00
225.00
45.00
45.00
225.00
45.00
29.00
11.00
18.00
23.00
13.00
$2,376.50
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
uii1Miran
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
* *PRELIMINARY **
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
N O. 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305-3910
Our Order No.
103400 -119
Your Order No.
Terms
NET 10 DAYS
1 -1/2% per month (18% per annum)
Invoice Date
10/07/2011
DESCRIPTION
COST PERIOD(S) 7/25/2011 TO 10/01/2011
EQUIPMENT DESCRIPTION
EQUP WK END 07/30/11
EQUP WK END 08/20/11
EQUP WK END 09/17/11
Page: 07
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labo Standards Act of 1938, as amended
ORIGINAL INVOICE
Total EQUIPMENT:
AMOUNT
8,620.82
3,538.28
136.00
$12,295.10
NNMMMiran
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
**PRELIMINARY**
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
NO. 08431
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305 -3910
Our Order No.
103400 -119
Your Order No.
Terms NET 10 DAYS
1 -1/2% per month (18% per annum)
Invoice Date
10/07/2011
DESCRIPTION
AMOUNT
COST PERIOD(S) 7/25/2011 TO 10/01/2011
MATERIAL DESCRIPTION
STEVES ACE HARDWARE
YARD MATERIALS
BARD MATERIALS LLC
TOP BLOCK AND BRICK
STEVES ACE HARDWARE
DUBUQUE HOSE & HYDRAULICS
DUBUQUE HOSE & HYDRAULICS
YARD MATERIALS
LOWE'S COMMERCIAL SERVICE
JP MORGAN CHASE BANK
MULGREW OIL CO
Page: 08
HOSE F /CLEANFOOTINGS
MTRL WK END 08/06/11
CONC UNDER TRAILER
BLOCK FOR TRAILERS
MENDER HOSE
VACUUM TRUCK HOSES
COUPLING
MTRL WK END 08/20/11
WATER COOLER, BLEACH
UTILITY PUMP
FUEL
Total MATERIAL:
64.18
238.08
2,493.00
105.75
31.97
306.70
3.87
117.75
153.46.
131.09
965.89
$4,611.74
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
Miron Construction Company
Equipment / Material Invoice
Job Number: 103400 Sub Job: 119
DBQ WATER- FLOOD 712812011
mill
lII1lllII1llIlIlIll II
Invoice Number: 105306
For period 7/24/2011 to 7/30/2011
Item Order --- - - - - -- Usage Rates - - -- - -- BiII Basis -- ---- --
Number Description Number qty Usage Units HOUrI Daily Weekly Monthly Qty Units Charge
102 -168 Fan Elec. Cage #18 0 1.00 17.0 Hours 7.20 .00 .00 .00 17.0 Hours 122.40
102 -170 Fan Elec. Cage #20 0 1.00 17.0 Hours 7.20 .00 .00 .00 17.0 Hours 122.40
100 -615 'Pump 3" 110V /220V Sump #15 0 1.00 17.0 Hours 14.70 .00 .00 .00 17.0 Hours 249.90
100 -633 Pump 2" 110V. Sump #33 0 1.00 17.0 Hours 7.60 .00 .00 .00 17.0. Hours 129.20
100 -664 Pump 3" 110V /220V Sump #64 0 1.00 -17.0 Hours 14.70 .00 .00 .00 17.0 Hours 249.90
100 -670 Pump 2" 110V. Sump #70 0 1.00 17.0 Hours 7.60 .00 .00 .00 17.0 Hours 129.20
100 -676 Pump 2" 110V. Sump #76 0 1.00 17.0 Hours 7.60 .00 .00 .00 17.0 Hours 129.20
100 -680 Pump 2" 110V. Sump #80 0 1.00 17.0 Hours 7.60 .00 .00 .00 17.0 Hours 129.20
112 -687 Pump 3" 220V Sump- #87 0 1.00 17.0 Hours 14.70 .00 .00 .00 17.0 Hours 249.90
112 -725 Pump 2" 110V. Sump #125 0 1.00 17.0 Hours 14.70 .00 .00 .00 17.0 Hours 249.90
112 -748 Pump 2" 110V. Sump #148 0 1.00 17.0 Hours 7.60 .00 .00 .00 17.0 Hours 129.20
112 -749 Pump 2" 110V. Sump #149 0 1.00 17.0 Hours 7.60 .00 .00 .00 17.0 Hours 129.20
112 -750 Pump 2" 110V Sump #150 0 1.00 17.0 I-tours 7.60 .00 .00 .00 17.0 Hours 129.20
100 -6B1 Pump 3 "•Gas Trash #1 0 1.00 17.0 Hours 14.70 .00 .00 .00 - 17.0 Hours 249.90
112 -705 Pump 4" Gas Trash #105 0 1.00 17.0 Hours 15.40 .00 .00 .00 17.0 Hours 261.80
100 -087 Truck 2007 Chev #87 0 1.00 10.5 Hours 22.00 .00 .00 .00 10.5 Hours 231.00
106 -114 Truck 2001 Chev #114 0 1.00 17.0 Hours 22.00 .00 .00 .00 17.0 Hours 374.00
104 -096 Skytrak Lift (8000#) #16- L 0 1.00 17.0 Hours 54.00 .00 -.00 .00 17.0 Hours 918.00
110 -181 Skytrak Lift [10,000#) #101 - L 0 1.00 17.0 Hours 54.00 .00 .00 .00 17.0 Hours 918.00
110 -188 Skytrak Lift (8000#) #108 - L 0 1.00 17.0 Hours 54.00 .00 .00 .00 17.0 Hours 918.00
108 -179 Skid Steer #29 0 1.00 17.0 Hours 34.00 .00 .00 .00 17.0 Hours 578.00
106 -008 Rtv Kubota #8 0 1.00 17.0 Hours 15.88 .00 .00 .00 17.0 Hours 269.96
107 -978 Rtv Kubota #18 0 1.00 17.0 Hours 7.35 .00 .00 .00 17.0 Hours 124.95
107 -298 Welder Gas #38 0 1.00 9.0 Hours 14.60 .00 .00 .00 9.0 Hours 131.40
115 -183 Welder Gas #83 0 1.00 9.0 Hours 14.60 .00 .00 .00 9.0 Hours 131.40
205 -020 Hose 2" X 50' Water Discharge 0 24.00 17.0 Hours 1.74 .00 .00 .00 17.0 Hours 709.92
205 -022 Hose 3" X 50' Water Discharge 0 11.00' 17.0 Hours 2.27 .00 .00 .00 17.0 Hours 424.49
205 -024 Hose 4" X 50' Water Discharge 0 4.00 17.0 Hours 3.40 .00 • .00 .00 17.0 Hours 231.20
Equipment Total: 8,620.82
Total Charges: 8,620.82
Page 1 of 1
Miron Construction Company
Equipment / Material Invoice
Job Number: 103400 Sub Job: 119
DBQ WATER- FLOOD 7/28/2011
Item
Number
100 -633
100 -646
112 -159
104 -096
108 -179
107 -978
205 -020
840 -150
1111
11111
11
1111
Description
Pump 2" 110V. Sump #33.
Pump 2" 110V. Sump #46
Truck 2002 Chev #159
Skytrak Litt (8000 #) #16- L
Skid Steer #29
Rtv Kubota #18
Hose 2" X 50' Water Discharge
Diesel Fuel
111
11111 III1
Order
Number
0
0
0
0
0
0
0
358412
Qty
1.00
1.00
-1.00
1.00
1.00
1.00
4.00
25.00
111
Usage Units Hourly
28.0 Hours 7.60
28.0 Hours 7.60
10.0 Hours 22.00
19.5 Hours 54.00
38.0 Hours 34.00
48.0 Hours 7.35
28.0 Hours 1.74
Gal 4.71
Invoice Number: 105950
For period 8/14/2011 to 8/20/2011
Usage Rates
Daily Weeky
.00 .00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
.00
Monthly
.00
.00
.00
.00
.00
.00
.00
Equipment Total:
Material Received:
Material Total:
Total Charges:
Bill Basis - - -- -
Qty Units
28.0 Hours
28.0 Hours
10.0 Hours
19.5 Hours
38.0 Hours
48.0 Hours
28.0 Hours
117.75
Charge
212.80
212.80
220.00
1,053.00
1292.00
352.80
194.88
117.75
3,538.28
117.75
3,656.03
Page 1 of 1
Miron Construction Company
Equipment / Material Invoice
Job Number;: 103400 Sub Job: 119
DBQ WATER- FLOOD 7/28/2011
1111
111
1
11111111111111111111111 111111111111111111111
Invoice Number: 106337
For period 9/11/2011 to 9/1712011
Item
Order -- - - - - -- Usage Rates • - -- - - - - -- Bill Basis ----- ---- --
Number Description Number Qty Usage Units Hourly ady Weekly Monthly ay Units Char
108 -179 Skid Steer #29 0 1.00 4.0 Hours 34.00 .00 .00 .00 4.0 Hours' 136.00
Equipment Total: 136.00
136.00
Total Charges:
Page 1 of 1
v �sa73'
lomoo it 4
. .. -..._
•
THANK YOU-FOR .SHOPPING'AT`STEVE'S ACE
#9597 - STEVES ACE HARDWARE
200 S. LOCUST
(563) 588 -9755
7/29/11 12:01PM NORMA 564 SALE
7064249 2 EA 29.99 EA
ACE HD HOSE 5/8 "X50' 59.98
. J
SUB - TOTAL: 59.98 TAX: . 4.20
. _ -TOTAL : n 64.18
CHARGE AMT: , 64.1 8 ,.. .
= =» JRNL #F30333 I
GUST # 697669
Hitse-Xdete
5 /vdy€--lo' 0 spev2,
Name'. JMS1104480
DANIEN PofVER J
Acct: MIRON Acct: UNIENNUIE
PG#: 103400
RETURNS MUST BE MADE WITHIN 90 DAYS
HOLIDAY ITEMS NOT AFTER HOLIDAY
COUPON
Basket Shoppe now open!.
www.stevesace.com-
Find us. on Facebook!
C0UP0,N.
ra MATERIALS
CENT I1AL REGION
T 503 582 1208
F 583 502 4052
PNYO■CAL A130RE5S:
2.10002 SOUTH
OUCUCUE. 1A 02003
'APEX. CONCRETE.,
PLEASE MAIL PAYMENTS TO:
EIARO MATERIALS, CENTRAL REGION
P.O. BOX 370. OYERSVILLE. IA 52040
MIRON CONSTRUCTION
1471 MCMAHON DRIVE
NEENAH, WI 54956
47/31/201 . 32517 1
Submitted VIa email
VI5O5
AUG 01 2011
CO Milron Construction Co., Inc T1RMOI PAYIAENI Due 10TH OP FOLLOWING MONTH
A Fll•IAIM:C CIIATIGC WILL EIL' m0.03E0 ON FAIT SUC ACCOUIITO
TI[ PINAHCP CNAROE 1'i COMPUTrO 02 A •PI1RIOOIC 0ATC' OR 1.04
PCR MOARH. WIIIC14 IC All ANNUAL P5OCGIJTA0E RATC Of• IOMI OR
MINIMUM GERVICIE CIIARGE OF 00.00 WI•II011LIVCR IG 01111/0 CIL
JOB NUMBER - JOB LOCATION - ADDRESS
QUANTITY Y
DESCRIPTION' >'
UNIT PRICE
•
000110 WATER POLLUTION CONTROL PLANT
07/29/11 30.00 CY 2500 41 C44
30.00 CY CENTRAL TRUCKING
TICKET DATE TOTALS:
TICKETS: 203 -30151 203 -30168 203 -30176
JOB TOTALS
47.100
36.000
TAX.
0.00
0.00
0.00
2493.00 0.00
TOTAL
IF PAYMENT IS MADE BY 08/15/2011, DISCOUNT FOR INVOICE IS 124.65.
03i/6a — Il j
HMM2500346
I I IIIIINI IIIIIIIIINII IIIIIIII IIIIIIII
DELIVERING MATERIAL VALUE WITH INTEGRITY.
1413.00
1080.00
2493.00
2493.00
AMOUNT OUE
2493.00
Top Block and Brick
84 Frentress Lake Rd.
East Dubuque IL 61025
Ph: (815) 747 -3159
Fax: (815) 747 -3109
Bill To:
Miron Construction Co., Inc.
P.O. Box 509
Neenah WI 54957 -0509
;I'nvo ice "lliilll INI!Illl6�ii1!Iii! 3187428
1D' a.' teHIIIII011 !IIII�IIIIllIIIilliili 7/29/2011
•,?a 01/1ii;i110ilrlMAIIINI 1
Ship To:
Miron Construction Co., Inc.
City Of Dubuque -Water Pollution Control
Dubuque IA
r, ,•.., nr•••r:•ur::. +cumr., n"" r:,••. ru, :u•nmr.�•, ;,•'•,,ir.::•,i7::lgq •• yt�i, i• rr,• rTefmsll�: I'8 ei'' S' tii itJU etf�J!IIIi[MBSte�INolf;Ilgl�l�t
°` u "•°''eL rder O f!''') tCustomerJID , !rJu:I<Ira tSalespersonhID.,..f.: ,:U:,: ,Sh:ppinglMethodi::•!u.•:,: IPa menu! I pI p{ ii 64 063
P.urchasef.OrderlNo:,,',;4 PICKUP . Net 30_Days.. __.
C31840 _ I MARC —�!„ .7/29/2011_ rl +:j +• +r�nur :�;
IExt:IPrlce.L'i;lf
75
IShlpped1IIPI
75
'.B�o'Ii!Ulllll
lal•� I + "lUllf �d6, a 1. .r . p :6 �G:U,n9,71y l+ ' +' +',, , n , , i : i� 4; I- ,
IltemlNumberl�Il 'Ilrf✓�illii!ulll loescnption7L+.' f�flirl�} l4fnYlfillllllliyhf •Iflifb!��'1�I'r. L II�'ii,:;:ha, ,'„nll
0
0
C0801 -2
M1060
8x8x16 Regular
Pallets
All returns subject to 15% restocking charge
�Urnt• Pnce,l,;l iuI
$1.21
$15.000
subtoallili ll:iIfliiHl2i;;il
;
1,5i igfit :g l!IIVIlhllli!illlll
gWg1 1.11i! Ilif!l 7 !IIIPI? 1.'
Disco 'uri't ?Ilil'Iil;Lillllll;Il
i7ota lllir!i !iii 'lf3111iflli l<uJ
$90.75
$15.00
$105.75
$0.00
$0.00
$0.00
$105.75
3
10 J f -6'
THANK YOU FOR SHOPPING AT STEVE'S ACE
#9597 - SIEVES ACE HARDWARE
200 S. LOCUST
(563) 588 -9755
8/04/11 9:25AM BONNIE, 563' SALE
74895 ..,. , ... :s3, ..EA' _.,. 249 EA
MENDERHOSE 5/8X3/..4ML: ACE.. ; 7.47
74893 _. '-'s-1.' `4... EA - . -':-.49 EA
MENDERHOSE 5 /8X3 /4FM ACE 9.96
74891 5 EA ' 2.49 EA
MENDER HOSE 5/8 &3/4" ACE 12.45
SUB- TOTAL: 29.88 TAX: 2.09
TOTAL: 31.97
CHARGE ANT: 31.97 ' ./
11111011111111111111R:
Name: X
DANIEN WEYER JMS1105094
Acct: MIRON � �
PO# ::103400711
RETURNS MUST -BE MADE-WITHIN---AD90 DAYS
HOLIDAY. ITEMS°•,NOT, AFTER - HOLIDAY
COUPON
Basket Shoppe now open!
www,stevesace.com
Find us on Facebook!
COUPON
500 E. 14th St. 1 Dubuque, Iowa 52001
(563)- 582 -46731 (800)- 593 -4673
FAX: (563)- 582 -8939
BILL C97000
TO: MIRON CONSTRUCTION CO.
1471 MCMAHON DRIVE
P.O. BOX 509
NEENAH, WI 54957 -0509
Contact:
Tracking #:
Our Order #
00093488
8Thq7(0
Invoice #
341694
• Invoice Date
08/12/2011
Page: 1
of 1
SHIP
TO: MIRON CONSTRUCTION CO.
1471 MCMAHON DRIVE
P.O. BOX 509
NEENAH, WI 54957 -0509
Customer PO #: 103400 -119
Terms:
'DA
S'
Order Qty B.O. Qty
25.00
25.00
1,00
1.00
Ship Qty Item # / Description
U/M
Unit Price
Ext Price
0.000 25.00 HK400
TIGER FLEX K 4
0.000 25.00 HK300
TIGER FLEX K 3
0.000 1.00 DTBC350 EA 4.230
3.50 ID STAINLESS STEEL TBOLT CLAMP
0.000 1.00 DDM36 EA 12.900
3 DIXON MENDER
FT
FT
6.722
4.058
LAMo56433
EIIIIIIIIIn11111111101111111�1111
osa.
telkfee /-ze...; wee-Pe,
1)-3-by
168.05
101.45
4.23
12.90
THANK YOU FOR PLACING YOUR ORDER WITH US!
Sub Total
Sales Tax
Freight
TOTAL DUE
Payment Method
Payment Amount
$286.63
$20.07
$0.00
7 1...T$'•3-0-6.1770
A
0.00
Order Date •
Ship Via
Freight 1
F.O.B.
Taker
+DHH4
•
I '
PRE PAY AND ADD
•
08/12/2011
Order Qty B.O. Qty
25.00
25.00
1,00
1.00
Ship Qty Item # / Description
U/M
Unit Price
Ext Price
0.000 25.00 HK400
TIGER FLEX K 4
0.000 25.00 HK300
TIGER FLEX K 3
0.000 1.00 DTBC350 EA 4.230
3.50 ID STAINLESS STEEL TBOLT CLAMP
0.000 1.00 DDM36 EA 12.900
3 DIXON MENDER
FT
FT
6.722
4.058
LAMo56433
EIIIIIIIIIn11111111101111111�1111
osa.
telkfee /-ze...; wee-Pe,
1)-3-by
168.05
101.45
4.23
12.90
THANK YOU FOR PLACING YOUR ORDER WITH US!
Sub Total
Sales Tax
Freight
TOTAL DUE
Payment Method
Payment Amount
$286.63
$20.07
$0.00
7 1...T$'•3-0-6.1770
A
0.00
• .11'0S-E rHYDRA I C
500 E. 14th St. 1 Dubuque, Iowa 52001
(563) - 582 -46731 (800)- 593 -4673
FAX: (563)- 582 -8939
BILL C97000
TO: MIRON CONSTRUCTION CO.
1471 MCMAHON DRIVE
P.O. BOX 509
NEENAH, WI 54957 -0509
Contact:
.D
En
AUG 2 4.2011 I�
Ml IRO OMPANY INC.
v F
Invoice #
341779
--Invoice-Date
08/15/2011 . I
I Page: 1 of 1
SHIP
TO: MIRON CONSTRUCTION CO.
1471.MCMAHON DRIVE .
• .
NEENAH, WI 54957 -0509
Customer PO #:
Terms:
Order Qty
B.O. Qty Ship Qty Item # / Description
. UIM
Unit Price
•Ext Price • -
1.00 0.000 1.00 W3300X6
PIPE BRASS COUPLING 3/8 NPT
IIINIIII
LAA1056940
NIIIIIIIIIII INNINIIININII
■
EA
3.868
3.87
THANK YOU FOR PLACING YOUR ORDER WITH USI
Sub Total
Sales Tax
Freight
TOTAL DUE
Payment Method
Payment Amount
A
0.00
$3.87
$0.27
$0.00
"�$4`y1�,
114
Our Order #
Order Date
Ship Via
Freight
F.O.B. .
Taker
00093579
08/15/2011
•
PRE PAY AND ADD
DHH4
Order Qty
B.O. Qty Ship Qty Item # / Description
. UIM
Unit Price
•Ext Price • -
1.00 0.000 1.00 W3300X6
PIPE BRASS COUPLING 3/8 NPT
IIINIIII
LAA1056940
NIIIIIIIIIII INNINIIININII
■
EA
3.868
3.87
THANK YOU FOR PLACING YOUR ORDER WITH USI
Sub Total
Sales Tax
Freight
TOTAL DUE
Payment Method
Payment Amount
A
0.00
$3.87
$0.27
$0.00
"�$4`y1�,
114
LOWE'S
ea„n r,l •
SERVICES
Primary Account: 98001377799 Statement Date: 08125111 Page: 1 of 4
Consolidated Statement
Call ahead, fax or order online
before 3 PM, pick up in ,Just 2 hours,
Order by 6 PM, pick up the next day at 7 AM.
See Lowesforpros.com for details.
IrudiI,IIUrlrllrlIhuIII 1IIIIIIIIIrIIIIIIIIIIIJIIIrril rllrll
MIRON CONSTRUCTION CO 47263
ATTN AP
° PO SOX 509
NEENAH, WI 54957 -0509 it AUG 2 9 2011
:WI
PAYMENT STUB
Pagel, of 4
Account: 9800 137779 9
__COPAL
PL INrCT!Qli
Customer Service Online at www.IoQ�5cred•Lt.COm
•
This account is already registered.
--- See your Online Admi to ` a User ID & Password y
•
: j'"l -Aecount'(s} Balance -S !
— a t: j: •i I� i
;� I:t::. I r .I E:7.71..'.4 :. :, i:::
:Cutrent:Involgiik& Reiums. �- ,,; . �. :1 i 1 :.3. a ba P ast D ue :.:a..$14.19
•1
-30 s
�r ``
Y
I
I • 91 81)' Days Fact Due
�**-r,r7 .. T ..
ofelzso Days Past Due L7 r71$0.00
:i:.r'-vifc7c.?%r:7;'-'1770;r:::)(7=-; :)[,,',..1f7\-; 1:4 :' 67)1.1
mw
If you haveu(rapplled paymenls•and.adJustaments „please call us:at•860,- 232- 7443,wfln your
Instructloas to•apply..You;do not n9ed.tb coma' cl us If you are paying•.the•tolaliamount now
dita.`: i ° : LJ
to34QO -1\ c
LAA1057123
IIIIII I� 11 N111111111111111111111U 111111
Send payments to:
Lowe's
P.O. Box 530954
Atlanta GA 30353 -0954
Send Inquiries
(not payments) to:
P.O. Box 2918
Shawnee Mission, KS 66201
For Customer Service: call 1-866-232-7443
Purchases, returns. and payments made Just prior to the statement date may not appear
until the next month's statement. Any payments received after 5pm on any business day or
on any day other than a business day, et the address above. will be credited on the next
business day. If the payment Is made at a location other than such address, credit may be
delayed.
5879 0069
001 07
- Continue-
PAGE 1 of 4
MIRON CONSTRUCTION CO INC
ATTN AP
PO BoX 509
NEENAH, WI 54951.0509
PLEASE INDICATE ADDRESS CHANGES
PAYMENT ADDRESS
(AL 'S
P.O. BOX 530954
ATLANTA, GA 30353-0954
Consolidated Amount Due
AMOUNT.ENCLOSED $
FOR PAYMENT ENCLOSED
PLEASE CHECK ONE OF
THE FOLLOWING OPTIONS:
O Payment Is for entire amount billed.
Please apply to all Invoices.
O Payment Is for specific Invoices.
Please Indicate by 0 beside the
Involceslreturnslunapplled payments
you are payinglapplying and return
the payment stub(s) with your check. •
❑ Apply enclosed payment to oldest
Invoice(s).
66LLLE200V6
9hEST0000
PLEASE RETURN ALL STUBS
WITH YOUR PAYMENT •
Retain left portion for your records.
COLR649A 47263
-1
4
a
0
0
r
m
COST PERIOD(S) 7/25/2011 TO
yyy�y� N
rC O H 0
£ ja] N
oz
o r
m H
0 0 o %
IA
in a 3 H
0
U U
N P in
.Z H 33 N
cd r
3 U
IQ
103400 -119 DDBU
0
CO 0
N a
01
FOR PERIODS: PAY PERIOD(S)
Description
Merchant Name
Trans Date
Employee Name
THEISEN'S #1
Credit Card Totals:
Gas e49wear-fr
03012419' 13
BP
AUTO /TRUCK PLAZA
563 - 557 -5180
00007681398 16TH ST BP
1215 E 16TH ST DUBUOUE IA
Descr. q Y mount
<CUSTOMER COPY:
S1L) CA #02 22.6766 01.61
@3.59/6
Sub Total
Tax
TOTAL
CREDIT
81.61
0.00
61.. 61
$ 01.61
11P BUS. PLUS $81■61l1 �
Acct /Card 0: X XXXX i111fIPlf►AfLi
Auth 0: 551027
Ref: 27765028
ROSP Code: 000
Stan: 16223543405
SITE ID: 7681398
CUSTOMER COPY
- THANKS:. COME AGAIt4
REGO 0003 CSHO 010 DMM 01 THAN# 39483
08/09/11 10:32 :54 STS 16TH
Dias ,qnS
4-444/
tfte
r0/4/63/0",
BP
iJ O/ LR PLAZA
5l 3-55 { -5100
00001481398 16TH ST BP
1215 E 14TH ST DUBUQUE IA
qty mount
count
<CUSTOMER COPY::.
Sid L CA #05 19.2086 69.13
@ 3.599/ 13
Sub Total 49.
Tax 0.00
TOTAL 69
CREDIT $
BP BUS. PLUS $69.13
Acct /Card : XXXXXXXXXXXXXXO76b
flit 1 II: 702491
r Ref 9178804?
Resp Ctide 000
S t an: 093123
r
SITE 11): ?481390
CUSTOMER COPY
THANKS r COME AGAIN
fl002 CO 007 tiRU 01 TRAM 27741
06:50:39 ST1 OH
9140.40e4way
n,L
.
(rro/TRUCK PLAZA
0000, 7601 90 16TH ST BP
1215 E I6Ti ► ST D I U +NNE IA
563-557-520
Dew.
'�.t� }ii mpo
dU
qty amount
ount
19J.466
3.599/ 6
i u y��
1b Total
l.al
Tax
TOTAL
CREDIT
tai ` . p 'L US * 8.9 l,.
AutTrrd 0% 14j (Y5 5 I1 Y i l i CF';
nu- m l 2 11
,r
R.:, n a {fir.•r��Ai li
: 1 • I..ty 1 it %i
:es t Code 000
Star 16143523364
SITE ID: 7681390
CUBTOMFR COPY
THANKS .6 COME
RECI4 0002 CH 015 DRf
OB /01/ 1' . 07:53:01
ial r J.
0,00
�- 6R.91
AGAIN
01 TRF'W ` 20090
fIt ! r�ti: }.r
S T 0 1 6TH
Jot
/�fDO/I?
BF'
AUTO/TRUCK AUTO/TRUCK PLAZA
563 -J57 -5180
00007681398 1 6TH UT BP
1215 E 16TH ST DUBUQUE IA
Desci . qty
< USTOMER COPY:>
BLUE CA #07
@
17.4246
j
@ 3.s f9/ 6
Sub Total
V
x
TOTAL 5 15
CREDIT $ 65,15
mount
65.15
65.15
0.00
DP BUS. PLUS $65.15
Acct /Card #: XXXXXXXXXXXXXX0766
Ruth #: 346001
Ref: 81760047
REP Code: 000
Stan: 16143524548
SITE ID: 7681398
CUSTOMER COPY
THA a COME A A IN
RR 0003 z L H# 010 DRO 01 TRAM 36506
08/01/11 16:0433 8T# 16TH
dob
/034'0c9 -1/
gae3111)0 PLf3cPiioY
wakeol 734-1)
+A fry) 7-1,- /1l-1
F�'.i l
5'�
L �.,�, •;s. �a �r� 'fir �sr r:•�x�"� a"'k
I j^' O s.'r •..... #'•.,� 4� �. i. ..2 ".i at....i
5 3„ F rt7.._r, ,
K «1{ •
4
r 1.'11 ryr
■ ,F1 i•. rte+ f`1 �
/pi tcYnTATirt
1(t7
�1.5.:.1l.. %,H. tY
.ii .F q
tit lu r: -
uk'
Total
Tax
ri it 'd st
PD.YT
:.• r . . � n.�► f IR , ,}i 010 . ifgt
07/X/1,— 11 r�t;
w� 4
'
�
:• rtNtI O
ON 1
•
as c..1/`:
` "iQ6BOO --ttaC
-Qt9LO E�v4mpi
AVM 00/ ikha3 4/4040.1
--310-41--F7r1
AUTO /T ..UCK NAVA
563-557 -5180
08 7681 98 16TH ST BP .
1215 E 16TH ST DUBUQUE IA
escr.
qty amount
.CUSTOMER COPY. r,
+ILV CA #03 13,7016 49.31
@ 3.599/ 6
Sub .Total 49.31
Tex 0.00
TOTAL 49 . 31
CREDIT $ 49.31
BP BUS. PLUS $49.31
Acct/Card 4: XXXXXXXXXXXXXX0766
Auth 4: 052953
Ref: 53723009
ResP Code: 000
Stan: 1610518115-, ._
SITE ID: 7681398.
CUSTOMER COPY
THANKS COME AGAIN
R,ES# 0003 CSI# 014 DR# 01 TRAH�# 35275
07/30/11. 01:26:01 S � ,l 16TH
Bit .
AUTO/TRUCK P AZ f
63- 557 -5160
00007 661398 16TH ST BP
1215 E 16TH ST DUBUQUE IA
qty amount
<CUS fOMER COPY':
SILU CA #03 17.0666
i 3.599/ 6
Sub Total
Tx
TOTAL
CREDIT
6,4.31
64.31
(
0. l'{1f
64.31_
$ 64,31
BP BUS. PLUS $64.31
Acct) Card 0: XXXXXXXXXXX X07 ,6
Auth t: [ Jt (}949314
Ref: 1.471002
PEP Cone. 000
16103515891
SITE ID. 7601398
CUSTOMER COPY
THANKS t COME AGAIN
RE60 0002 CM 015 DWI 01 TRAM 20520
07/29/11 11 :22 :41 5T# 16TH
a7/15
e47154egorte
/Cr
BP
AUTO /TRUCK PLAZA
563 -55? -5100
00007681398 16TH ST BP
1215 E 16TH ST DIME IA
Deem +q• y
• <CUSTOMER Co v>
SILU CA #08
LARGE ICE
LARGE ICE
21.0176
t 3.5991
1
1
Total
1 of al
TaY,
TOTAL'
CREDIT
mud:
75.64
4,75
4.75
I'r` UO5. PLf $85.14
Acct/Card : XXXXXXXXXXXXHX0766
;uh #, 52029
Ref: 294018
RASP COdB: 000
Stan: '16223543192
SITE ID: 7681398
CUSTOMER GUF`V
85.14
0.00
5 i4
85.14
THANKS t. COLE . AGAIN
REED 0002 CSH4 007 0Ri 01 'TRAM 24996
08/09/11 08:46•29 •8T# 16TH
1/.
A'• diinc
I
B,
AUTO /TRUCK PLAZA
563-557-5180
000076813 DUBUQUE IA
1215 E 16TH ST
fescr. ... • amount
QTR COPY.
BLUE CAi #08 14.6026 54.60
@ 3.739/ 8 r.0
LARGE ICE .
Sub Total 64.10
Tax 0.00
TOTAL. • 64.10
CREDIT $ 64.10
BP ice. PLUS $64.10
Acct/Card #: Xx}00 XX) XXXXXX0%6
Auth #: 971801 '
Ref: 01709008 .
Resp Code: O00
Stan: 16183532996
SITE ID: 7601398
CUSTOMER COPY •
THANKS 'COME AGAIN
REG# 0002 MU 015 OR# 01 TR 111 22506
08/05/11 06:39:31 8111 16TH
�36 •-i/7
2/4443IteL
�'''j�
y BP •
•,
AU Y '�(`'O/TR Ci r PLAZA
0000768190 16TH ST BP
1215 E 16TH BT • DUBUQUE IA. •
Descr. .qtY amount
cunt
<C1!ST1 ER COPY>
BLUE CA #05 14.5756
• t 3,339/ 6
SIL') CA #06 12.2393
3.599/ 6
Sub Total
Tax
TOTAL •
CREDIT
Pr . 0
44.05
98.55
0.00
re ld 1.1
W :• 7)
BP BUS. 118S x•98,.55
Acct/Card #: XXXXXXXX XXXXXO 65
A' t{ #: 8+09619
Ref: 1970401
Resp Code: 000
r .,497441
Stan: 8.�a
SITS ID: 7601:98
CUSTOMER COPY
THANKS COME
_ CSH# 010 DO
r
0' #1 47�I 07907 :25
AGAIN r
001 T RANG 31397
8T# ;6TH
/to 3 z/0 o c-
Cr,¢5 dos
/GE
ry
..b.. „•. ..1. 1 1•1 ++
c rJ C" %c
•
'y.y' {.1 .d, ...
_1J2
111,'n
L , 1 T
" 'S. PLUS $77..e4
er'. rl t: X, Tk
i sf
O 0
'4.415736
^ ,76.702
r`r'Or1 fr ?P; OCA
•:j+Iri: {41n►'- 12°,10`
1 7 s .•N w�.J� �./ \ .
fE ID: 71521399
C STB .ER
•
THANKEIT COME
9Er ;O 0001 # 5i# 012 L 1fi 01 TRiNi 16953
(7,fj1 =M't LTA? “TV,
VA/044Bp
AUTO/TRUCK PLAZA
563-557-5180
00007681398 16TH ST BP
1215 E 16TH ST DUBUQUE I
Descr.
-- iw.rlrr��
<t. USTOMER CO
SIIV CA #O8
LARGE ICE
LARGE ICE
qty a�i j Eri1
22rrt�.94 0
t 359/6
1
1
Sub Total
Tax
TOTAL
CREDIT
82.5 8
92.08
i.
92.02
BP BUS. PLUS $92.08
Acct/Card #1 XXXXXXXXXXXXXX0?66
t uti #: 601252
Ref: 52781002
R8sP Code: 00O
Stan:- 1616 X52813'
SITE IN t 76 81398
CUSTOMER COPY
THANKS COME AEA I
REG# 0003 CSS# 00? #R# 01 TRAMP 37001
00/03/11 06 :53 :15 ST4 16TH
/a 3ycv - //9
• a46 Can S
I a (,
AUTO/TRUCK PLAZA
O 1.6 3 b' _
Y•
In-lc p {
•
16TH ST BP
DU .-UC iE Ii
e •war qty
• l�11iot,�rji�
<flUsTOMFR COPY. + r+ r}
LAR �E CE i � l � t l.!
11w
0.1010 ! F�. 0j.4.%)
T1 A YV { i!
ILI
-r ry•• § fi cif!
°�..Q F. -. �• . 7 en F
11 D�._ $ 83 20
HP DUE. PLUS $83.20
6itL•./JC.. 1 •tt ltlt.lAM !S .ref 1
Auth #: 785855
r iiiXIA0f:3
nUlm
Pnriqft ;VIA
Stan:. 16173570529
SITE O: RP
t.:}.S;iiMER COPY
THANKS :F DIME Ab - IN
77 ! �f1 .(br)r
E4, l002 flSH# 015 i,; �� 01 TRAM i 2. '
.ol /04/1 . `0 :07 811 l6;{
OMNI GLASS & PAINT, INC.
3530 Omni Drive
PO Box 2186
Oshkosh, WI 54904
(920) 233-3333
INVOICE
13i
Invoice Number: 0095708 -IN
Invoice Date: 8/30/2011
Job Number: CP61002
Terms: NET 30 DAYS
MIRON CONSTRUCTION
PO BOX 509
Neenah, WI 54957 -0509
Customer Number: 10- G56923
Salesperson: K KEAS
Customer P.O.: 103400
Job Description:
DUBUQUE WPCP MOD(WS /C)
Description
Quantity
Price
Amount
LABOR AND MATERIALS
CLEANING /POWER WASHING REQUIRED FOR CLEAN
UP AFTER FLOODING. THIS IS AN INSURANCE CLAIM
PER MIRON.
LABOR - 80 HRS - $4,920.00
FUEL & MISC MATERIALS - $333.75
OVERDUE INVOICE SUBJECT TO 1-1/2% INTEREST PER MONTH OR 18% ANNUALLY
1.00 5,253.75 5,253.75
Net Invoice:
Freight:
Sales Tax:
Invoice Total:
P.O. Box 2186 • Oshkosh, Wi 549O3
p0. Box 348 • Schofield, Wi5 920 - 234'`'
447 .
775%355.8938
3'- 33
450 Gruber Road • Green Bay, Wi 5431.3 6 X3 3
s�0 -434 _
5,253.75
0.00
0.00
5,253.75
iiii/Mi/'O/1
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
* *PRELIMINARY **
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
1 3j
NO. 08432
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305-3910
Our Order No.
103400 -120
Your Order No.
Terms NET 10 DAYS
1 -1/2% per month (18% per annum)
Invoice Date
9/28/2011
DESCRIPTION
PAY PERIOD(S) 7/25/2011 TO 9/17/2011
COST PERIOD(S) 7/25/2011 TO 9/17/2011
PROJECT: DUBUQUE WPCP ADDITIONS /RENOVATIONS
STRUCTURE 20 & 60 WORK REQUIRED TO KEEP
PLANT FUNCTIONAL AFTER FLOODING ON 07/28/11
******************* * * * * * * * * * * * * * * ** * * * * * * ** * * * * * **
Page Ol of 02
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
Total Labor Costs:
Total Subsistence Costs:
Total Equipment Costs:
Total Material Costs:
Total Subcontract Costs:
Total General Costs:
TOTAL AMOUNT DUE:
AMOUNT
3,074.59
.00
.00
.00
.00
.00
$3,074.59
Miran
w
Building Excellence
Corporate Office
P.O. Box 509
Neenah, WI 54957 -0509
Phone: 920/969 -7000
Fax: 920/969 -7396
* *PRELIMINARY **
ATTN: ACCOUNTS PAYABLE
CITY OF DUBUQUE
50 WEST 13TH STREET
DUBUQUE IA 52001
NO. 08432
Please Remit to:
Miron Construction Co Inc.
Box 23910
Green Bay, WI 54305-3910
Our Order No.
103400 -120
Your Order No.
Terms NET 10 DAYS
1 -1/2% per month (18% per annum)
Invoice Date
9/28/2011
DESCRIPTION
PAY PERIOD(S) 7/25/2011 TO 9/17/2011
EMPLOYEE RG HRS RG RTE OT HRS OT RTE PT HRS PT RTE
MICHAEL J HASS 2.00 84.35 .00 116.04 .00 147.73
MATTHEW R KONRARDY .00 76.85 5.00 105.12 4.00 133.38
DANNY L RECTOR 1.00 71.20 1.00 96.90 .00 122.57
CRAIG A WELCH 2.00 67.53 .00 92.67 .00 117.79
BRIAN A VASKE .00 94.96 5.00 128.23 4.00 161.50
BRIAN A VASKE .00 94.96 2.00 128.23 .00 161.50
Page: 02
Total LABOR:
AMOUNT
168.70
1,059.12
168.10
135.06
1,287.15
256.46
$3,074.59
Seller represents that with respect to the production of the article and/or services covered by this invoice, it has fully complied with the provisions of the Fair Labor Standards Act of 1938, as amended
ORIGINAL INVOICE
f
i
i
HERN
855 Morris Street
P.O. Box 1316
J. F. ANERN CO. Fond du Lac, WI 54936 -1316
MEChANiCAL & FIRE Ph (920)921 -9020 / Fx (920)929 -8825
PROTECTION CONTRACTORS www.jfahem.com
October 7, 2011
Ph: (920) 969 -7392
Fx : (920) 969 -7399
Mr. Jonathan Daniels
Miron Construction Co., Inc.
1471 McMahon Road
PO Box 509
Neenah, WI 54957 -0509
RE: Dubuque WWTP
J. F. AHERN CO. JOB #: 211921
CUSTOMER CONTRACT #:
MOD 13: FLOOD CLEANUP COSTS - J. F. AHERN CO.
Dear Jonathan:
Please see the attached cleanup cost T &M sheets for between July 29, 2011, and August 12,
2011 for miscellaneous work required as a result of the July 28, 2011, flood event.
Respond by: 10/17/2011
THREE THOUSAND FOUR HUNDRED SIXTY -FIVE AND 00 /100 DOLLARS $3,465.00
This proposal only covers the direct costs of labor, materials and equipment to execute the changed work
described in the proposal.
At the present time, we cannot assess or evaluate the overall impact of the changed work on our original
scope of work.
We thereby reserve our rights to claim for any indirect costs which may arise in the future as a result of
delays to the work, out of sequence work, inefficiencies, extended contract completion, labor and
material escalation and / or acceleration and extended warranties.
Sincerely,
J. F. AHERN CO
;�tJI,S
IMOTHY SCHNEIDER
PROJECT MANAGER
WI MAJOR CONSTRUCTION DIVISION
CC: Jason Talbot, J. F. Ahem Co.
Craig Jerabek, J. F. Ahern Co.
Enclosures
Building the Midwest Since 1880
131
$3,4651
Change Order Summary
HERN
Project: Dubuque WWTP
Project #: 211921
Proposal Date: 10/07/2011
• Change Order #: 57
Revision: 0
Description of Work: MOD 13: Flood Cleanup Costs - J. F. Ahern Co.
Total CO Amount: $3,465.00
Item Description
Foreman
Journeyman
Foreman Room & Board
Tool Costs
TOTAL L - Labor
Overhead & Profit - Labor
TOTAL O - Overhead & Profit
Unit of Unit Price
Calc Type Quantity Measure or Rate PCT % Total Amount
Unit Price 29.00 Hour 81.50 0.00 2,363.50
Unit Price 2.00 Hour 64.97 0.00 129.94
Unit Price 29.00 Hour 12.50 0.00 362.50
Percent 2,855.94 0.00 5.50 157.08
$3,013
Percent 3,013.02 0.00 15.00 451.95
$452
Grand Total:
This proposal only covers the direct costs of labor, materials and equipment to
execute the changed work described in the proposal.
At the present time, we cannot assess or evaluate the overall impact of the
changed work on our original scope of work.
We thereby reserve our rights to claim for any indirect costs which may arise in
the future as a result of delays to the work, out of sequence work, inefficiencies,
extended contract completion, labor and material escalation and / or acceleration
and extended warranties.
Page 1 of 1
SINCE 1880
.855 Morris Street;P O Box 1316
.p0:4 .44 Lac, WI 54936 1316
® (920) 921 =9020 p;,:• (920) 921 8632 f
wwwjfahern com .
WORK ORDER
❑ CONTRACT CHANGE
ORIGINAL JOB NO
SALESMAN'
CUST PO #
DATE STARTED
DATE FINISHED.
%u- COMPLETE
PROJECTNAME h
INV,OICETO s r .
—. a i t
ADDRESS 4 'r
4 �f `P.EtE- evf
ADDRESS r .
-- a xi v r 1 t s
CITY'0
_ ; �' A ,,If ltap r - � `K ..<
CITY zIP y
S f 4 _. 3 i
:PO REMANS S GNATUREk 3 a ,t
AUTHORIZED SIGNATURE 1 t1 { v'
PRINT NAME:. ` t
DATE Cllg
PROJECTTELEPHONE. r
CUSTOMERTELEPHONE NO FI G 1 t 1 {
WORK DESCRI TIO�J
r K �J SvyV� E-
rk= i7.1•. ,p Jllf; Ad-
., _ 3" L
}}r " /+
^�.k.! A '1 l _
: Fy S. - _ �'. - -~7_' Z >'t J •4F� 4 �r `k t 5.
rfg� E� }
i
tt i a t,
TERMS OF THIS AGE EE;MENT ARE L
,. „”? c; i�❑TIMEAND„MATERIAL,`._ _ r_„ ,::
_.� „Q FIXED" PRICE •,;;, _,.:= - , ._ •. s .„ . ❑FAKE NOT ". TOEXCEED$x�
'0
}
z i+
W/E
S'
M
T
W
T
F
S
OVERTIME NOTES
�
l
�
� 11
�c
A 4b\ S/'`� 4 �l.:t i S ' 1
!
tit :
I,
-
vt,
l}L
_ -1' r_„
n
3
•.s 5
SF ( b 1.
l t. 1 Y! `
, IJ _ S - -
4
j '� 7 t L. t '
z
~
Q
2" ..
EQUIPMENT `�
DESCRIPTION
$_'
M
T
W
T
F94 -0590!
•7" • '
• • . ; • ' • •
.
855 - F A/"141''- .•-. • - koiF Box 1316
p A 54936
. '
_921 ,9‘.,20p
■ea, •",
bL-Jo N�.
•
SALESMAN ,
...,.: ,.,,,,,,...,..,..,...,•,....,. -
:P ..?4I,:PP;0,.t::t-. :
PATE •!:,•.'i--4.START g.Pb ' . "
•.D'.•:":•:,''..A..;::.:.!'..T..!E ..:.:., F' I1'.N' ::. I.i1SH ED':".':"'.:..-,.;:-.1.;=,.•:'::•,. i
. _ .. _ ...,.....
' :• :1- !1..; ,-?- :,-.'- 4,Z. • t):t „.'':. .-,1..'.Z:..?„ :•.:, 1'. ,. .:.::•.-.V..-i.-••.... ,-.•.. : •
A':'''' COMPLETE ,:'; .'.i•
....
eRct. gp . ,.,-- ,-,
, ',-,..
...
- ....,
- '-' *.t2
,•:;:-. - "'''''
Appag§p,-.-,,,,-,.,,
. -,.• •..:, y....ZIP.V.."A ,(.•
: - /14 S2
,:•,..f,„,:,.:'",•"_.,...„..;.:.'t :..:•.
•9-Ptiz.„.....Z.,,•',...,;:::.ii„.„
: -::,„-..' F 9Fq . M_S.S IP N ATL
R
k ,
.,,. .
-
:.-•',4.-p-
PRINT
-
•
;:.PATEV
.,... ,
-(ONE
.•,Y 'v-::,',,:.--.,-,i',;':,....-.:-...:!.-_o-.:I.:.c4::_41=-w.d-.,,i
V
0uSTQW9LC9WT?NV:0...E
;..AUTtO....,4.,-
i.
1...E
;. NO
.,.,
ICDESCRIP 1 Wri:. ,-, ...,.f.*.,..
:WOR , ,. ''.,!•.,i•
•-;:;:',.
4 't ,.„•-,
. , .---
.,..
..,
.• ...
f.'''..-;,- - •' ee.' •
..,.,,-. =,, •
.,-
,-..._
,
.."....0 -.''' '•".
a '-f-ilift,,f.:::.....•
„.• 4.
' ' '•.', '''''''''''';'14.t.q'
.,. ,.
,.. 1.,:. ,
TERMSART
'-•'-' ..,r,,,,,-,.7.4:',A?:,,,e,-4V44,.-
...,...i.y.:-:„.,.....:,
-
HISAGREgMENTA.... '
ii-5,•;•;,'.''',-'2. ..A-, ',,• .'A"'''4,•N I M t A D:MATE8 1
--_,.- •- `'''' -
aPiXED:PE.1P..,.
,
r k . .-.!•
' •i''..,' '.'i= '.
PRICE
°7-T°. EXCEED -!„_,
• . - -,.: .,
''';': .g-i=-1"-.
.:',7: ' - ''','
-:;•.•
:::....
...
..:,..;',
.._.
, . ',. l'-' '''' ?;-';'•1.'":;51'";§.-6.f....0.r
•;1, ,,
' --- ••&'• •••••-
_
'
... .
,1A
._,.
i
...'l
OVERTIME
:-N:-
„ •?...4. ' ''''
,..,t.,
:„..-,,:-
''.5.1.-.;W:1;•';
..s.:-..!....'',V=.'„,:._
:.'....-7-4,-:.'...:•::
_.-=•.:=•'.,f_.:.....::::-,.1,....:...i.,-,;.4
;,-,',;,4.,•
•,,,-
.,.
o
,.„ f. .,- ''• ., ..1,.•
%
,,,,,,,,,?,?;,..:
,,,,,,_...!„:;,,,;:A
„.,•,,,,,..,..;1::
,.'•,•;m7k;..-?,--
.-::::•,,,4-,,,.;...,:::,7,....
r:;:•.•?:A:,..',
'
•
?;-.,•
..:-.;,6...i''',',...,
'..';:ei'..'..!•;,f.;
...'::::.',.',::ii,,„,,i
';',,A.;',:17,-
'.:','..r,-f,'.;,,,•:
.-1.1.
...,....,„.......
.....•,,,,..„.
...,,,,,.•.to....„=.„
...-,
.,....
7.'•••14.,-•:.
•:•;..,-7m.i,;....,.
'-;•.-:;`-..‘;A';,.
!-::,,v-§",',P.,,,,
-.,,,,,,,,,, ._, „=, .,;•
., ....,,,,...3-
•••,. i? 4..!
:'• '''l Ri.
, --, ■
'.• 5V, 0 +.
0 .',::;..:
Z3.'
• .',. al '3
-...i.lit.4.
• .. ■.,.
V ..'_::■• CI:: •
'T',.•51‘..:
;.' ''...,:•.< ':'',
,„ .,,,:.J:J'0:',`,:•-'4g,:r..;1;:i."±:..}.- - •
...„ ,
•„
7f:'..T.5!..31',.',... .,,
;.....'3.LE;z1.i,-,_.,-.::':...Eii;•i'f ''''• :4' 1'5-
-...,1:-..-4,:. ,..,_.........
•,--,,,,,,,,,,,,i,... ._
, :_•
' — "•■4',-• . , ti.,
,...".. '.?:.: t'-')--iiktg.',,,
;ik.i.‘,...'e.','..,''.':,'..'t ,,!...,,, ' -
•-•,...•,........,...•...,......,...„.,...,.,
,.,...
- t, ,3,.. -•-• T,
. ._.'.'. '.c.-
■._
...
i-p
..-
•P- ,-I. ..„_ ,...
■-•■•'.. •-,. 4.-• ..-, V'i
33
.-
- ",',
,
- ,..•
, • ,,,,,,,,,'
-3;
' •••;,.•1-1••:-.,... 4,;•" ...„ ..„..,,,......,„.„..,
i4.•
,,.
.,... y".
-3"
V.,,V.:',;•,''.'f'1:-..ie;:i, ,".71;‘,.j;'.'„'„' i, -?•
_.,
';'"''!';'''','',.',..•
•N-2. -'•
....
•Vi
„ • .. ••••-• ' •
.''.'-;:::-:;;;-..?:••', ..1••• .
i2.;:,-•:!.::i.,,,,,,...„,..,',',.•
''''-'"••''' ''''''''.""•--';• • • .1..., ....•
;'•'■ r•-•,.....,,,,,,,,,.... . , ' -- .Y: ;.„
';','••..1.te.,•'...
..--.; '''
--...........
„• -J....
...,.. , ,..„,
•■•••;;:•,•;,.,•
...,,,
7,„:„..„••••••;,,,..,!,,,," • ;
,-...•............,,,,,, ,„........, „...,
......,.......,..„... ...„.., ...,...•,,,„:,
•.,-; ;.,-,-,,,,••••- • •• '
.,-.......„ • .
,.....„ ...„:„„,„.., .„.
.4, .....
. ..,
EQUIPMENT
. , „ • ,,..... ..•
-.-,.2;Y±;..,'..-;;„.••••-,...,...• -,..-e.r--.....• ' .• • ...
•,...1,,,,,,,,-
•
;.• ...
, -
- . ' ''.• • ' ' ---"' .. '''• ' • ' ' •.- '
. • - • • ••• '
• • - • •
.- . . . •
• • •-•
. ,•..". •
•.. , ..,..,
. ... ... • .,
• ••••• • . ,..„
......•'. ;;:
... - •
•....-........
....... ....
••••••••
. -, .....„„.
...... • ,..
-- '''..-
,-, ., ......•
.... .• ,j,
.‘••• .„...... .
• ..... .• „,
„ .:.',..--.
,• ..• • • .-••••••
...
. •
. . ,•
.. • . - •
,„ ...,
:, , • . -
1.
.,.......,,,,,. ..
•., .• ..• .
• ••,.......•',
;,..,, ........
„ •,,......„
•••,•;-• •••• •-••
; ... , . ,..
;,, .... .,-,,
...
,--,
• .
.-j..•.,. ..., • '...•
' ' •
• ' • •
„, , ... .. • , . ". :, . . .• .. •• , .. , - . .,. , . • ... , •
• • . •
. , •
'
•• ;. •
. 1,. •
.. ,..„..,•„,,. ,
• • '
••• '. ' • '
•
-
'•
... ..•
.
• • ; -
, ;•' - . •
. • .
' •'• ••"'•'‘•
'
• •-. • • - .
- •
••••••' '"'
•
. •
' ' ..
, .
„ • . •,,,- .. • • '
.;. -- . ,...; ... • ; • • • .••••••• • .. .. ,,,•• ...,
„ • • - ..._ • :, .....• • • ,•.,"..,••••• •
. ., :•;•,,
. . ..
-,•.• .. , •'
. •
' •• • .•-
• ...•
••
... , - ........,,, . •.,••••
: • . • .1 ••• • . • . • . '• ..• .. .,•• • •.' • •••• • • •• .-.., .;••• •-;.j., • '„,•••,
. .. ..... - . '. • • . • • . .: • ..,,. • .. ....... , ...,..,.........•-•
• .• , ,. • .• • • . • ...... • . ; • ... • •
• . • ....
"-7
•
F54=95°°
)RK ORDERf
�NTRACT CHANGE;:
Li INAL JOB NO
- tz r s a a
1 DATE STARTED TE FINISHED 9. COMPLETE`
�3ALESMA?) BUST P O /� fi d R 3
,:.--,-3
INVOICE TO• h 1 ,.rc n 1 s .�.e was {�; ? i Y"� T �v.
=PROJECT NAME
TO. i~r -' €` � -C-k
DDRESS.- �, f s ] v
AODRESSI yu i
yet: �5' c�i����w��� 33i�ss +1 �3�4 '�� Ic S' {�„
.t` w 4 O. }. ZIP }'
7'ht �,. 1 iJ� CITYt ri
CITY s'` •� xcia'` + -*t r< r�i
FOR MN�S 51ONATUR! fs�'P� x4 u�� AUTF(ORIZEOSIONI►TURE 4 5 Y: 3 lsa E 5
�n'c a 7x `� r - ��a t•� cfi i-,-� i `.�-' S c � �r7s: Ss4 % x .!} t:_s .� 3 s �
w1�"� w
�� 1 E� �r�'3j PRINT f`(AME iS
PRbJEOTTELEPHONErc� €aa"a.r
,0-,:.,...,),,,;., r 1: e c t3 t CUs OlAEa TEIz.EPHONE NOi. 1tKr
����I•`,i„""�>c � # � �3 °� �`�t'$t 31 � t ' -r` f� ati 5 v.� 1 k
'7,.',.... .....
WORK CESCRIQTI - t�N �x� � �
�? a'tt a w'£s t
,S � �" ��t�t � �
t� 13��°44''s8 ail � n:]
k y t ,MI x. a� 16''''',-
lK r zx, i ,
31 � � . tK Y� 5Y'(T 2
Y h
m: R lr {ur E
s � `t1 Ln'� S
S� rt p� y.J G1a 4 Z ��Jij �� St V�},Y +,f�p as rt rJ ;r�� ry3-3 7 n !£
eP.�.A �,fs >
1z - rL7(rizx r` <?2t'As�P.r� �e 3'2k:'iir t. s,ab
TERMS OFT1SOREEFAENT�IHE Y :�• %x�_ r C � ^n:�t'r'j5 >�� °i�a �� i' 3i`x� :k ��
i�" w i TIME ACID MAtERIAL" o Eo PRL E ��� ' �U PRICE FIOT TO EXCEED S} a
k 1 �OVERTIME7MOTES
p.?�<7 �, 777- �Tt:`ra's-`"14 it,.
F`��,�wt �1� Yr- L r
3 Fs vs a q: ' IItX � � `� ;Y t a �€ ; �r2 eC 7 .i t �+
_ r � Sr ...,-1_ f a� � r r'N Fn�rs �'�
�-'9S' w r�,`i $�'.S{.�j d ! y�a. s� � � 7 ''''.--.-W' �.. 5 � �#",f�. '. j
-1 ',Y_. w2yA # ?7 i`�,ri5'3 S�E - M -pL` 4 -� `�
�- P-�.c? ."�?. :�= �r5'w^��51 YF t� � +��=� rid � - �F
�._Zr4'� f-xs,� iF r��,c _�� E-.
��� �+ ��
x fi"r, -s.i y �y t't ?.r a fad -ca: .e.. r.
ZF' 1I7 t`5?�iF. -- � l� d w
f..f 4. � x r . �L 'g✓�- zF�`,� `[.�; t �' "'� �: �a� �1 ;�5 „,,,..-4 0 R �k5 �. -tiir Ek t1 ?x 5. 1 x z�
�g 4 W ��.�'�Er r'” r� r�'Y '1...,-. i -.r` L.y �3 wry ti � cl �
.� � ) �-5 `t c � f � y 4 yy 5£ f•-�` �' A tai 1ti k -a.as. s' r. a � * c� I S' „-•' Y
is ,-41:4-.m A- 3
..� } -f� i' x:
i L.,,,,-- �,. s �
7..j sj � +,r ,? c'fm�.�A �3�a.4sin suet
rn 4.au'7 .-..4.(- >< x,� -� lti s�."�}' r-: . p,� i7. r ,..„1,4„.., -'•
xr.y,-- -T'ti'� yid F Z;_� -FeS ert t. �`}5�`a l� �•:T >t -7�. E r� ��e�s r 3
� �)'� d - ?.t'�..2. �[ i,�s- "•v�"`rf �'�5 � 1 x � e�i€S.�- ,2 ,�'=� ait filar � C �Ya. r� s'1� -L 'G�ry �
� ._:3 � x�� ;;.•_ .�ssz����'�?G��'yL -�Cr�. c>sti�<��� - ���r yY S�� ��x`�s -�r_ }'"�>�cr'x��� ���'�.
->rr. 1 T � FM-0, -"�'" 3 i++,.F r,-a y� '4441a. ? �v 3'' 'x r`f 7 r
gl � ..�[�L"'rk �1} ��h .,+'.a - "r++.P� }'y arty fir` a Sa�. °. ti "a? � -. st
Y+�,� i �,7 i` �h .i 'Y i1 .E Ira's r f
04 a .r-r 2, -4 M4 c t vA n --41 i7 ,,.; 'ate jx �,`Y 4 .x?'tJY' .x 1; `^,r t ..
f � .1--3,... �.n'Kr -. ‘;'.,r-,- t +- t � -44,t �.r t$isi'Yc:�. �Z��. �. -�' s
�0. � ( � g s..� #.�et �t�, �p 't fz���_ �sst�..�����j � v� r�� F�4� �"�t�� r3Cs� ����•r •r- �a,c,
� r• �� t: J3 ! r �. �� r'" �y��td�;4, i�y�s �..T'c4��' ,t�:"'� .-.26,- U�.� r- "e `L #f`�t +x, w.>�t �F3� ���
re"a'- r Jtt.5 r , - r�rY c',''.� p� ���� sy � �wXT. 'S rrT i �r ti d a r't.- �t � s
�h � - =Sv q.- s t -.4 t t °+” "- `�, -,t4` �,�E•Zr�1�Ts� ��s.,.�. U'��`�t'� �� tr�'. �K� iii �� ��Jt.� s�.
§3�* }l' 12 L3,'� y rid �� Th {- `v {sCS'3 rr S:f -Z •Iv �k 5-7'' dx c� a5 it ° r
� s t i L�s'.�Y
02� 4(6,41-!:ix � .:'t 4�,� �-,€ '? , c .y
{ �`ytz"'4y 3 rY.A a '4
��S I,a� cs•� A��� ��4�t**_.� It�$�..mk� S�yYF "'-'1,,,-„, x�c,..�' � h'. -i' '�
ti> ^I F k, 5 f3- � €�y. z a � stiY7. la
�- -s�� t. ,�
5v.is tt� x tt X�; -. t�7p-
�r rc {� ,,I.3-, Y i K, t C Srr.f t- 7xh
fs�'�rtt 1 "firy "'.tG"f,�.`�- •m$-,a r - "£.x'"7,.7
�� -- ?,?er "g,,-.1 4-1.-IS �,� rt�r ��, 7�If�Sy�.at?e � °-L �]�-�., r� s
:,-r''..' t J-c' ' t+ tef^s.`l=�r'.il nk,a r 7 f
} �'C 3Ea r��eY 1x +. '�'. ��r
;Q i to 4 7 u37 n � AA ', � � 1, 1r� rix { f.
:r s IS kt Fr r= t s,�e}, -r€ i ' ss a,�n L>
p.,....:, a .c ,,,i,,,,,,:;5'
a- s ' s�`'`�.'2. -.. �� _,,-1- �_, i �
Y7 L 7 1 _.
' { -,-,2,-.. t it $4s c''. zr _ n' i--+a r. 7 x
r,,7 `a- €I,S e iv i T ].
f-tir s t
k �: aE7l t
DESCRIPTION r
f
1 ]
1
rsi
- tz r s a a
1 DATE STARTED TE FINISHED 9. COMPLETE`
�3ALESMA?) BUST P O /� fi d R 3
,:.--,-3
INVOICE TO• h 1 ,.rc n 1 s .�.e was {�; ? i Y"� T �v.
=PROJECT NAME
TO. i~r -' €` � -C-k
DDRESS.- �, f s ] v
AODRESSI yu i
yet: �5' c�i����w��� 33i�ss +1 �3�4 '�� Ic S' {�„
.t` w 4 O. }. ZIP }'
7'ht �,. 1 iJ� CITYt ri
CITY s'` •� xcia'` + -*t r< r�i
FOR MN�S 51ONATUR! fs�'P� x4 u�� AUTF(ORIZEOSIONI►TURE 4 5 Y: 3 lsa E 5
�n'c a 7x `� r - ��a t•� cfi i-,-� i `.�-' S c � �r7s: Ss4 % x .!} t:_s .� 3 s �
w1�"� w
�� 1 E� �r�'3j PRINT f`(AME iS
PRbJEOTTELEPHONErc� €aa"a.r
,0-,:.,...,),,,;., r 1: e c t3 t CUs OlAEa TEIz.EPHONE NOi. 1tKr
����I•`,i„""�>c � # � �3 °� �`�t'$t 31 � t ' -r` f� ati 5 v.� 1 k
'7,.',.... .....
WORK CESCRIQTI - t�N �x� � �
�? a'tt a w'£s t
,S � �" ��t�t � �
t� 13��°44''s8 ail � n:]
k y t ,MI x. a� 16''''',-
lK r zx, i ,
31 � � . tK Y� 5Y'(T 2
Y h
m: R lr {ur E
s � `t1 Ln'� S
S� rt p� y.J G1a 4 Z ��Jij �� St V�},Y +,f�p as rt rJ ;r�� ry3-3 7 n !£
eP.�.A �,fs >
1z - rL7(rizx r` <?2t'As�P.r� �e 3'2k:'iir t. s,ab
TERMS OFT1SOREEFAENT�IHE Y :�• %x�_ r C � ^n:�t'r'j5 >�� °i�a �� i' 3i`x� :k ��
i�" w i TIME ACID MAtERIAL" o Eo PRL E ��� ' �U PRICE FIOT TO EXCEED S} a
k 1 �OVERTIME7MOTES
p.?�<7 �, 777- �Tt:`ra's-`"14 it,.
F`��,�wt �1� Yr- L r
3 Fs vs a q: ' IItX � � `� ;Y t a �€ ; �r2 eC 7 .i t �+
_ r � Sr ...,-1_ f a� � r r'N Fn�rs �'�
�-'9S' w r�,`i $�'.S{.�j d ! y�a. s� � � 7 ''''.--.-W' �.. 5 � �#",f�. '. j
-1 ',Y_. w2yA # ?7 i`�,ri5'3 S�E - M -pL` 4 -� `�
�- P-�.c? ."�?. :�= �r5'w^��51 YF t� � +��=� rid � - �F
�._Zr4'� f-xs,� iF r��,c _�� E-.
��� �+ ��
x fi"r, -s.i y �y t't ?.r a fad -ca: .e.. r.
ZF' 1I7 t`5?�iF. -- � l� d w
f..f 4. � x r . �L 'g✓�- zF�`,� `[.�; t �' "'� �: �a� �1 ;�5 „,,,..-4 0 R �k5 �. -tiir Ek t1 ?x 5. 1 x z�
�g 4 W ��.�'�Er r'” r� r�'Y '1...,-. i -.r` L.y �3 wry ti � cl �
.� � ) �-5 `t c � f � y 4 yy 5£ f•-�` �' A tai 1ti k -a.as. s' r. a � * c� I S' „-•' Y
is ,-41:4-.m A- 3
..� } -f� i' x:
i L.,,,,-- �,. s �
7..j sj � +,r ,? c'fm�.�A �3�a.4sin suet
rn 4.au'7 .-..4.(- >< x,� -� lti s�."�}' r-: . p,� i7. r ,..„1,4„.., -'•
xr.y,-- -T'ti'� yid F Z;_� -FeS ert t. �`}5�`a l� �•:T >t -7�. E r� ��e�s r 3
� �)'� d - ?.t'�..2. �[ i,�s- "•v�"`rf �'�5 � 1 x � e�i€S.�- ,2 ,�'=� ait filar � C �Ya. r� s'1� -L 'G�ry �
� ._:3 � x�� ;;.•_ .�ssz����'�?G��'yL -�Cr�. c>sti�<��� - ���r yY S�� ��x`�s -�r_ }'"�>�cr'x��� ���'�.
->rr. 1 T � FM-0, -"�'" 3 i++,.F r,-a y� '4441a. ? �v 3'' 'x r`f 7 r
gl � ..�[�L"'rk �1} ��h .,+'.a - "r++.P� }'y arty fir` a Sa�. °. ti "a? � -. st
Y+�,� i �,7 i` �h .i 'Y i1 .E Ira's r f
04 a .r-r 2, -4 M4 c t vA n --41 i7 ,,.; 'ate jx �,`Y 4 .x?'tJY' .x 1; `^,r t ..
f � .1--3,... �.n'Kr -. ‘;'.,r-,- t +- t � -44,t �.r t$isi'Yc:�. �Z��. �. -�' s
�0. � ( � g s..� #.�et �t�, �p 't fz���_ �sst�..�����j � v� r�� F�4� �"�t�� r3Cs� ����•r •r- �a,c,
� r• �� t: J3 ! r �. �� r'" �y��td�;4, i�y�s �..T'c4��' ,t�:"'� .-.26,- U�.� r- "e `L #f`�t +x, w.>�t �F3� ���
re"a'- r Jtt.5 r , - r�rY c',''.� p� ���� sy � �wXT. 'S rrT i �r ti d a r't.- �t � s
�h � - =Sv q.- s t -.4 t t °+” "- `�, -,t4` �,�E•Zr�1�Ts� ��s.,.�. U'��`�t'� �� tr�'. �K� iii �� ��Jt.� s�.
§3�* }l' 12 L3,'� y rid �� Th {- `v {sCS'3 rr S:f -Z •Iv �k 5-7'' dx c� a5 it ° r
� s t i L�s'.�Y
02� 4(6,41-!:ix � .:'t 4�,� �-,€ '? , c .y
{ �`ytz"'4y 3 rY.A a '4
��S I,a� cs•� A��� ��4�t**_.� It�$�..mk� S�yYF "'-'1,,,-„, x�c,..�' � h'. -i' '�
ti> ^I F k, 5 f3- � €�y. z a � stiY7. la
�- -s�� t. ,�
5v.is tt� x tt X�; -. t�7p-
�r rc {� ,,I.3-, Y i K, t C Srr.f t- 7xh
fs�'�rtt 1 "firy "'.tG"f,�.`�- •m$-,a r - "£.x'"7,.7
�� -- ?,?er "g,,-.1 4-1.-IS �,� rt�r ��, 7�If�Sy�.at?e � °-L �]�-�., r� s
:,-r''..' t J-c' ' t+ tef^s.`l=�r'.il nk,a r 7 f
} �'C 3Ea r��eY 1x +. '�'. ��r
;Q i to 4 7 u37 n � AA ', � � 1, 1r� rix { f.
:r s IS kt Fr r= t s,�e}, -r€ i ' ss a,�n L>
p.,....:, a .c ,,,i,,,,,,:;5'
a- s ' s�`'`�.'2. -.. �� _,,-1- �_, i �
Y7 L 7 1 _.
' { -,-,2,-.. t it $4s c''. zr _ n' i--+a r. 7 x
r,,7 `a- €I,S e iv i T ].
f-tir s t
k �: aE7l t
DESCRIPTION r
f
1 ]
1
F AHERN; CO
855 Morris Street,'P O Box 1316
Fond du Lacs 54936 1316
920 921=9020 920 921 8632 f
i ) P� c �c_
rvww�fahern com,;=
SALESMAN
CUST P \O If
DA E STARTED
DATE FINISHED
fi a
MP ETE
%+CO L
'a ,, nr
PROJECT NAME , s ♦ y .� tt
INVOICE TO
ADDRESS uYTTTr -
ADDflESS
y i � c E z
'
--
GIT ZIP -
,+ f
FOREMANS SIGNATURE of ° +' ° °
�� '� f F : �' 1 `
AUTHORIZED SIGNATURE
fl e c
PRINT NAME;
,�F °
t s ' ? Y
DATE 3. y ry s,�, tf.�:
Fes`
ON
PROJECT TELEPHONE
~
CUSTzOMERTELEPHONENO kryr r r -_ ys- s{ •
WORJfDESCflIPTION
?iv 4 :., 4 tT✓
e 1 9 �5i
Z'�W d 1_f��
C C 5yy i :J y j
) H y E - i` r i +nS
If 1ps`� -t {i
r r
TERMSOFTHISAGHEEMENTARE
TIME AND MATERI
s lti a G a
® FXED PRIG
7r
t
�
yx:a v .x
O PRICE NO O EXCEED $
-3
_
f ft7 : F _
{ ,`„ }S• +� 3'°^i �'�1 YY -t }i�
3 "�F
k...
t Y?..
- �'�'
f i
�i:-
`' .�
t t
fT ..fix
_
�° 'Z i
F"T
& £
,�-S ti
- $. P
OVERTIME NOTES
r ma�yy,, .,n,,,, Fly ty,5 ,��1 i s 1 ''';i=,
L 'fL ? li -ftt2 `' L�r'1 Sc3
hh w! -S. Y £ 5 ,i
X t
T 5
1
S
C
-
[l
-f.
p
7.L
M �.*
J 4
£Y .1
f - r1"Si� " ;yg5�- $Fr3 t-
Y'� kt"I . T¢' i Y t l.�S..t
'iy' A 'S s t F
,'i �{ [,r SC t• 2 3 yd
-1.
4f'- -i
rf!
�1'
-�
P
}.;
eeYZi- �F�}8�' r4F3
1
.f - Z 5
��` T
s
ova :
,
t.'s,' r
r
3 5L rr` ' 2 1 y
-, ` Z I i YJ 5� 4 C r,. A �f i - 1 l
1
.l C°nt 1FTj 19 °3v5 -� i t r� s' t$ [ .k 'S:� h�
'.Q
L 1 } f
3 F ? \:S '.Y `�
`"S
,v
I � l t,, is� lvili
k� f z _£ - 'E.cyWFT
� v?
11 i "l.a !
-- H
t r - s 7 Y
_.�
l''' _ s
+ + C r ,.
, YLt fr( 4✓ Y i :. f h•:
,.. 4t - 1 - sr
x F�:
z3
%INDI
4 i
r
�[ i �
t
i
4
J'- i
'..r
i i -
EQUIPMENT:.
DESCRIPTION`
,3�t . 1
r .t`
.
-. -
..: °`
_...,
_.
.. ,;. -... cue Anon
-, - -,..........._ . ... .
'-:'p-,n2::.;:R:.;,i;Rf,...fzg:-m-wA,•-.--gRi:;:kt2Foii.wxg.yi_c.i.:4n,o-,:x:-J:.:.i-:i,-6,A.;:,•,..•.:---.If,:-?::- 7:--,iolzR_;. -a--,5i.,-,,,,;,,,,,,„..
.:..sAt:Est_..atci.;,, i,„,..,,,,igsxm
14gzi,.
dus-I.ppo..#,;,,_
, k.--4-4::}v-:-.:,-;:i,....=,',-..•
pkTsT,V,,„...64.,,,...;A:,4,.:ctvi.0:i
0N1,-A-..,,,.,,,,,,2,....-,4.1-0.,,,,,,....,vr..,,
,it0901:5)v.a,..-.7.4..-;07slm
,!-M5,113,Am-,:,-.?.=.T.a.:_tiirspkt,f,,,r;s:, ,..;.--.?•••4:.taWiRt?..:).U.:P.,-Ntva'',6i*
7,..-;,,,,,,,,',-,,,,,---,-n--2-----,--_,:-.-::-fi,,,,,,"-..-.---- - - ---,::,, --: -,-- • -,,,,,,,,,,,,,,,,. -,,.::k.K
:.-.r..1 .. R aftdt1.-.gN, A-,. gc '
/gf4T:
tkw..s,..'' 1, o,icET ' i
' 7?fAi 4 e!40:.',i2,,,..-.'.'..,?, '
4:::"-- ::.,'--.. -'...-.1.7,..■;,-,;1,,,,i,i,,07A-,f.--,y,wx,4f.--,::.,:,::.,-.1,-,yo,
3::Apopg.s.p. • , .,x;etw.„1,,,,,,i1-;', -,,,,,,t,,,,,,,,:,4,.w ... ..k.,
'',W,.!,.:',,,,t,,Ve.'s.fi.!
W----i-:"..,4" - ..4 ' , • ,m-ii
• ,-:,.
ADDRESS--,--.---1:.1j:*-:4,.-A7g,...,.:it,5,.S.Ltrf,y.;:pdiTi.,:,,,,::::',-,-;,,,
. . ,,.,-.,,,,, ..•_■.-Et.,i,11
:3-57/4-.,,ri,,-,--1,;-"AN'i:4,-,i,+,,,,,Q,.5's.:.,',.1-ftg.-h--!QI
-r,:,....,..,",,,z:.,,:,.14.,,,..A,..,-A.:,-,-4,,,,,
- -
Z:,_,!,t,
i c,,-,:.1!,,.::1.,..!,
...:4,-.-,,,ft.,--• ..., , . -...e..,-w
,. „ AR52.0.410.1,PAIrl.n5:5;47--,,'7iP-?,441'7'ilA71"4T-f.",14,T): .
;,,,,,!..L.0_,t,I13,4-9,,Wlet-',4P-1.0,,Pct7:',1,'-'..g-fr:4=5P--4V4•-'''',46Cik,j1kg-e,eft----4.4112,4:14.°:v'24i'--4-°:-'6'L-4"5-4V
,V1
-,_..,..:_.,.--r-,:.,,;;;;,
Atft.H.Q81.ZEPA19tWNREkNg4V.',7g,*kilqV4 ' trifiP:904.-F,FiRit(47%Ni'i.4.1:5".7.0.
.=„-..,t-,:,--_-„,.t.,,,..v,,,,,,,,,,,Ir..-,-:,,,,,k,,,,,,-,-,,,,,,-,;,..■,4-,,,,-„,,,,,,,,,,,..3.x.nr.A,r,.. q0,V,.,..,:i1-•,-.7.94,,,,,,,,,,,,,,=-4,-.1,7=-Ttt-',,,,,,Y- i':-.,'.'
= iz,. -'-'-i'■-t' ''''''...,,, P _ -i. ,
TOREW‘NIS NA 9- ''', -1.!. ,7,-c. -'
'
6t...k.,■2:--,44,.. . .
.6.,-0,-
„
eFINVNAIAE4T■A=:@.aw-ritg-
cr4.4cs_Ag7'442-.,;,.:,,,,,,,t----41-,,,,-
24Ri
io.-1,
i...tiEtleitiI01:104
IF.4..,I.-.'..VV-1i-Z4Z_ te-___,'
4
',-1,:-:..-1,3AJr-
1,143-itlg,$
koE
DUSTDMEKIELEE,N-10:1..,
- ,„.,, ,p,..,,,,,,i, * -:o.' , ■,',-.„1:."41.•,,:,-4.2-4.1.,,,,-HZ.-.--,--.1,',r- 'z,k '''-'1:5•4'
.- - -9,:::',1,,,•=t-4',7•V-:"..,,-4-,,,in, fy-,,-, -k. 0- ..., ..,,:- , ,
'...t AA S.3- • Z,
$- ,..,..q.p—...,., .
, „..., ...76,,z-ww.tr,:iygthl,70.;:-,11-- wnis ',illy -,,,,, • i. ,,/,, .k,, 4,, • 4 . .. 4,,....s..- ., ..,-
1 14
_ , .1 , : F '
44- . -
,'
l..,i'VW.:37•11.- ,6, 1,i- r ,,or.:.,-T,",:,,,EV.,-.,. 1-:1',,, eA'6,,,K1,
, , ,,.....M, . _ 'f:,. k • 7. ,....., 1- ,,,.......u.0,:45„,,,,*4.-,,,,t. '..- F.7'i
2. .,,,,,,, .7,,,,,..1,...,,,,-. .-i`,,,,,.--.1..;, '.f.,- '" -,-.4-,,,:z,.:-.?.i; --...k 2 -,7,2".% s. '!---, g,:,-. itakk•-1..p,i4C-;,;,wf.,4-4,Wt,r.,,i.,',-, , ,,,.
e`
4.7rER
, r ,, -,,,,
-0D,,f,li-lisiADREEMOIT'ARE ;,
, e - - ,_•,-,'-lf..,-,..w..4.a.-440-.-V 4.4.
a&44„,...?..
1,-440,
,
4t,
_ ,
..c.t....E.P_ii.s.,,tici:AV.
w.,-5,0:m.•Nr.z,3,,,,4..,-,3,-..,-0-7,4--,,t*w. -,.., ,,..--- ,
,14 *
ger-:,;•
NT 4
...,..f ,_
51=Vi liA
_ ragt:
4 : .
- .,
- ,
:
• -'4"efq
14.V.Iilft
mg
e
..,--.'-?-:::41-:
,-,
g
,
t-X,,,
' - --,
','. ,-,a
-...,-7,,u-kir:
ii:2.4,
••, .--, ,• ...61,-., 44.., •
1.w-...1.1-_,., - „, ,4,-7- ...---,-•,-,..z.,‘1,
, - ,..,,,,....,,,..
iltilia.V4TUci q•-,:-4. ,---af-,--,-
,f-t.n.,'&-_,',,',, {,-...':W-y..,,.'ir,,,,,',.. - -.Z.....-, -W6Q-n,.10.#..
.1--',,?kv,
3,U,riV.'
c1
'Fr.,,,,,
'A',,11;;;"
P`Wi,-::ir;
.
. ..,-, -,,,,,--..,1%. ■ k , .V., .2,1`..t.,1:2,,,,,. ,,...,
`sq.,.-A■5,1f,,q,'W,'T;ikr,,T,TiVri",..-K1':'-'i7;:kg:91‘vitMl..4,%1
..0 - ,,..i,,,,,,,,,,,,,,,tykA*.,4g:
., .=-J,..:.zs.4,z,A,..,r,.1,-.,,,.,,,,I..:.,,I.,:-...t...,,,,,,tk..,.
ZI.ciaajpi,";-1Z.,,,cle,,i,;",-*1-'1,4-1■4,0,1•1.,=.76A'n".10g2--t
1",7A
,....-.-.,-,4",,,
e+''`?.,‘S.rg.';''
■:::-.1;,''ef';
:,.4,e"-Er
' ,..-T- '
;-
■ ,,‘"-i
,.',
•; ,Alol
; PC4, -._
;L.-w- .1,
‘n
i'-' ''
.- ,..1:3',.
-Z ...?,
i ;lily-
,. "■,- '
.,',f.:EciF.,,
0
, f-.
, - '-- ,,,, -1:-- ,' ''''-',-'1%,,-4:',■-,-kltr'.,",-.11'.:15.itW.Ii:Tri'VtWV.-gik:A.IV.,::?;-"24: ,.::,-.■.,,,,-,:,-:,'..,j.---,',:-..44-1,,,,,:,,i.
r,,..,1,,,,,,,,?,,,,.e.4,:.:.,,,!fl.,,,5,.4.4fr.,01kA,.-XV:jc-..A1',."..4.:,1■;,,,7
441'.=i'fr V;f2-4,.-
V'',..i.,:-Li' -',(''''''
V
--,-'',,,. ,'-.■,'.- -,i•
PZIi..,:r•V'' - ' '
%-''...t:',r,";:-......
,4,'-',,...4:-. /43°,..,,,,, ' , 7 - Pa..,,e,44,W,a,,7,4,,,,,,,4',',a1-,..0.,1)---3,1
,V;Y-_,."=3'jigli.'-i 1.04.,-:....1",T.,,,N,--;-'''''.5%1",;"r'?,':•'.0"€':'
1:-:i2:2'1,;:,... ,,? '■,-.0.: ,,,,,, -,., .,,,,,,,,K, ,,,,o`p,„r, ,r,i,-70.,,,c,.”-,:,.V.,,,,ir--,:, Z-,
4illiatV1,-%:PINYP:4241)7ip0-Warqii%';1413-fig"-4;j1W-Vi2k:'?,4:t V-k.-.',
a''V.:;',,"-;',1;: Wi.g.2,'Ifit,Irrit.,,O:t'X';`-itktkft
-;',.,it.,::-.:',;i-i-,:,;,,,t7,3,,,-;-:,,,, - ,:,,..,•=e4.„'",e..%-4,71t,.:..1.,,..1'..-.0-7,,,,C-ht...-7,V1`,14.1,-.:F.A.'..P,,,;=-'
Z7`'` '-'''
?i•.;-,1.---_- • :x..ti,,,,,J.- ,---,..,-,., -,-- ,------- : - ..-: • 2 ,..,_.._,,..,.....,,,,,.... •
'_;-.... :-.--, .,..,,,- - ,-- ,, -...,,,,, • ._«-v-,,,1&•::-).,,o,:mr,41-1, -....li'yr,e,,:,..7_,;.,C,.-..,;:te.-4,-1W-,-.-4,,,,V t
,:ei:-.,,=.,■,,,,-,1,-,.,,s-- - e.,,,e .,.,;i,_,-,-2=4,,‘,.., -..-.47-ko,:Fr-rfri-ro ':.i, ,,,,,V-■'..!;....A...--.:?,',,-;`,.4.,,F.A0 .,`.1.1-',,.!..,.
' %F.:I':..a.,..id-'UVS.--45,i-1,-"i'AR-...1,76....e•-?:Aiiik -,1,-v-,,,,',,-.:-gr,,,,,,,,,,,,...,,,-,,,--!:,---,,,-....!:
ff,:..--1,,?;•kse...:.-v.4-,,ei•e,.4!,-,-, . 41--te.V,'-',..f i::-.4-..e—'''''''r.,-,;.g. e,,,f‘l',351,161,,T i ' .:-,,.v.,----*) it-5:1141-13--a0.1,-T.:7:tikTf ilt-gr.,.1-,\14
,,,,,,c,,t,-,t,:..ii,A","-V.,...C.--;--...2.:".:.,-..,,i --tiV.,,,,,,,r-,v.,,i,9,-s4k,, _,A,,....,,,,F,..' a...4,....-.,...p...,,,,- . 1,- ,,,,,,m,F,..,,A
,:,-',0,-,
-....:.,:,--..z,-:;f7...„.-:.,.%-"._,-,:,,,,,:"-..„.„.._:,,i;i:..,,,,,-_,,,y,._w_msq7,-k .1....T.,",-.Kw.km....v.t.,:,:va-,,-
,..-,:-.,,,,W,,...,-,..,',...,0.,:,,,40.- vd•=.1',.6....?-',..-.L,.. ,3,-.W.f.,,q'''',',., -1., W...,,,, p0,,-1,f1-q=gw,,,,,,,,ZY,N,
..a,"P,..i.t.1:.r.2_,2W-',..^t,,,,,,:,'S.,',,s..-....:.-g.„-...,,q..,.*:,,,-,,a-,,,,,...,1±..., -tu . , ..:::. • -.._; •,-,_ .:,....,-; ...,-;,,,..: - - ' .,,,,„:,,,,„
---'5-'■',Z45.3it-il'f-C,-.,
''''''' '2, "--,-'. ,,,,,''...,.'",,' = ' , ,--..,,,. / o ',.',-R.9,,,.Z,,,- .,-,,,,.-s,'-.,-,",‘ ,..-.,---,,,,,,„.',,,-,-',,,,,-.-0-.,,,-
'-‘_;',.._k".,,..2.'!'.-C'4,4','"- .,.7a4,1,--1,-.',,,,,W.,--q,..k.1.-9,.:0' ,k_,,,,,,,,,A,,..,,,., f.,,,,,;.',,,,,f_p,,,,,....Aa,„,.Na,A,;.-.UVAhif,36
'10iFgE',7i,,.,,a',1 V A r'Zr,IS,?r,e4''''l '''''' ''''er `' ''_.',"s•'.._ ' -,Z.-__,;,,,..;,,,,,;.,,,,,,,,,',.:
r -'' „,::,'Y'r'..:::,...':.,:r.
..,,,,,,,,„,,,,-,c,:fzit-a\--c,M.VZ,,,WA,,,,,i4=itiY.ii.Wgip,tiTIZ40$-.4,VW.32_4-2,,,,3,K-,:...74-14 ,--C,A1-,r,`,_,Tfre-VS.,..V
'''Ii.,Y, .,k,,Zir.,,..W.,,;',,...,
t,.',,=r7-;--,,',-,,-,F',:irr,:;,,A°..--'-'.•-P.V4V-4.4g,',1,--VV,P',--,n1:44.',.P,-,9i,.-,''',,;.6-,',.,-Clfi,p,,,,:_;,„,-i,".i..,,,,4.:1,-,
-0,T,2.;:•.:,',1M-0,ge,IN" '-',:,-;,„,,..:-I:1`,--,0-.,...;',W,,W..0&,-,W..z,.-:-"-,-4::44;',-4.... sv-,- .,,,-,:,---,,,,!;-‘,:.,, -,--.-'^' •.;;'..
,,,, ■-,`.. ,,-. .ci"."i''''',A,r,;77",-.Ri-..:=-='iAgit",,!..0=.'"fAiWei.W..=24,1-7-,,A,C-tt4:44' -.AIANV=';56 ., -'.',IrLig;'ali
''.,,,fg•K.: i'i'?1,14-!...,-,4.7-,...,4Jn45q-..,'A.V",.figi.W.,,,41,--1,--4:,,,:,'..,;;PF-i,',4,4%;,:f:q,p,:yat: .e.,,f_ciAg,-,,,A-9.,
PI,'..4b- - -L,I.,1'.'7,..,,f,ti--,,,,,„■,..-14.T.t.3.6,3,.1,q,,,,o5f.....?,i7-,.,it,„-i.,,,...A..,,,,,,,-__,....,4, ,.., _..!-.. ..-_-, - -
'.',;.;-'7.;-;,,,„.„...,,,,,,,,iL;',,,,,,,,,,,,,,,,,,,,,,-,,,,,t,:_,1*.■f-,,.-,E.,-_-,__oiee4 -,:;,-;„,,v4.-ef,_
m,,T ci
. fl 3A;
1'
,_, , , „:„..„:,;47,47.-i
V 7,,- t .,..sw
eteektfi:kr.Alf.:1.4:;:•gi-WO.',,-;-?,,j`.,f..,,y0-4-w-,---14-1..-
it'ZIPS-491*-Vii.-4-C-7,-.LiV'qVg°.-40.,r,y,,,i&f,!1-4:4-3471:1,-g-.,;4,41,4.th-Zgr._iftr.p
,V g
-.,!-,,Aa:K:TV,M,,t.Q-.%:•-.4.Q.,_:-.'eta.;.:,,,,T,,,,W,Str.4.;,-4:*-'' - ,-,.....g.,..,.,.....,,.;,,,;.,,, . . ,,,,,,,,,,,.„:1,,./,,,„„,,
._,,,,,„.„.„.,,,.,,„,„. , - '' '...,-.Ah- .,.qu.71.4,46,1,..,,,toNwe..tg.T4-4........
-" .-`,'."--.' ''.. ":-... : . - -::;... - 7, • -•,--,--r-:-.,‘ - • • -,---4-41,-,- ,,,,T.4,,v-.':.1.,;,1 .-V:7-it,"1-,Yz,*I'''•'..grkTt'fg-Ti17,'Ai'V'iq-Le--1
... .:„.._ ___,_,,,,,,'
,t03,..+:',--;•1'-'1',.::,,hee,-,:t4Wi '',x;',``'.--z .4.:'A.e 5 )'--- ,,, 'I ,1,---t4.1?i,
.--.
,,,,,,,,,,,,,0,0,1)
E'75,'Vr.fki 7-,-:,,A,,,R.:1!..-,,,,:a.,1P.T.,,,.',...',.
',-..`,-",,,,,,J. ,,,,,,,,,,,,,s,- ,--',,,,
• '.),..,-.7",,,..,..,-, F li,:x- ,,,,,,,,, ' d01-L=t,,,,,,,..i?,,,,,,,,,,,,,,-4,-;,
,,,.., 4,„, ,.._,,,, ,,,.;..rv„..,2,_,,E,,,,J,,,,,,,,,,,-....,...-. -,„,
,. ski.giva-avyffl4-0-/A1-{,Nv.qs.7.:g-:
6:-.4_, .a. :7„..7..;..i.,1..,..6."..,,.
,',..-.d.c,"-,--'^,-,..,'-',.t.'.
,5',..,7'4,-,--' . • ' '-,,,.,
' --,:r
;■,..;.„..,::,....z.
,:',,,,z,f;;;.,',.:-
,, ,, „.,,v,,,K.:7,;,■,...„, ,e,,.v,:1-issi,Zny,,.:-4p:',,f.-::::=1.t:Yg V., ..
.,-.,,, .1-z.:',1,,,,..,7„Z-V„...,:p.,,,,,r
.
‘,.:(J': MT:=.'
'--.. :,--,:o.',,
-
:?-..n,,..i' i
r;"..■...V.:1'
.',■,.',:",,-,
..,
,•,. , .
, .
'-
' ' '
,v,
''''.":: ■., ,
......,,,..1.1',,..,
.
. '-', ,
'
,.'-',;.--...Y,-1-:
‘.‘..";',"_::...- :
L'P.T.:7.=.'
',.;',..T.''':
'_.-,1.:,,..,:-:-..,
.:::;-:-':';';
,.'.,.=:--".Y .;
'•:"...,-..V .
.
. . .
. ,
' ...,.-:'',..,.',-;. '-i ,._.:--.,-..
,,.
,...
,, ...
.
.
, ,. ,
..... .,
...--": .-.,•.;‘-;,.......-f.,;:, -',':,
... . . . ,
. , .
TE
EtECTRsCAL CONTRACTOR
13m
Owner City of Dubuque Computed by JHJ
Project Dubuque Water Pollution Control Plant Modific Date 10- Oct-11
Project No. Verified by
Title Change Order Request Documentation Date
Page l of l
Revision 0
Change Order Request Number: 634701 -026
Description of Modification: Flood Damage Job Reports
Items Included in this proposal:
Miron Constriction Co.. Inc. Material Labor
1.0 MODIFICATION INFORMATION
a) Faith Technologies $ 2,893.28 $ 6,400 00 - b) Wunderlich - Malec $ $
$ - $
$ - $
$ - $
$ - $
$ - $
$ - $
Subtotal: $ 2,893.28 $ 6,400.00
Faith Technologies Mark Up @ 15% $ 433.99 $ 960.00
Subcontractor Mark Up @ 5% $ - $
Bond @ 0% $ - $
TOTAL - Flood Damage Job Reports $ 3,327 :27 $
7,360.00
1t HNO O IES
ELECTRICAL CONTRACTOR
CHANGE PROPOSAL
Faith Technologies, Inc.
800 Wilburn Road, Suite 0
Sun Prairie, WI 53590
faith -tech nologles.com
To Jonathan Daniels Date 10.10.2011
Miron Construction Proposal No. 634701 -026
PO Box 509 Project Dubuque WPCP
Neenah, WI 54957 Location Dubuque, WI
Phone 920.969.7000 Copy To File
Fax 920.969.7399
Faith Technologies, Inc. is pleased to provide the following change proposal regarding Dubuque WPCP — Flood Damage
Job Reports. This proposal is based on the clarifications listed below.
Break Out:
Electrician Labor 80.00 hrs @ $80.00 /hr $6,400.00
Truck Driver 0.00 hrs @ $35.00 /hr $0.00
Materials $2,893.28 $2,893.28
Subtotal $9,293.28
Mark Up 15% $1,393.99
Total Contractor costs w/ markup $10,687.27
Subcontractor Costs $0.00
Subcontractor Markup 5.00% $0.00
Total Subcontractor cost w/ markup $0.00
Bond 0.00% $0.00
Total cost w/ markup $10,687.27
(Note: All work associated with the Flood Damage /Clean Up is described on the attached job reports. This work was completed on
multiple days.)
If you have arty questions or concerns please feel free to contact me at (608) 834 - 2666. Thank You.
Authorized Signature
son Borgardt, Project Manager
This proposal may be withdrawn by us if not accepted in 30 days.
ACCEPTANCE OF PROPOSAL
The above prices, specifications, and conditions are satisfactory and are hereby accepted. You are authorized to do the work as specified.
Accepting this change proposal will extend our contract by working days.
Customer Acceptance
Date of Acceptance
Visit Our Website at www.faith- technologies.com
PROPOSED CHANGE ORDER
CCN #
Date:
Project Name:
Project Number:
Page Number:
Client Address:
Dubuque- Flood
10/10/2011
Dubuque WWTP
Dubuque WWTP
1
Work Description
*Job Reports- Material and Labor for Flooding
We reserve the right to correct this quote for errors and omissions.
This quote covers direct costs only and we reserve the right to claim for impact and consequential costs.
This price is good for acceptance within 10 days from the date of receipt.
We request a time extension of 3 days.
We will supply and install all materials, labor, and equipment as per your instructions on CCN # Dubuque- Flood Work.
Itemized Breakdown
Phase
Material($)
Labor Hrs
8/1/11
0.00
12.00
8/3/11
0.00
10.00
8/4/11
0.00
4,00
8/15/11
0.00
8.00
8/17/11
0.00
16.00
8/18/11
2,893.28
30.00
Total
2,893.28
80.00
8/1/11
Description
Qty
Net Price
U
Total Mat.
Labor
U
Total Hrs.
Total Labor
12
0.00E
E
0.00
1.00E
E
12.00
Totals
0.00
12.00
8/3/11
Description
Qty
Net Price
U
Total Mat.
Labor
U
Total Hrs.
Total Labor
10
0.00E
E
0.00
1.00E
E
10.00
Totals
0.00
10.00
8/4/11
Description
Qty
Net Price
U
Total Mat.
Labor
U
Total Hrs.
Total Labor
4
0.00
E
0.00
1.00
E
4,00
Totals
0.00
4.00
8/15/11
ORIGINAL.
PROPOSED CHANGE ORDER
Client Address:
CCN #
Date:
Project Name:
Project Number:
Page Number:
Dubuque- Flood 1
10/10/2011
Dubuque WWTP
Dubuque WWTP
2
Description
Qty
Net Price
U
Total Mat.
Labor
U
Total Hrs.
Total Labor
8
0.00
E
0.00
1.00
E
8.00
Totals
1,120
166.21
1,861.55
0.00
C
8.00
8/17/11
Description
Qty
Net Price
U
Total Mat.
Labor
U
Total Hrs.
Total Labor
16
0.00E
O O W W W
0.00
1.00E
C
16.00
Totals
1,120
166.21
1,861.55
0.00
C
16.00
8/18/11
Description
Qty
Net Price
U
Total Mat.
Labor
U
Total Hrs.
2" PVC
280
57.76
O O W W W
161.73
0.00
C
0.00
0.00
4" PVC
1,120
166.21
1,861.55
0.00
C
PVC Glue
1
30.00
30.00
0.00
E
0,00
0.00
4" Duct Bank Stands
280
3.00
840.00
0.00
E
Total Labor
30
0.00
0.00
1.00
E
30.00
Totals
1
1 2,893.28
30.00
Summary
General Materials
Material Total
ELECTRICIAN
Subtotal
Markup
Subtotal
Final Amount
(80.00 Hrs @ $80.00)
(@ 15.000 %)
2,893.28
2,893.28
6,400.00
9,293.28
1,393.99
10,687.27
$10,687.27
CONTRACTOR CERTIFICATION
Name:
Date:
Signature:
I hereby certify That this quotation is complete and accurate based on the information provided.
CLIENT ACCEPTANCE
CCN #: Dubuque- Flood Work
Final Amount:$10,687.27
Name:
Date:
Signature:
Change Order #:
I hereby accept this quotation and authorize the contractor to complete the above described work.
ORIGINAL
TECHNOWGieS
E Amairm L coNV7L4 rsvrs
JOB REPORT
/
Dubuque WPCP
❑ JOB COMPLETE
634701
8/1/2010
1346
NOT COMPLETE
❑CONTRACT
0
EXTRA
T &M
DESCRIPTION OF WORK;
pump out manholes 2- 01,4 - 01,4 -02,5- 01,6 -01,6- 02,6- 03,8 -01
HINDRANCE TO JOB
mud and the need for a generator
JOURNEYMAN
APPRENTICE
0 ST HOUR(S) X S HR = $
0 ST HOUR(S) X $ - HR = $
0 OT /DT HOUR(S) X S - HR = $
0 OT /DT HOUR(S) X s - HR = $
`Aiogro mv7 ;omf /,''%��%//%///%///// //,%%iiRA9,y,o
-o 1 w,/
,f;mt omoo'; r,,
LABOR
Rob Wiessman
DATE
1 -Aug
TIME IN
0 :00
TIME OUT
0:00
STRAIGHT TIM
6
OVERTIME
DOUBLE TIME
DU
RM
PV
Joel Zimmerman
1 -Aug
0:00
0:00
6
0 :00
0:00
0:00
0:00
0:00
0:00
JOURNEYMAN
APPRENTICE
0 ST HOUR(S) X S HR = $
0 ST HOUR(S) X $ - HR = $
0 OT /DT HOUR(S) X S - HR = $
0 OT /DT HOUR(S) X s - HR = $
`Aiogro mv7 ;omf /,''%��%//%///%///// //,%%iiRA9,y,o
-o 1 w,/
,f;mt omoo'; r,,
rri
O
On
7J
METHOD OF PAYMENT CREDIT CARL) ❑ M/C / ❑ AM EX
VISA
CASH CHECK NO
1have read the job report and hereby acknowledge
the accuracy elite hours and the satisfactory
completion of the above described work.
TOTAL LABOR CHARGED TO JOB $
TOTAL VENDOR INVOICES CHARGED TO JOB $
PERMIT FEES CHARGED TO JOB $
TOTAL MATERIAL FROM EET STOCK CHARGED TO JOB S
MISC. CHARGE I% TOTAL BILL. MINIMUM 0E52.00
GRAND TOTAL
LESS DOWN PAYMENT $
WI SALES / COUNTY TAX WACCRUABLE I�66j
CUSTOMER SIGNATURE DATE
3,5 Pe-W M3AJ6 -a -1c
AMOUNT PAID
Inv
ar eteerRRrrOAL CONrwrwc1101
JOB REPORT
/AA':Ae: mg;
DATE
TIME IN
.4144!/4'.4
A. i..e.,Ade
/ L .asi !4 /•,`i'.'.4 A
.
Dubuque WPCP
1211
PV
634701
ME
8/3/2010
1346
5
El
NOT COMPLETE
DCONTRACT
El EXTRA
Seth Anton
T & M
• JOB COMPLETE
•
5
DESCRIPTION OF WORK:
pump water out of conduits between transformer containment and the ct cabinets
clean mud out of transformer vault
HINDRANCE TO JOB
LABOR
DATE
TIME IN
TIN E OUT
S'1'R,\ICII'I'TIM
OVER1`l\II'.
DOUBLE TIME DM
1211
PV
Matt Broitzman
ME
0:00
0 :00
5
Seth Anton
MN
0:00
0:00
5
0:00
0 :00
MEI 0:00
0:00
IIIIINIIIIIII
0:00
0:00
1,/,/,‘//4.07/ * %Lj'•'4'x' 1✓21
JOURNEYMAN
APPRENTICE
r
0 ST HOUR(S) X $ - HR =
0 OT/DT HOUR(S) X S - HR = $
0 ST HOUR(S) X $ - HR = $ 0 OT /DT HOUR(S) X $ - HR = $
I 'rev T :X . (GI%
<
O
n
7d cr2
METHOD OF PAYMENT CREDIT CARD
CASH CHECK NO
❑ NixI ❑ AMEX
VISA
I have read the Job report and hereby acknowledge
the accuracy of the hours and the satisfactory 19 _ Qt,1%
completion of the above described work. fa- - (,(
TOTAL LABOR CHARGED TO JOB S
TOTAL VENDOR INVOICES CHARGED TO JOB $
PERMIT FEES CHARGED TO JOB S
TOTAL MATERIAL FROM EET STOCK CHARGED TO JOB S
MISC. CHARGE 1 TOTAL BILL MINIMUM OF $2.00
GRAND TOTAL
LESS DOWN PAYMENT $
WI SALES / COUNTY TAX IF ACCRUABLE %/�j�Y�
CUSTOMER SIGNATURE DATE
AMOUNT PAID
wa_aeariercaa cONrir•acWR
JOB REPORT
Dubuque WPCP
❑ JOB COMPLETE
634701
/
8/4/2010
1346
DESCRIPTION OF WORK:
O NOT COMPLETE
❑CONTRACT
Q
EXTRA
2
T &M
pump water out of conduits between transformer containment and the ct cabinets
clean mud out of transformer vault
HINDRANCE TO JOB
LABOR
Matt Broitzrnan
DATE
4 -Aug
'MTh IN
0:00
TIME OUT
0:00
STRAIGHT /I'IM
4
OVERTIME, E,
DOUBLE TIME
DM
R\I
PV ...
Y
0:00
0:00
O p
ti
0:00
0:00
0:00
0:00
0:00
0:00
JOURNEYMAN
APPRENTICE
tat , -/4,/awiferiW,
0 ST HOUR(S) X s - HR = $
0 ST HOUR(S) X s - HR = 5
0 OT /DT I-TOUR(S) X s
- HR= $
0 OT /D'I' HOUR(S) X s - HR = $
.lJ !. 61 J/ • Cl ,g /F / / / / /%,> /f /f / / %` / /f /f % "I.i�' / %= " /r:i. %'/ `
:2;,:74";;V';',1.'. V ,{+fk. / . ,/
. ;= •f'II.Lf &:19,Y i /f/ii:
MI ti
Y
t
- ■
O p
ti
METHOD OF PAYMENT CREDIT CARD
CASH CHECK NO
1 have read the Job report and hereby acknowledge
the accuracy of the hours and the satisfactory
completion of the above described work.
STAA-a U / f� t..
CUSTOMER SIGNATURE
❑ M/C / ❑ AM EX
VISA
--- f- ..!I
TOTAL LABOR CHARGED TO JOB S
TOTAL VENDOR INVOICES CHARGED TO JOB S
PERMIT PEES CHARGED TO JOB S
TOTAL MATERIAL FROM EET STOCK CHARGED TO JOB S
MISC. CHARGE I% TOTAL BILL MINIMUM OF S2.00
GRAND TOTAL
LESS DOWN PAYMENT $
WI SALES / COUNTY TAX IF ACCRUABLE ? / /j;U:
DATE
AMOUNT PAID
/1""1:411111111111M111ra
"t"Ec x OILOGV S
let.ECrArCAL CONTRACTOR
JOB REPORT
/
Dubuque WPCP
JOI3 COMPLETE
634701
8/15/2010
1346
DESCRIPTION OF WORK:
NOT COMPLETE
DCONTRACF
EXTRA
T & M
remove conduits in ductbank due to bank colapsing
HINDRANCE TO JOB
LABOR
DATE
TIi 1E IN
TIME OUT STRAIGHT TIM OVERTIME DOUBLE TIME DM RM PV
2
2
2
2
30'/ % 1, / / 0,11
JOURNEYMAN
APPRENTICE
0 ST HOUR(S) X s HR =
0 ST HOUR(S) X $ HR
$
f ?.P.t1.1rf'iti itli.,F %ff /./%'/ 7 M0'/ , /f %/,
0 OT /DT HOUR(S) X
0 OT /DT HOUR(S) X
s - HR= $
FIR = $
METHOD OF PAYMENT CREDIT CARD
CAST -1 CHECK NO
1 have read the job report and hereby acknowledge
the accuracy of the hours and the satisfactory
completion of the above described work.
177- A—TX
❑ M/C / ❑ AM EX
VISA
CUSTOMER SIGNATURE
TOTAL LABOR CHARGED TO JOB S
TOTAL VENDOR INVOICES CHARGED TO JOB $
PERMIT FEES CHARGED TO JOB $
TOTAL MATERIAL FROM EET STOCK CHARGED TO JOB $
MISC. CHARGE I% TOTAL BILL MINIMUM OF 52.00
GRAND TOTAL
LESS DOWN PAYMENT S
WI SALES / COUNTY 'TAX IF ACCRUABLE %/'!%°i'
DATE
AMOUNT PAID
0:00
Rob Wiessmann
15 -Aug
0:00
0:00
Joel Zimmerman
15 -Aug
0:00
0:00
Josh bedward
15 -Aug
0:00
0:00
Seth Anton
15 -Aug
0:00
0:00
0 :00
2
2
2
2
30'/ % 1, / / 0,11
JOURNEYMAN
APPRENTICE
0 ST HOUR(S) X s HR =
0 ST HOUR(S) X $ HR
$
f ?.P.t1.1rf'iti itli.,F %ff /./%'/ 7 M0'/ , /f %/,
0 OT /DT HOUR(S) X
0 OT /DT HOUR(S) X
s - HR= $
FIR = $
METHOD OF PAYMENT CREDIT CARD
CAST -1 CHECK NO
1 have read the job report and hereby acknowledge
the accuracy of the hours and the satisfactory
completion of the above described work.
177- A—TX
❑ M/C / ❑ AM EX
VISA
CUSTOMER SIGNATURE
TOTAL LABOR CHARGED TO JOB S
TOTAL VENDOR INVOICES CHARGED TO JOB $
PERMIT FEES CHARGED TO JOB $
TOTAL MATERIAL FROM EET STOCK CHARGED TO JOB $
MISC. CHARGE I% TOTAL BILL MINIMUM OF 52.00
GRAND TOTAL
LESS DOWN PAYMENT S
WI SALES / COUNTY 'TAX IF ACCRUABLE %/'!%°i'
DATE
AMOUNT PAID
411Airwri-
TECHNOLOGIES
eL.corirtrcvit. Cf3IVYITIMCMair
JOB REPORT
4.'0A; At! :4116,
DATE
TIME IN
.41,:4.',4
At •./,'4"
,A.4110..G.(!','.A.0 A
Dubuque WPCP
DM
R1I
634701
8/17/2010
1346
0:00
❑ JOB COMPLETE
8
NOT COMPLETE
❑CONTRACT
T & M
1'J
0 EXTRA
El
0:00
8
DESCRIPTION OF WORK:
restack conduits and clean conduits due to flooding
HINDRANCE TO JOB
LABOR
DATE
TIME IN
TIME OUT
Sl'RAIGI I'1' TIM
OVERTIME
DOUBLE TIME
DM
R1I
I'1'
Matt Broitzmann
17 -Aug
0:00
0:00
8
d O
On
Seth Anton
17 -Aug
0:00
0:00
8
0:00
0:00
0:00
0:00
0:00
0:00
T
JOURNEYMAN 0 ST HOUR(S) X s HR = $
APPRENTICE 0 ST HOUR(S) X s HR= $
0 OT/DT HOUR(S) X s - HR = $
0 OT /DT HOUR(S) X $ - HR = $
METHOD OF PAYMENT CREDIT CARD ❑ M/C / ❑ AM EX
CASH CI -HECK NO VISA
1 have read the job report and hereby acknowledge
the accuracy of the hours and the satisfactory
completion of the above described work.
TOTAL LABOR CHARGED TO JOB 5
TOTAL VENDOR INVOICES CHARGED TO JOB $
PERMIT FEES CHARGED TO JOB 5
TOTAL MATERIAL FROM EET STOCK CHARGED TO JOB S
MISC. CHARGE I% TOTAL BILI, MINIMUM OF 52.00
GRAND TOTAL
LESS DOWN PAYMENT $
WI SALES 1 COUNV TAX IF ACCRUABLE %%,�i
CUSTOMER SIGNATURE DATE
tit/v e -18 -( l
AMOUNT PAID
W5
,`, .�,
/SG
P
./.
f.N" ;,1D „ �4 M
�. ' O/5 ' ;
d O
On
METHOD OF PAYMENT CREDIT CARD ❑ M/C / ❑ AM EX
CASH CI -HECK NO VISA
1 have read the job report and hereby acknowledge
the accuracy of the hours and the satisfactory
completion of the above described work.
TOTAL LABOR CHARGED TO JOB 5
TOTAL VENDOR INVOICES CHARGED TO JOB $
PERMIT FEES CHARGED TO JOB 5
TOTAL MATERIAL FROM EET STOCK CHARGED TO JOB S
MISC. CHARGE I% TOTAL BILI, MINIMUM OF 52.00
GRAND TOTAL
LESS DOWN PAYMENT $
WI SALES 1 COUNV TAX IF ACCRUABLE %%,�i
CUSTOMER SIGNATURE DATE
tit/v e -18 -( l
AMOUNT PAID
ELLCTR{CRL 1•ONTRA•TC7tr2
JOB REPORT
DESCRIPTION OF WORK: install duetbank on hill that was berried due to the storm
used 280 4" PVC stands from our onsite supply also used 5 quarts of PVC glue all supplies will need to be replaced
used 1120' of 4" PVC conduit from our supplies on site and 280' of 2" PVC conduit also from our on site supply all supplies will need to be
replaced
HINDRANCE TO JOB
•r•i
. .. IaVVUa('G:1V..Us;.:,.. -..
. : ,22 :-
"�: %1✓.G% %!'US:N.Or:' -� ::
LABOR
Matt Broilzmann
DATE
18 -Aug
TIME IN
0:00
Dubuque WPCP
STRAIGHT TIM
10
OVERTIME
634701 •
8/18/2010
1346
PV
Seth Anton
18 -Aug
NOT COMPLE l'E
❑CONTRACT
10
'1' S: M
■ J013 COMPLETE
ID
0 EXTRA
is
I8 -Aug
0:00
0:00
10
DESCRIPTION OF WORK: install duetbank on hill that was berried due to the storm
used 280 4" PVC stands from our onsite supply also used 5 quarts of PVC glue all supplies will need to be replaced
used 1120' of 4" PVC conduit from our supplies on site and 280' of 2" PVC conduit also from our on site supply all supplies will need to be
replaced
HINDRANCE TO JOB
srTB 1
J �( C .Ii•.
•
JOURNEYMAN
APPRENTICE
0 ST HOUR(S) X s - i-llt = $
0 ST HOUR(S) X s - FIR = $
0 OT /DT I•IOUR(S) X S - HR = S
U OT /D'1' IIOUR(S) X s - FIR = $
come/01610 is !; _i: :i: /, i;5' !
'%•. " /..., .:. : r,r:.. ` - %.. ,.,.... ,. r'�
•r•i
. .. IaVVUa('G:1V..Us;.:,.. -..
. : ,22 :-
"�: %1✓.G% %!'US:N.Or:' -� ::
LABOR
Matt Broilzmann
DATE
18 -Aug
TIME IN
0:00
TIME OUT
0:00
STRAIGHT TIM
10
OVERTIME
DOUBLE TIME
DM
RM
PV
Seth Anton
18 -Aug
0:00
0 :00
10
Joel Zimmerman
I8 -Aug
0:00
0:00
10
0:00
0:00
0:00
0:00
srTB 1
J �( C .Ii•.
•
JOURNEYMAN
APPRENTICE
0 ST HOUR(S) X s - i-llt = $
0 ST HOUR(S) X s - FIR = $
0 OT /DT I•IOUR(S) X S - HR = S
U OT /D'1' IIOUR(S) X s - FIR = $
come/01610 is !; _i: :i: /, i;5' !
'%•. " /..., .:. : r,r:.. ` - %.. ,.,.... ,. r'�
•r•i
. .. IaVVUa('G:1V..Us;.:,.. -..
. : ,22 :-
"�: %1✓.G% %!'US:N.Or:' -� ::
tTi
d O
7:J V
ME}HOD OF PAYMENT CREDIT CARD ❑ M /C/ ❑ AMEX
CASH • CFIECK NO
1 hare read the job report and hereby acknowledge
the rtccurrrc' of the hours and the satisfactory
completion of the above described work.
VISA
Q�JU
CUS'I'OA ?RSIG\A'I'L!Itl's DA'I'S
*2, 9 -
TOTAL LABOR CHARGED 10 J013 S
TOTAL VENDOR INVOICES CHARGED TO J013 S
PERMIT FEES CHARGED' 1'O JOB S
TOTAL. MATERIAL FROM EE•1' STOCK CHARGED TO JOB S
MISC. CHARGE 1% 'I0I'AL BILL MINIMUM OF S2.00
GRAND TOTAL
LESS DOWN PAYMENT 5
WI :SALES / COUNTY TAX 117 ACCRUABLE ',5'J,:0.00'V
AMOUNT PAID