Loading...
Signed Contracts_Giese Roofing_Fire Station No. 5 Roof ReplacementAy /cie A pi, Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager SUBJECT: Fire Station No. 5 Roof Replacement DATE: November 30, 2011 INTRODUCTION Dubuque bitti MAmedcaCNy 11111, 2007 „0-4-//e- In October 2011, Giese Roofing Company was awarded the Fire Department Headquarters Roof Replacement Project. Bids were lower than expected and Fire Chief Dan Brown asked the Engineering Department to investigate using the project savings to replace the leaking roof of Fire Station #5 on Grandview Avenue. DISCUSSION Fire Station #5 roof has been actively leaking since the hail storm of April 3, 2011. The roof was inspected by a Traveler's insurance adjustor on September 23, 2011. The report concluded that "No evidence of hail impact was observed on the subject roof ". Since the roof did not leak prior to the hail storm and began leaking immediately after the storm, the City disagreed with Traveler's findings. This week the Engineering Department hired Weatherproofing Technologies, Inc, (WTI), a subsidiary of Tremco, Incorporated, to conduct an Infrared Moisture Survey of the roof. After conducting the roof inspection, WTI concluded that moisture had leaked underneath the roof membrane as a result of hail damage. The City will submit the report from WTI with the expectation that a substantial portion of the roof replacement cost will now be covered by the City's insurance policy. Since the roof is actively leaking into the sleeping quarters of the fire station and the onset of winter conditions would not permit the roofing work to be completed by usig a traditional bidding process, the Engineering Department sought to expedite this work by adding a change order to Giese Roofing Company's Fire Headquarters Roof Replacement contract. However, City Attorney Barry Lindahl advised that a Page 1 of 2 separate contract should be executed with Giese for the work. Since the value of the contract is less than $25,000, Iowa State Code does not require competitive bidding. Giese's price quote for the work on Fire Station #5 was compared to other recent City roofing projects and found to be competitively priced. RECOMMENDATION It is recommended that the attached contract with Giese Roofing Company for Fire Station #5 Roof Replacement be executed and that the savings from the Fire Headquarters Roof Replacement CIP be used to fund the project. BUDGET IMPACT The estimate of probable cost for Fire Station No. 5 work is as follows: Giese Roofing Company — Roof Installation $24,895.00 City Direct Purchase of Roof Materials from State of Iowa Cooperative Purchasing Contract $20,652.00 Total Cost $45,547.00 The current balance of the Fire Headquarters CIP (101 -1139) is $78,390.33. ACTION TO BE TAKEN It is requested that the attached Fire Station No. 5 — Roof Replacement Short Form Public Improvement Contract be executed and returned to the Engineering Department for final processing. cc: Barry Lindahl, City Attorney Gus Psihoyos, City Engineer Dan Brown, Fire Chief Jenny Larson, Budget Director Ken Tekippe, Finance Director Attach. Page 2 of 2 Masterpiece on the Mississippi City of Dubuque Engineering Dept. 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 (563) 589 -4205 FAX CITY OF DUBUQUE, IOWA SHORT FORM PUBLIC IMPROVEMENT CONTRACT THIS PUBLIC IMPROVEMENT CONTRACT (the Contract), made in triplicate, between the City of Dubuque, Iowa (City), by its City Manager, through authority conferred upon the City Manager by its City Council and Giese Roofing Company (Contractor) of the City of Dubuque, Iowa. PROJECT TITLE: Firestation No. 5 — Roof Replacement For and in consideration of the mutual covenants herein contained, the parties hereto agree as follows: CONTRACTOR AGREES: 1. To furnish labor only. All materials to be supplied by the City and purchased from Tremco per the materials list unless otherwise specified for Firestation No. 5 Roof Replacement (the Project): The work described above shall be completed at the following location(s): Firestation No. 5 — 689 S. Grandview Avenue The Project shall be constructed to the existing grades and to any revised grades as described In this Project contract; In strict accordance wkh the requirements of the taws of the State of lowa and ordinances of the Cky of Dubuque relating to public works, and in accordance with the Contract Documents which provisions and documents are each and all hereby referred to and made a part of this Contract just as much as lf the detailed statements thereof were repeated herein. Page 1 of 4 2. Contract Documents shall mean and include the following: This Improvement Contract ail ordinances and resolutions heretofore adopted by the City Council having to do with the Project; the Contractors Proposal, and the conditions described in the Contract, Including any Special Conditions, Plans and Specifications and General Requirement as adopted by the City Council for the Project. 3. All materials used by the Contractor in the Project shall be the best of their several kinds and shall be put in place to the satisfaction of the City Manager. 4. The Contractor shall remove any materials rejected by the City Manager as defective or improper, or any of said work condemned as unsuitable or defective, and the same shall be replaced or done anew to the satisfaction of the City Manager at the cost and expense of the Contractor. 5. Five percent (5%) of the Contract price may be retained by the City for a period of thirty (30) days after final completion and acceptance of the Project by the City Manager to pay any clairn that may be filed within said time for labor and materials done and furnished in connection with the performance of this Contract and for a longer period W such claims are not adjusted within that time, as provided in Iowa Code Chapter 573. The City shall also retain additional sums to protect itself against any claim that has been filed against it for damages to persons or property arising through the prosecution of the work and such sums shall be held by the City until such claims have been settled, adjudicated or otherwise disposed of. 6. The Contractor has read and understands the City of Dubuque Standard Specifications including General Requirements and has examined and understands the project description described in Section 1 and any attached Special Conditions herein referred to and agrees not to plead misunderstanding or deception because of estimates of quantity, character, location or other conditions surrounding the same. 7. The Contractor shall guarantee for a period two years and make good any other defect in any part of the Project due to improper construction or material performance notwithstanding the fact that said Project may have been accepted and fully paid for by the City. The guarantee shall commence on the date that the City pays full compensation for the complete performance of this contract. 8. The Contractor shall fully complete the Protect under this Contract on or before January 15, 2012. 9. To the fullest extent permitted by law, the Contractor shall indemnIfy and hold harmless the City from and against all claims, damages, losses and expenses, including but not limited to attorneys' fees, arising out of or resulting from performance of the Contract, provided that such claim, damages, loss or expense is attributable to bodily Injury, sickness, disease or death, or injury to or destruction of property (other than the Project itself) including loss of use resufting there from, but only to the extent caused in whole or in part by negligent acts or omissions of the Contractor, the Contractor's subcontractor, or anyone directly or indirectly employed by the Contractor or the Contractor's subcontractor or anyone for whose acts the Contractor or the Contractors subcontractor may be liable, regardless of whether or not such claim, damage, loss or expense Is caused to part by a party indemnified hereunder. Page 2of4 10. Unless otherwise specified in the Contract Documents, prior to the commencement of any work on the Project and at all times during the performance of this Contract, the Contractor shall provide evidence of insurance which meets the requirements of the City's Insurance Schedule for Artisan Contractors or General Contractors. THE CITY AGREES: Upon the completion of the Contract, and the acceptance of the Project by the City Manager, the City agrees to pay the Contractor as full compensation for the complete performance of this Contract, the amount determined for the total number of units completed at the unit prices stated in the Contractor's Proposal and less any liquidated damages provided for In the Contract Documents. The number of units stated in the contract, special conditions and contractors proposal Is approximate only and the final payment shall be made by the work covered by the Contract. CONTRACT ESTIMATED AMOUNT $24,895.00 THE MAXIMUM CONTRACT AMOUNT SHALL BE LIMITED TO AN INCREASE OF 6% OF THE ABOVE LISTED ESTIMATED AMOUNT. CITY OF D UQUE, IOWA By: CONTRACTOR: i Michael C. Van Milligen ► at Com City Manager By: '10• I Zek ture Date /est/ G TF /Q .(gi Lr i,1/ Printed Name J. Title CONTRACTOR ACKNOWLEDGEMENT OF ATTACFI D SPECIAL CONDITIONS: Bv: nature Date Ay.- TGJI« L,i' Printed Name /62.40.10 ./470-N Title Page 3 of 4 The following special conditions shall apply to this Project: ATTACHED : GIESE COMPANIES NOVEMBER 21, 2011 ROOF QUOTE. V. 07!07 Page 4 of 4 ` `a r'is-. ,.,. • 'lr:..a+lr`'..., • HVAC • SHEET METAL • ROOFING • ELECTRICAL • MANUFACTURING Since 1923 November 21, 21111 Steve Sampson Drown City of Dubuque — Engineering Department 50 W. 13th Street Dubuque. IA 52001 RE: Firestation No.5 — Trento) roof quote i)car Steve. Wc propose to furnish labor only for Firestation No.5 as fellow's. To include: a. All materials to be supplied by the city purchased through 't t•emco per our material list unless otherwise specified. b. Remove existing reef down to wood deck. c. Remove existing clay cups and sine to reinstall later. d. Remove shingle and metal from sides of penthouse (hose drying tower). e. Inspect wood deck, if repairs arc necessary, they will be billed on time & material basis. !: lmstail (3) layers of 2" IS() insulation (joints staggered) mechanically attached with screws and plates. g. Install al:" dens deck primed with fasteners and plates. h. install Trcnnco '11'A roof system per manufactures speciticaaticnsx. i. Field tabrkale crickets between scuppers, behind penthouse and roof hatch W' per b slope. j. Shop fabricate and install (2) scuppers and (4) pitch pockets for antenna stand from TPA mated metal. k. Fabricate and install new standing seam roof, wall panels and fascia metal on penthouse. I. lustall Rollcx vented soffit on penthouse - Giese will supply petal. m. Fabricate and install counter flashing, collector boxes (2) dnwnsix►uts (commercial) and cover plates. at. Raise existing roof hatch lo accommodate new insulation height. %imp inside with new mcital and insulate curb and cap, Install TPA on roof hatch cater. o. Install 60mil 1 i'1)M loose laid ntctubraane on top of parapet wall. - Giese will supply. p. Reinstall clay cap with mortar. q. infrared scan for warranty. r. 15 -year material and labor warranty through Tremco. s. Cant rental to lit materials on roof'. Our complete price for the above proposal is to be Twenty-Four Thousand Eight Hundred Ninety -live Dollars (S24,895.tl0). Nole: The above proposal is valid titr only 30 days. If you have any questions please call our office at (563)58R 2060. Sincerely, eR Schmidt Project Aiinager Giese Roofing Company 2620 Elan Street. Dubuque, 1A 52501 (563) 566 -2060 Phone • (563) 505.2061 Fax www.gieseco.com (ell: (561) 590 -1212 1 ;mail: jsehmidlri giesecn.caaa