Loading...
Green Alley Permable Pavers Project_17th to 18th, Jackson, Washington Streets 12 19 11THE CITY OF Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque kard All- America City 'I'll®, 2007 SUBJECT: Green Alley Permeable Pavers Project (17th - 18th, between Jackson & Washington Streets) (FY11 CIPs 3002044, 7101335, 7201066, 7201081, 7201088, 7401405) DATE: December 8, 2011 City Engineer Gus Psihoyos recommends initiation of the public bidding procedure for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets), and further recommends that a public hearing be set for January 3, 2012. I concur with the recommendation and respectfully request Mayor and City Council approval. ititih+-P;-%1709 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Dubuque knerd All-America City 'I'll®, 2007 SUBJECT: Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) (FY11 CIPs 3002044, 7101335, 7201066, 7201081, 7201088, 7401405) DATE: December 8, 2011 INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets). DISCUSSION The Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) will involve the reconstruction of the alley between Jackson and Washington Streets, from 17th Street to 18th Street. This alley is adjacent to the Washington row houses that the Housing Department is renovating. The project will include: Reconstruction of the pavement surface with interlocking concrete pavers. Watermain reconstruction. Replacement of four (4) lead water services with copper. Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. This project is one of the alleys identified in the Annual Green Alley Program Capital Improvement Plan and it will be the first green alley that will involve water service and alley pavement assessments. The previous Green Alley Permeable Paver Projects were partially funded with Community Development Block Grant funds (CDBG) from the American Recovery & Reinvestment Act; these monies are no longer available. This project was originally bid in August of 2011. At that time many of the contractors who do this work were very busy. The bids that were received were much higher than anticipated. Engineering believes that re- bidding this project over the winter of 2011 -2012 and allowing more time to construct the project will help reduce the prices bid on this project. Staff altered some of the bid items to help reduce costs. This is a result of some value engineering done on the project as a result of the last bidding cycle. PUBLIC INVOLVEMENT Engineering staff held a public information session for the property owners at the Comiskey Park shelter on July 6, 2011 to discuss the project. The meeting was not well attended. Those who did attend are in support of the project. Engineering will be making special accommodations for the business at 260 East 18th Street so deliveries can occur at all times in the alley. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans, Specs, Assessments Mail Special Assessment Notice to Property Owners Publish Notice of Special Assessment: 1st Publication: 2nd Publication: Public Hearing on Plans & Specs, Spec. Assessments Receipt of Bid Proposals (Bid - Letting) Award Construction Contract Project Completion Date RECOMMENDATION December 19, 2011 December 22, 2011 December 22, 2011 December 22, 2011 December 22, 2011 December 29, 2011 January 3, 2012 January 19, 2012 February 6, 2012 June 30, 2012 I recommend that the City Council give preliminary approval to the construction plans and specifications, approve the Resolution of Necessity, approve the Preliminary Schedule of Assessments, establish January 3, 2012, as the date of the public hearing, and hereby authorize the City Clerk to advertise for bid proposals for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets). BUDGET IMPACT The estimate of probable cost for the Green Alley Permeable Pavers Project (17th — 18th between Jackson & Washington Streets) is as follows: Estimate Construction Contract $146,436.50 Contingency 14,643.65 Construction Engineering & Inspection 24,162.02 Total Project Cost $185,242.17 The estimated project category costs are as follows: Cost Summary /Description Alley Construction Improvements Special Assessment - Street Improvement, Residential Properties Special Assessment - Street Improvement, Commercial Properties Special Assessment - Street Improvement Deficiency, Paid by the City Special Assessment - Water Services, Residential Properties Watermain Improvements Sanitary Sewer Improvements Storm Sewer Improvements Total Project Cost The project funding summary is as follows: Amount $ 34,313.58 11,174.39 2,878.91 0.00 4,604.60 60,450.56 43,074.20 28,745.93 $185.242.17 Fund CIP No. Fund Description Amount 3002044 Green Alley Pilot Project $ 68,000.00 7101335 Sanitary Sewer Manhole Replacement 30,511.80 7201066 Storm Sewer General Repairs 11,745.93 7201081 Catch Basin Maintenance 7,000.00 7201088 Storm Sewer Improvements 10,000.00 7401405 Water Main Replacements 57,984.44 Total Project Funding $185,242.17 ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, approve the Preliminary Schedule of Assessments, establish the date of the public hearing, and authorize the City Clerk to advertise for bid proposals through the adoption of the enclosed resolutions for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets). Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II Todd Shoemaker, Environmental Engineer RESOLUTION NO. 432 -11 GREEN ALLEY PERMEABLE PAVERS PROJECT (17th — 18th, BETWEEN JACKSON AND WASHINGTON STREETS) PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets), in the estimated amount $185,242.17, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 3rd day of January, 2012, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets) is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty -five days before the date for filing bids before 2:00 p.m. on the 19th day of January, 2012. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 6th day of February, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this 19th day of December, 20 11 Attest: Kevi S. Firnstahl, City Jerk tlyyn Sutton, Mayor Pro -Tem RESOLUTION NO. 433 -11 GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH - 18TH, BETWEEN JACKSON & WASHINGTON STREETS) APPROVING THE PLAT, SCHEDULE OF ASSESSMENTS AND ESTIMATE OF TOTAL COST AND SETTING DATE OF PUBLIC HEARING ON RESOLUTION OF NECESSITY Whereas, the proposed Resolution of Necessity for the Project has been introduced for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The attached plat, schedule of assessments, and estimate of total cost for the Green Alley Permeable Pavers Project (17th - 18th, between Jackson & Washington Streets) and the proposed Resolution of Necessity are hereby approved and ordered placed on file in the Office of the City Clerk. The City Council will meet on the 3rd day of January, 2012, at 6:30 p.m. at the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity. A property owner will be deemed to have waived all objections unless at the time of hearing the property owner has filed objections with the City Clerk. The City Clerk be and is hereby authorized and directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Passed, approved and adopted this 19th day of De ember , 2011. Lyn utton, Mayor Pro -Tem RESOLUTION NO. 434 -11 RESOLUTION OF NECESSITY FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH —18TH, BETWEEN JACKSON & WASHINGTON STREETS) Whereas, the plat, schedule of assessments, and estimate of total cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) have been duly prepared and approved by the City Council of the City of Dubuque and ordered placed on file in the office of City Clerk. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: - Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th 18th Streets with new concrete manholes. There is on file in the office of the City Clerk an estimated total cost of the work, and a preliminary plat and schedule showing the amount proposed to be assessed to each lot for the improvement. The date, time, and place the council will hear property owners subject to the assessment and interested parties for or against the improvement, its cost, the assessment, or the boundaries of the district: The City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements. Unless a property owner files objections with the City Clerk at the time of hearing on the resolution of necessity, the property owner is deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed in accordance with the plans and specifications which have been approved by the City Council and are now on file in the Office of the City Clerk. The cost of making such improvement will be assessed against property lying with the assessment limits. The above resolution was introduced, approved and ordered placed on file with the City Clerk this 19th day of December , 2011 Attest: Kevi S. Firnstahl, City lerk n Sutton, Mayor Pro -Tem NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17th — 18th, BETWEEN JACKSON AND WASHINGTON STREETS) NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets), in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 3rd day of January, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Reconstruction of the alley between Jackson and Washington Streets, from 17th to 18th Street. — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services will be replaced with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18til Streets with new concrete manholes. Any visual or hearing- impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD at (563) 690 -6678 at least 48 hours prior to the meeting. 2012. Published by order of the City Council given on the day o Amy z,z1 Kevin S. Firnstahl, City Clerk NOTICE TO PROPERTY OWNERS GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH —18TH, BETWEEN JACKSON & WASHINGTON STREETS) Notice is given that there is now on file for public inspection in the office of the clerk of the City of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of the City of Dubuque, Iowa, for a public improvement of the type(s) and in the location(s) as follows: — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. The proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: Green Alley Permeable Pavers Project (17th —18th, between Jackson & Washington Streets) The City Council will meet on the 3rd day of January, 2012, at 6:30 p.m. at the Historic Federal Building, 350 West 6th Street, Dubuque, Iowa, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of the Resolution of Necessity. A property owner will be deemed to have waived all objections unless at the time of hearing the property owner has filed objections with the clerk. Any visual- or hearing- impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD (563) 690 -6678 at least 48 hours prior to the meeting. Kevin S. irnstahl, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH — 18TH BETWEEN JACKSON AND WASHINGTON STREETS) Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on the 19th day of January, 2012, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on 19th day of January, 2012, at City Hall - Conference Room A, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on 6th day of February, 2012. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by 30th day of June, 2012. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained at the Engineering Department, City Hall — Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. No plan deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets) CIPs 3002044, 7401405, 7101335, 7201066, 7201088, 7201081 Reconstruction of the alley between Jackson and Washington Streets, from 17th Street to 18th Street. — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. Published in the Telegraph Herald, 22nd day of December, 2012. CITY OF DUBUQUE, IOWA ALLEY BETWEEN JACKSON AND WASHINGTON STREETS FROM 17TH to 18TH PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE JULY 12, 2011 The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque PROPERTY OWNER NAME LOT DESCRIPTION PARCEL NUMBER NAILING ADDRESS STREET ADDRESS NET ASSESSED VALUATION VALUATION WITH IMPROVEMENT NET PAVING IMPROVEMENT COST NET PAVING IMPROVEMENT DEFICIENCY TOTAL PUBLIC IMPROVEMENT COST WATER SERVICE PRIVATE LATERAL COST TOTAL NET ASSESSMENT Vorwald, Jean M S 31'02 " LOT 36 EAST DUBUQUE ADD 10-24 -263 -009 1710 Jackson St 1710 Jackson St $85,00000 $85,87717 $877 17 $000 $87717 $877 17 Vorwald, Jean M 1720 -1722 10- 24-263 -008 1720 Jackson St 1720 Jackson St $51,10000 $52,38202 $1,28202 $000 $1,28202 $000 $1,28202 Hagensten, Joseph G N1 /2 LOT 35 EAST DUBUQUE ADD 10- 24-263 -007 1732 Jackson St 1732 Jackson St $35,50000 $36,21973 $71973 $000 $71973 $000 $71973 Mihalakis, Elizabeth A & Michael M S172 LOT 34 EAST DUBUQUE ADD 10- 24-263 -006 1756 Jackson St 1756 Jackson St $60,30000 $61,01973 $71973 $000 $71973 $000 $71973 Mihalakis, Elizabeth A & Michael M N1 /2 LOT 34 EAST DUBUQUE ADD 10- 24-263 -005 1760 Jackson St 1760 Jackson St $47,600 00 $48,319 73 $719 73 $0 00 $719 73 $0 00 $719 73 Pluym, Ronald 0 S112 LOT 33 EAST DUBUQUE ADD 10-24 -263 -004 1616 Lincoln Ave 1768 Jackson St $45,50000 $46,21973 $71973 $000 $71973 $000 $71973 Wiemerslage, Annette N1 /2 LOT 33 EAST DUBUQUE ADD 10- 24-263 -003 1776 Jackson St 1776 Jackson St $48,10000 $48,81973 $71973 $000 $71973 $000 $71973 Nicolalde, Daisy V S1f2 LOT 32 EAST DUBUQUE ADD 10- 24-263 -002 2525 Date St #602 1786 Jackson St $16,50000 $18,37088 $71973 $000 $71973 $1,15115 $1,87088 Crippes, Mary M N1 /2 OF LOT 32 EAST DUBUQUE ADD 10-24 -263 -001 1796 Jackson St 1796 Jackson St $38,10000 $39,97088 $71973 $000 $71973 $1,15115 $1,87088 Knockel, Frank & Rachel LOT 87 EAST DUBUQUE ADD 10- 24-263 -023 1715 Washington St 1715 Washington St $58,00000 $59,43946 $1,43946 $000 $1,43946 $000 $1,43946 Trausch, Forrest R LOT 1 -1 -88 EAST DUBUQUE ADD 10- 24-263 -022 PO Box 4 1725 Washington St $33,50000 $35,14149 $49034 $000 $49034 $1,15115 $1,64149 Trausch, Forrest R LOT - 2 -1 -88 EAST DUBUQUE PDD 10-24 -263 -021 P O Box 4 1731 Washington St $32,500 00 $32,939 15 $439 15 $0 00 $439 15 $0 00 $439 15 Trausch, Forrest R LOT 2 -88 EAST DUBUQUE ADD 10- 24-263 -020 P 0 Box 4 1737 Washington St $32,000 00 $33,657 21 $506 06 $0 00 $506 06 $1,151 15 $1,657 21 Wagner, Sharon M EAST DUBUQUE ADDS 23'7" -S 1/2 LOT 89 10- 24-263 -019 1741 Washington St 1741 Washington St $38,20000 $38,86294 $66294 $000 $66294 $000 $66294 City of Dubuque N 2' S112 OF 89 & N1/2 OF LOT 89 EAST DUBUQUE ADD 10-24 -263 -018 50W 13th Street 1753 Washington St $42,300 00 $43,075 96 $775 96 $0 00 $775 96 $0 00 $775 96 Clark, Keith Kadton W1 /2 OF LOT 90 & W1/2 OF LOT 91 EAST DUBUQUE ADD 10- 24-263 -010 206 East 18th 260 East 18th St $76,400 00 $79,278 91 $2,878 91 $0 00 $2,878 91 $0 00 $2,878 91 TOTALS= $14,39011 You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com) $4,60460 $12,99471