Asbury Rd Sidewalk JFK to IA 32 (NW Art.) 5~~~JE ~~~ MEMORANDUM April 26, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Asbury Road Sidewalk Installation Project John F. Kennedy Road to Iowa 32 (Northwest Arterial) (Capital Improvement Projects: 010C88 and 350042) City Engineer Gus Psihoyos recommends initiation of the bidding process for the Asbury Road Sidewalk Installation Project, and further recommends that a public hearing be set for June 6, 2005. I concur with the recommendation and respectfully request Mayor and City Council approval. fit{ &~l /t,L Micnael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer '~) ,-.., ". , ,,' A few property owners aSKea aooU1 me maJmemmce ana access lO Asbury side of Kimberly properties. The area is presently difficult to cut the grass and trim bushes, but will be more difficult to maintain and access for snow removal, especially after snow plows have passed. A comment was made that school children in the Kimberly Road area are outside the two-mile limit from the Middle School and would be probably bussed to the school. (Note: Resurrection School is within the two-mile limit.) Expense to Kimberly property owners affected by any future Asbury Road project. Some property owners on Kimberly were required to repair defective sidewalks as part of the 2004 Sidewalk Inspection Program. Also some property owners in this area would be assessed as part of the proposed 2006 Bonson Road Reconstruction Project. Engineering responded as follows: Petition received and directive of City Council was for installation of sidewalks on the north side of Asbury Road only. Asbury Road is not unique and many other areas of the City have multiple frontages, access issues, topographical difficulties with property owners responsible for maintenance of sidewalk condition, grass-cutting, plant trimming, and snow removal. Sidewalks are not only for school children who may be walking to Resurrection School; they are used by bicyclists, strollers, disabled, and other pedestrians wishing to have a continuous walking network from neighborhoods and from one development area to another. Property owners are being allowed to seek bids and install walks prior to June 27, 2005; after that, the City contractor will perform the work on the assessment project. As part of a previous City Council directive, the City of Dubuque will not assess a property owner more than 25% of the value of the property with improvements over a cumulative 1 O-year period. There are several small trees in the public right-of-way that will have to be removed to construct the sidewalk on Asbury Road. City Forester Steve Pregler has reviewed all the trees that must be removed and has determined that there is no significant effect of their removal. The schedule for the project will be as follows: Receipt of Bids Public Hearing Award of Contract Completion May 6, 2005 May 27, 2005 May 6, 2005 May 6, 2005 May 13, 2005 May 26, 2005 June 6, 2005 June 6, 2005 August 20, 2005 Advertisement for Bids Notice of Hearing on Plans & Specifications Mail Notice to Property Owners Published Notices to Property Owners PROJECT COMPLETION INCENTIVE Since the sidewalk is an integral part of the overall sidewalk network for safe passageway for students and all pedestrian usage, staff has included an incentive bonus for the contractor to complete all work prior to the specified completion date of August 20, 2005. For each calendar day that all work is fully completed prior to the specified completion date of August 20, 2005, one percent (1 %) of the actual construction costs will be given, to a maximum of five percent (5%) of the actual construction costs, as an incentive to complete the project ahead of schedule. For each calendar day that any work shall remain uncompleted beyond the specified completion date of August 20, 2005, $1,000 per calendar day will be assessed, not as a penalty but as predetermined and agreed liquidated damages. The Contractor will be separately invoiced for this amount, and final payment will be withheld until payment has been made of this invoice. BUDGET IMPACT The estimate for the project is as follows: Total Project Cost $ 93,732.00 9,373.20 15,465.78 4,686.60 8,850.00 $132,107.58 Construction Cost Contingency Engineering Project Completion Incentive Right-of-Way Purchase Funding for this project is as follows: Total Project Funding $ 28,310.33 23,251.60 80,545.65 $132,107.58 City Share (Agricultural Land Deferred) City Share Property Owner Assessment The City Share includes the maximum incentive of five percent (5%) of the actual construction costs, tree removal, payment of agricultural-zoned properties, and the purchase of right-of-way for sidewalk. The City's share will be funded through CIP010C88 and City Sidewalk Project 350042. RECOMMENDATION It is recommended that the City Council give preliminary approval to the Resolution of Necessity, to approve the preliminary assessment schedule, to establish the date for the public hearing, and to authorize the City Clerk to advertise for proposals. ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, to approve the preliminary assessment schedule, to establish the date for the public hearing, and to authorize the City Clerk to advertise for proposals through the adoption of the enclosed resolutions. Prepared by Jane Smith cc: Dawn Lang, Budget Director Jane Smith, Engineering Assistant Kelly Ambrosy, Engineering Assistant t. RESOLUTION NO. 185-05 PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Asbury Road Sidewalk Installation Project, in the estimated amount of $132,107.58 are hereby approved and ordered filed in the office of the City Clerk for public inspection. Passed, adopted and approved this 2nd day of May, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 186-05 FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary approval on the proposed plans, specifications, and form of contract and placed same on file in the office of the City Clerk for public inspection of the Asbury Road Sidewalk Installation Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Hearing will be held on the 6th day of June, 2005, at 6:30 p.m. in the Public Library Auditorium at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and cost of said improvement, and the City Clerk be and is hereby directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be not less than four days nor more than twenty days prior to the day fixed for its consideration. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, contract, or estimated cost of the improvement. Passed, adopted and approved this 2nd day of May ,2005. Terrance M. Duggan, Mayor Attest: Jeanne, F. Schneider, CMC, City Clerk RESOLUTION NO. 187-05 RESOLUTION OF NECESSITY Whereas, proposed plans have been duly prepared and approved by the City Council of the City of Dubuque and are now on file in the office of City Clerk showing among other things the plans, specifications, form of contract, estimated cost and preliminary plat and schedule showing the amount proposed to be assessed against each lot and the valuation of each lot as filed by the City Council, for the Asbury Road Sidewalk Installation Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements, and unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity, they shall be deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed and done in accordance with the plans and specifications which have been approved by the City Council and now on file with the City Clerk. That the cost and expense of making such improvement will be assessed partially or totally against privately owned property lying with the assessment limits, and in an amount not to exceed that provided by law, and in proportion to the special benefits conferred. The portion of the cost which shall be borne by the City will be paid from Sales Tax Fund and special assessment bonds may be issued in anticipation of deferred payments of assessments when a contract has been performed and accepted, and the proceeds thereof used to pay the contractor. The above resolution was introduced, approved and ordered placed on file with the City Clerk this 2nd day of May, 2005. Approved and placed on file for final action. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 188-05 FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary approval on the proposed plans, specifications and form of contract and placed same on file in the office of the City Clerk for public inspection for the Asbury Road Sidewalk Installation Project; and Whereas, the proposed Resolution of Necessity for said improvement has been introduced and is now on file in the City Clerk's office for public inspection. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 6th day of June, 2005, a public hearing will be held at 6:30 p.m. in the Public Library Auditorium in the City of Dubuque at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a Resolution of Necessity and the City Clerk be and is hereby authorized and directed to cause a notice of time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity they shall be deemed to have waived all objections thereto. Passed, adopted and approved this 2nd day of May , 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE OF HEARING ON PLANS AND SPECIFICATIONS Notice of public hearing on proposed plans and specifications, proposed form of contract and estimate of cost for the Asbury Road Sidewalk Installation Project: 3,428 lineal feet of sidewalk on the north side of Asbury Road from John F. Kennedy Road to Iowa 32 (Northwest Arterial). NOTICE IS HEREBY GIVEN: The City Council of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimate of cost for the Asbury Road Sidewalk Installation Project, in accordance with the provisions of Chapter 384, City Code of Iowa, at 6:30 p.m., on the 6th day of June, 2005, in the Public Library Auditorium, 360 West 11th Street, in Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimate of cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto or to the cost of the improvements. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the ,2005. day of Jeanne F. Schneider, CMC, City Clerk NOTICE TO PROPERTY OWNERS Notice is given that there is now on file for public inspection in the office of the City Clerk of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost, and a plat and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of Dubuque, Iowa, for an improvement of the type(s) and in the location(s) as follows: Asbury Road Sidewalk Installation Project The project consists of 3,428 lineal feet of sidewalk installation on the north side of Asbury Road from John F. Kennedy to Iowa 32 (Northwest Arterial) That the proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: North side of Asbury Road from John F. Kennedy Road to Iowa 32 (Northwest Arterial) All properties abutting along the line of the described improvements. The City Council will meet at 6:30 p.m. on the 6th day of June, 2005, at the Public Library Auditorium, 360 West 11th Street, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a Resolution of Necessity. A property owner will be deemed to have waived all objections unless at the time of hearing he has filed objections with the City Clerk. Any visual- or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the ,2005. day of Jeanne F. Schneider, CMC City Clerk RESOLUTION NO. 189-05 RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets, Page 1 to Page 1 inclusive, are hereby determined to be the schedule of proposed assessments for the Asbury Road Sidewalk Installation Project and the valuations set out herein are hereby approved. Passed, approved and adopted this 2nd day of May, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk ..JCII <(I- ii2ffi W::E I-CII IX:CII <(W tnCIII- WCIIU 3:<(W J:O'" - I-~~f- IX:OD.. OD..I- ZOZ <(OIX:W 3:1-D..::E Q~~~ WO<(W ::lIX:ZCII a>-Q~ ::lfi}I-Z IDZ<(O gz3i= -u.0~~:3 . ..J ~~15~ u5~~ ..,::ll<: ::Eo..J ow<( IX:J:3: U.uw ClIO 0>-_ <(IX:CII 0<( _ IX:Z ~:E ::l::i IDW CIIIX: <(D.. "iO o o N ;r; N ~ o cD Ig rJ ::J '00 Ql- '" 0 ~I~ ~~ -.r= c _ ::J_ o 0 ~g Ql ::J .r= 0 -u ~I~ ~u Ql Ql .r= .r= ~;; O'rJ - '" ~.2 3: +:<..c U) .:gg 0 -'" W .s'O en c'" 0 ~g-~ ..c~ 0::: ~~ a.. ~m E ~ ~ ~2 c;; 0- ~Ql J: ~; ~ Ql'" 0 =~ z ..Q~ ~ aJ ~f- !!; ~~ ~ ",.r= <( gJ~ 3: Ql '" Z ~.2 ::E -.<::: 0 ~m If Q Ql 0 0' 1ii <( i5. 0 0 _ i5.f-IX: .Qg >- .<:::c IX: ~ ~ ~ Ql.<::: CII ~ ~ <( .<::: c '" 0 .9~ '0.2 Ql '" c: > ~.:g Ql- a;-g '0", I~o Ql- ~.r= Ql u .r= '" '" Ql -~~ ::J .- ~g ~~ Ig ::l 3 :g o '" = '" .l2Ql QlrJ t=.8 :,,: -' ~I- w::< OCII _en en<( z . 0> -0 I-IX: <(a. 3~ ~~ ..J ..J <( I- CII ~ MMNMID~m~OO~NMID~m~IDNvIDN~NMvm~oo M~oomMIDwomNmmM~~MomoMooIDro ~m~m ~~NIDWm~m~~~MN~~WroMO~mNmaO~~~ NmNIDNoo~~mM~NIDN~~O~vMID~ID~MM~~ mONrooomo> ID~N~N~~~m ~ooooo~~~oo ~N~~IDID~MNMMMMmN~m~N~NNNNNN~m wwwww wwwwwwwwwwwwwwwwwww 0 ... -' a. en :5 <( en ~ Iwe) _IX: Q~ ~~ ~~ 0 ~~ ON ~BBo -.0 Z-'W 1-<(<(0 ~;;; :5;:::~ ~tntn~ :5'" wNZ en~~en en -,;::UJNa::m ~(/)(f.)~ UJ WS:NIX:Z~IX:IX:<(~~en i= ~enIX:Z~.oWWI-<(<(~ IX: z~~~I-~~~~tntn<( ~ OOOOOOOOalalalal m~rol-~enWws:wwtn 0 ::l::l::l::l::l::l::l::l ~s:~<Den~~~~s:s:W <D~~~~~~~~~~~~ .oen~en~>enen>~~S: * **IX:~IX:~~~~IX:al ~en",~>wwl->>W OO~OOal<(<(<(<(<(<(<(<(::l ~~~-s:~~~enI-1-5::<~~~~a.a.a.a.a.a.a.a.~ en~~s:en~~~~~~I-~<(<(<(<(~~~~~~~~W ~~s:en~S:OOal~>>~~tn~tntnenenenenenenenen~ >~~~ientntnI~~~~5W55SSSSSSSS~ ~~~s:z~ww~II<(O<(G<(<(enenenenenenenena. ~~s:en~~~~~~~~~fficffiffi:,,::,,::,,::,,::,,::,,::,,:~~ 'i"U) I "";""r-<(<(,,"a:Jm~N::>~::>::>rocccoOOCOCCCI)m'7 ~":,,,:,~~:r::r:'?oot--CI)~CO ,COCO"""<DIO-.::t(,,)N o~ NN~.q-N~~~O~NIO~ ~N ~~~~~~~~~~~~~~~~~~~~~~~~~~ -' <( C> W -' z o i= <( u o -' o ~ >- ~ ::l al en <( o '" r-- .,. I- en ~ u:: ~ W Z s: o o IX: >- IX: ::l 00 en <( .0 ;;; .,. s: W :iU~ ~ 5 I- >->->-en a::IX:~W ::l::l::l> alIDOOIX: enenen<( <(<(<(I ooo~ ~IOOo ("')C'\lN("') <o;f'<o;f'~C'\l Z I o ~ o 0 0 0 ~~ ~>->->->->->->->-IX: ~~~1'l:ii:!ii:!ii:!ii:!ii:!ii:!ii:!ii:!1'l: ::l::len::lWWWWWWWW::l ~~~~~~~~~~~~~ <(<(....l<(l<:l<:l<:l<:l<:l<:l<:~<( oocno(Oooooocoo<ooo <0 <0 0\0 00 t--CO CO............ NT""" 0> COCO~CO......v.........,.v.q-......"d'"("') ("')("')C'\l(")("')(f')("')("')("')("')("')('")("') <( W <( ~~ - W Z wIX:z zZC> u~ O~IW ~~IX: >-Z::<~II--' <(<(0:;: O<(zzl-<(W IIW> ~en<(wZuI enUlC>Q ~::len>G~~ ~~~W uen::lW~~~a. -'-'O::ll<:o~entn WO::< enenIX:a<(-,<(~ _Oz~<( ww~::l::<<(-,a>-l<:w:;:::; ::<::< OO-,Z::l-=~~C>>-, <(<(~::lWO<(~<(<(::lO> ~~~O>IX:a.l<:C>::<WW> s: W I ~ <( ::< (; '" N W Z ~ ::< -; z 5 W l<: <(W -,u oz IX:~ <(w uoo ~ W ::< <( z u ::< ::< o (3 en I Z ~~ ~ z WW 0 ~ Q uO uQQ I W I- zi=>ZWW W enen> en <( -UW-ZZ ~ >-Ww> W a:: en::lO~II z ~i=i=0 i= :,,::5 WIX:S:Wuu 0 a::a::a::a. a:: zu ::<~w~enen i= ~~~~ ~ ~~ ~~5W~~ <( 000<(-'0 enOl-u~~ C>w 0 ~z ~~~tn~~5~~~~uen~~~~~~en~ffi-,~z ~~~ ~en -,-,a::w:,,: > alC> ::lIW:5~IWN baa~::lazWIX:OO~IX:~oowz~wocw<(U::lC 066z~68~~~8~~~ssg8~tn~~s:~~~~ I- en :5 ~ W z s: o IX: W al ~ ::l Z -' W U ~ <( a. N~co,.....t--mcnN(")~NCOCOIOT"""N(,,,)("')~lOcot--comOM OT"""OOT"""OO~M~~OOOT"""OOOOOOOOOT"""N qqqqqqqqqqqqqqqqqqqqqqqqqq ~T"""T"""T""""""""""""oo<omO~~NN,.....t--t--t--t--t--t--,.....t-- ~IOIOIO\O\Ot--t--"""t--t--t--O\O\OOONNNNNNNNN (",)M(",)(",)(",)(",)(",)(,,)M("')("')(")T"""~~NNNNNNNNNNN IDIDIDIDwwIDIDIDIDmID~IDID~""" I. " .. I I . I I I I " .~~~~~~~":'~~~~~~ 00000000000000000000000000 T"""T"""T"""T"""T"""~T"""T"""T"""~T"""T"""T"""T"""T"""T"""T"""T"""~T"""T"""T"""T"""T"""T"""T""" ;;; RESOLUTION NO. RESOLUTION ADOPTING PLANS AND SPECIFICATIONS Whereas, on the 2ih day of April, 2005, plans, specifications, form of contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for the Asbury Road Sidewalk Installation Project. Whereas, notice of hearing on plans, specifications, form of contract, and estimated cost was published as required by law. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the said plans, specifications, form of contract and estimated cost are hereby approved as the plans, specifications, form of contract and estimated cost for said improvements for said project. Passed, adopted and approved this day of ,2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 190-05 ORDERING BIDS NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the Asbury Road Sidewalk Installation Project is hereby ordered to be advertised for bids for construction. BE IT FURTHER RESOLVED, that the amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved as a part of the plans and specifications heretofore adopted. That the City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall not be less than four days nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 26th day of May, 2005. Bids shall be opened and read by the City Clerk at said time and will be submitted to the Council for final action at 6:30 p.m. on the 6th day of June, 2005. Passed, adopted and approved this 2nd day of May, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. RESOLUTION WITH RESPECT TO THE ADOPTION OF THE RESOLUTION OF NECESSITY PROPOSED FOR THE ASBURY ROAD SIDEWALK INSTALLATION PROJECT Whereas, the City Council has proposed a Resolution of Necessity for the Asbury Road Sidewalk Installation Project, has given notice of the public hearing thereon as required by law; and Whereas, the public hearing has been held, all persons offering objections have been heard and consideration given to all objections and is pending before this Council; and Whereas, this is the time and place set as provided for the taking of action on the proposed Resolution of Necessity. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed Resolution of Necessity described above is hereby: Adopted, without amendment, and all objections filed or made having been duly considered are overruled. Adopted as amended by the Schedule of Assessments attached hereto as Exhibit A, and made a part hereof by reference. All objections filed or made having been duly considered are overruled. Deferred for later consideration to a City Council meeting to be held on the day of , 2005, next at 6:30 p.m. in the Public Library Auditorium, with jurisdiction retained for further consideration and action at the adjourned meeting. Abandoned. Passed, adopted and approved this day of 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk NOTICE TO BIDDERS OF THE RECEIPT OF BIDS FOR THE ASBURY ROAD SIDEWALK INSTALLATION PROJECT Sealed proposals will be received by the City Clerk of the City of Dubuque, Iowa, at the Office of City Clerk in City Hall no later than 2:00 o'clock p.m. on the 26th day of May, 2005, for the Asbury Road Sidewalk Installation Project. Proiect Description: The project consists of 3,428 lineal feet of sidewalk installation on the north side of Asbury Road from John F. Kennedy Road to Iowa 32 (Northwest Arterial). Copies of the construction documents may be obtained in the City Engineer's office at the City Hall. No plan deposit is required. Payment to the contractor will be made from funds as may be legally used for such purposes. All work herein provided for shall be commenced within ten (10) days after the Notice To Proceed has been issued, and shall be fully completed by August 20, 2005. For each calendar day that all work is fully completed prior to the specified completion date of August 20, 2005, one percent (1 %) of the actual construction costs will be given, to a maximum of five percent (5%) of the actual construction costs, as an incentive to complete the project ahead of schedule. HOWEVER, IF THE CITY AT ANY TIME EXTENDS THE COMPLETION DATE FOR ANY REASON, NO INCENTIVE SHALL BE PAID, UNLESS THE CITY IN ITS SOLE DISCRETION ELECTS TO PAY AN INCENTIVE. For each calendar day that any work shall remain uncompleted beyond the specified completion date of August 20, 2005, $1,000 per calendar day will be assessed, not as a penalty but as predetermined and agreed liquidated damages. The Contractor will be separately invoiced for this amount, and final payment will be withheld until payment has been made of this invoice. If the City extends the completion date, liquidated damages shall be calculated from the extended completion date. All bids must be submitted on the Bid Proposal Form bound in the construction documents. Each bid shall be accompanied by a satisfactory Bid Bond executed by the Bidder and an acceptable surety; or a cashier's or certified check payable to the City Treasurer, City of Dubuque, drawn on a bank in Iowa or a bank chartered under the laws of the United States, in the amount of ten percent (10%) of the bids submitted as security that the bidder will enter into a contract for doing the work and will give bond with proper securities for the faithful performance of the contract in the form attached to the construction documents. The successful bidder (Contractor) will be required to furnish a Performance Bond in an amount equal to one hundred percent (100%) of the contract price. Said bond is to be issued by a responsible surety company approved and acceptable to the City Council, and shall guarantee the faithful performance of the contract and terms and conditions therein contained, and shall guarantee the prompt payment of all materials and labor and protect and save harmless the City of Dubuque, Iowa, from claims and damages of any kind caused by the operations of the Contractor. The successful bidder (Contractor) will also be required to furnish a Maintenance Bond that will guarantee the material, workmanship and the maintenance of the improvement(s) constructed for a minimum period of two (2) years from and after its completion and acceptance by the City Council. The successful bidder (Contractor) will also be required to furnish a Payment Bond that will guarantee the prompt payment of all subcontractors, suppliers, materials, labor and protect and save harmless the City of Dubuque, Iowa, from claims and damages of any kind caused by the operations or non- payment on behalf of the Contractor. The Contractor and approved subcontractors will be provided a Sales Tax Exemption Certification to purchase, or withdraw from inventory, materials furnished under for this project. No bid submitted by any Contractor which contains a condition or qualification shall be recognized or accepted by the City Council and any letter or communication accompanying the bid which contains a condition or qualification upon the bid which has the effect of qualifying or modifying any provision of the specifications in any manner will be rejected by the City Council as not responsive. All proposals must be made on blanks furnished by the City Engineer and each bidder will be required to state his prices for doing all the items in each section on which he makes a bid and for all things necessary to make a complete job. The Bidder's attention is directed to the City of Dubuque's Affirmative Action Program which is included in the Contract Specifications and the provisions thereof and hereby made a part of the Contract Documents by reference and incorporated therein. The Contractor, when requested by the City of Dubuque, will furnish a statement of his financial and practical qualifications as provided for in the General Requirements of the Specifications. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa Domestic Labor. The City Council reserves the right to reject any and all bids or to waive any technical ties and irregularities. All bids will be publicly opened and read by the City Clerk at 2:00 o'clock p.m. on the 26th day of May, 2005, and will be submitted to the City Council for final action at a meeting to be held in the Public Library Auditorium, 360 West 11th Street, at said City at 6:30 p.m. on the 6th day of June, 2005. A contract will be awarded at that time or such subsequent time as the City may determine. Published by order of the City Council of the City of Dubuque, Iowa and dated this of , 2005. Jeanne F. Schneider, CMC, City Clerk CONSTRUCTION SCHEDULE AND LIQUIDATED DAMAGES Work herein provided for shall be commenced within the (10) days after notice to proceed has been issued and shall be fully completed by August 20, 2005. For each calendar day that all work is fully completed prior to the specified completion date of August 20, 2005, one percent (1 %) of the actual construction costs will be given, to a maximum of five percent (5%) of the actual construction costs, as an incentive to complete the project ahead of schedule. HOWEVER, IF THE CITY AT ANY TIME EXTENDS THE COMPLETION DATE FOR ANY REASON, NO INCENTIVE SHALL BE PAID, UNLESS THE CITY IN ITS SOLE DISCRETION ELECTS TO PAY AN INCENTIVE. For each calendar day that any work shall remain uncompleted beyond the specified completion date of August 20, 2005, $1,000 per calendar day will be assessed, not as a penalty but as predetermined and agreed liquidated damages. The Contractor will be separately invoiced for this amount, and final payment will be withheld until payment has been made of this invoice. If the City extends the completion date, liquidated damages shall be calculated from the extended completion date. The assessment of liquidated damages shall not constitute a waiver of the City's right to collect any additional damages which the City may sustain by failure of the contractor to carry out the terms of his contract. City Gerk's Office 50 West 13th Street Dubuque, Iowa 52001-4864 (563) 589-4120 Office (563) 589-0890 Fax (563) 690-6678 TOD www.cityofdubuque.org TH: C~l::IF (~:--="\ [) LJ fTI}Q~Ti~. ~t/k.~ May 6, 2005 NOTICE TO PROPERTY OWNERS Notice is given that there is now on file for public inspection in the office of the City Clerk of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost, and a plat and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of Dubuque, Iowa, for an improvement of the type(s) and in the location(s) as follows: Asbury Road Sidewalk Installation Project The project consists of 3,428 lineal feet of sidewalk installation on the north side of Asbury Road from John F. Kennedy to Iowa 32 (Northwest Arterial) That the proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: North side of Asbury Road from John F. Kennedy Road to Iowa 32 (Northwest Arterial) All properties abutting along the line of the described improvements. The City Council will meet at 6:30 p.m. on the 6th day of June, 2005, at the Public library Auditorium, 360 West 11th Street, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a Resolution of Necessity. A property owner will be deemed to have waived all objections unless at the time of hearing he has filed objections with the City Clerk. Any visual- or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TOD (563) 690-6678 at least 48 hours prior to the meeting. zJ2J Jeanne F. Schneider, CMC City Clerk Service People Integrity Responsibility Innovation Teamwork Engineering Division City Hall 50 West 13th Street Dubuque,IA 52001-4864 (563) 589-4270 office (563) 589-4205 fax (563) 690-6678 TDD ~<k-~ May 6, 2005 RE: Asbury Road, north side, John F. Kennedy Road to Iowa 32 (Northwest Arterial) Sidewalk Installation TO: All Property Owners Within the Assessment District Attached is your preliminary assessment for the Asbury Road, north side, John F. Kennedy Road to Iowa 32 (Northwest Arterial) Sidewalk Installation as it was initiated for bidding purposes at the May 2, 2005 City Council meeting. As previously indicated property owners have the opportunity to install their sidewalk prior to June 27,2005 in order to be removed from the assessment project. Installation must be in accordance with all City Standards and Specifications, with permit being obtained prior to commencement of any work. This is a preliminary notice and no payments are due at this time. After construction is complete, for those properties constructed as part of the assessment project, the actual construction cost will be calculated and a final assessment notice sent to the assessed property owner with payment instructions. We anticipate the project to be completed in August 2005 and final assessments sent out in September or October, 2005. If you have any questions, please feel free to contact the Engineering Division office at (563) 589-4270. Sincerely,..../....}. .~ -Y1~._-~.~ Gus Psihoyos City Engineer Ene. cc: Ron Turner, P.L.S. Jane Smith, Engineering ____".___._.__._._.,..~__..___._~._~_u.~__,~_.__,__.__'_~~~'_._"___<_~~____'~________"'__'_'~'___'~~""~____,~__'___Y_n..<_..~~"._<______~.__~~._~____.~_~_._~.. .~_,_~_ Service People Integrity Responsibility Innovation Teamwork PROPERTY OWNER: MAILING ADDRESS: CITY STATE ZIP: LOCATION: PARCEL: LEGAL DESCRIPTION: PRELIMINARY ASSESSMENT: lOOT PROPERTY EXECUTIVE COUNCIL OF IOWA - CAPITAL SLOG DES MOINES IA 50319 $4921.3287 PROPERTY OWNER: QHQ PROPERTIES MAILING ADDRESS: 3430 DODGE ST #6 CITY STATE ZIP: DUBUQUE IA 52003 LOCATION: PARCEL: 10-16-351-002 LEGAL DESCRIPTION: L 1-1-1-3 SW 1/4 SEC 16 T89N R2E (LAND INSIDE) PRELIMINARY ASSESSMENT: $2095.5335 PROPERTY OWNER: QHQ PROPERTIES MAILING ADDRESS: 3430 DODGE ST #6 CITY STATE ZIP: DUBUQUE IA 52003 LOCATION: 4730 ASBURY RD PARCEL: 10-16-351-015 LEGAL DESCRIPTION: L 1-1-2-3 & S 34' L2-2-3 SW 1/4 SW 1/4 S 16 T89N R2E PRELIMINARY ASSESSMENT: $4222.8175 PROPERTY OWNER: INTERSTATE POWER C/O TAX DEPT - POBOX 77007 MADISON WI 53707 MAILING ADDRESS: CITY STATE ZIP: LOCATION: PARCEL: 10-16-351-006 LEGAL DESCRIPTION: L 1-2 SW 1/4 SW 1/4 S 16 T89N R2E PRELIMINARY ASSESSMENT: $1866.9298 PROPERTY OWNER: INTERSTATE POWER MAILING ADDRESS: C/O TAX DEPT - POBOX 77007 CITY STATE ZIP: MADISON WI 53707 LOCATION: PARCEL: 10-16-351-006 LEGAL DESCRIPTION: L 1-2 SW 1/4 SW 1/4 S 16 T89N R2E PRELIMINARY ASSESSMENT: $1866.9298 PROPERTY OWNER: ROUSSELMAXINE MAILING ADDRESS: 4616 ASBURY RD CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 4616 ASBURY RD PARCEL: 10-16-351-007 LEGAL DESCRIPTION: L 1-2-1 SW 1/4 SW 1/4 S 16 T89N R2E (LAND INSIDE) PRELIMINARY ASSESSMENT: $6826.3591 PROPERTY OWNER: QHQ PROPERTIES MAILING ADDRESS: 3430 DODGE ST #6 CITY STATE ZIP: DUBUQUE IA 52003. LOCATION: PARCEL: 10-16-351-017 LEGAL DESCRIPTION: L 2-1-1-1 NW 1/4 SW 1/4 S 16 T89N R2E & L 2 SALVO-SALAS PL PRELIMINARY ASSESSMENT: $16689.6542 PROPERTY OWNER: CONLONKEVIN J. MAILING ADDRESS: 4310 ASBURY RD CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 4310 ASBURY RD PARCEL: 10-16-351-009 LEGAL DESCRIPTION: L2-1-1-1-1-1 SW 1/4 SW 1/4 S 16 T89N R2E PRELIMINARY ASSESSMENT: $955.6903 PROPERTY OWNER: FIDELITY BANK MAILING ADDRESS: POBOX 277 CITY STATE ZIP: DYERSVILLE IA 52040 LOCATION: 4250 ASBURY RD PARCEL: 10-16-377-009 LEGAL DESCRIPTION: L 1 HARVEST BUSINESS CENTER PRELIMINARY ASSESSMENT: $3175.0507 PROPERTY OWNER: FIDELITY BANK MAILING ADDRESS: POBOX 277 CITY STATE ZIP: DYERSVILLE IA 52040 LOCATION: 4250 ASBURY RD PARCEL: 10-16-377-009 LEGAL DESCRIPTION: L 1 HARVEST BUSINESS CENTER PRELIMINARY ASSESSMENT: $3175.0507 PROPERTY OWNER: MURRAY DECLARATIONCAROL A MAILING ADDRESS: 16344 COVENTRY LN CITY STATE ZIP: DUBUQUE IA 52001 LOCATION: 4200 ASBURY RD PARCEL: 10-16-377-012 LEGAL DESCRIPTION: L 4 HARVEST BUSINESS CENTER PRELIMINARY ASSESSMENT: $2694.9831 PROPERTY OWNER: BLOEHLBERNICE MAILING ADDRESS: 2301 HARVEST VIEW CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 2301 HARVEST VIEW PARCEL: 10-16-377-033 LEGAL DESCRIPTION: L 2-37 BK 1 HARVEST VIEW ESTATES 1ST ADD PRELIMINARY ASSESSMENT: $3137.2676 PROPERTY OWNER: COOKIES HOMES INC MAILING ADDRESS: C/O LEON COOK - 2305 WHITETAIL DR. CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: PARCEL: 10-16-378-011 LEGAL DESCRIPTION: L 18 BK 1 HARVEST VIEW ESTATES 1ST ADD PRELIMINARY ASSESSMENT: $3257.9196 PROPERTY OWNER: GIBBS CONSTRUCTION MAILING ADDRESS: 16628 CARMEN OAKS DR CITY STATE ZIP: DURANGO IA 52039 LOCATION: 2301 MATTHEW JOHN PARCEL: 10-16-378-012 LEGAL DESCRIPTION: L 17 BK 1 HARVEST VIEW ESTATES 1ST ADD PRELIMINARY ASSESSMENT: $3123.9324 PROPERTY OWNER: HARVEST VIEW DEVC/O M MCNAMER MAILING ADDRESS: 5070 WOLFF RD - POBOX 767 CITY STATE ZIP: DUBUQUE IA 52004-767 LOCATION: PARCEL: 10-16-379-006 LEGAL DESCRIPTION: L 1 BK1 HARVEST VIEW ESTATES 1ST ADD PRELIMINARY ASSESSMENT: $3262.3646 PROPERTY OWNER: PLASTIC CENTER INC MAILING ADDRESS: 290 MAIN CITY STATE ZIP: DUBUQUE IA 52001 LOCATION: PARCEL: 10-21-100-006 LEGAL DESCRIPTION: LOT 2 PFOHL FARM PRELIMINARY ASSESSMENT: $9525.1522 PROPERTY OWNER: UND 1/2 INT, SCHNEIDERJAMES L & SHARON MAILING ADDRESS: 1640 MAIN CITY STATE ZIP: DUBUQUE IA 52001 LOCATION: 3860 ASBURY RD PARCEL: 10-16-454-005 LEGAL DESCRIPTION: L 1 BUENA VISTA SUB #6 PRELIMINARY ASSESSMENT: $2571.7911 PROPERTY OWNER: UND 1/2 INT, SCHNEIDERJAMES L & SHARON MAILING ADDRESS: 1640 MAIN CITY STATE ZIP: DUBUQUE IA 52001 LOCATION: 3860 ASBURY RD PARCEL: 10-16-454-011 LEGAL DESCRIPTION: L 2-1 KITCHEN FAMILY PROPERTIES PRELIMINARY ASSESSMENT: $5556.3388 PROPERTY OWNER: GOEBELRICHARD & GEORGIA MAILING ADDRESS: 2409 LAVISTA CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 2409 LAVISTA PARCEL: 10-21-202-002 LEGAL DESCRIPTION: L 5 BUENA VISTA SUB #1 PRELIMINARY ASSESSMENT: $9908.0634 PROPERTY OWNER: CONGREGATION JEHOV AHSDUBUQUE IOWA MAILING ADDRESS: 2738 LINDA CT CITY STATE ZIP: DUBUQUE IA 52001 LOCATION: 3650 ASBURY RD PARCEL: 10-21-202-003 LEGAL DESCRIPTION: L 4 BUENA VISTA SUB #1 PRELIMINARY ASSESSMENT: $4173.9217 PROPERTY OWNER: MEINSMEVELMA K MAILING ADDRESS: 3486 KIMBERLY CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 3486 KIMBERLY PARCEL: 10-21-227-003 LEGAL DESCRIPTION: L 17 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $2540.0406 PROPERTY OWNER: STEUERRONALD C & JOYCE E MAILING ADDRESS: 3478 KIMBERLY CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 3478 KIMBERLY PARCEL: 10-21-227 -004 LEGAL DESCRIPTION: L 16 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $4031.3619 PROPERTY OWNER: PFOHLPAUL A & SUSAN R MAILING ADDRESS: 3468 KIMBERLY CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 3468 KIMBERLY PARCEL: 10-21-227-005 LEGAL DESCRIPTION: L 15 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $2069.8156 PROPERTY OWNER: REITERKIM D & SUSAN M MAILING ADDRESS: 3460 KIMBERLY CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 3460 KIMBERLY PARCEL: 10-21-227-006 LEGAL DESCRIPTION: L 14 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $2072.6731 PROPERTY OWNER: WEILANDGARY, STEVEN, RONALD MAILING ADDRESS: 3446 KIMBERLY CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 3446 KIMBERLY PARCEL: 10-21-227-007 LEGAL DESCRIPTION: L 13 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $2069.8156 PROPERTY OWNER: SHAWMARK D & CYNTHIA MAILING ADDRESS: 3440 KIMBERLY CITY STATE liP: DUBUQUE IA 52002 LOCATION: 3440 KIMBERLY PARCEL: 10-21-227-008 LEGAL DESCRIPTION: L 12 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $2070.1331 PROPERTY OWNER: BECHENEUGENE J & CATHERINE MAILING ADDRESS: 3428 KIMBERLY CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 3428 KIMBERLY PARCEL: 10-21-227-009 LEGAL DESCRIPTION: L 11 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $2730.5436 PROPERTY OWNER: KRUEGEREDWARD J & HELEN J MAILING ADDRESS: 3410 KIMBERLY CITY STATE ZIP: DUBUQUE IA 52002 LOCATION: 3410 KIMBERLY PARCEL: 10-21-227-010 LEGAL DESCRIPTION: L 10 BK 1 SUNSET PARK SUB PRELIMINARY ASSESSMENT: $2734.9887 PROPERTY OWNER: HEITZMANWILLlAM P MAILING ADDRESS: 11019 N 75TH ST CITY STATE ZIP: SCOTTSDALE AZ 85260 LOCATION: 3390 ASBURY RD PARCEL: 10-21-227-023 LEGAL DESCRIPTION: L 2-1-3 J P METTEL SUB #2 PRELIMINARY ASSESSMENT: $3714.8094 PROPERTY OWNER: MAILING ADDRESS: CITY STATE ZIP: LOCATION: PARCEL: LEGAL DESCRIPTION: PRELIMINARY ASSESSMENT: $111999.28 PROPERTY OWNER: MAILING ADDRESS: CITY STATE ZIP: LOCATION: PARCEL: LEGAL DESCRIPTION: PRELIMINARY ASSESSMENT: $111999.28 PROPERTY OWNER: lOOT PROPERTY MAILING ADDRESS: EXECUTIVE COUNCIL OF IOWA - CAPITAL SLOG CITY STATE ZIP: DES MOINES IA 50319 LOCATION: NE corner Iowa Highway 32 (Northwest Arterial) & Asbury Road PARCEL: LEGAL DESCRIPTION: Iowa Highway 32 PRELIMINARY ASSESSMENT: $4921.3287 THE CITY OF f" Y{ ";r{L-'r f:~~.l" ;l~ ..;""" ~>. - . ,.1 - ," ~~~ City Clerk's Office 50 West 13th Street Dubuque, Iowa 52001-4864 IOWA DEPARTMENT OF TRANSPORTATION EXECUTIVE COUNCIL OF IOWA CAPITAL BUILDING DES MOINES IA 50319 WO-:J"li.eM<3"MMM pue wO-:J"ss<3JdX3<3leJodJo)"MMM :6,ig"8El) AV-aO.l 3)"888" ~ I M~dX3 ~ 3 1I n .I. V N D I S a~eJodJo::>V QHQ PROPERTIES 3430 DODGE ST #6 DUBUQUE IA 52003 INTERSTATE POWER C/O TAX DEPT POBOX 77007 MADISON WI 53707 ALLIANT ENERGY KEN ANTHONY 910 KERPER BLVD DUBUQUE IA 52001 MAXINE ROUSSEL 4616 ASBURY ROAD DUBUQUE IA 52002 QHQ PROPERTIES 3430 DODGE ST #6 DUBUQUE IA 52003 KEVIN CONLON 4310 ASBURY ROAD DUBUQUE IA 52002 FIDELITY BANK PO BOX 277 DYERSVILLE IA 52040 FIDELITY BANK 4250 ASBURY ROAD DUBUQUE IA 52002 MURRA Y DECLARATION OF TRUST 16344 COVENTRY LANE DUBUQUE IA 52001 COOKIE HOMES INC C/O LEON COOK 2305 WHITETAIL DRIVE DUBUQUE IA 52002 HARVEST VIEW DEVELOPMENT C/O MARTY MCNAMER POBOX 767 DUBUQUE IA 52004-0767 PFOHL PROPERTY CHURCH ONT OF BAPTIST JAMES L & SHARON SCHNEIDER 1640 MAIN DUBUQUE IA 52001 RI CHARD & GEORGIA GOEBEL 2409 LAVISTA DUBUQUE IA 52002 CONGREGATION JEHOV AHS 2738 LINDA CT DUBUQUE IA 52001 VELMA MEINSME 3486 KIMBERLY DUBUQUE IA 52002 RONALD C & JOYCE E STEUER 34 78 KIMBERLY DUBUQUE IA 52002 PAUL A & SUSAN R PFOHL 3468 KIMBERLY DUBUQUE IA 52002 KIM D & SUSAN M REITER 3460 KIMBERLY DUBUQUE IA 52002 GARY, STEVEN & RONALD WEILAND 3446 KIMBERLY DUBUQUE IA 52002 8~lE093) <3leldw<3l <3Sn ,J-OOJd-Wer SI<3qel 6u!l!eV\l J<3sel JJO?'li.eM<3'MMM pue WOYSS<3JdX3<3leJodJo)'MMM 6lE9"8El) A'~aO.l 3)'888' ~ I ",s'S'aJd'X3 ~ 3 1I n .I. V N D I S a~eJodJo::>V MARK D & CYNTHIA SHA W 3440 KIMBERLY DUBUQUE IA 52002 EUGENE J & CATHERINE BECHEN 3428 KIMBERLY DUBUQUE IA 52002 EDWARD J & HELEN J KRUEGER 341 0 KIMBERLY DUBUQUE IA 52002 WILLIAM P HEITZMAN 3390 ASBURY ROAD DUBUQUE IA 52002 PLASTIC CENTER INC 290 MAIN DUBUQUE IA 52001 GIBBS CONSTRUCTION 16628 CARMEN OAKS DRIVE DURANGO IA 52039 3400 ASBURY 18' IN ITALlZED HA VE fE KS IN ALREADY MICHAE~" WHITE 3350 ASB Y ROAD DUBUQU IA 52002 MULGRE OIL CO BOX 894 DUBUQU IA 52004-0894 STEVE & MA~HA SMITH 4962 ASBURY 'IRCLE DUBUQUE IA 2002 THEODORE & 'LENE JOHNSON 3462 ASBURY R iAD DUBUQUE IA 5 002 RITA THEL EN DECLARATION 3442 ASBU Y ROAD DUBUQUE IA 52002 THOMAS E & B j FAULKNER 3422 ASBURY R D DUBUQUE IA 52 02 AREA RES! ENTIAL CARE FACILITY 2429 HAC! 'NDA DUBUQUE J4 52002 MARK & SALLY.1 NES 2418 HACIENDA DUBUQUE IA 520 2 MURRAY DECLA~TION, CAROL 3370 ASBURY ROA DUBUQUE fA 520 \ CHURCH F THE RESURRECTION 4300 ASBU Y ROAD DUBUQU IA 52002 I EXECUTIf COUNCIL OF IOWA CAPITAL UILDING DES MOIN S IA 50319 ! B~lE093) <3leldw<3l <3Sn ,J.oOJd-wer SI<3qel 6u!l!eV\l J<3Sel