Signed Contracts_Allender Butzke Engineers, WPPC Geothermal ServicesMasterpiece on the Mississippi TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager Steve Sampson Brown, Project Manager Dubuque All-America City 2007 Water Pollution Control Plant Replacement Project Allender Butzke Engineers, Inc. — Amendment 2 CIP 7101837 DATE: October 17, 2011 Attached is Amendment 2 to the June 6, 2009 Professional Services Agreement for geotechnical engineering services between Allender Butzke Engineers, Inc. (ABE) and the City for the Water Pollution Control Plant (WPCP) Replacement Project (Project). The attached proposal will provide for ABE to perform six (6) test borings of 20 to 30 feet deep to further assess the extent of the outfall pipe deterioration. This amendment of $5,900 will be taken from the current contingency of $1,104,829.18. ACTION TO BE TAKEN Your execution of Amendment 2 to the June 6, 2009 ABE Professional Services Agreement is requested. Upon execution of the noted documents, please return to the Engineering Department for further processing. cc: Gus Psihoyos — City Engineer Jenny Larson, Budget Director Jonathon Brown, Water Pollution Control Plant Manager Attach. K: \PROJECTS \Water Pollution Control Plant Replacement\ PSA Negotiations\ABE\2011 10 -17 -11 MVM Memo re Amendment 2 of ABE Agreement.doc ALLENDER BUTZKE ENGINEERS INC. GEOTECHNICAL • ENVIRONMENTAL • CONSTRUCTION Q. C. 2" AMENDMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES PROJECT NAME: Dubuque WPCP Outfall Sewer PN: 111403 PROJECT ADDRESS: Dubuque, Iowa CLIENT: City of Dubuque Attn: Mr. Steve Brown, Project Manager ADDRESS: 50 W. 13th Street Dubuque, Iowa 52001 SCOPE: Geotechnical Exploration - Mobilization with truck mounted drilling equipment, boring locations, utility locations (Iowa One Call), drill and sample 6 test borings 20 to 30 feet deep, install 3 temporary piezometers, laboratory testing, engineering analysis, and written report. COMPENSATION TERMS: Total cost for above scope of services will be $5,900. The field exploration cost presented above assumes all drilling will be in soil materials. Extra charges of $25.00 per foot will apply for drilling in hard limestone bedrock, if encountered. Consultation subsequent to completion of report at current engineering rates. REMARKS: Field exploration is scheduled to be conducted within the next few weeks when we have a drill crew in the Dubuque area as weather permits. A verbal report of our findings and initial recommendations will be available one week after drilling, followed one to two weeks later with the written report. Services covered by this 2nd Amendment will be performed in accordance with the Terms and Conditions ofthe original 2009 Agreement for Geotechnical Services between the City of Dubuque (Project No. 7101837, Purchase Order 00049457) and Allender Butzke Engineers Inc. (ABE PN 091207) PROPOSED BY ABE INC. ACCEPTED FOR CLIENT By: signed By: David Logemann, P.E. m Title: Principal Engineer Title: C / f G A)o ,ev. Date: October 17, 2011 Date: C 6e0, / co/t Printed Name PLEASE SIGN AND RETURN ACCEPTANCE AGREEMENT TO OUR OFFICE, THANK YOU! 3660 109114 STREET • URBANDALE, IOWA 50322 • PHONE 515- 252 -1885 • FAX 515- 252 -1888