2011 Sewer Cured-in-Place Pipe (CIPP) Lining ProjectMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project (CIPs 7101637, 7101638 and 7201066) DATE: November 15, 2011 Dubuque kEttd AlwMericaCity 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project, as completed by Visu- Sewer, Inc., in the final contract amount of $94,363.75, which is a 0.2% increase from the original contract amount of $94,219.00. I concur with the recommendation and respectfully request Mayor and City Council approval. ,t,,A44 '.-., 7)4, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi Dubuque hilikd AN acity 1 1 1 1 r 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer -CD SUBJECT: 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project (CIPs 7101637, 7101638 and 7201066) DATE: November 14, 2011 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project. BACKGROUND The sewers identified for lining as part of the 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project were as follows: Location Sewer Diameter (Inches) Length (Feet) Kaufmann Avenue (JFK to Trygg) 12 770 Kaufmann Avenue (Theda to Carter) 8 1,295 Kaufmann Avenue (at Martin) 8 192 Tomahawk 8 250 Laurel Street Storm Sewer 15 254 TOTAL 2,761 DISCUSSION The 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project was completed by Visu- Sewer, Inc. of Pewaukee, Wisconsin, in the final contract amount of $94,363.75, which is a 0.2% increase from the original contract amount of $94,219.00. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $94,363.75 to Visu- Sewer, Inc. for the 2011 Sewer Cured -in- Place Pipe (CIPP) Lining Project. BUDGET IMPACT The project cost summary for the 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project is: Award Final Construction $ 94,219.00 $ 94,363.75 Contingency 10,749.00 Engineering 17,735.85 1,600.00 Total Project Cost $ 122,703.85 $ 95,963.75 The funding summary for the project as follows: CIP Funding Source 7201066 General Storm Sewer Repairs 7101638 Street Program Related Sanitary Sewer 7101637 Sanitary Sewer Lining program Total Project Funding ACTION TO BE TAKEN Amount $ 16,691.50 71,056.25 8,216.00 $ 95,963.75 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $94,363.75 to Visu- Sewer, Inc. for the 2011 Sewer Cured -in -Place Pipe (CIPP) Lining Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II 2 RESOLUTION NO. 381 -11 ACCEPTING THE 2011 SEWER CURED -IN -PLACE PIPE (CIPP) LINING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2011 Sewer Cured -In -Place Pipe (CIPP) Lining Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the General Storm Sewer Repairs, Street Program Related Sanitary Sewer, and Sanitary Sewer Lining Program appropriations for the contract amount of $94,363.75 Tess any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 21st day of Novembe 2011. Attest: Kevin : Firnstahl, City Jerk Q4J Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2011 SEWER CURED -IN -PLACE PIPE (CIPP) LINING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2011 Sewer Cured -In -Place Pipe (CIPP) Lining Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $95,963.75. Dated this i5411 day of NoucrascR , 2011. City Engineer Filed in the office of the City Clerk on the day of /A) , 011. K vin S. Fir stahl, City Clerk THE CITY OF DUB Masterpiece on tire Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 PROJECT CLOSE OUT FORM Project Name: 2011 SEWER CIPP Contractor Address: LINING PROJECT CIP Number: CIP: 7101637 Project Contract Amount: $04,219.00 Project Completion Date: 16- Sep-11 Contractor Name: Visu- Sewer, Inc. Contractor Address: '130 N4855 Balker Rd. City, State, Zip: Pewaukee, WI. 63072 Contractor Telephone: 262-695.234011-800.876-8478 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1493 LF $ 1.00 1500.00 $ 1,500.00 100.47% 100.47% 100.00% 100.00% 100.65% 100.65% 98.82% 98.82% 100.00% 100.00% 100.00% 1 Clean 8 -Inch Diameter Sewer 2 Line 8-inch Diameter Sewer 1493 LF $ 26.50 1500.00 $ 38,250.00 3 Clean 8 -Inch Diameter Sewer (Lining Program) 244 LF $ 1.00 244.00 $ 244.00 4 Line 8 -Inch Diameter Sewer (Lining Program) 244 LF $ 25.50 244.00 $ 6,222.00 5 Clean 12 -Inch Diameter Sewer 770 LF $ 1.00 775.00 $ 775.00 6 Line 12 -Inch Diameter Sewer 770 IF $ 30.75 775.00 5 23,831.25 7 Clean 15- Inch Diameter Sewer (Storm) 254 IF $ 3.00 251.00 $ 753.00 8 Line 15 -Inch Diameter Sewer (Storm) 254 LF $ 63.50 251.00 $ 15,938.50 9 Reinstate Laterals 43 EA $ 150.00 43.00 $ 6,45000 10 _ Reinstate Laterals (Lining Program) 1 0 $ 150.00 1.00 $ 150.00 11 Traffic Control 1 0 $ 250.00 1.00 $ 250.00 CHANGE ORDER Payment Totals $ 94,363.75 I hereby codify that the above statement shows, In detail, the correct amount of ell work re •g1 o complete the above Improvement. Total Contract Work Performed to Date: $ 94,363.75 Total Change Order Work Performed to Date: $ Total Contract and Change Order Work Performed to Date: $ 94,363.76 Miscellaneous Costs Engineering 1,600.00 Gus Psihoyos, City Engineer Dubuque, Iowa TOTAL FINAL PROJECT COSTS: $ 95,963.75 The UndersignedV1 SU- SEWER, INC. contractor for the above Improvement, does hereby accept the abo "Total Due Contractor ", as full settlement ms for said l t r- imenl. APPROVE., ,I/ in) 6Y: Phillip S. om a, Vice - President