Green Alley Permeable Pavers (17th-18th, Jackson-Washington) Project AwardMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Green Alley Permeable Pavers Project (17th - 18th, between Jackson and Washington Streets) DATE: January 19, 2012 Dubuque bierd All-America City 1 2007 Sealed bids were received for the Green Alley Permeable Pavers Project (17th — 18tH between Jackson and Washington Streets). City Engineer Gus Psihoyos recommends award of the contract to the low bidder, McDermott Excavating, in the amount of $148,847.05, which is 1.6% over the estimate of probable cost of $146,436.50. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Green Alley Permeable Pavers Project (17th - 18th between Jackson and Washington Streets) DATE: January 19, 2012 INTRODUCTION Dubuque bierd All-America City 1 2007 The enclosed resolution authorizes the award of the construction contract for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets). DISCUSSION The Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) will involve the reconstruction of the alley between Jackson and Washington Streets, from 17th Street to 18th Street. This alley is adjacent to the Washington row houses that the Housing Department is renovating. The project will include: Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. Replacement of four (4) lead water services with copper. Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. This project is one of the alleys identified in the Annual Green Alley Program Capital Improvement Plan and it will be the first green alley that will involve water service and alley pavement assessments. The previous Green Alley Permeable Paver Projects were partially funded with Community Development Block Grant funds (CDBG) from the American Recovery & Reinvestment Act; these monies are no longer available. BID RESULTS When this project was originally bid in August 2011 and the bids were rejected, the low bid was $ 179,287.00. Sealed bids were received on the project on January 19, 2012. McDermott Excavating of Dubuque, Iowa, submitted the low bid in the amount of $148,847.05. This amount is 1.6% over the estimate of probable cost. A summary of the bid proposals received is as follows: Contractor Name McDermott Excavating Tschiggfrie Excavating Portzen Construction Drew Cook & Sons Excavating Connolly Construction Total Bid $148,847.05 $170,387.25 $174,707.00 $185,265.05 $188,848.85 RECOMMENDATION I recommend that the contract for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets) be awarded to McDermott Excavating in the amount of $148,847.05. BUDGET IMPACT The estimate of probable cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) is as follows: Construction Contract Bid $146,436.50 Contingency 14,643.65 Construction Engineering & Inspection 24,162.02 Total Project Cost $185,242.17 The estimated project category costs are as follows: Cost Summary /Description Alley Construction Improvements Special Assessment - Street Improvement, Residential Properties Special Assessment - Street Improvement, Commercial Properties Special Assessment - Street Improvement Deficiency, Paid by the City Special Assessment - Water Services, Residential Properties Watermain Improvements Sanitary Sewer Improvements Storm Sewer Improvements Total Project Cost 2 Award $148,847.05 14,643.65 24,162.02 $187,652.72 Amount $ 36,724.13 11,174.39 2,878.91 4,604.60 60,450.56 43,074.20 28,745.93 $187,652.72 The project funding summary is as follows: CIP No. Fund Description Funding 3002044 Green Alley Pilot Project $ 68,000.00 7101335 Sanitary Sewer Manhole Replacement 30,511.80 7201081 Catch Basin Maintenance 14,140.92 7201008 Storm Sewer Improvements 10,000.00 7402044 Water Main Replacements 65,000.00 Total Project Funding $187.652.72 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) to McDermott Excavating in the amount of $148,847.05. Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II Todd Shoemaker, Environmental Engineer 3 RESOLUTION NO. 25 -12 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH - 18TH, BETWEEN JACKSON AND WASHINGTON STREETS) Whereas, sealed proposals have been submitted by contractors for the Green Alley Permeable Pavers Project (17th - 18th, between Jackson and Washington Streets) (the Project) pursuant to Resolution No. 432 -11 and Notice to Bidders published in a newspaper published in the City of Dubuque, Iowa on the 19th day of December, 2011. Whereas, said sealed proposals were opened and read on the 19th day of January, 2012, and it has been determined that McDermott Excavating of Dubuque, Iowa, with a bid in the amount of $148,847.05, is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to McDermott Excavating and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved and adopted this 6th day of February , 2012. Attest: Kevi S. irnstahl, ity C erk oy D. Buol, Mayor CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET BID TABULATION FOR: 17th St. - 18th St. GREEN ALLEY PROJECT (Between Jackson St. & Washington St.) BID ITEM DESCRIPTION BASE BID: EXCAVATION & STONE BID DATE: January 19, 2012 UNIT ESTIMATE QUANTITY ESTIMATE UNIT COST ESTIMATE COST 1 Remove Pavement SY 834 $ 4.50 $ 3,753.00 2 Remove Existing Manhole Each 3 $ 600.00 $ 1 800.00 3 Excavation Unclassified CY 255 $ 6.00 $ 1,530.00 4 Excavation, (Waterproofing) CY 35 $ 6.00 $ 210.00 5 Select Backfill Ton 700 $ 15.00 $ 10,500.00 6 Bedding and Void Opening Aggregates (ASTM #8 Washed stone) -(3l8" Asphalt chips) Ton 45 $ 15.00 $ 675.00 7 Porous Aggregate (ASTM #57 washed stone) -(1" Clean) Ton 130 $ 19.00 $ 2 470.00 8 Porous Aggregate (ASTM #2 washed stone) -(3" Clean) Ton 312 $ 24.00 $ 7,488.00 9 Backfill, Topsoil SY 41 $ 6.00 $ 246.00 10 Existing Curb & Gutter Removal (as indicated/approved by City Engineer) LF 35 $ 5.00 $ 175.00 11 Subbase Granular Material (6" Thick) Ton 156 $ 17.00 $ 2,652.00 PAVEMENT 12 PCC Concrete Collar - Standard Concrete SY 123 $ 45.00 $ 5,535.00 13 Permeable Concrete Block Pavers SF 2975 $ 6.00 $ 17,850.00 14 Foundation Waterproofing SF 473 $ 8.00 $ 3,784.00 15 HMA 300k Headers & Streets, 1/2" (PG 64-22) Ton 134 $ 100.00 $ 13,400.00 16 HMA 300k Driveways 1/2" (PG 6422) Ton 26 $ 100.00 $ 2 600.00 17 PCC Concrete Wall (Along 17th St. Sidewalk Eastside) SF 100 $ 8.00 $ 800.00 18 PC Concrete Sidewalk, 4 ", Remove & Construct SF 39 $ 5.00 $ 195.00 19 PC Concrete Sidewalk 6 ", Remove & Construct SF 357 $ 6.00 $ 2,142.00 20 PC Concrete Curb, 2.5' Construct LF 75 $ 20.00 $ 1,500.00 21 Geotechnical Fabric SY 678 $ 3.00 $ 2,034.00 22 Install Green Alley Identifier Panel Each 2 $ 160.00 $ 320.00 23 PC Concrete Access Ramp, Detectable Each 6 $ 100.00 $ 600.00 WATER MAIN 24 6" DIP, Class 52 w. /Polywrap & Tracer Wire LF 410 $ 38.00 $ 15,580.00 25 Tracer Wire Box Each 2 $ 150.00 $ 300.00 26 3/4" Copper Service Line TYPE K LF 60 $ 21.00 $ 1,260.00 27 1" Copper Service Line TYPE K LF 20 $ 22.00 $ 440.00 28 3/4" Tap & Curb Box/Stop Box W/ installation Each 15 $ 500.00 $ 7,500.00 29 1" Tap & Curb Box/Stop Box W/ installation Each 1 $ 550.00 $ 550.00 30 6" RS Gate Valve & Box Each 7 $ 800.00 $ 5,600.00 31 6" x 6" x 6" Anchoring Tee Each 3 $ 275.00 $ 825.00 32 6" 45 Degree Bend Each 4 $ 250.00 $ 1 000.00 33 6" Solid Sleeve Each 3 $ 125.00 $ 375.00 34 6" x 4" Reducer Each 1 $ 125.00 $ 125.00 35 6" Cap MJ Each 2 $ 90.00 $ 180.00 36 6" Field Lock Gasket _ Each 1 $ 65.00 $ 65.00 37 6" Mega Lug Each 10 $ 60.00 $ 600.00 38 Fixture Adjustment, Valves & Manholes Each 11 $ 150.00 $ 1,650.00 SANITARY SEWER 39 18" DIPw. /Bedding LF 60 $ 130.00 $ 7,800.00 40 48" Diameter Manhole Base (to include any additional pipe connections) Each 2 $ 750.00 $ 1,500.00 41 48" Diameter Manhole Sidewall VF 20.0 $ 200.00 $ 4,000.00 42 4" PVC Lateral w /Bedding LF 40 $ 25.00 3 1,000.00 43 6" PVC Lateral w /Bedding LF 20 $ 35.00 $ 700.00 44 18" x 4" GENCO CI SADDLE TEE- PT #12X4US W /4T' STRAP Each 3 $ 95.00 $ 285.00 45 4" FERNCO Coupling W /Shear Ring Each 3 $ 15.00 $ 45.00 46 4" Sewer Taps Each 3 $ 275.00 $ 825.00 47 Manhole Frame & Cover Each 2 $ 300.00 $ 600.00 BIDDER: McDermott Excavating BIDDER: Tschiqqfrie Excavating BIDDER: Portzen Construction UNIT COST TOTAL COST $4.10 $900.00 $11.85 $11.85 312.43 319.40 315.13 $26.53 $5.75 $6.00 314.98 33,419.40 $2,700.00 $3,021.75 5414.75 $8,701.00 $873.00 $1,966.90 $8,277.36 $235.75 $210.00 32,336.88 350.82 $4.96 33.73 3105.00 9105.00 $9.90 $7.35 $9.13 316.12 31.95 $125.00 $175.00 $6 250.86 $14,756.00 91,764.29 $14,070.00 $2,730.00 $990.00 $286.65 $3,259.41 31,209.00 $1,322.10 $250.00 31,050.00 339.97 560.00 322.95 329.56 3553.00 3580.00 3908.00 $392.00 5265.00 $288.00 3223.00 3133.00 595.00 339.00 $290.00 316,387.70 $120.00 $1,377.00 $591.20 $8,295.00 9580.00 96,356.00 $1,176.00 $1,060.00 5864.00 3223.00 $266.00 $95.00 $390.00 $3 190.00 UNIT COST TOTAL COST 34.00 $3,336.00 $560.00 $1,680.00 $13.90 $3,544.50 $15.00 5525.00 311.00 $7700.00 320.00 $900.00 $18.60 $2,418.00 $20.70 36,458.40 $6.70 $274.70 96.30 $220.50 314.60 $2,277.60 $50.00 $6,150.00 $5.50 316,362.50 35.00 32,365.00 3120.00 316,080.00 $120.00 33,120.00 $20.00 $2,000.00 $5.40 $210.60 $5.95 92,124.15 323.75 31,781.25 $1.90 31,288.20 31,000.00 $2,000.00 $180.00 31,080.00 UNIT COST TOTAL COST 36.00 $5,004.00 3600.00 $1,800.00 $10.00 32,550.00 $25.00 5875.00 311.00 $7,700.00 522.00 3990.00 322.00 $2,860.00 527.00 $8,424.00 312.00 5492.00 $10.00 $350.00 $17.00 32,652.00 350.00 $20,500.00 $80.00 $160.00 $25.00 $1,500.00 330.00 $600.00 $540.00 38,100.00 3570.00 $570.00 $1,035.00 37,245.00 $400.00 $1,200.00 3250.00 $1,000.00 $300.00 $900.00 5225.00 3225.00 3180.00 3360.00 3150.00 $150.00 $55.00 $550.00 $305.00 $3,355.00 349.50 34.60 510.00 3107.50 3107.50 $22.00 $6.00 57.50 $22.00 32.00 $1,000.00 $175.00 $6,088.50 313,685.00 $4,730.00 314,405.00 $2,795.00 $2,200.00 5234.00 52,677.50 $1,650.00 31,356.00 $2,000.00 51,050.00 $42.50 $75.00 $30.00 340.00 3525.00 3575.00 3950.00 $375.00 $275.00 $315.00 3250.00 3200.00 3150.00 $65.00 $200.00 $17,425.00 $150.00 $1,800.00 $800.00 57,875.00 $575.00 $6,650.00 $1,125.00 91,100.00 $945.00 3250.00 3400.00 3150.00 $650.00 $2,200.00 3127.50 $7,650.00 $150.00 $9,000.00 $170.00 3650.00 $1,300.00 $580.00 $1,160.00 $550.00 $132.00 32,640.00 $160.00 $3,200.00 3195.00 $31.20 $1,248.00 350.00 32,000.00 560.00 $36.55 3731.00 $60.00 $1,200.00 $85.00 $200.00 $600.00 5300.00 3900.00 3350.00 $30.00 $90.00 $65.00 $195.00 $65.00 $330.00 $990.00 $430.00 $1,290.00 $375.00 $350.00 0700.00 $590.00 51,180.00 $800.00 $10,200.00 $1,100.00 33,900.00 $2,400.00 _ $1,700.00 $1,050.00 $195.00 $1,125.00 $1,600.00 MISCELLANEOUS 48 Sawcut, (Regardkess of Pavement Type) LF 253 $ 3.00 $ 759.00 49 6" Subdrain (Perforated Drain Tile) LF 295 $ 10.00 $ 2,950.00 50 Connect Subdrain to Storm Sewer Pipelines EA 1 $ 500.00 $ 500.00 51 2" Insulation Board SY 85 $ 8.50 5 722.50 52 Sod - SY 41 $ 6.00 $ 246.00 53 Dust Control Surface Treatment MGAL 13 $ 15.00 $ 195.00 54 Erosion Control Plan - Operating Procedures LS 1.00 $ 1,000.00 $ 1,000.00 55 Traffic Control & Safety Control LS 1.00 $ 1,000.00 $ 1,000.00 56 Mobilization LS 1.00 $ 4 000.00 $ 4 000.00 Bid Sub -Total Contingency (10 %) Construction Engineering & Inspection (15 %) Total Construction Estimate: $ 146,436.50 $14,643.65 $24,162.02 $ 185 242.17 $3.50 $3.95 $700.00 511.50 $11.80 $40.00 $1,000.00 52,575.00 $885.50 51,165.25 5700.00 $977.50 $483.80 $520.00 $1,000.00 $2,575.00 $3.525.00 $3,525.00 eld Sub -Total % Under /Over 0148,847.05 $148,847.05 1.65% 53.95 510.00 5600.00 615.30 $11.00 $50.00 $1,000.00 $2,000.00 5999.35 $2,950.00 5600.00 $1,300.50 $451.00 $650.00 $1,000.00 $2,000.00 510000.00 510,000.00 Bid sub -Total 6170,387.25 $ 170,387.25 % Under /Over 16.36% 53.00 510.00 $400.00 $20.00 $15.00 550.00 $3.000.00 $2.700.00 5759.00 52,950.00 5400.00 51,700.00 5615.00 5650.00 $3,000.00 52,700.00 $10000.00 $10,000.00 eld sot -Total % Under /Over 6174,707.00 $ 174,707.00 19.31% CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET BID TABULATION FOR 17th St. - 18th St. GREEN ALLEY PROJECT (Between Jackson St. & Washington St.) BID ITEM DESCRIPTION BASE BID: UNIT BID DATE: January 19, 2012 ESTIMATE QUANTITY ESTIMATE UNIT COST BIDDER: Drew Cook Excavating BIDDER: Connolly Construction ESTIMATE COST UNIT COST TOTAL COST UNIT COST TOTAL COST EXCAVATION & STONE 1 Remove Pavement SY 834 $ 4.50 $ 3,753.00 $6.00 55,004.00 $3.85 53 210.90 2 Remove Existing Manhole Each 3 $ 600.00 $ 1,800.00 $600.00 $1,800.00 $672.00 $2,016.00 3 Excavation, Unclassified CY 255 $ 6.00 $ 530.00 513.00 53,315.00 $8.85 $2256.75 4 Excavation, (Waterproofing) CY 35 $ 6.00 $ 210.00 530.00 51,050.00 59.15 5320.25 5 Select Baekfill Ton 700 $ 15.00 $ 10,500.00 $13.00 $9,100.00 $13.50 $9,450.00 6 Bedding and Void Opening Aggregates (ASTM #8 Washed stone) -(3/8" Asphalt chips) Ton 45 $ 15.00 $ 675.00 $18.00 $810.00 522.35 $1 005.75 7 Porous Aggregate (ASTM #57 washed stone)-(1 " Clean) Ton 130 $ 19.00 $ 2,470.00 521.00 $2,730.00 $22.40 $2 912.00 8 Porous Aggregate (ASTM #2 washed stone) -(3" Clean) Ton 312 $ 24.00 $ 7,488.00 524.00 57,488.00 528.70 $8,954.40 9 Backfill, Topsoil SY 41 $ 6.00 $ 246.00 $6.00 $246.00 515.35 $629.35 10 Existing Curb & Gutter Removal (as indicated/approved by City Engineer) LF 35 $ 5.00 $ 175.00 $5.50 $192.50 $6.90 5241.50 11 Subbase Granular Material (6" Thick) Ton 156 $ 17.00 $ 2,652.00 320.00 $3,120.00 $19.10 52 979.60 PAVEMENT 12 PCC Concrete Collar- Standard Concrete SY 123 $ 45.00 $ 5,535.00 $45.00 $5,535.00 556.15 $6 906.45 13 Permeable Concrete Block Pavers SF 2975 $ 6.00 $ 17,850.00 55.00 514,875.00 35.35 $15 916.25 14 Foundation Waterproofing SF 473 $ 8.00 $ 3,784.00 326.00 512,298.00 58.20 53,878.60 15 HMA 300k Headers & Streets 1/2" (PG 64422) Ton 134 $ 100.00 $ 13,400.00 5120.00 $16,080.00 $114.00 $15 276.00 16 HMA 300k Driveways, 1/2" (PG 64-22) Ton 26 $ 100.00 $ 2 600.00 $120.00 $3,120.00 $114.00 $2 964.00 17 PCC Concrete Wall (Along 17th St. Sidewalk Eastside) SF 100 $ 8.00 $ 800.00 $25.00 52,500.00 59.05 5905.00 18 PC Concrete Sidewalk, 4 ", Remove & Construct SF 39 $ 5.00 $ 195.00 55.00 5195.00 37.30 5284.70 19 PC Concrete Sidewalk, 6 ", Remove & Construct SF 357 $ 6.00 $ 2 142.00 $4.25 $1,517.25 58.25 $2 945.25 20 PC Concrete Curb, 2.5', Construct LF 75 $ 20.00 $ 1,500.00 525.00 $1,875.00 516.25 $1,218.75 21 Geotechnical Fabric SY 678 $ 3.00 $ 2,034.00 $2.00 51,356.00 52.10 $1 423.80 22 Install Green Alley Identifier Panel Each 2 $ 160.00 $ 320.00 5425.00 5850.00 5155.00 $310.00 23 PC Concrete Access Ramp Detectable Each 6 $ 100.00 $ 600.00 $75.00 $450.00 381.20 5487.20 WATER MAIN 24 6" DIP, Class 52 w. /Polywrap & Tracer Wire LF 410 $ 38.00 $ 15,580.00 $52.00 321,320.00 $47.50 $19 475.00 25 Tracer Wire Box Each 2 $ 150.00 $ 300.00 $100.00 3200.00 $89.00 5178.00 26 3/4" Copper Service Line TYPE K LF 60 $ 21.00 5 1,260.00 $20.00 $1,200.00 $25.40 $1 524.00 27 1" Copper Service Line TYPE K LF 20 $ 22.00 $ 440.00 326.00 $520.00 527.20 $544.00 28 3/4" Tap & Curb Box/Stop Box W/ installation Each 15 $ 500.00 $ 7,500.00 5600.00 59,000.00 5657.00 39,855.00 29 1 " Tap & Curb Box/Stop Box W/ installation Each 1 $ 550.00 $ 550.00 $750.00 5750.00 $686.00 5686.00 30 6" RS Gate Valve & Box Each 7 $ 800.00 5 5,600.00 51,090.00 $7,630.00 $1 125.00 $7,875.00 31 6" x 6" x 6" Anchoring Tee Each 3 $ 275.00 $ 825.00 5440.00 51,320.00 $435.00 $1,305.00 32 6" 45 Degree Bend Each 4 $ 250.00 $ 1,000.00 5350.00 51,400.00 5320.00 51 280.00 33 6" Solid Sleeve Each 3 $ 125.00 $ 375.00 $370.00 51,110.00 5230.00 5690.00 34 6" x 4" Reducer Each 1 $ 125.00 $ 125.00 $310.00 $310.00 $288.00 $288.00 35 6" Cap MJ Each 2 $ 90.00 $ 180.00 5150.00 5300.00 $145.00 $290.00 36 6" Field Lock Gasket Each 1 $ 65.00 $ 65.00 5320.00 5320.00 5164.00 5164.00 37 6" Mega Lug Each 10 $ 60.00 $ 600.00 $75.00 $750.00 568.00 $680.00 38 Fixture Adjustment, Valves & Manholes Each 11 $ 150.00 $ 1,650.00 $290.00 $3,190.00 5495.00 55445.00 SANITARY SEWER 39 18" DIPw. /Bedding LF 60 $ 130.00 $ 7,800.00 $210.00 $12,600.00 5186.00 $11 160.00 40 48" Diameter Manhole Base (to include any additional pipe connections) Each 2 $ 750.00 $ 1,500.00 $580.00 $1,160.00 51 655.00 $3,310.00 41 48" Diameter Manhole Sidewall VF 20.0 $ 200.00 $ 4,000.00 5160.00 $3,200.00 $172.00 $3 440.00 42 4" PVC Lateral w /Bedding LF 40 $ 25.00 S 1,000.00 517.00 $680.00 548.00 $1 920.00 43 6" PVC Lateral w /Bedding LE 20 $ 35.00 $ 700.00 524.00 $480.00 $55.00 $1 100.00 44 18" x 4" GENCO CI SADDLE TEE- PT #12X4US W/47" STRAP Each 3 $ 95.00 $ 285.00 $190.00 5570.00 $449.00 51,347.00 45 4" FERNCO Coupling W /Shear Ring Each 3 $ 15.00 $ 45.00 $30.00 $90.00 566.00 $198.00 46 4" Sewer Taps Each 3 $ 275.00 $ 825.00 3420.00 $1,260.00 5446.00 $1 338.00 47 Manhole Frame & Cover Each 2 $ 300.00 $ 600.00 $470.00 3940.00 5415.00 5830.00 MISCELLANEOUS 48 Sawcut, (Regardkess of Pavement Type) LF 253 $ 3.00 $ 759.00 93.60 3910.80 33.20 $809.60 49 6" Subdrain (Perforated Drain Tile) LF 295 $ 10.00 $ 2950.00 $12.50 $3,687.50 312.00 33 540.00 50 Connect Subdrain to Storm Sewer Pipelines EA 1 $ 500.00 $ 500.00 $300.00 $300.00 $689.00 $689.00 51 2" Insulation Board SY 85 $ 8.50 $ 722.50 $16.00 $1,360.00 316.80 31 428.00 52 Sod SY 41 $ 6.00 $ 246.00 310.00 $410.00 312.75 $522.75 53 Dust Control Surface Treatment MGAL 13 $ 15.00 $ 195.00 330.00 $390.00 340.00 $520.00 54 Erosion Control Plan - Operating Procedures LS 1.00 $ 1,000.00 $ 1,000.00 $1,500.00 $1,500.00 $3,815.00 $3 815.00 55 Traffic Control & Safety Control LS 1.00 $ 1,000.00 $ 32,400.00 32,400.00 $2 785.00 32 785.00 56 Mobilization LS 1.00 $ 4 000.00 $ 4,000.00 38,500.00 $8,500.00 313,325.00 $13,325.00 Bid Sub -Total Contingency (10 %) Construction Engineering & Inspection (15 %) Total Construction Estimate: $ 146,436.50 314,643.65 324 162.02 $ 185 242.17 Bld Sub -Total Under /Over $185,265.05 $ 185,265.05 1 26.52% Bid Sub -Total 3188,848.85 1 5188,848.85 1 % Under /Over 28.96% Masterpiece on the Mississippi Dubuque hititt All- America City 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Green Alley Permeable Pavers Project (17th - 18th, between Jackson and Washington Streets) (FY11 CIPs 3002044, 7101335, 7201066, 7201081, 7201088, 7401405) DATE: December 28, 2011 The Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) will involve the reconstruction of the alley between Jackson and Washington Streets, from 17th Street to 18th Street. This alley is adjacent to the Washington row houses that the Housing Department is renovating. The project will include: — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. This project is one of the alleys identified in the Annual Green Alley Program Capital Improvement Plan and it will be the first green alley that will involve water service and alley pavement assessments. The previous Green Alley Permeable Paver Projects were partially funded with Community Development Block Grant funds (CDBG) from the American Recovery & Reinvestment Act; these monies are no longer available. This project was originally bid in August, 2011. At that time many of the contractors who do this work were very busy. The bids that were received were much higher than anticipated. Engineering believes that re- bidding this project over the winter of 2011- 2012 and allowing more time to construct the project will help reduce the prices bid on this project. Staff altered some of the bid items to help reduce costs. This is a result of some value engineering done on the project as a result of the last bidding cycle. City Engineer Gus Psihoyos recommends that the City Council approve the plans, specifications, form of contract and the estimated cost of $185,242.17 and to adopt the Resolution of Necessity and the Preliminary Schedule of Assessments for the Green Alley Permeable Pavers Project (17th — 18th between Jackson & Washington Streets). I concur with the recommendation and respectfully request Mayor and City Council approval. ht/1144 lirv,714, Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II Todd Shoemaker, Environmental Engineer Jon Dienst, PE 2 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Dubuque All America City 2007 SUBJECT: Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) (FY11 CIPs 3002044, 7101335, 7201066, 7201081, 7201088, 7401405) DATE: December 23, 2011 INTRODUCTION The enclosed resolutions are in reference to the public hearing for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets). DISCUSSION The Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) will involve the reconstruction of the alley between Jackson and Washington Streets, from 17th Street to 18th Street. This alley is adjacent to the Washington row houses that the Housing Department is renovating. The project will include: — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. This project is one of the alleys identified in the Annual Green Alley Program Capital Improvement Plan and it will be the first green alley that will involve water service and alley pavement assessments. The previous Green Alley Permeable Paver Projects were partially funded with Community Development Block Grant funds (CDBG) from the American Recovery & Reinvestment Act; these monies are no longer available. This project was originally bid in August, 2011. At that time many of the contractors who do this work were very busy. The bids that were received were much higher than anticipated. Engineering believes that re- bidding this project over the winter of 2011 -2012 and allowing more time to construct the project will help reduce the prices bid on this project. Staff altered some of the bid items to help reduce costs. This is a result of some value engineering done on the project as a result of the last bidding cycle. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity and the Preliminary Schedule of Assessments for the for the Green Alley Permeable Pavers Project (17th — 18th between Jackson & Washington Streets). BUDGET IMPACT The estimate of probable cost for the Green Alley Permeable Pavers Project (17th — 18th between Jackson & Washington Streets) is as follows: Estimate Construction Contract $146,436.50 Contingency 14,643.65 Construction Engineering & Inspection 24 162.02 Total Project Cost $185,242.17 The estimated project category costs are as follows: Cost Summarv/Description Alley Construction Improvements Special Assessment - Street Improvement, Residential Properties Special Assessment - Street Improvement, Commercial Properties Special Assessment - Street Improvement Deficiency, Paid by the City Special Assessment - Water Services, Residential Properties Watermain Improvements Sanitary Sewer Improvements Storm Sewer Improvements Total Project Cost The project funding summary is as follows: Amount $ 34,313.58 11,174.39 2,878.91 0.00 4,604.60 60,450.56 43,074.20 28,745.93 $185,242.17 Fund CIP No. Fund Description Amount 3002044 Green Alley Pilot Project $ 68,000.00 7101335 Sanitary Sewer Manhole Replacement 30,51 1.80 7201066 Storm Sewer General Repairs 11,745.93 7201081 Catch Basin Maintenance 7,000.00 7201088 Storm Sewer Improvements 10,000.00 7401405 Water Main Replacements 57,984.44 Total Project Funding $185,242.17 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost and to adopt the Resolution of Necessity and the Preliminary Schedule of Assessments for the Green Alley Permeable Pavers Project (17th —18th, between Jackson & Washington Streets). Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II Todd Shoemaker, Environmental Engineer RESOLUTION NO. 7 -12 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH - 18TH, BETWEEN JACKSON & WASHINGTON STREETS) NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Green Alley Permeable Pavers Project (17th -18th, between Jackson & Washington Streets), in the estimated amount $185,242.17, are hereby approved. Passed, adopted and approved this 3rd day of January , 2012. Attest: e .'in S. Firnstahl, City —erk 1 Ric W. Jone / ayor Pro -Tem RESOLUTION NO. 8 -12 RESOLUTION WITH RESPECT TO THE ADOPTION OF THE RESOLUTION OF NECESSITY PROPOSED FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH -18TH, BETWEEN JACKSON & WASHINGTON STREETS) Whereas, the City Council has proposed a Resolution of Necessity for the Green Alley Permeable Pavers Project (17th - 18th, between Jackson & Washington Streets) and has given notice of the public hearing thereon as required by law; and Whereas, the public hearing has been held, all persons offering objections have been heard and consideration given to all objections and is pending before this Council; and Whereas, this is the time and place set as provided for the taking of action on the proposed Resolution of Necessity. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Attest: That the proposed Resolution of Necessity described above is hereby: Adopted, without amendment, and all objections filed or made having been duly considered are overruled. Adopted as amended by the Preliminary Schedule of Assessments attached hereto as Exhibit A, and made a part hereof by reference. All objections filed or made having been duly considered are overruled. Deferred for later consideration to a City Council meeting to be held on the day of , 2012, next at 6:30 p.m. in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, with jurisdiction retained for further consideration and action at the adjourned meeting. Abandoned. Passed, adopted and approved this 3rd day of January 2012. Ri'W. Jo / 'kayo Pro -Tem Kevin rnsthal, City Clerk RESOLUTION NO. 9 -12 APPROVING SCHEDULE OF ASSESSMENTS AND ESTIMATE OF TOTAL COST FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH - 18TH, BETWEEN JACKSON & WASHINGTON STREETS) NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached plat, schedule of assessments, and estimate of total cost for the Green Alley Permeable Pavers Project (17th - 18th, between Jackson & Washington Streets) are hereby approved. Passed, approved and adopted this 3rd day of Janus Ric • Jones`►T'ayor Pro -Tem Attest: Kevin S i nstahl, City Clerk Masterpiece on the Mississippi Lug Dubuque kireLd All America Cify i \' 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Green Alley Permeable Pavers Project (17th - 18th, between Jackson & Washington Streets) (FY11 CIPs 3002044, 7101335, 7201066, 7201081, 7201088, 7401405) DATE: December 8, 2011 City Engineer Gus Psihoyos recommends initiation of the public bidding procedure for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets), and further recommends that a public hearing be set for January 3, 2012. I concur with the recommendation and respectfully request Mayor and City Council approval. ,udivt4 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Masterpiece on the Mississippi TO: FROM: Gus Psihoyos, City Engineer SUBJECT: Green AIIey Permeable Pavers Project (17th — 18th between Jackson & Washington Streets) (FY11 CIPs 3002044, 7101335, 7201066, 7201081, 7201088, 7401405) Michael C. Van Milligen, City Manager Dubuque AII•AtnencaCily ! 2007 DATE: December 5, 2011 INTRODUCTION The enclosed resolutions authorize the public bidding procedure for the Green AIIey Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets). DISCUSSION The Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) will involve the reconstruction of the alley between Jackson and Washington Streets, from 171h Street to 18th Street. This alley is adjacent to the Washington row houses that the Housing Department is renovating. The project will include: — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. This project is one of the alleys identified in the Annual Green AIIey Program Capital Improvement Plan and it will be the first green alley that will involve water service and alley pavement assessments. The previous Green AIIey Permeable Paver Projects were partially funded with Community Development Block Grant funds (CDBG) from the American Recovery & Reinvestment Act; these monies are no longer available. This project was originally bid in August of 2011. At that time many of the contractors who do this work were very busy. The bids that were received were much higher than anticipated. Engineering believes that re- bidding this project over the winter of 2011 -2012 and allowing more time to construct the project will help reduce the prices bid on this project. Staff altered some of the bid items to help reduce costs. This is a result of some value engineering done on the project as a result of the last bidding cycle. PUBLIC INVOLVEMENT Engineering staff held a public information session for the property owners at the Comiskey Park shelter on July 6, 2011 to discuss the project. The meeting was not well attended. Those who did attend are in support of the project. Engineering will be making special accommodations for the business at 260 East 18th Street so deliveries can occur at all times in the alley. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans, Specs, Assessments Mail Special Assessment Notice to Property Owners Publish Notice of Special Assessment: 1st Publication: 2nd Publication: Public Hearing on Plans & Specs, Spec. Assessments Receipt of Bid Proposals (Bid- Letting) Award Construction Contract Project Completion Date RECOMMENDATION December 19, 2011 December 22, 2011 December 22, 2011 December 22, 2011 December 22, 2011 December 29, 2011 January 3, 2012 January 19, 2012 February 6, 2012 June 30, 2012 I recommend that the City Council give preliminary approval to the construction plans and specifications, approve the Resolution of Necessity, approve the Preliminary Schedule of Assessments, establish January 3, 2012, as the date of the public hearing, and hereby authorize the City Clerk to advertise for bid proposals for the Green Alley Permeable Pavers Project (17th - 18th, between Jackson & Washington Streets). BUDGET IMPACT The estimate of probable cost for the Green Alley Permeable Pavers Project (17th _ 18th, between Jackson & Washington Streets) is as follows: Estimate Construction Contract $146,436.50 Contingency 14,643.65 Construction Engineering & Inspection 24,162.02 Total Project Cost $185,242.17 The estimated project category costs are as follows: Cost Summary /Description AIIey Construction Improvements Special Assessment - Street Improvement, Residential Properties Special Assessment - Street Improvement, Commercial Properties Special Assessment - Street Improvement Deficiency, Paid by the City Special Assessment - Water Services, Residential Properties Watermain Improvements Sanitary Sewer Improvements Storm Sewer Improvements Total Project Cost The project funding summary is as follows: Amount $ 34,313.58 11,174.39 2,878.91 0.00 4,604.60 60,450.56 43,074.20 28,745.93 $185,242.17 Fund CIP No. Fund Description Amount 3002044 Green AIIey Pilot Project $ 68,000.00 7101335 Sanitary Sewer Manhole Replacement 30,511.80 7201066 Storm Sewer General Repairs 11,745.93 7201081 Catch Basin Maintenance 7,000.00 7201088 Storm Sewer Improvements 10,000.00 7401405 Water Main Replacements 57,984.44 Total Project Funding $185,242.17 ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, approve the Preliminary Schedule of Assessments, establish the date of the public hearing, and authorize the City Clerk to advertise for bid proposals through the adoption of the enclosed resolutions for the Green AIIey Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets). Prepared by Jon Dienst, PE cc: Jenny Larson, Budget Director Don Vogt, Public Works Director John Klostermann, Street & Sewer Maintenance Supervisor Bob Green, Water Department Manager Bob Schiesl, Assistant City Engineer Deron Muehring, Civil Engineer II Todd Shoemaker, Environmental Engineer RESOLUTION NO. GREEN ALLEY PERMEABLE PAVERS PROJECT (17th — 18th, BETWEEN JACKSON AND WASHINGTON STREETS) PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets), in the estimated amount $185,242.17, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 3rd day of January, 2012, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets) is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty -five days before the date for filing bids before 2:00 p.m. on the 19th day of January, 2012. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 6th day of February, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this day of , 2012. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17th — 18th, BETWEEN JACKSON AND WASHINGTON STREETS) NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets), in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 3rd day of January, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Reconstruction of the alley between Jackson and Washington Streets, from 17th to 18th Street. — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services will be replaced with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 1 8tn Streets with new concrete manholes. Any visual or hearing- impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD at (563) 690 -6678 at least 48 hours prior to the meeting. 2012. Published by order of the City Council given on the day of Kevin S. Firnstahl, City Clerk RESOLUTION NO. GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH — 18TH, BETWEEN JACKSON & WASHINGTON STREETS) APPROVING THE PLAT, SCHEDULE OF ASSESSMENTS AND ESTIMATE OF TOTAL COST AND SETTING DATE OF PUBLIC HEARING ON RESOLUTION OF NECESSITY Whereas, the proposed Resolution of Necessity for the Project has been introduced for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The attached plat, schedule of assessments, and estimate of total cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) and the proposed Resolution of Necessity are hereby approved and ordered placed on file in the Office of the City Clerk. The City Council will meet on the 3rd day of January, 2012, at 6:30 p.m. at the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity. A property owner will be deemed to have waived all objections unless at the time of hearing the property owner has filed objections with the City Clerk. The City Clerk be and is hereby authorized and directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Passed, approved and adopted this day of , 2011. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, City Clerk CITY OF DUBUQUE, IOWA ALLEY BETWEEN JACKSON AND WASHINGTON STREETS FROM 17TH to 18TH PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE: JULY 12, 2011 The following schedule Is hereby determined to show each lot proposed to be assessed for the improvement sham in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite ear valuations of such lots by the City Council of the City of Dubuque. PROPERTY OWNER NAME LOT DESCRIPTION PARCEL NUMBER MAIUNG ADDRESS STREET ADDRESS NET ASSESSED VALUATION VALUATION WITH IMPROVEMENT NET PAVING IMPROVEMENT COST NET IMPRO DEF PAVING VEMENT CIENCY Vonvald, Jean M. 5 3l'02 LOT 36 EAST DUBUQUE ADD 10- 24-263 -009 1710 Jackson St. 1710 Jackson St. 385000.00 585,877.17 5877.17 50.00 Vorwaid, Jean M. 1720-1722 10-24.263 -008 1720 Jackson 5t. 1720 Jackson St. 951,100.00 352382.02 51,282.02 30.00 Hagensten, Joseph G. N12 LOT 35 EAST DUBUQUE ADD 10-24-263-007 1732 Jackson Sl. 1732 Jackson SI. $35,500.00 536,219.73 5719.73 90.00 Mihalakis, Elizabeth A. & Michael M. 5112 LOT 34 EAST DUBUQUE ADD 10-24-263-006 1756 Jackson 5l. 1756 Jackson SL 360,300.00 361,01573 8719.73 30.00 Mihalakis, Elizabeth A. & Michael M. N1/2 I.0734 FAST DUBUQUE ADD 1044.263 -005 1760 Jackson St. 1760 Jackson SL 547,600.00 548,319.73 5719.73 50.00 Pluym, Ronald D. S12 LOT 33 EAST DUBUQUE ADD 10- 24- 263-004 1616 Lincoln Ave. 1768 Jackson SI. 545,500.00 548,219.73 5719.73 50.00 Wiemerslage, Annette N12 LOT 33 EAST DUBUQUE ADD 10-24- 263 -003 1776 Jackson St. 1776 Jackson 5L 348,100.00 948,81573 5719.73 30.00 Nicolalde, Daisy Y. 512 LOT 32 EAST DUBUQUE ADD 10-24- 263-002 2525 Date 5t. 9602 1786 Jackson St. 516,500.00 518,370.88 5719.73 50.00 Crippes, Mary M. N12 OF LOT 32 EAST DUBUQUE ADD 10-24- 263-001 1796 Jackson St. 1796 Jackson Sr. 538,100.00 539,970.88 5719.73 50.00 Knoche!, Frank & Rachel LOT 87 EAST DUBUQUE ADD 10.24 - 263-023 1715 Washington St. 1715 Washington SI. 558,000.00 559,439.46 51,439.46 30.00 Trausch. Forrest R. 1071 + -88 EAST DUBUQUE ADD 1024. 263-022 P.O. Box 4 1725 Washington St. 533,500.00 535,141.49 5490.34 50.00 Trausch, Forrest R. 107.2-148 EAST DUBUQUE ADD 10-24-263-021 P.O. Box 4 1731 Washington 51. 532,500.00 532,939.15 5439.15 50.00 Trausch, Forrest R. 107248 EAST 010000E ADD 10-24-263-020 P.O. Box 4 1737 Washington St. 532,000.00 533,657.21 5506.06 30.00 Wagner, Sharon M. EAST DUBUQUE ADD S. 23' T- S. 12 LOT e9 10 -24-263-019 1741 Washington 5t. 1741 Washington 51. 538,200.00 338,862.94 5662.94 50.00 City of Dubuque N 2' S12 OF 89 & N12 OF LOT 69 EAST DUBUQUE ADD 10- 24-263-018 50 W. 131h Street 1753 Washington SI. 342,300.00 543,075.96 5775.96 30.00 Clark, Keith Karlton W12 OF LOT 90 & W12 OF LOT 91 EAST DUBUQUE ADD 10-24-263-010 200 East 181h 260 East 1801 SI. 576,400.00 579,278.91 52,878.91 30.00 TOTALS' NOTICE TO PROPERTY OWNERS GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH — 18TH, BETWEEN JACKSON & WASHINGTON STREETS) Notice is given that there is now on file for public inspection in the office of the clerk of the City of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of the City of Dubuque, Iowa, for a public improvement of the type(s) and in the location(s) as follows: — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18th Streets with new concrete manholes. The proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: Green Alley Permeable Pavers Project (17tH — 18tH, between Jackson & Washington Streets) The City Council will meet on the 3`d day of January, 2012, at 6:30 p.m. at the Historic Federal Building, 350 West 6tH Street, Dubuque, Iowa, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of the Resolution of Necessity. A property owner will be deemed to have waived all objections unless at the time of hearing the property owner has filed objections with the clerk. Any visual- or hearing- impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD (563) 690 -6678 at least 48 hours prior to the meeting. Kevin S. Firnstahl, City Clerk RESOLUTION NO. RESOLUTION OF NECESSITY FOR THE GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH —18TH, BETWEEN JACKSON & WASHINGTON STREETS) Whereas, the plat, schedule of assessments, and estimate of total cost for the Green Alley Permeable Pavers Project (17th — 18th, between Jackson & Washington Streets) have been duly prepared and approved by the City Council of the City of Dubuque and ordered placed on file in the office of City Clerk. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17tH 18th Streets with new concrete manholes. There is on file in the office of the City Clerk an estimated total cost of the work, and a preliminary plat and schedule showing the amount proposed to be assessed to each lot for the improvement. The date, time, and place the council will hear property owners subject to the assessment and interested parties for or against the improvement, its cost, the assessment, or the boundaries of the district: The City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements. Unless a property owner files objections with the City Clerk at the time of hearing on the resolution of necessity, the property owner is deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed in accordance with the plans and specifications which have been approved by the City Council and are now on file in the Office of the City Clerk. The cost of making such improvement will be assessed against property lying with the assessment limits. The above resolution was introduced, approved and ordered placed on file with the City Clerk this day of , 2012. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT GREEN ALLEY PERMEABLE PAVERS PROJECT (17TH — 18TH, BETWEEN JACKSON AND WASHINGTON STREETS) Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on the 19th day of January, 2012, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on 19th day of January, 2012, at City Hall - Conference Room A, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on 6th day of February, 2012. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued and shall be fully completed by 30t day of June, 2012. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the construction documents may be obtained at the Engineering Department, City Hall — Second Floor, 50 West 13th Street, Dubuque, Iowa 52001. No plan deposit is required. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Green Alley Permeable Pavers Project (17th — 18th, between Jackson and Washington Streets) CIPs 3002044, 7401405, 7101335, 7201066, 7201088, 7201081 Reconstruction of the alley between Jackson and Washington Streets, from 17th Street to 18th Street. — Reconstruction of the pavement surface with interlocking concrete pavers. — Watermain reconstruction. — Replacement of four (4) lead water services with copper. — Replacement of the brick sanitary manholes in the alley and on 17th and 18tn Streets with new concrete manholes. Published in the Telegraph Herald, 22nd day of December, 2012.