2 23 12 Water & Resource Recover Center Budget Presentation FY 2013t r W&RRC- R'r"wal $J 1 / i ff1 1 1._ -I rrii lion for engineering & Cof err! J : • n services construction $ 5 million for contingency($2.7 million for Cogeneration Project) $ 3.3 million for design Total project of $64 million W &RRC Renewal City of Dubuque Initiated Project in 2415 and a Facility plan was submitted to IDNR in 2008 USEPA /IDNR — July 2011 the City signed with USEPA a Consent Decree which among other things requires that the W &RRC be completed as specified in the Facility Plan submitted s Future Capacity Current I Existing Design Conditions jar Conditions FY11 T Hydraulic Peak Loading BOD Load (lbs/day) Solids Load (lbs/day) 33.6 17969 13187 34.3 24,400 24,600 W &RRC Renewal Capacity Increases City of Dubuque will be poised for Aoulation and industrial uses with this increased capacity Dubuque will have a highly energy efficient operation W &RR Impac tr uction Loan Repayment S J 11 Rah riesign loan 3.25% for construction 12% 13% 14% 7% Fy12 Fy13 Fy14 Fy15 Fy16 0% I Energy Costs uctions ce Cost Reductions J P cl�_ucrigrn ire le Haitjfrjl CjE.j; ajor `ralfirernai Inciner.:rur i'! tenance and Fuel Purchase Reductions ower Pol er Usage New Line item added for Bio- Solids Hauling and Application Re on in Electrical Energy FY10 11 Actual $523,574 Savings FY1 t $355,790 ($167,784) imate $312,000 ($211,574) FY15 Estimate $198,451 ($325,123) fr!Jr 1 1 Actual t imate FY15 Estimate e Reductions $65,365 $50,000 $10,000 $10,000 Savings ($15,365) ($55,365) ($55,365) Y'ijur j /J��irj ce Cost Reductions Actua $165,081 Savings t $79,981 ($85,100) $95,000 ($70,081) rrrJ Bud__ J FY-11 r LiIliEL Department Manager Administrative Assistant Assistant Manager Eight Operators 3 Laboratory Technicians 0.16 Intern Maintenance Foreman 2 Mechanics & 1 Electrici Inciner mntenance and Fuel tions r'l 1 Actual $324,108 Savings Et d c -t $71,000 ($253,108) timated $0.00 ($324,108) w!� Usage '.0/11 Actua $95,613 Savings t $58,000 ($37,613) imate+ $45,000 ($50,613) s O &M Budget - Current vs Proposed F Fl!2 Adopted FY 12/13 Recomm'd FY 14 Estimate FY 15 Estimate $3.55 Million $3.73 Million $3.50 Million -6.1% from FY11/12 adopted $3.40 Million -8.8% from FY11/12 adopted $3.30 Million -11.5% from FY11/12 adopted Weath' r omplications Impacting Cons ruc[irn Schedule d Storm • ches & 28 eading to a 120 working day extension of two major milestone dates; The startup of the Anaerobic Digesters and Bio- Solids Processing Center. _ -r -r july �J!.lJy rf rEli>'l a•.....5:1 - l l) a I Ization — Summer 2012 1, I LL1 F • rr . 111111 11111111 11 (ZTOZ 112J) Eiu!PHni no pan st0S-0!9 Final Clarifier Modifications (Spring 2013) r a.• tf111b • tantial Completion-Fall 2013* 4$, 45> 4 10' (9 AP ff!' el I e e 0 — 41, 1.171,F, Aka _It a I. ."719■.1441Y-:. •TL.. . • r P - .'"jr- 1.51/26t.t. • - • '" ." • ..;:j74.4 “Vne •Tir n Project _ as been approved for SRF funding esigiikocuments have been submitted pprova is forthcoming hree 200kw microturbines for a combined initial cavity of 600kw Plant is projected to need on average 650kw vs. 950kw for current operation. 9 to 10 years payback Stable Energy Costs for future Addi Research for Methane Use a ressed Natural Gas Fueling Station -thane from Digesters 02 Generation onsite using Digester Gas Produced Electrical Energy Pro Increase — 16% 13% percent rate increase to SRF Repayment actes4, typical family using 6,000 gallons per month would be - $23.67 to $27.57 4, Rate Comparison (based on usage of 800 cubic feet or 6000 gallons per month) City Iowa City West Des Moines Sioux City Des Moines Rates fy12 $36.08 Ames Cedar Rapids Davenport Waterloo Council Bluffs Average (without Dubuque) $3210 $34.55 $31.04 $23.63 $23.95 $24A7 $24.63 $22.40 $17.21 $27.38 fy13 (proposed) $36.08 $34.99 ( +9 %) $34.72 ( +0.5 %) $31.04 $27.57 ( +16 %) $26.35 ( +10 %) $25.55 ( +4.4 %) $24.63 Unknown Unknown $28.11 er & Resource Recovery Center Water Resource Recovery Center "Aqua est Vita" Water is ife "Along With" "Things Required for Life" "Brought Back for Use" "The Place Where it Happens" The Water & Resource Recovery Center W &RRC • atory Services W&RRC, Water, Heal rj Pepartment & Community LEin d n • W &RRC - From Disposing of Waste to Extracting Resources Potential Resources Burned To B10- Solids for in Incineration. Beneficial Use Previous words like `waste, pollution, dispose' "There is no waste until it is wasted" • Than, o the W &RRC Staff a Administrative & Laboratory Personnel Operations Maintenance • Fy2011 W &RRC Operations — Average Day Avg. Day Res. /Com. Ind. % Ind. Flow 10.978 mgd B.O.D. 17969 lbs. T.S.S. 13187 lbs. 10.278 mgd 12039 lbs 11605 lbs 0.70 mgd 5930 lbs 1582 lbs 5.3% 33% 12% wuaad ipM aDuei'.woj %OOT uoi4eaauPui Orion!' lesodsi4 ao4 (J2A aad suoi SIOt) /Tea spHos -oig suol kla WTI pawaauaD (sp! 105 papuadsnS I21o1) 'S'S'1 %16 panowau (pu2waa ua6Axp 1e30010i9) 141019 40 %%6 panouaa1:l (uo!II!9 0'b lenuue) 'Ow 8L6'0T passanid @DU 04 DUH18M • IIO: Ad I IOi atfish Creek Generator Project IrLi 11r.1 Completion — fy2011 tOrrl;d nits- ........ sy S Stan. c Power at Pumping Stations s of the summer 2011 all three major stations have onsite standby power. All smaller stations can be supplied with power from dedicated generators, portable generators and /or portable diesel pump. By the spring /summer of 2012 the W &RRC will have 100% standby power Stan r by Power With t e addition of standby power existing businesses can remain operational ling an extended power outage. Citizens will be able to use the system without interruption. Eliminates risk of permit violations caused by power outages.