7th Street Retaining Wall Reconstruction Project AwardMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 7th Street Retaining Wall Emergency Repairs CIP 3501029 DATE: January 15, 2012 Dubuque bierd All- America City 1 2007 Through the competitive quotation process for public improvements, the 7th Street Retaining Wall Emergency Repairs Project was awarded on January 13, 2012, to Portzen Construction in the amount of $351,336.20, which was 8.35% under the revised engineer's estimate of $373,585.00. City Engineer Gus Psihoyos recommends that the award for the 7th Street Retaining Wall Emergency Repairs Project be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: FROM: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer SUBJECT: 7th Street Retaining Wall Emergency Repairs CIP 3501029 DATE: January 12, 2012 Dubuque All- America City 'I'll®, 2007 On October 3, 2011, the City Council authorized (Resolution 328 -11) emergency repairs to the public retaining wall along 7th Street and the associated street pavement. The project provides for the: reconstruction of the retaining wall; resurfacing of 7th Street in the area of the wall; replacement of the curb and gutter along this repair; and the replacement of the guardrail along the retaining wall. On November 7, 2011, the City Council was notified that the project would be delayed since only one bid was received for $464,553.00. This bid was 15.1 percent over the original estimate of $403,535. The following is a summary of the bids received on January 12, 2012: Portzen Construction Drew Cook & Sons Excavating Tschiggfrie Excavating Minnowa Construction Top Grade Excavating M -Z Construction $351,336.20 $362,982.00 $383,990.90 $396,097.50 $404,808.00 $459,464.00 Through the competitive quotation process for public improvements, this project was awarded on January 13, 2012, to Portzen Construction, of Dubuque, Iowa, in the amount of $351,336.20. This amount is 8.36% under the revised engineer's estimate of $373,585.00. The engineer's bid was revised to remove temporary pavement as a bid item. Temporary pavement is not needed due to the time of year the wall will be reconstructed. In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the 7th Street Retaining Wall Emergency Repairs Project to be officially recorded in the minutes of the City Council. cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Jon Dienst, PE CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET TABULATION FOR 7th Street Retaining Wall Reconstruction BID DATE JANUARY 12, 2012 BID ITEM DESCRIPTION DEMOLITION & REMOVAL 1 Sawcut Pavement,Curb 2 Pavement and Curb Removal 3 Retaining Wall Removal 4 Excavation (Unclassified) 4a Rock Excavation UNIT LF SY LS CY CY RETAINING WALL 5 Structural Concrete w1 Reinforcing Steel CY 6 Decorative Structural Concrete w/ Reinforcing S CY 7 Wrought Iron Railing on Barrier LF 8 Engineered Fill - Gradation 30 TON 9 Satisfactory Soil Fill CY 10 Free Draining Backfill TON 11 4" Perforated CPE Drain Tile LF STONE & PAVEMENT 12 7" PCC Pavement w /integral Curb SY 13 4" Stone Base TON 14 2 5' Type 'A' PCC Curb and Gutter LF 15 5" HMA Pavement Patch SY LANDSCAPING/MISCELLANEOUS 16 Mobilization LS 17 Erosion Control LS 18 Traffic Control LS 19 Topsoil CY 20 Erosion Mat with Seed SY TOTAL BASE BID ESTIMATE QUANTITY ENGINEER'S ESTIMATE ESTIMATED UNIT PRICE PRICE BIDDER: Portzen Construction BIDDER: Drew Cook & Sons Exc. UNIT PRICE BID PRICE UNIT COST TOTAL COST 70 $5 00 $350 00 $5 00 $350 00 $5 00 $350 00 1030 $10 00 $10,300 00 $5 00 $5,150 00 $9 60 $9,888 00 1 $8,000 00 $8,000 00 $13,500 00 $13,500 00 $24,000 00 $24,000 00 3600 $12 00 $43,200 00 $6 00 $21,600 00 $9 10 $32,760 00 10 $35 00 $350 00 $100 00 $1,000 00 $100 00 $1,000 00 240 $350 00 $84,000 00 $400 00 $96,000 00 31 $900 00 $27,900 00 $622 00 $19,282 00 280 $85 00 $23,800 00 $115 00 $32,200 00 4500 $20 00 $90,000 00 $15 00 $67,500 00 450 $12 00 $5,400 00 $25 00 $11,250 00 154 $20 00 $3,080 00 $22 00 $3,388 00 220 $15 00 $3,300 00 $9 00 $1,980 00 990 $35 00 $34,650 00 $33 50 $33,165 00 186 $25 00 $4,650 00 $14 20 $2,641 20 15 $25 00 $375 00 $32 00 $480 00 50 $45 00 $2,250 00 $35 00 $1,750 00 $425 00 $ 600 00 $78 00 $15 00 $19 50 $19 00 $10 00 $38 00 $22 00 $35 00 $30 00 $102,000 00 $18,600 00 $21,840 00 $67,500 00 $8,775 00 $2,926 00 $2,200 00 $37,620 00 $4,092 00 $525 00 $1,500 00 1 $25,000 00 $25,000 00 $31,400 00 $31,400 00 $14,000 00 $14,000 00 1 $2,000 00 $2,000 00 $1,500 00 $1,500 00 $4,750 00 $4,750 00 1 $2,500 00 $2,500 00 $2,900 00 $2,900 00 $1,400 00 $1,400 00 74 $20 00 $1,480 00 $50 00 $3,700 00 $44 00 $3,256 00 200 $5 00 $1,000 00 $3 00 $600 00 $20 00 $4,000 00 Bid Sub -Total Engineer's Cost Estim ate $373,585 00 % Under /Over Bid Proposal Form Page 1 of 3 $351,336.20 -5 96% Bid Sub Total % Under /Over $362,982.00 -2 84% CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET ABULATION FOR 7th Street Retaining Wall Reconstruction BID DATE JANUARY 12, 2012 BID ITEM DESCRIPTION DEMOLITION & REMOVAL 1 Sawcut Pavement,Curb 2 Pavement and Curb Removal 3 Retaining Wall Removal 4 Excavation (Unclassified) 4a Rock Excavation UNIT LF SY LS CY CY RETAINING WALL 5 Structural Concrete w1 Reinforcing Steel CY 6 Decorative Structural Concrete w/ Reinforcing S CY 7 Wrought Iron Railing on Barrier LF 8 Engineered Fill - Gradation 30 TON 9 Satisfactory Soil Fill CY 10 Free Draining Backfill TON 11 4" Perforated CPE Drain Tile LF STONE & PAVEMENT 12 7" PCC Pavement w /Integral Curb SY 13 4" Stone Base TON 14 2 5' Type 'A' PCC Curb and Gutter LF 15 5" HMA Pavement Patch SY LANDSCAPING /MISCELLANEOUS 16 Mobilization LS 17 Erosion Control LS 18 Traffic Control LS 19 Topsoil CY 20 Erosion Mat with Seed SY TOTAL BASE BID ESTIMATE QUANTITY ENGINEER'S ESTIMATE ESTIMATED UNIT PRICE PRICE BIDDER: Tschiggfrie Excavating BIDDER: Minnowa Construction Inc UNIT COST TOTAL COST 70 $5 00 $350 00 $8 00 $560 00 1030 $10 00 $10,300 00 $13 60 $14,008 00 1 $8,000 00 $8,000 00 $27,940 00 $27,940 00 3600 $12 00 $43,200 00 $5 70 $20,520 00 10 $35 00 $350 00 $50 00 $500 00 240 $350 00 $84,000 00 $450 00 $108,000 00 31 $900 00 $27,900 00 $600 00 $18,600 00 280 $85 00 $23,800 00 $89 50 $25,060 00 4500 $20 00 $90,000 00 $13 75 $61,875 00 450 $12 00 $5,400 00 $10 25 $4,612 50 154 $20 00 $3,080 00 $22 50 $3,465 00 220 $15 00 $3,300 00 $17 90 $3,938 00 990 $35 00 $34,650 00 $33 50 $33,165 00 186 $25 00 $4,650 00 $20 40 $3,794 40 15 $25 00 $375 00 $18 00 $270 00 50 $45 00 $2,250 00 $30 00 $1,500 00 1 $25,000 00 $25,000 00 $50,225 00 $50,225 00 1 $2,000 00 $2,000 00 $990 00 $990 00 1 $2,500 00 $2,500 00 $1,400 00 $1,400 00 74 $20 00 $1,480 00 $32 00 $2,368 00 200 $5 00 $1,000 00 $6 00 $1,200 00 Bid Sub -Total Engineer's Cost Estimate $373,585 00 % Under /Over Bid Proposal Form Page 2 of 3 $383,990.90 2 79% UNIT COST TOTAL COST $8 00 $1500 $33,000 00 $10 00 $200 00 $500 00 $ 600 00 $160 00 $12 00 $6 00 $15 00 $5 00 $33 25 $20 00 $30 00 $30 00 $20,100 00 $990 00 $1,000 00 $50 00 $6 00 Bid Sub -Total % Under /Over $560 00 $15,450 00 $33,000 00 $36,000 00 $2,000 00 $120,000 00 $18,600 00 $44,800 00 $54,000 00 $2,700 00 $2,310 00 $1,100 00 $32,917 50 $3,720 00 $450 00 $1,500 00 $20,100 00 $990 00 $1,000 00 $3,700 00 $1,200 00 $396,097.50 6 03% CITY OF DUBUQUE - ENGINEERING DIVISION - BID TABULATION SHEET ABULATION FOR 7th Street Retaining Wall Reconstruction BID DATE JANUARY 12, 2012 BID ITEM DESCRIPTION DEMOLITION & REMOVAL 1 Sawcut Pavement,Curb 2 Pavement and Curb Removal 3 Retaining Wall Removal 4 Excavation (Unclassified) 4a Rock Excavation UNIT ESTIMATE QUANTITY ENGINEER'S ESTIMATE ESTIMATED UNIT PRICE PRICE BIDDER: Top Grade Excavating BIDDER: M -Z Construction Inc UNIT COST TOTAL COST UNIT COST TOTAL COST LF 70 $5 00 $350 00 $3 00 $210 00 $3 00 SY 1030 $10 00 $10,300 00 $7 00 $7,210 00 $10 00 LS 1 $8,000 00 $8,000 00 $24,000 00 $24,000 00 $10,000 00 CY 3600 $12 00 $43,200 00 $10 00 $36,000 00 $15 00 CY 10 $35 00 $350 00 $150 00 $1,500 00 $300 00 RETAINING WALL 5 Structural Concrete w/ Reinforcing Steel CY 240 $350 00 $84,000 00 $525 00 $126,000 00 6 Decorative Structural Concrete w/ Reinforcing S CY 31 $900 00 $27,900 00 $700 00 $21,700 00 7 Wrought Iron Railing on Barrier LF 280 $85 00 $23,800 00 $70 00 $19,600 00 8 Engineered Fill - Gradation 30 TON 4500 $20 00 $90,000 00 $15 00 $67,500 00 9 Satisfactory Soil Fill CY 450 $12 00 $5,400 00 $10 00 $4,500 00 10 Free Draining Backfill TON 154 $20 00 $3,080 00 $25 00 $3,850 00 11 4" Perforated CPE Drain Tile LF 220 $15 00 $3,300 00 $8 00 $1,760 00 $750 00 $800 00 $100 00 $15 00 $10 00 $10 00 $10 00 $210 00 $10,300 00 $10,000 00 $54,000 00 $3,000 00 $180,000 00 $24,800 00 $28,000 00 $67,500 00 $4,500 00 $1,540 00 $2,200 00 STONE & PAVEMENT 12 7" PCC Pavement w /Integral Curb SY 990 $35 00 $34,650 00 $40 00 $39,600 00 $40 00 $39,600 00 13 4" Stone Base TON 186 $25 00 $4,650 00 $18 00 $3,348 00 $9 00 $1,674 00 14 2 5' Type 'A' PCC Curb and Gutter LF 15 $25 00 $375 00 $20 00 $300 00 $20 00 $300 00 15 5" HMA Pavement Patch SY 50 $45 00 $2,250 00 $35 00 $1,750 00 $30 00 $1,500 00 LANDSCAPING/MISCELLANEOUS 16 Mobilization LS 1 $25,000 00 $25,000 00 $30,000 00 17 Erosion Control LS 1 $2,000 00 $2,000 00 $5,000 00 18 Traffic Control LS 1 $2,500 00 $2,500 00 $3,500 00 19 Topsoil CY 74 $20 00 $1,480 00 $20 00 20 Erosion Mat with Seed SY 200 $5 00 $1,000 00 $30 00 TOTAL BASE BID Engineer's Cost Estimate Bid Sub -Total $30,000 00 $5,000 00 $3,500 00 $1,480 00 $6,000 00 $404,808.00 $24,000 00 $2,000 00 $3,000 00 $10 00 $3 00 Bid Sub -Total $373,585 00 % Under /Over 8 36% % Under /Over Bid Proposal Form Page 3 of 3 $24,000 00 $2,000 00 $3,000 00 $740 00 $600 00 $459,464.00 22 99%