2011 CDBG Ramp Installation ProjectMasterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2011 CDBG Access Ramp Installation Project (CIP 2601236) DATE: November 18, 2011 INTRODUCTION Dubuque bikti All- America City 2007 The enclosed resolution provides for the acceptance of the construction contract for the 2011 CDBG Access Ramp Installation Project. BACKGROUND The 2011 CDBG Access Ramp Installation Project provided for the replacement of twenty -one (21) access ramps at various locations throughout the City. DISCUSSION The 2011 CDBG Access Ramp Installation Project was completed by Skyline Trucking & Storage, Inc. of Dubuque, Iowa, in the final contract amount of $32,320.00, which is a 5.0% increase from the original contract amount of $30,767.00. The project increase was due to additional work in order to meet the construction guidelines. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $32,320.00 to Skyline Trucking & Storage, Inc. for the 2011 CDBG Access Ramp Installation Project. BUDGET IMPACT The project cost summary for the 2011 CDBG Access Ramp Installation Project is: Award Final Construction $30,767.00 $32,320.00 Contingency 0 0 Engineering 0 1,616.00 Total Project Cost $30,767.00 $33,936.00 The funding summary for the project is as follows: CIP Funding Source Amount 2601236 Wheel Chair Ramps $33,936.00 Total Project Funding 533,936.00 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $32,320.00 to Skyline Trucking & Storage, Inc. for the 2011 CDBG Access Ramp Installation Project. Prepared by Jane Smith, Engineering Assistant cc: Jenny Larson, Budget Director Aggie Tauke, Community Development Jon Dienst, PE RESOLUTION NO. 391 -11 ACCEPTING THE 2011 CDBG ACCESS RAMP INSTALLATION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 2011 CDBG Access Ramp Installation Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Wheel Chair Ramps appropriation for the contract amount of $32,320.00 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 5th day of Decembe 2011. Attest: Kevi Firnstahl, ity Cler Roy D. B ol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2011 CDBG ACCESS RAMP INSTALLATION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2011 CDBG Access Ramp Installation Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $33,936.00. Dated this ,29 day of Wourmu , 2011. Filed in the office of the City Clerk on the/-- day of 2011. Alit/ --41Mig e in S. Firns ahl, City Clerk City of Dubuque FINAL CONTRACT Date: 11/7/11 PROJECT NAME: 2011 CDBG ACCESS RAMP INSTALLATION PROJECT Contract Amount $30,767.00 CONTRACTOR: SKYLINE CONSTRUCTION ITEM Demoltion & Removal QTY. TOTAL UNIT UNIT COST TO DATE COST 1. PC Concrete Sidewalk, Remove 2051.00 S.F. $1.00 2239.00 $2,239.00 2. Remove Curb & Gutter 205.00 L.F. $6.00 200.00 $1,200.00 Construction 3. Graded Stone Base 40.00 Ton $14.00 15.00 $210.00 4. PC Concrete Sidewalk, 6" Construct 2051.00 S.F. $6.00 2239.00 $13,434.00 5. PC Concrete Curb & Gutter, 2.5' 205.00 L.F. $30.00 200.00 $6,000.00 Construct 6. PC Concrete Access Ramp 35.00 Each $145.00 23.00 $3,335.00 Detectable Warning Area (Each = 2' x 4' area) 7. HMA Patching 10.00 Ton $125.00 29.00 $3,625.00 8. Backfill, Topsoil 113.00 S.Y. $15.00 35.00 $525.00 9. Sod 15.00 S.Y. $10.00 0.00 $0.00 10. Traffic Control & Safety Control 1.00 Lump Sum $100.00 1.00 $100.00 11. Erosion Control 1.00 Lump Sum $100.00 1.00 $100.00 12. Mobilization 1.00 Lump Sum $100.00 1.00 $100.00 EXTRA WORK: 13. Street Patch Remove & Replace 1.00 Lump Sum $1,452.00 $1.00 $1,452.00 TOTAL DUE CONTRACTOR $32,320.00 I hereby certify that the above statement shows in detail the correct amount of all work re fired to complete the above improvement. APPROVED: / Y Michael Van Milligen, City Manager City of Dubuque,lowa ENGINEERING $1,616.00 TOTAL CONSTRUCTION COS" $33,936.00 d`; Gus Psihoyo City Engineer The City of Dubuque Masterpiece on the Mississippi City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 PROJECT CLOSE OUT FORM Project Name: 2011 DRAIN TILE PROJECT Key Way and Hilton Springs CIP Number: 7201354 Project Contract Amount: $15,760.45 Project Completion Date: 30 -Oct -11 Contractor Name: Connolly Construction Inc. Contractor Address: 18409 N. Cascade Road City, State, Zip: Peosta, Iowa 52068 -0068 Contractor Telephone: 563- 876 -3225 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE 1 6" Drain tile, Non-Perforated / Includes Excavation 2 4" Drain tile, Perforated 3 318" Chips 4 Backfill, Limestone 5 Graded Stone Base 6 PC Concrete Sidewalk 4 ", Including Removal 7 PC Concrete Sidewalk 6 ", Including Removal 8 Tap Exisitng Intake 9 Seeding, Mulching, and Watering 10 Traffic Control And Safety Control 600 LF $ 6.35 565 LF $ 2.10 70 Ton $ 19.30 45 Ton $ 8.60 45 Ton $ 15.75 64 SF $ 3.80 108 SY $ 43.00 2 EA $ 390.00 1 LS $ 2,000.00 1 LS $ 650.00 600.00 $ 3,810.00 560.00 $ 1,176.00 95.65 $ 1,846.05 0.00 $ 36.41 $ 573.46 125.83 $ 478.15 96.60 $ 4,153.80 2.00 $ 780.00 1.00 $ 2,000.00 1.00 $ 650.00 Sub -Total 1 2 3 CHANGE ORDER Connected Drain tile between #2456 & 2472 per estimate Water shut off box replaced at 2189 Keyway (Broken) Added topsoil to all locations (Native soil was mostly stone) I hereby certify that the above statement shows, in detail, the correct amount of all work required to mplete the above improvement. APPROVED: $ 15,467.46 1.00 $ 902.00 1.00 $ 236.18 1.00 Change order Total $ 260.00 $ 1,398.18 Total Payment $ 16,865.64 100.00% 99.12% 136.64% 0.00% 80.91% 196.61% 89.44% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% Total Contract Work Performed to Date: $ 15,467.46 Total Change Order Work Performed to Date: $ 1,398.18 Total Contract and Change Order Work Performed to Date: $ 16,865.64 Miscellaneous Costs $ Engineering $ 1,250.00 Michael Van Milligen, City Manager Dubuque, Iowa Gus Psihoyos, City Engineer Dubuque, Iowa TOTAL FINAL PROJECT COSTS: $ 18,115.64 /� i The Undersigned, Co v. t I L.. , contractor for the above improvement, does hereby accept the above "Total Due Contractor', as full settlement for all claims for said improvement. /9 L4 L APPROVED: SA CU L BY: