Blanche Avenue Resurfacing Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Blanche Avenue Resurfacing Project (CIP 3002142) DATE: December 9, 2011 Dubuque kraal All- America City 'I'll®, 2007 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Blanche Avenue Resurfacing Project, as completed by River City Paving, in the final contract amount of $39,967.19, which is a 10.1% increase from the original contract amount of $36,293.00. The project increase was due to the need for additional full -depth patching required and the replacement of culvert pipe under Blanche Avenue. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Blanche Avenue Resurfacing Project (CIP 3002142) Dubuque bitil All- America City 'I'll®, 2007 DATE: December 5, 2011 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Blanche Avenue Resurfacing Project. BACKGROUND The Blanche Avenue Resurfacing Project provided for the resurfacing of 1,500 lineal feet of 13 -foot wide roadway with 1 -1/2 inches of asphalt. The project also included four areas of full -depth pavement repair totaling 4,500 square feet and one area of partial depth pavement repair totaling 500 square feet. DISCUSSION The Blanche Avenue Resurfacing Project was completed by River City Paving, a Division of Mathy Construction, of Dubuque, Iowa, in the final contract amount of $39,967.19, which is a 10.1% increase from the original contract amount of $36,293.00. The project increase was due to the need for additional full -depth patching required and the replacement of culvert pipe under Blanche Avenue. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $39,967.19 to River City Paving, a Division of Mathy Construction, Inc., for the Blanche Avenue Resurfacing Project. BUDGET IMPACT The project cost summary for the Blanche Avenue Resurfacing Project is: Award Final Construction $36,293.00 $39,967.19 Contingency 0 0 Engineering 0 2,230.80 Total Project Cost $30,767.00 $42,197.99 The funding summary for the project as follows: CIP Funding Source Amount 3002142 Street Construction - General $10,000.00 3002141 Sunset Ridge Savings 28,959.85 Portzen Construction Share 3,238.14 Total Project Funding $42,197.99 Since Blanche Avenue was partially damaged by truck traffic from materials hauling, Portzen Construction, Inc., the primary contractor for the Historic Millwork District Complete Streets Project, has agreed to cost share ($3,238.14) for that portion of overlay upgrade to improve pavement strength. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $39,967.19 to River City Paving, a Division of Mathy Construction, for the Blanche Avenue Resurfacing Project. Prepared by Jon Dienst, Civil Engineer II cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer II RESOLUTION NO. 420 -11 ACCEPTING THE BLANCHE AVENUE RESURFACING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Blanche Avenue Resurfacing Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Street Construction — General and Sunset Ridge Reconstruction appropriation for the contract amount of $39,967.19 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 19th day of December, 2011. L n Sutton, Mayor Pro -Tem Attest: Ke n S. Firnstahl, City Jerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE BLANCHE AVENUE RESURFACING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Blanche Avenue Resurfacing Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $42,197.99. Dated this It* day of Neeco€R , 2011. Filed in the office of the City Clerk on the 97-6 day of City Engineer 2011. kevin S. Firinstahl, city Clerk Masterpiece on the Mississippi City of Dubuque - Engineering Division Council Final Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: Blanche Street Resurfacing Project CONTRACTOR: River City Paving BID ITEM DESCRIPTION EXCAVATION & STONE 1 Excavation (Unclassified) 2 Graded Stone Base 3 Saw Cut Asphalt, Full Depth UNIT CY Ton LF DATE: November 14, 2011 CONTRACT AMOUNT: $36,293.00 CONTRACT UNIT COST $10.00 $15.50 $1.50 QUANTITY TO DATE AMOUNT EARNED TO DATE 262.00 $ 295.87 $ 318.00 $ 2,620.00 4,585.99 477.00 PAVEMENT 4 HMA 300k, Surface, 1/2" (PG- 64 -22), Paver Laid TON $74.44 5 HMA 300k, Base, 1/2" (PG- 64 -22), Hand Patching TON $89.00 MISCELLANEOUS 6 Erosion Control Plan - Operating Procedures 7 Tree Preservation 8 Traffic Control and Safety Control 9 Mobilization & Miscellaneous 184.62 $ 13,743.11 120.00 $ 10,680.00 LS $500.00 LS $500.00 LS $750.00 LS $3,100.00 1.00 $ 500.00 1.00 $ 500.00 1.00 $ 750.00 1.00 $ 3,100.00 TOTAL AMOUNT EARNED TO DATE: $ 36,956.10 CHANGE ORDER - EXTRA WORK ITEMS $33.00 891,00 C1 18" HDPE Culvert C2 3" Breaker Run LF TON 27.00 136.78 $15.50 2,120.09 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL AMOUNT EARNED TO DATE: TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: $ 3,011.09 $ 39,967.19 $ 39,967.19 $ 2,230.80 $ 42,197.99 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to corete the above improvement. APPROVED: APPROVED: Michael Van Millige City of Dubu• - I • �k_ Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR he undersigned, River City Paving contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. ,.LUL /175i /,4-1 -'4. CONTRACTOR: BY: f-/ TITLE: /.j,?'d DATE: % t /4Q//