Loading...
City Hall Third Floor Structural Repairs D~~E ~<k~ MEMORANDUM March 28, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: City Hall - 3rd Floor Structural Repairs Building Services Manager Rich Russell recommends initiation of the bidding process for the City Hall - 3rd Floor Structural Repairs Project, and further recommends that a public hearing be set for May 16, 2005. I concur with the recommendation and respectfully request Mayor and City Council approval. 'lIL L/J{ ,: tVVl fl _ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Rich Russell, Building Services Manager ') i! w CITY OF DUBUQUE, IOWA MEMORANDUM March 29, 2005 TO: FROM: Michael C. Van Milligen, City Manager Rich Russell, Building Services Manager il\.../'- SUBJECT: City Hall_3rd Floor Structural Repairs INTRODUCTION The enclosed resolutions authorize the public bidding procedures for the City Hall_3rd Floor Structural Repairs. BACKGROUND The funding for the analysis of the 3rd Floor Structural system is in the CIP for City Hall Remodeling. The firm of IIW Engineers and Surveyors was selected to conduct this study after responding to an informal Request for Proposals. One other firm also responded. The completed analysis indicated that there are three areas of the third floor that would not meet the current loading requirements of the building code. These are located at the center of the engineering office cubicle area, the center of the storage area at the east end of the building and at the top of the circular stairs. IIW then developed conceptual repair options for each that were reviewed by Klauer Construction for constructability and estimated costs. A meeting was held with Brad Mootz and Mike Jansen of IIW, Randy Klauer of Klauer Construction, Civil Engineer II Bob Schiesl and me. As a result of this meeting, final design options were selected for each area. The design in the Engineering office area includes a grid of supporting steel members being added at a height of ten feet above the current third floor level. This grid will attach to the current floor system and provide support, similar to a suspension bridge. Due to the extensive work needed and the time frame of the project in the engineering office area, the Engineering staff members will be relocated to an office space outside of City Hall. The specific site has not been selected at this time. The design in the storage area is similar, but the grid is constructed at a level just above the current floor. The result will be a platform in the center of this space that can be used for storage. The files stored in the east end of third floor will be temporarily relocated to the former Adams Company building. Informal bids for this moving service are currently being solicited. The schedule for the project will be as follows: Advertisement for Bids Notice of Hearing on Plans & Specifications Receipt of Bids Public Hearing Award of Contract Completion April 8, 2005 May 6, 2005 May 5, 2005 May 16, 2005 May 16, 2005 September 2, 2005 RECOMMENDATION I recommend that the City Council establish the date for the public hearing, and authorize the City Clerk to advertise for proposals for the City Hall-3rd Floor Structural Repairs. BUDGET IMPACT The construction costs estimate for the City Hall- 3rd Floor Structural Repairs: Total Project Cost $ 127,000.00 12,700.00 $ 139,700.00 Construction Contract Contingency The funding source for this project will be from the City Hall Remodeling CIP. ACTION TO BE TAKEN The City Council is requested to establish the date for the public hearing and to authorize the City Clerk to advertise for proposals through adoption of the attached resolutions. cc: Cindy Steinhauser, Assistant City Manager Dawn Lang, Budget Director .. RESOLUTION NO. 145-05 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the City Hall_3rd Floor Structural Repairs in the estimated amount of $127,000, are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, approved and adopted this 4th day of April, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 146-05 FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the City Hall-3rd Floor Structural Repairs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 16th day of May, 2005, a public hearing will be held at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, approved and adopted this 4th day of April, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 147-05 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Hall_3rd Floor Structural Repairs is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the notice to bidders hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 5th day of May, 2005. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 16th day of May, 2005. Passed, approved and adopted this 4th day of April. 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk