Loading...
Historic Millwork District Planned Unit DevelopmentPlanning Services Department City Hall 50 West 13th Street Dubuque, IA 52001 -4864 (563) 589 -4210 phone (563) 589 -4221 fax (563) 690 -6678 TDD planning cityofdubuque.org The Honorable Mayor and City Council Members City of Dubuque City Hall — 50 W. 13th Street Dubuque IA 52001 THE CITY OF DUB Masterpiece on the Mississippi Dubuque City ri r 2007 January 5, 2012 Applicant: City of Dubuque Location: Historic Millwork District Description: Amend Historic Millwork District PUD Conceptual Development Plan to allow for Intermodal Center and an 80 -space surface parking lot. Dear Mayor and City Council Members: The City of Dubuque Zoning Advisory Commission has reviewed the above -cited request. The application, staff report and related materials are attached for your review. Discussion Assistant Economic Development Director Aaron DeJong spoke in favor of the request, reviewing the proposed changes to the conceptual plan for the District and the process to locate the Intermodal Center. Staff reviewed the staff report, noting the proposed changes are significant enough to warrant an amendment, that the Intermodal Center will serve rail, bus, bicycle, and pedestrians, and is located in an area accessible to downtown, Washington Street neighborhood and the Port of Dubuque. There was one public comment in support of the changes. The Zoning Advisory Commission discussed the request, and noted that while they agree with the changes, they regret the loss of open space. Recommendation By a vote of 6 to 0, the Zoning Advisory Commission recommends that the City Council approve the request. A simple majority vote is needed for the City Council to approve the request. Respectfully submitted, nn /1 `u /6 {' VV`1 Charles Miller, Chairperson Zoning Advisory Commission Attachments cc: David Heiar, Economic Development Director Service People Integrity Responsibility Innovation Teamwork THE CITY OF Dub Masterpiece on the Mississippi ['Variance ❑Conditional Use Permit ['Appeal ❑Special Exception ['Limited Setback Waiver Rezoning/PUD Dubuque Itstezi 2007 PLANNING APPLICATION FORM ❑Preliminary Plat ['Major Final Plat ['Minor Final Plat ❑Simple Site Plan ['Minor Site Plan ❑Major Site Plan ['Simple Subdivision ❑Text Amendment ❑Temporary Use Permit ['Annexation ❑Historic Revolving Loan ❑Historic Housing Grant Please type or print legibly in ink Property owner(s):Various (see attached list) Address: City: Fax Number: Cellular Number: Applicant /Agent: City of Dubuque Address: 50 W. 13th Street Fax: 563 - 589 -4221 Cell: City of Dubuque Planning Services Department Dubuque, IA 52001 -4805 Phone: 563-589-4210 Fax: 563- 589 -4221 ['Certificate of Appropriateness ['Advisory Design Review (Public Projects) ['Certificate of Economic Non - Viability ❑Historic Designation ❑Demolition in Conservation Districts ['Neighborhood Association Phone: State: E -mail Address: Phone: 563 -589 -4210 Zip: City: _ State: IA Zip:52001 Site location /address: Historic Millwork District (see attached map) Existing zoning: PUD /PC E -mail: Planning@ cityofdubuque.org Proposed zoning: PUD /PC District: Yes Landmark: No Legal Description (Sidwell parcel ID# or lot number /block number /subdivision): See attached Ordinance. Total property (lot) area (square feet or acres): 50.31 acres Describe proposal and reason necessary (attach a letter of explanation, if needed):.Amend existing PUD Master Plan to allow for intermodal center and an 80 space surface parking lot. CERTIFICATION: I /we, the undersigned, do hereby certify /acknowledge that: 1. It is the property owner's responsibility to locate property lines and to review the abstract for easements and restrictive covenants. 2. The information submitted herein is true and correct to the best of my /our knowledge and upon submittal becomes public record; 3. Fees are not refundable and payment does not guarantee approval; and 4. All additional required written and graphic materials are attached. Property Owner(s): Date: Applicant /Agent: Date: /`� /? // FOR OFFICE USE ONLY — APPLICATION SUBMITTAL CHECKLIST Fee: — Received by: Date: /2•Z3. // Docket: THE CITY OF Masterpiece on the Mississippi Dubuque ruff 2007 Vicinity Map Applicant: City of Dubuque Location: Historic Millwork District A Description: Amend Historic Millwork District PUD Conceptual Development Plan to allow for Intermodal Center and an 80 -space surface parking lot. Legend Historic Millwork District Boundary Mississippi River Path: H:1Planning Services\Vicinity Maps1ZAC Vicinity Maps\projects \Historic Millwork District Amend PUD 12_14_11.mxc Base Data Provided by Dubuque County GIS Masterpiece on the Mississippi TO: Zoning Advisory Commission FROM: Kyle L. Kritz, Associate Planner SUBJECT: Historic Millwork District PUD Amendment Dubuque kraal AU AmericaCity 1� iII i 2007 December 27, 2011 INTRODUCTION This memorandum outlines a proposed amendment to the Historic Millwork District PUD Ordinance that established zoning and development regulations for the Historic Millwork District. The proposed amendment addresses the location of the Dubuque Intermodal Transportation Center and a transitional surface parking lot on the PUD Conceptual Development Plan. BACKGROUND The Historic Millwork District Master Plan adopted by the City Council in 2009 was intended to foster opportunities for retention of existing businesses as well as a recruitment and expansion of new businesses into the substantial floor space that the existing large warehouses in this district offered. The highlights of the Master Plan included the conversion of over 1 million square feet of vacant and/or underutilized space into a live, work, play community. The redevelopment of the Historic Millwork District is consistent with and had been aided by the creation of Sustainable Dubuque (www.sustainabledubuque.org) focusing on environmental /ecological integrity, economic prosperity and social /cultural vibrancy to create a viable, equitable, and livable community. The existing industrial uses and the growing adaptive re -use of these warehouses into a mix of office, commercial and entertainment and residential uses are supported by the Master Plan's unique qualities of melding market opportunities, sustainable design, historic preservation, and sound planning principles. The redevelopment of the Historic Millwork District is well underway with the reconstruction and update to City streets and utilities. The redevelopment of the Caradaco building is also progressing that will, when finished, include 72 dwelling units and 50,000 square feet of leasable commercial space. Memo to Zoning Advisory Commission Historic Millwork District PUD Amendment Page 2 DISCUSSION The proposed amendment to the Historic Millwork District PUD is a result of the planning effort to establish a location for an intermodal facility to support transit connections, passenger rail connections, vehicular parking, electric vehicle charging, bicycle parking, intercity bus passenger waiting area, taxicab stands, public restrooms and a ticketing office. The proposed facility will also have potential for retail space, a daycare facility, commercial office space and possibly lockers and showers /changing areas as part of the restrooms. The amendment to the Conceptual Plan for the Historic Millwork District PUD is necessary as the preferred location for the intermodal facility is located in an area that was originally identified as the location of the Landform Park. Landform Park is the working name and the official name will be selected by the City Council at the time the park is created. This area is north of 9th street, south of 11th Street and east of Elm Street. While this is still intended to be a public park in the area, the scale will be different and any name would be determinate at a later time. Presently, the City does not have a centralized transportation hub and lacks many interconnectivity capabilities between air, rail, bus, vehicle, bicycle and pedestrian facilities. The Dubuque Intermodal Transportation Center will address these problems and is proposed to be strategically located in the Historic Millwork District near Dubuque's Historic Downtown and the Port of Dubuque. The Dubuque Intermodal Transportation Center compliments and leverages the Complete Streets of Dubuque's urban core, promotes greater use of public transportation, and will provide for a more livable and sustainable community. The other proposed change to the adopted Conceptual Plan for the Historic Millwork District PUD is the location of a transitional surface parking lot in the area identified as Foundry Square on the Master Plan. Foundry Square is to be located west of Elm Street between 9th and 10th Streets. The proposed 80 -car surface lot to the east of the Foundry building would be removed as some point in the future to create Foundry Square, a public plaza. RECOMMENDATION Planning staff recommends that the Zoning Advisory Commission review the proposed amendment to the Historic Millwork District PUD Conceptual Development Plan and then make a recommendation to the City Council. KLK/mkr Attachments cc: David Heiar, Economic Development Director Aaron DeJong, Assistant Economic Development Director '!c 10th Street: Renovated warehouse buildings will animate and define a key pedestrian connection to Downtown. Tenth Street will be a unique urban space, with reused bricks, portals to courtyards, and adapted loading docks. Jackson Street: Partial reconstruction will include upgrades to utilities and conditions but will enable Jackson Street to retain its inherent character. Existing rail tracks, brick pavers, and other unique features will remain in place where appropriate. Green Streets: New and reconstructed streets will irrigate landscape by collecting stormwater. On- street convenience parking, well- marked crosswalks, and ample space for amenities such as public art, seating, and lighting will contribute to the pedestrian and environmentally friendly streetscape. Foundry Square: The Alamo Building and new plaza is a lively, year -round focal point and gathering space in the heart of the District. Landform Park: Stormwater management, recreation, artistic features, and geothermal opportunities are some of the features Landform Park will offer. Kirby /Farley Plaza: The plaza pair will define a key address for new commercial and office tenants and will be a significant public space along the 7th Street connection between Downtown, the District, and the Port. Dubuque Warehouse District Project Group Steering Committee Mike Blouin Jay Borrell Paul Butler Laura Carstens Jill Connors Brian Dalziel Aaron DeJong Rick Dickinson Teri Goodmann John Gronen David Heiar Bob Johnson Dan LoBianco Tim McNamara Tony Pfohl Joel Schmidt Michelle Scbnier Jerry Schroeder Cindy Steinhauser Nancy Van Milligen City of Dubuque Staff Liaisons David Heiar, Economic Development Director Aaron DeJong, Asst Economic Development Director Cindy Steinhauser, Assistant City Manager Laura Carstens, Planning Services Manager Consultants Cuningham Group Architecture, P.A. Economic Research Associates Jeffrey Morton Architecture Next Steps • Work with property owners to assemble a Phase One Historic Tax Credit Application for approximately 200 rental units and 100,000 square feet of non- commercial space. • Develop a detailed streetscape plan and plaza design. • Pursue full funding for public infrastructure. • Work with regional and national partners to develop a comprehensive District Energy Plan. • Build a small parking deck adjacent to the Alamo Building. • Work with IDOT to begin the process of rerouting Elm Street. Executive Summary -4 6. Phase I: Central Area The Plan (continued) The Alamo Building, Foundry Square & Landform Park The Plan recommends creating a significant public open space in the middle of the District. The space has two separate but related parts: 1) a plaza (Foundry Square) and a 2) stormwater feature (Landform Park). These will be built in two phases. Foundry Square is a year -round gathering space defined by the historic Caradco buildings on two edges, the restored Alamo Building in the middle, and by the plaza design throughout. The plaza sets the District standard and tone by highlighting and showcasing the arts and sustainable technologies and techniques. Active edges animate the plaza and occupy both the ground floor and upper levels of surrounding structures. The Alamo Building is a landmark building in the plaza. It should be renovated as a flexible space for lease to retailers, restaurateurs, or as a gallery space, with open circulation similar to a market structure. The south edge of the Foundry Square is defined by a two -level parking structure. The parking structure has a well designed north edge, such as an art wall, for better integration with the plaza. The bosque of trees on the east edge of Foundry Square provides shade, defines the plaza, and offers a variety of spatial experiences. The bosque can improve infiltration and increase permeability. In addition, maintaining portions of existing buildings on site creates a structured corner to the bosque and plaza. Over time, the District's central open space can be expanded to include a green space on the east edge of the District. By realigning Elm Street, land can be reclaimed and used for redevelopment and public amenity. As the topographic low point in the District, this area is ideal for a stormwater feature /landform park (using the excavated fill from the parking structure). Like the plaza, Landform Park showcases both the arts and sustainable techniques and technologies, possibly serving as a sculpture park, geothermal field, a structured wetland, or space for a blackwater or graywater treatment plant known as a living machine. Phase 1A: Foundry Square Lr` r i1 !i) The Alamo Building:The former Dean and Rouse Foundry. Phase 113; Laridiorm Park CUNtNGHAN G s o u p 6. Phase 1: Central Area —* - .71 - - Ir., JO 7 g — I r, rTT I --- 1-/-1, "-TI_IL,- ---,--=_,:„ _.,-.-.._-,--..„M".---7--rf tI----17-`-f=_EIV -- , ,- .1.A-a ,„:•- 14-1.13,.--_-1--- -" '---2s---L.,--6L.L.,.7-fe _ 4 En_r _ - ---= ---- -- -- • 1 1 IN , ig u colt - ... - Y-, • ( '''.7-■:‘,,.. , -- - --.• 110 , Qlin roer ft --, 1 - -,.., ! 1: i• Foundry Square:The images above show some of the artistic, event-oriented, and spatial possibilities for Foundry Square. 200 car parking structure BIT , I .6,011kaimic--.111.14.- mow: r..1.0 The Alamo Building 10th St • Section through Foundry Square Looking West: Foundry Square Will be a flexible space to be used for a variety of public activities. The Plaza will showcase and highlight sustainable technologies and practices. - •evi', • CLININGHAM 5 ROUP 6. Phase I: Central Area Lanclform Park:The images above show some of the artistic, sustainable, and spatial possibilities for Lanclform Park. CUNINGHAM G R O U P Masterpiece on the Mississippi TO: Michael Van Milligen, City Manager FROM: Aaron M. DeJong, Asst. Economic Development Director SUBJECT: Draft Intermodal Project Design Concepts - DATE: November 29, 2011 Dubuque 2007 INTRODUCTION This memo is to provide information for the City Council prior to the work session scheduled for December 5 on the Intermodal Center. BACKGROUND Neumann Monson Architects was hired in June 2011 to conduct preliminary design for the Intermodal facility in the Historic Millwork District. The vision for the facility is that it will support transit connections, rail connections, vehicular parking, electric vehicle charging, bicycle parking, intercity bus, a passenger waiting area, taxicab stands, public restrooms and a ticketing office. There is the potential for retail space, a daycare facility, commercial office space and possibly lockers and showers /changing areas as part of the restrooms. Dubuque was recently awarded a State of Good Repair Grant from the U.S. DOT to build certain components of the Intermodal facility. The awarded components are • Transit Hub (Local and Inter -City buses) • Passenger Rail Platform • Funding for parking (first phase is 250 spaces) The State of Good Repair Grant award from the FTA is $8,000,000 which represents 70% of a $11,428,000 project. The local match is figured to be $3,428,000. DISCUSSION On August 31, 2011, several public input meetings were conducted to get input about the needs of the Intermodal Facility, and what was important from a design perspective to encourage a successful development of an intermodal facility in the Millwork District. Based on input from the Public and the FTA, the design quickly moved to creating several buildings as opposed to one large facility. The consultants were back in Dubuque on Monday, October 24, to meet with Millwork Property Owners and City Staff to review the several site options. The preferred site option is attached to this memorandum. Reasons for this site plan being the most desirable by adjoining property owners and City staff are as follows: • Parking is close to the Millwork Buildings • Terminal building defines the view corridor down 10th Street (the main pedestrian street to downtown) • Additional parking potential near the Terminal building • Bus facility is close to Terminal • Relocation of Elm Street is avoided The 80 car surface lot to the east of the Foundry Building would be removed at some point in the future to create the open public space identified in the Millwork District Master Plan. It should be noted there are still unknowns with this project. There are additional environmental tests, soil borings, zoning and historic clearance questions that must be answered. In addition, part of the site is owned by the Iowa DOT. City Staff has already begun the discussions with the Iowa DOT to acquire the needed property for his proposed Intermodal Center. ACTION STEP This memorandum, and the attachments, are for informational purposes. The intent of the work session is to update the City Council on the Intermodal Center Project, answer any questions they may have related to the project and to seek their input prior to final design. F \USERS \Econ Dev\Intermodal Facility \Phase II - Intermodal RFP \Work Session Dec 5\20111129 Draft Intermodal Project Design Concepts Memo 2 docx A Ramo 295 (phase 1) = 505 409 (phase 2a) + 30 + 80 + 100 = 619 485 (phase 2b) = 695 Retail Lot Plaza Lot Terminal Lot Site Totals Parking Layout III I City of Dubuque Intermodal Campus Scale: 0 40 80 ft. N 716 MVO, NEUMANN MONSON DuB E ARCHITECTS Atuko,y,iy m.Aqda+rN Aerial View - Facing north City of Dubuque Intermodal Campus 171ZOITOV NEUMANN MONSON Dug E ARCHI E C TS kr„”.„,f,„.„ Au.,,/„/J,0 wogs Aerial View - Facing northwest City of Dubuque Intermodal Campus NEUMANN MONSON 5UBQ ARCHITECTS kkomi.ren h ,.nwa„yr4 Aerial View - F iccong southwest City of Dubuque Intermodal Campus NEUMANN MONSON ARCHITECTS errya DUB E Hampden an lNe M1Urindppl Aerial View - Facing south City of Dubuque Intermodal Campus NEUMANN MONSON ARCHITECTS 1,11.77.31. Due E Masloriro• on Pk A11,51%54,0 Wes l ( �'T :. = y,1 MM ;7--- �3° CC LC -- CC d :_ :C et: CC -C CC C \' C p I t C 4 C C C C C C C C O 7 C C C a C C C C 8 C � a •` r • ''¢ zt =* t at ■■ t gr ■I IA it :I` \• ! {{�, c ■ n a c a t r r e r a a r c I .. tAt: �,S• -- -- • h A di Asa.. iii► ' . • . .e& 1 '7'; r_ tom II■6MI MN 5 iii Aerial View - Facing north City of Dubuque Intermodal Campus NEUMANN MONSON Dug E ARCHI TEC , A.trreeer art the . ' "H, 11. AerEmE - Facing northeast City of Dubuque Intermodal Campus Street View - Facing north City of Dubuque Intermodal Campus THE erfrOr NEUMANN MONSON DUB E A R C H I T E C T S Alnrcrrinr.n flu,TfH�lnlnN Street View - Facing west City of Dubuque Intermodal Campus NEUAMNN MONSON DUB A P. C H I T E C T o City of Dubuque Intermodal Campus i1J.11HD21N C Example Project - Garland Street Ramp Example Project - Garland Street Ramp City of Dubuque Intermodal Campus NEUMANN MONSON A E C H T E C T I J DUB UE !maarr„r „gr m, nrn.14.1e1 9_ 9 SECOND LEVEL MOOR PLAN • -- 9 - 9 -- (;), 9 9 ■ rl.. •■•• , • •0_,:•• ae4 7-1 Plans - Terminal building rrn.T LEVEL noon PLAIJ City of Dubuque Intermodal Campus et= a 'Mare OP NEUMANN MONSON Dug ARCHITECTS v•-• kr. C•cl ; 0174: ). e..7$6.?"• I, 11 - -s=1._—";_„ 4.,..r. ' •e , .. , •it:, • -: .. . , •4,7;h71--4:, 4:': ,-.:. : : . .,.:'.:‘,:,::... -, ,9-c::.r•sl-, .....- -:,,... ---:-..." ' '' '. -... " -- .,- • . ..• ;1:41■fitn:4 ..;'-::.-!: -:••,, rt34144q41A54 ' -.•• ;"":''' At;.;*. :<■:_lt -';.■ "-1----:, '.* Street View - Facing east City of Dubuque Intermodal Campus merry a. NEUMANN MONSON Dus ARCHITECTS Ad.wrkeenn the mbarelm Street View - Facing south City of Dubuque Intermodal Campus NEUMANN MONSON ARCHITECTS DUB E Mu.fesp6rrAr/IrAfMSfrtyT! f I; ill, I i!;I� I, � �i I Ii' it 1. K � Street View - Facing northeast City of Dubuque Intermodal Campus NEUMANN MONSON DUB ARCHITECTS p�y�,�. p,N join, 11111111111111111111111111111111111111111111111111111111111111111111111111111111 Doc ID 007281020028 Type GEN Kind ORDINANCE Recorded: 01/27/2012 at 02:04:25 PM Fee Amt: $142.00 Page 1 of 28 Dubuque County Iowa Kathy Flynn Thurlow Recorder F11e2012- 00001606 Prepared by: Laura Carstens, City Planner Address: 50 W. 13th St., City Hall Telephone: 589 -4210 Return to: Kevin Firnstahl, City Clerk, Address: City Hall- 50 W. 13t" Street Telephone: 589 -4121 ORDINANCE NO. 2 -12 AN ORDINANCE AMENDING TITLE 16, THE UNIFIED DEVELOPMENT CODE OF THE CITY OF DUBUQUE CODE OF ORDINANCES BY RESCINDING ORDINANCE 20 -10 WHICH ESTABLISHED REGULATIONS FOR A PUD PLANNED UNIT DEVELOPMENT DISTRICT WITH A PLANNED COMMERCIAL DESIGNATION FOR THE HISTORIC MILLWORK DISTRICT PUD AND NOW BEING AMENDED TO ALLOW FOR THE INTERMODAL CENTER AND AN 80 -SPACE SURFACE PARKING LOT. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That Title 16, the Unified Development Code of the City of Dubuque Code of Ordinances is hereby amended by rescinding Ordinance 20 -10 which established regulation for a with a Planned Commercial District designation and adopting an amended conceptual development plan, a copy of which is attached to and made a part hereof, and now being amended to allow for the Intermodal Center and an 80 -space surface parking lot for the following described property, to wit: All real property generally located south of 12t" Street, east of White Street and west of Highway 61/151 as highlighted in Exhibit A, and to the centerline of the adjoining public right -of -way, all in the City of Dubuque, Iowa. A. Use Regulations. The following regulations shall apply to all uses made of land in the above - described PC Planned Commercial District: Principal permitted uses: The following uses are permitted in the Historic Millwork District PUD: 1. Places of religious exercise or assembly. 14200 City Clerk Historic Millwork District PUD Page 2 2. Public, private or parochial school approved by State of Iowa (K- 12). 3. Public or private park, golf course, or similar natural recreation area. 4. Railroad and pubic or quasi - public utility, including substation. 5. Residential use. 6. Housing for the elderly and persons with disabilities (not identified with (5) above). 7. Noncommercial art gallery. 8. Museum or library. 9. School of private instruction. 10. Private club. 11. General office. 12. Medical office or clinic. 13. Dental or medical lab. 14. Barber or beauty shop. 15. Hotel. 16. Shoe repair. 17. Laundry or drycleaner. 18. Bakery (wholesale or commercial). 19. Retail sales or service. 20. Indoor restaurant. 21. Bar or tavern. 22. Supermarket. 23. Tailoring or alterations. 24. Furniture or home furnishing. Historic Millwork District PUD Page 3 25. Appliance sales or service. 26. Animal hospital or clinic. 27. Laundromat. 28. Furniture upholstery or repair. 29. Artist studio. 30. Photographic studio. 31. Neighborhood shopping center. 32. Business services. 33. Department store. 34. Auditorium or assembly hall. 35. Indoor theater. 36. Bank, savings and loan, or credit union. 37. Indoor amusement center. 38. Vending or game machine sales and service. 39. Indoor recreation facility. 40. Mail order house. 41. Printing or publishing. 42. Parking structure. 43. Vocational school. 44. Business or secretarial school. 45. Passenger transfer facility. 46. Warehousing and storage facility. 47. Artisan production shop. Accessory Uses: The following accessory uses are permitted in the Historic Millwork District PUD: Historic Millwork District PUD Page 4 1. Any use customarily incidental and subordinate to the principal use it serves. 2. Boiler system in use as part of an industrial business or use. 3. Outdoor seating as part of an indoor restaurant, bar or tavern. Conditional Uses: The following conditional uses are permitted in the Historic Millwork District PUD, subject to the provisions of Article 8 of the Unified Development Code that establishes requirements for application to the Zoning Board of Adjustment for a conditional use permit, and any other specific conditions listed below for a conditional use. 1. Drive -in or carry-out restaurant. 2. Drive -up automated bank teller. 3. Vehicle rental. 4. Construction supplies sales and service. 5. Contractor shop or yard. 6. Wholesale sale /distributor. 7. Agricultural supply sales. 8. Lumberyard or building materials. 9. Laboratory for research, development or engineering, provided that such use complies with all local, state, and federal regulations governing hazardous substances, hazardous conditions, hazardous wastes, and hazardous materials. 10. Freight transfer facility. 11. Moving or storage facility. 12. Millworking. 13. Manufacture, assembly, repair or storage of electrical or electronic products, components or equipment. 14. Manufacture or assembly of musical instruments; toys; watches or clocks; medical, dental, optical or similar scientific instruments; orthopedic or medical appliances; signs or billboards. Historic Millwork District PUD Page 5 15. Manufacturing, compounding, assembly or treatment of articles or products from the following substances: clothing or textiles; rubber, precious or semiprecious stones or metals; wood; plastics; paper; leather; fiber; glass; hair; wax; metal; concrete; feathers; fur; cork; and celluloid or cellulose products. 16. District energy system. 17. Private energy generation facility. 18. Exterior storage. 19. Licensed child care centers, provided that: a. Such facility shall supply loading and unloading spaces so as not to obstruct public streets or create traffic or safety hazards; b. All licenses have been issued or have been applied for and are awaiting the outcome of the state's decision; and c. Such use shall not be located within the same structure as any gas station, bar /tavern, automated gas station or any facility selling, servicing, repairing, or renting vehicles. d. The conditional use applicant certifies that the premises on which the licensed child care center will be located complies with, and will for so long as the licensed child care center is so located, continue to comply with all local, state and federal regulations governing hazardous substances, hazardous conditions, hazardous wastes, and hazardous materials. e. If the applicant is subject to the requirements of Section 302 of the Superfund Amendments and Reauthorization Act of 1986, as amended, the Emergency Management Director shall certify whether or not the applicant has submitted a current inventory of extremely hazardous substances kept or stored on the premises. If any such extremely hazardous substances are kept or stored on the premises, the applicant shall also post in a conspicuous place on the premises a notice indicating a description of the extremely hazardous substances, and the physical and health hazards presented by such substances. f. Applicant shall submit an evacuation plan for approval by the City, both written and drawn, that details where the children will go in the event of a hazardous materials Historic Millwork District PUD Page 6 g. incident. The plan shall include a "house in place" scenario in which the children can be kept safely within a room of the building that has no penetration to the outside (windows, doors, etc). Applicant shall submit plans for approval by the City that indicate the installation of a main emergency shut -off switch for the heating, ventilation, and air conditioning (HVAC) system to minimize the infiltration risk of airborne hazardous materials. B. Lot and Bulk Regulations. The following bulk regulations shall apply in the Historic Millwork District PUD, subject to the provisions of the Unified Development Code. 1. Setbacks: a) Front yard = 0 feet b) Side yard = 0 feet c) Rear yard = 0 feet 2. Building Height = no maximum. 3. New Construction Transition. New construction on the blocks between 12th Street and 11th Street should transition in scale from the Washington Neighborhood to the District PUD. C. Sign Regulations. 1. The number, size and location of signs in the Historic Millwork District PUD shall be regulated in accordance with Exhibit C and all other applicable regulations of Article 15 of the Unified Development Code. 2. A comprehensive sign plan is required as part of the sign permit submittal for all multi- tenant buildings. 3. Free - standing signs in the District PUD shall be monument -style signs. 4. The design of signage shall comply with the Downtown Design Guidelines for signs. Waiver requests from these guidelines shall be reviewed by the Historic Preservation Commission in accordance with the provisions of Article 10 of the Unified Development Code. Historic Millwork District PUD Page 7 5. Variance requests from sign requirements established in Article 15 of the Unified Development Code shall be reviewed by the Zoning Board of Adjustment in accordance with provisions of Article 8 of the Unified Development Code. 6. Off - premise signs are prohibited in the Historic Millwork District PUD. D. Performance Standards. Creation of a viable, equitable, and livable mixed -use neighborhood in the Historic Millwork District PUD that includes residential, retail, office, commercial, and industrial uses requires both strategy and flexibility for its sustainability. The development and maintenance of uses in the Historic Millwork District PUD conceptually should follow the goals, objectives, and recommendations of the Historic Millwork District Master Plan, incorporated herein by reference and on file in the Planning Services Department. The development and maintenance of uses in the Historic Millwork District PUD shall be regulated as follows: 1. Conceptual Development Plan a. Referenced herein as Section 5. Development Summary of the Historic Millwork District Master Plan, and shown on Exhibit B, on file in the Planning Services Department, and made a part of this zoning reclassification by reference as the Conceptual Development Plan for the Historic Millwork District PUD. b. It is recognized that minor shifts or modifications to the general plan layout may be necessary and compatible with the need to acquire workable street patterns, grades and usable building sites. c. The Land Use / Development Patterns depicted in the Historic Millwork District Master Plan for ground floor uses reflect a predominance of residential uses; however, for District sustainability, these ground floor uses shall be characterized by a flexible designation for the Historic Millwork District PUD Conceptual Development Plan as shown in Exhibit B. 2. Parking Regulations Off - street parking is not required as part of the Historic Millwork District PUD. Off - street parking spaces may be provided in a building as an accessory use, subject to review and approval under Building, Fire, and other applicable City Codes. If a property Historic Millwork District PUD Page 8 owner chooses to provide surface off - street parking within the District PUD, the City Council must first approve the request and the following regulations shall apply: a. Parking lot design shall comply with the Downtown Design Guidelines for surface parking lots. b. All vehicle - related features shall be surfaced with standard or permeable asphalt, concrete, or pavers. c. Curbing and proper surface drainage of storm water shall be provided. d. All parking and loading spaces shall be delineated on the surfacing material by painted stripes or other permanent means. e. The size and design of parking spaces shall be governed by applicable provisions of the Unified Development Code enforced at the time of development of the lot. f. The number, size, design, and location of parking spaces designated for persons with disabilities shall be according to the local, state, or federal requirements in effect at the time of development. 3. Parking Structures. Parking structures (ramps) are allowed in the Historic Millwork District PUD subject to City Council review and the following standards: a. Parking structures shall comply with the Downtown Design Guidelines for parking facilities. b. The size and design of parking spaces shall be governed by applicable provisions of the Unified Development Code enforced at the time of development. c. The number, size, design, and location of parking spaces designated for persons with disabilities shall be according to the local, state or federal requirements in effect at the time of development. 4. Site Lighting a. Exterior illumination of site features shall be limited to the illumination of the following: i. Parking areas, driveways and loading facilities. Historic Millwork District PUD Page 9 H. Pedestrian walkway surfaces and entrances to building. Hi. Building exterior. b. Location and Design i. All exterior lighting luminaries shall be designed and installed to shield light from the luminaries at angles above 72- degrees from vertical. H. Fixtures mounted on a building shall not be positioned higher than the roofline of the building. Hi. All electrical service lines to posts and fixtures shall be underground and concealed inside the posts. iv. The design of exterior lighting luminaries shall comply with the Downtown Design Guidelines for signs. Waiver requests from these guidelines shall be reviewed by the Historic Preservation Commission in accordance with the provisions of Article 10 of the Unified Development Code. 5. Open Space It is the intent of these regulations that the development of open spaces Of provided) shall reflect a high quality of environmental design. The following provisions shall apply. i. Open space plans are required as part of submittals for site plan review. Such plans are to include type, number and size of proposed plantings, paving and other open space amenities. Open space areas shall be designed in compliance with Downtown Design Guidelines and the Historic Millwork District Master Plan. H. Within one (1) year following completion of construction, or by the date that a building is issued an occupancy certificate by the Building Services Department of the City of Dubuque, whichever occurs first, required open space amenities shall be installed. 6. Stormwater Management The developer shall be responsible for providing stormwater management in a means that is satisfactory to the City Engineer Historic Millwork District PUD Page 10 and consistent with the Historic Millwork District Master Plan. Sustainable, low impact development techniques for stormwater management approved by the City Engineer will be used where feasible. Other applicable regulations also enforced by the City Engineer relative to stormwater management and drainage shall apply to the subject property. 7. Exterior Trash Collection Areas a. The storage of trash and debris shall be limited to that produced by the principal permitted use and accessory uses of the lot. b. All exterior trash collection areas and the materials contained therein shall be visually screened from view. The screening shall be completely opaque fence, wall or other feature not exceeding a height of 10 feet measured from the ground level outside the line of the screen. Screens built on sloping grades shall be stepped so that their top line shall be horizontal. All exterior entrances to a screened trash area shall be provided with a gate or door of similar design to that of the screen. c. Exterior trash collection areas shall comply with the Downtown Design Guidelines for service areas. 8. Exterior Storage a. Exterior storage is allowed in the Historic Millwork PUD District. Exterior storage areas shall comply with the Downtown Design Guidelines for service areas. b. The use of semi - trailers and /or shipping containers for storage is prohibited. 9. Final site development plans shall be submitted in accordance with provisions of Article 12 and Article 13 of the Unified Development Code prior to construction or expansion of any buildings, free - standing signs, or parking facilities. The Downtown Design Guidelines shall apply to site development in the District PUD, and shall take precedence over the Design Standards for Big Box Retail Uses (over 100,000 square feet) and the Design Standards for Retail Commercial Uses (over 60,000 square feet) and Regional Shopping Centers in Article 13 of the Unified Development Code. Historic Millwork District PUD Page 11 10. Retail uses should be clustered around each other and adjacent to public spaces, such as at the intersection of 10th and Washington Streets, in the Farley & Loetscher and Kirby Buildings along 7t Street, and in a highly visible commercial corridor at the east edge of the District along Elm Street. 11. Land uses should transition from industrial on the south to residential on the north, with new commercial or mixed use buildings along the new block to be created by realigning Elm Street in accordance with the Historic Millwork District Master Plan. E. Other Codes and Regulations 1. Service Lines. All electric, telephone, cable, or other similar utility lines serving the building and other site features shall be located underground, where feasible. 2. These regulations do not relieve the owner from other applicable city, county, state or federal codes, regulations, laws and other controls relative to the planning, construction, operation and management of property within the city of Dubuque. F. Transfer of Ownership Transfer of ownership or lease of property in the Historic Millwork District PUD shall include in the transfer or lease agreement a provision that the purchaser or lessee acknowledges awareness of the conditions authorizing the establishment of the District PUD. G. Recording A copy of this PUD Ordinance shall be recorded, at the expense of the City of Dubuque, with the Dubuque County Recorder as a permanent record of the conditions accepted as part of this reclassification approval. This ordinance shall be binding upon the undersigned and his /her heirs, successors and assigns. Section 2. The foregoing amendment has heretofore been reviewed by the Zoning Advisory Commission of the City of Dubuque, Iowa. Section 3. The foregoing amendment shall take effect upon publication, as provided by law. Passed, approved and adopted this 17th day of January 2012. Ric W. Jon ¢S,(N}ayor Pro Tem Historic Millwork District PUD Attest: Kevi i nstahl, City Ierk Page 12 Exhibit A Historic Millwork District PUD Boundary 1E CrIY OF Dubuque [ V sn the P Mississippi 2007 Legend Historic Millwork District PUD Historic Millwork District PUD Boundary 11_13_09 OFFICIAL PUBLICATION ORDINANCE NO. 2-12 AN ORDINANCE AMENDING TITLE 16, THE UNIFIED DEVEL- OPMENT CODE OF THE CITY OF DUBU- NANCESDE OF OR BY RESCINDING ORDI- NANCE 20-10 WHICH ESTABLISHED REGU- LATIONS FOR A PUD PLANNED UNIT DE- VELOPMENT DIS- TRICT WITH A PLAN- NED COMMERCIAL DESIGNATION FOR THE HISTORIC MILL- WORK DISTRICT PUD AND' NOW BEING AMENDED TO ALLOW FOR THE INTERMO- DAL CENTER AND AN 80 -SPACE SURFACE PARKING LOT. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, 10- WA: Section 1. That Title 16, the Unified Devel- opment Code of the City of Dubuque Code of Ordinances is here- by amended by rescinding Ordinance 20 -10 which establish- ed regulation for a with a Planned Commercial District designation and, adopting an amended conceptual development plan, a copy of which is at- tached to and made a part hereof, and now being amended to al- low for the Intermodal Center and an 80 -space surface parking lot for the following described property, to wit: All real property gen- erally located south of 12th Street, east of White Street and west of Highway 61/151 as highlighted in Exhibit A, and to the centerline of the adjoining public right -of -way, all in the City of Dubuque, Iowa. A. Use Regulations. The following regula- tions shall apply to all uses made of land in the above - described PC Planned Commer- cial District: Principal permitted uses: The following uses are permitted in the Historic Millwork District PUD: L Places of religious exercise or assembly. 2. Public, private or parochial school ap- proved by State of Io- wa (K -12). 3. Public or private park, golf course, or similar natural recrea- tion area. 4. Railroad and public or quasi- public utility, including substation. 5. Residential use. 6. Housing for the eld- erly and persons with disabilities (not identi- fied with (5) above). 7. Noncommercial art gallery. 8. Museum or library. 9. School of private in- struction. 10. Private club. 11. General office. 12. Medical office or clinic. 13. Dental or medical lab. 14. Barber or beauty shop. 15. Hotel. 16. Shoe repair. 17. Laundry or drycleaner. 18. Bakery (wholesale or commercial). 19. Retail sales or service. ' 20. Indoor restaurant. 21. Bar or tavern. 22. Supermarket. 23. Tailoring or altera- tions. 24. Furniture or home furnishing. • 25. Appliance sales or service. 26. Animal hospital or clinic. 27. Laundromat. 28. Furniture uphols- tery or repair. 29. Artist studio. 30. Photographic stu- dio. 31. Neighborhood shopping center. 32. Business services. 33. Department store. • 34. Auditorium or as- sembly hall. 35. Indoor theater. 36. Bank, savings and loan, or credit union. 37. Indoor amusement center. 38. Vending or game machine sales and service. 39. Indoor recreation facility. 40. Mail order house. 41. Printing or pub- lishing. 42. Parking structure. 43. Vocational school. 44. Business or secre- tarial school. 45. Passenger transfer facility. 46. Warehousing and storage facility. 47. Artisan production shop. Accessory Uses:The, following accessory uses are permitted in been issued or have the Historic Millwork been applied' for and District PUD: L Any use dustomari- lyincidental and subor- dinate to the principal use it serves. • 2. Boiler system in use as part of an industrial business or use. 3. Outdoor seating as part of an indoor res- taurant, bar or tavern. Conditional Uses: The folldwing condi- tional uses are permit- ted in the Historic Mill- work District PUD, sub- ject to the provisions of Article 8 of the Unified Development Code that establishes require- ments for application to the Zoning Board of Adjustment for a con- ditional use permit, and any other specific conditions fisted below for a conditional use. 1. Drive-in' or carry- out restaurant. 2. Drive -up automated bank teller. 3. Vehicle rental. 4. Construction sup - plies.sales and service. 5. Contractor shop or yard. 6. Wholesale sale/ distributor.' 7. Agricultural supply sales. 8'' Lumberyard' or, extremely hazardous bulldingmaterials; .r substances kept or 9. Laboratory for re- stored on the prem- search, development ises. If any such ex- or engineering, provid- tremely hazardous ed that such use corn- substances are kept or plies with all local, stored on the prem- state, and federal regu- lations governing haz- ardous substandes, hazardous conditions, hazardous wastes, and hazardous materials. 10. Freight transfer fa- cility. 11. Moving or storage facility. 12 ;Millworkirig. 13. Manufacture, as- sembly, repair or stor- age of electrical or electronic products, components or equip- ment. 14. Manufacture or assembly of musical in- struments; . toys; watches or clocks; medical, dental, optical or similar scientific in- struments; orthopedic or medical appliances; signs or billboards. 15. Manufacturing, compounding, assem- bly or treatment of ar- ticles or products from the following substan- ces: clothing or tex- tiles; rubber,' precious or semiprecious stones or metals, wood; plas- tics; paper; leather, fi- ber; glass; hair; wax; metal; concrete; feath- ers; fur, cork; and cel- luloid or cellulose prod- ucts. 16. District energy system. . 17. Private energy generation facility. 18. Exterior storage. 19. Licensed child care centers, provided that: a. Such facility shall supply loading and un- loading spaces so as not to obstruct public streets or create traffic or safety hazards; b. All licenses have are awaiting the out- come of the state's de- cision; and c. Such use 'shall not be located within the same structdre'as zany gas . station, ' bar /ta- vern, automated gas station or any facility selling, servicing, re- pairing, or renting ve- hicles. d. The conditional use applicant certifies that the premises on which the licensed child care center will -be located complies with, and will for so long 'as the li- censed child are cen- ter is so located, con- tinue to comply with all local, state and federal regulations governing hazardous substances, hazardous-- conditions, haiard'ous -wastes,' and ' lazardbus riiaterials. e. If the applicant is subject to the require- ments of Section 302 of the Superfund Amend- ments and Reauthori- zation Act of 1986, as amended, the Emer- gency Management Di- rector shall , certify whether or.npt the ap- plicant has submitted a °current imithito y of ises, the applicant shall also post in a conspicu- ous place on the prem- ises a notice indicating a description of the ex- tiernely hazardous 'substances, and the physical and health hazards presented by such substances. f. Applicant shall sub- mit an evacuation plan for approval by the City, both written and drawn, that details where the children will go in the event of a hazardous materials incident. The plan shall include a "house ' in place" scenario in which the children can be kept safely within a room of the building that has no penetration to the outside (win- dows, doors, etc). g. Applicant shall sub- mit plans for approval by the City that indi- cate the installation of a main emergency shut -off switch for the heating, ventilation, and air conditioning (HVAC) system to mini- mize the infiltration risk of airborne hazard- ous materials. B. Lot and Bulk Reg- ulations. The following bulk regulations shall apply in the Historic Millwork District PUD, subject to the provisions of the Unified Development Code. 1. Setbacks: a) Front yard = 0 feet b) Side yard = 0 feet c) Rear yard = 0 feet 2. Building Height = no maximum. 3. New Construction Transition. New con- 1 -C,V, riMVO-CV -Li le 171 11 1l. PUD. C. Sign Regulations. . 1. The number, size and location of signs in the Historic Millwork District PUD shall be regulated in accord- ance with Exhibit C and all other applicable regulations of Article S. 15 of the Unified Devel- „ opment Code. 2. A comprehensive sign plan is required as part of the sign permit submittal for all multi - tenant buildings. 3. Free - standing signs in the District PUD shall be monument -style signs. 4. The design of signage shall comply with the Downtown De- - sign Guidelines for signs. Waiver requests from these guidelines shall be reviewed by the Historic Preserve-. tion Commission in ac- `_ cordance with the pro- _ visions of Article 10 of the Unified Develop- ' ment Code. 5. Variance requests from sign requirements established in Article 15 of the Unified Devel- opment Code shall be reviewed by the Zoning, Board of Adjustment in accordance with provi- sions of Article 8 of the Unified Development Code. 6. Off - premise signs are prohibited in the Historic Millwork Dis- trict PUD. D. Performance Standards. Creation of a viable, equitable, and livable mixed -use neighbor- hood in the Historic Millwork District PUD that includes residen- tial, retail, office, com- mercial, and industrial uses requires both strategy and flexibility for its sustainability. The development and maintenance of uses in the Historic Millwork 'Millwork District Mas- ter Plan for ground floor uses reflect a pre- dominance of residen- tial uses; however, for District sustainability, these ground floor uses shall be charac- terized by a flexible designation for the His- toric Millwork District PUD Conceptual Devel- opment Plan as shown in Exhibit B. 2. Parking Regulations Off- street parking is not required as part of the Historic Millwork District PUD. Off- street parking spaces may be provided in a building as an - accessory -use, subject to review and approval under Build- ing, Fire, and other ap- plicable City Codes. If a property owner choo- ses to provide surface off - street parking with- in the District PUD, the City Council must first approve the request and the following regu- lations shall apply: a. Parking lot design shall comply with the Downtown Design Guidelines for surface parking lots. b. All vehicle- related features-shall be sur- faced with standard or permeable asphalt, concrete, or pavers. c. Curbing and proper surface drainage of storm water shall be provided. d. All parking and loading spaces shall be delineated on the sur- facing material by painted stripes or oth- er permanent means. e. The size and design of parking spaces shall be governed by appli- cable provisions of the Unified Development Code enforced at the time of development of the lot. f. The number, size, design, and location of parking spaces desig- facilities. - - ii. Pedestrian walk- way surfaces and en- trances to building. iii. Building exterior. b. Location and De- sign i. All exterior lighting luminaries shall be de- signed and installed to shield light from the lu- minaries at angles above 72- degrees from vertical. ii. Fixtures mounted on a building shall not be positioned higher than the roofline of the building. ,iii. All electrical serv- ice lines to posts and fixtures shall be under- ground and concealed inside the posts. iv. The design of exte- rior lighting luminaries shall comply with the Downtown Design Guidelines for signs. Waiver requests from these guidelines shall be reviewed by the His- toric Preservation Commission in accord ante with the provi- sions, of Article 10 of the Unified Develop- ment Code. 5. Open Space It is the intent of these regulations that the development of open spaces (if provid- ed) shall reflect a high quality of environmen- tal design. The follow- ing provisions shall ap- ply. i. Open space plans are required as part of submittals for site plan review. Such plans are to include type, num- ber and size of pro- posed plantings, pav- ing and other open space amenities. Open space areas 'shall be designed in compli- ance with Downtown Design Guidelines and the Historic Millwork District Master Plan. ii. Within one (1) year followingg completion STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: January 20, 2012, and for which the charge is $182.78. feasible. to before me 2. These regulations do not relieve the own - f day o er from other applica- ble city, county, state or federal codes, regu- lations, laws and other controls relative to the planning, construction, operation and manage- ment of property with- in the city of Dubuque. F. Transfer of Own- ership Transfer of ownership or lease of property in the Historic Millwork District PUD shall in- clude in the transfer or lease agreement a pro- vision that the pur- chaser or lessee ac- knowledges awareness of the conditions au- thorizing the establish- ment of the District PUD. G. Recording A copy of this PUD Or- dinance- shall be - -re- corded, at the expense of the City of Dubuque, with the Dubuque County Recorder as a permanent record of the conditions accept- ed as part of this re- classification approval. This ordinance shall be binding upon the un- dersigned and his /her heirs, successors and assigns. Section 2. The forego- ing amendment has heretofore been re- viewed by the Zoning Advisory Commission of the City of Dubuque, Iowa. Section 3. The forego- ing amendment shall take effect upon publi- cation, as provided by law. Passed, approved and adopted this 17th day of January, 2012. /s /Ric W. Jones, Mayor Pro Tem Attest: /s /Kevin S. Firnstahl, City Clerk Published officially in the Telegraph Herald Newspaper on the 20th day of January, 2012. /s /Kevin 5. Firnstahl, City Clerk It 1/20 the materials ctin- tained therein shall be visually screened from view. The screening shall be completely opaque fence, wall or other feature not ex- ceeding a height. of 10 feet measured from the ground level out- side the line of the screen. Screens built on sloping grades shall be stepped so that their top line shall be horizontal. All exterior entrances to a screened trash area shall be provided with a gate or door of simi- lar design to that of the screen. c. Exterior trash col - lection areas shall comply with the Down- town Design Guidelines for service areas. 8. Exterior Storage a. Exterior storage is allowed in the Historic Millwork PUD District. Exterior storage areas shall comply with the Downtown Design Guidelines for service areas. b. The use of semi- trailers and /or ship- ping containers for storage is prohibited. 9. Final site develop- ment plans shall be submitted in accord- ance with provisions of Article 12 and Article 13 of the Unified Devel- opment Code prior to construction or expan- sion of any buildings, free - standing signs, or parking facilities. The Downtown Design Guidelines shall apply to site development in the District PUD, and shall take precedence over the Design Stand -_ ards for Big Box Retail Uses (over 100,000 square feet) and the Design Standards for Retail Commercial Uses (over 60,000 square feet) and Re- gional Shopping Cen- tare in Artirla IR oft P a Notary Public in and for Dubuque County, Iowa, 20/.? - Notary Public in and for Dubuque County, Iowa. NOW, IF1tHtYURt, 6t IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IO- WA: Section 1. That Title • 31. Neighborhood shopping center. 32. Business services. 33. Department store. 34. Auditorium or as- sembly hall. signs or billboards. 15. Manufacturing, compounding, assem- bly or treatment of ar- ticles or products from the following substan- to the outside (win- dows, doors, etc). g. Applicant shall sub- mit plans for approval by the City that indi- cate the installation of woyasudJa;u3eJo8618 £-6 'unS !S -6 '}PS '6 -51JJ Z3-1Z-OZ A.ienue' (JJEna 3 ZTZT `PuJ6JIEJ YMOI `V13NoriOv N MOHS M(19 Z868-Z£L-8O9'ysEo 00ES `screw q'seIEwa} £ `paAOwaJ SMEIOMap `salddnd pJaydags uawJao 032183elfld L4S0- bLS-809 ;xa; Jo bLbZ- £Z9-809 IIEO struction on the blocks between 12th Street a and llth Street should s ; transition in scale from the Washington Neigh- v borhood to the District PUD. C. Sign Regulations. . 1. The number, size f and location of signs in the Historic Millwork t District PUD shall be regulated in accord- ance with Exhibit C and all other applicable regulations of Article 4 15 of the Unified Devel- opment Code. 2. A comprehensive sign plan is required as part of the sign permit submittal for all multi - tenant buildings. 3. Free - standing signs in the District PUD shall be monument -style signs. 4. The design of signage shall comply with the Downtown De- - sign Guidelines for signs. Waiver requests from these guidelines shall be reviewed by • the Historic Preserva-. tion Commission in ac- `_ cordance with the pro- _ visions of Article 10 of the Unified Develop- ' ment Code. 5. Variance requests from sign requirements established in Article. 15 of the Unified Devel- opment Code shall be reviewed by the Zoning Board of Adjustment in - accordance with provi- sions of Article 8 of the Unified Development Code. 6. Off- premise signs are prohibited in the Historic Millwork Dis- trict PUD. D. Performance Standards. Creation of a viable, equitable, and livable mixed -use neighbor- hood in the Historic Millwork District PUD that includes residen- tial, retail, office, com- mercial, and industrial uses requires both strategy and flexibility for its sustainability. The development and maintenance of uses in the Historic Millwork District PUD conceptu- ally should follow the goals, objectives, and _ recommendations of the Historic Millwork District Master Plan, incorporated herein by reference and on file in the Planning Services Department. The devel- opment and mainte- nance of uses in the Historic Millwork Dis- trict PUD shall be regu- lated as follows: 1. Conceptual Devel- opment Plan a. Referenced herein as Section 5. Develop- ment Summary of the Historic Millwork Dis- trict Master Plan, and shown on Exhibit B, on file in the Planning Services Department, and made a part of this zoning reclassification by reference as the Conceptual Develop- ment Plan for the His- _ toric Millwork District PUD. . b. It is recognized that minor shifts or modifi- cations to the general _ plan layout may be r necessary and compat- ible with the need to acquire workable street patterns, grades nd usable building s ites. c. The Land Use / De- I elopment Patterns de- picted • in the Historic Millwork District Mas- f ter Plan for ground loor uses reflect a pre- dominance of residen- ial uses; however, for District sustainability, these ground floor uses shall be charac- terized by a flexible designation for the His- toric Millwork District PUD Conceptual Devel- opment Plan as shown in Exhibit B. 2. Parking Regulations Off- street parking is not required as part of the Historic Millwork District PUD. Off- street parking spaces may be provided in a building as an - accessory use, subject to review and approval under Build- ing, Fire, and other ap- plicable City Codes. If a property owner choo- ses to provide surface off - street parking with- in the District PUD, the City Council must first approve the request and the following regu- lations shall apply: a. Parking lot design shall comply with the Downtown Design Guidelines for surface parking lots. b. All vehicle- related features shall be sur- faced with standard or permeable asphalt, concrete, or pavers. c. Curbing and proper surface drainage of storm water shall be provided. d. All parking and loading spaces shall be delineated on the sur- facing material by painted stripes or oth- er permanent means. e. The size and design of parking spaces shall be governed by appli- cable provisions of the Unified Development Code enforced at the time of development of the lot. f. The number, size, design, and location of parking spaces desig- nated for persons with disabilities shall be ac- cording to the local,. state, or federal re- quirements in effect at the time of develop- ment • 3. Parking Structures. Parking structures (ramps) are allowed in the Historic Millwork District PUD subject to City Council review and the following standards: a. Parking structures shall comply with the Downtown Design Guidelines for parking facilities. b. The size and design of parking spaces shall be governed by appli- cable provisions of the Unified Development Code enforced at the time of development. c. The number, size, design, and location of parking spaces desig- nated for persons with disabilities shall be ac- cording to the local, state or federal re- quirements in effect at the time of develop- ment 4. Site Lighting • a Exterior illumina- 849-18S-E9S'£$ -a to q JaTEM'8 IMoq 'S$ IaegM /MJEO `01$ -3IuE L ssvID.:Ja;swEH /11gJaD 007$•Addnd Jnoi eAJeseJ o} Jo suopsanb y31M 1661-611'-STS 1115, •77-1,7 urtu • tion of site features hall be limited to the Ilumination of the fol- owing: i.,_ Parking areas, driveways and loading acilities. ii. Pedestrian walk- way surfaces and en- trances to building. iii. Building exterior. b. Location and De- sign i. All exterior lighting luminaries shall be de- signed and installed to shield light from the lu- minaries at angles above 72- degrees from vertical. ii. Fixtures mounted on a building shall not be positioned higher than the roofline of the building. All electrical serv- ice lines to posts and fixtures shall be under- ground and concealed inside the posts. iv. The design of exte- rior lighting luminaries shall comply with the Downtown Design Guidelines for signs. Waiver requests from these guidelines shall be reviewed by the His- toric Preservation Commission in accord ante with the provi- sions. of Article 10 of the Unified Develop- ment Code. 5. Open Space It is the intent of these regulations that the development of open spaces (if provid- ed) shall reflect a high quality of environmen- tal design. The follow- ing provisions shall ap- ply. i. Open space plans are required as part of submittals for site plan review. Such plans are to include type, num- ber and size of pro- posed plantings, pav- ing and other open space amenities. Open space areas shall be designed in compli- ance with Downtown Design Guidelines and the Historic Millwork District Master Plan. ii. Within one (1) year following completion of construction, or by the date that a building is issued an occupancy certificate by the Build- ing Services Depart- ment of.the City of Du- buque, whichever oc- curs first, required open space amenities shall be installed. 6. Stormwater Man- agement The developer shall be responsible for pro- viding stormwater management in a means that is satisfac- tory to the City Engi- neer and consistent with the Historic Mill- work District Master Plan. Sustainable, low impact development techniques for stormwater manage- ment approved by the City Engineer 'will- be used where feasible. Other applicable regu- lations also enforced by the City Engineer relative to stormwate management and drainage shall apply to the subject property. 7. Exterior Trash Col lection Areas a. The storage o trash and debris shal 9S9L-069 = ZLL6-06S-E9S •algE11EAE osle sboi •sezIS SnOIJEA UI elgElieAE p00M ;lids pauoseas - 000M32i1J lanj- saoeuanj- pooh- aaeldaaij be limited to that pro- duced by the principal permitted use and ac- cessory uses of the lot. b. All exterior trash collection areas and the materials con- tained therein shall be visually screened from view. The screening shall be completely opaque fence, wall or other feature not ex- ceeding a height of 10 feet measured from the ground level out- side the line of the screen. Screens built on sloping grades shall be stepped so that their top line shall be horizontal. All exterior entrances to a screened trash area shall be provided with a gate or door of simi- lar design to that of the screen. c. Exterior trash col- lection areas shall comply with the Down- town Design Guidelines for service areas. 8. Exterior Storage a. Exterior storage is allowed in the Historic Millwork PUD District. Exterior storage areas shall comply with the Downtown Design Guidelines for service areas. b. The use of semi- trailers and /or ship- ping containers for storage is prohibited. 9. Final site develop- ment plans shall be submitted in accord- ance with provisions of Article 12 and Article 13 of.the Unified Devel- opment Code prior to construction or expan- sion of any buildings, free - standing signs, or parking facilities. The Downtown Design Guidelines shall apply to site development in the District PUD, and shall take precedence over the Design Stand -_ ards for Big Box Retail Uses (over 100,000 square feet) and the Design Standards for Retail Commercial Uses (over 60,000 square feet) and Re- gional Shopping Cen- ters in Article 13 of the Unified Development Code. 10. Retail uses should be clustered around each other and adja- cent to public spaces, such as at the intersec- tion of 10th and Wash- ington Streets, in the Farley & Loetscher and Kirby Buildings along 7th Street, and in a highly visible "commer - cial corridor at the east edge of the District along Elm Street. 11. Land. uses should transition from indus- trial on the south to residential on the north, with new com- mercial or mixed use buildings along the new block to be creat- ed by realigning Elm Street in accordance with the Historic Mill- work District Master Plan. E: Other Codes and r Regulations 1. Service Lines. All electric, telephone, ca- ble, or other similar utility lines serving the building and other site f features shall be locat- 1 ed underground, where corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: January 20, 2012, and for which the charge is $182.78. feasible. to before me a Notary Public in and for Dubuque County, Iowa, 2. These regulations do not relieve the own- of day o er from other applica ble, city, county, state or federal codes, regu- lations, laws and other controls relative to the planning, construction, operation and manage - ment of property with- in the city of Dubuque. F. Transfer of Own- ership Transfer of ownership or lease of property in the Historic Millwork District PUD shall in- clude in the transfer or lease agreement a pro- vision that the pur- chaser or lessee ac- knowledges awareness of the conditions au- thorizing the establish- ment of the District PUD. G. Recording A copy of this PUD Or- dinance -shall be re- corded, at the expense of the City of Dubuque, with the Dubuque County Recorder as a permanent record of the conditions accept- ed as part of this re- classification approval. This ordinance shall be binding upon the un- dersigned and his /her heirs, successors and assigns. Section 2. The forego- ing amendment has heretofore been re- viewed by the Zoning Advisory Commission of the City of Dubuque, Iowa. Section 3. The forego- ing amendment shall take effect upon publi- cation, as provided by law. Passed, approved and adopted this 17th day of January, 2012. /s /Ric W. Jones, Mayor Pro Tem Attest: /s /Kevin S. Firnstahl, City Clerk Published officially in the Telegraph Herald Newspaper on the 20th day of January, 2012. /s /Kevin S. Firnstahl, City Clerk It 1/20 Notary Public in and for Dubuque County, Iowa. EXHIBIT B Devdopment Summary 5. Development Summary Context Plan: Off Site Improvements Washington St Improvements Central and White: traffic calming or two way conversion upon opening the Southwest Arterial. s n r � r 9 ` ,(i`,t`r ' ` �/ Kerper c, ,� 1�\ r Blvd: �, + Convert 4,51,.. ,4 Y .� t • frontage • •%.:'5-'. r road to ` r , two•wal r New street to the Port gt�a�o,�a`J 54: �tI ets\oo Go ti. 7th St Connection to Shot Tower and Port C lost v. oar doc. CUNINGFlAM n e o u r 5 Development Summary Illustrative Master Plan Landform Park frdundry Square ' \ \ I, I,s\ t .. \` 1� \4 .Kirby Farley Plaza cutvinnIlTS 5. Development Summary Places Streets Jackson Street C C I I I I t. G r 5. Development Summary Places (continued) Spaces Landform Park •/-:/7 • 7 • 4 \ • -- . . __I --: • --;--z,:,1,-...._n=„..„. ___"-_-, . —, ,t. ------- -, t I Ell lti , _ tit .11 7S III W -1:::*" I:1 1../-k. ti ;.rdi10. Foundry Square CUNINGIIMA F. 00 r Development Program • 5. Development Summary Mock . t A Spahn and Rose 25 1 B Spahn and Rose 55 1 Notth.. C Spahn and Rose SS • ‘Nt1e1 i D Geisler 47 � 1 / E Spahn and Rose 72 1 F Caradco 84 Name Units(new) Non Res sf Parking V 1 1 E - • 0 -e�Ols.. H 1 J 1 K / 1 L Wilmac' Caradco 22 new 64 various 70 Caradco 84 Foundry Square cp� M JELD -WEN N Kirby" O Farley Loetscher° 0 0 0 0 0 29 64 64 80 5,000 72 10,000 45 34,000 44 30,000 150 10,000 50 35,000 0 6,000 200 40 57,000 28 0 0 0 50 70,000 344 64 89,600 235 TOTAL 634 359,000 1468" 'assumes 1/2 residential, 1/2 non residential, see page 71 "(does not include on street parking) U 14114611 AM G / 1 0 1 1 P 5 Development Summary Land Use / Development Patterns Rehabilitation and New Construction 5t i 1 R I 1 El Existing Buildings: Rehabilitation ❑ New Construction Ground Floor Uses t r 1 7N "� 1 t .t ':)t fir:•' 1 I V r c 5 iF! ;..y' l fo 1, f iC f I 5 - '` r U n Retail n Residential n Parking El Flexible approximately 97,000 sf retail/ restaurant O approximately 10,000 sf retail! restaurant CUNINGIiAM r. n 0 0 1 Open Space •i: O V•1 r ! 5. Development Summary * r f r ` f r r n Sidewalks I I I I I Plazas and Plaza Streets Courtyards/ Passages Stormwater Feature/Sculpture Park t d n o a 9 WVIIDNINf ) OSSL 98S LEE ERE 1V101 909 0 £9L bbE 61 Linos 0b0 lZV 9Z 00Z £6L IeiIUa) bZ£ S9L UV 0 LIL Ll ON Gu!plinq ul 101 a)eJms a nI nJls laans uo adAl 6uiplln0 tit lola)LJins alnpulls palls u0 I I I 6UHied Aie.uwnS luawdoJanaQ S Streets Type of Investment 5 Development Summary Type of Street nExisting Streets: Full Reconstruction n New Streets and New Right -of -Way [] Streetscape Improvements Only ® Jackson Street: Partial Reconstruction f'fff Fl Green Street with Linear Stormwater Planters Green Streets with Stormwater Planters In Curb Extensions Plaza Street Jackson Street CUNtNGHAM G R O U P 5. Development Summary Streets with Linear Stormwater Planters a u■ III AZ O 2 $ & r stormwater collection In linear planterse Linear planter Streets with Stormwater Planters in Curb Extensions at the End of the Block 4, r Ye. direction of flow stormwater collection In curb extensions at the end of the block —4 9 �v C UN IN Gil AM G R O U P S. Development Summary Phasing Phase 1 A: Central Phase 1 13: Central \ \� 14,;31.1.1v*, „'y, IF ,. i Phase 2: South I 5� s+'d ry ! 9 $ ' !, I / t t L , `. t,.. 0. Phase 3: North d �e CUNINGIIAt4 G R O U P Historic Millwork District Planned Unit Development Permitted Sign On-Premise Signs Projection Over Right- Height Structures Area (sf) Number Heib of-Way Biii","-ia:kiiiiTi'a;r17:4"fiir5a47,;Tari`i'iAiT07;7,7i-v277,,E7ga:17.511Z2::`I';:::1,?1,1..,i4lifil.08i711)1;7:17.257;E;TiTiTE7,7,,!:±i7f7U';7i71`57",3;77.777,,,;;,17,,,, 1 Freestanding 100 per sign 1 1 per premises Projecting 25 per sign 11'1 per business per street Wall 50 per sign Freestanding 10 per sign 1 per building entrance 'I , Wall Maximum ' • r r,r,r,rrr r'r Identrricatien SIgns Business, Retail or Office !; Directory ::"a Applications Center sign for multi-tenant buildings ..' 17, DirectronallSigns All Applications O 25 feet 60 inches Below eave or Wall nameplate or 6 per sign 1 per business per street! frontage under-canopy sign 10% buidling wall area Wall-mounted minus openings with 1 per frontage 150 maximum Freestanding • Wall 6 per sign E IBIT C Permitted Lighting Type No flashing Permitted Mechanical Motion X111.11 :i O parapet : ,1 5 feet , I O , . None • Below eave or No flashing ! parapet '.., . Below eave or parapet :I .1 0 . No flashing . None '1 Below eave or i O .1 External None parapet None Not Specified 0 717 10 feet Below eave or parapet r,. Internal, no flashing None No flashing (phase 2a) A Ramp 295(phase 1) 409 (phase 2a) + 485 (phase 2b) Retail Lot Plaza Lot Terminal Lot Site Totals = 505 30 + 80 + 100 = 619 = 695 Parking Layout I I I AMENDED CONCEPTUAL PLAN City of Dubuque Intermodal Campus Scale: 0 40 80 ft. NEUMANN MONSON ARCHITECTS Dus d10/errSrran Mr Minkstopi