Dubuque Industrial Center South_Grading and Utilities 2012 ProjectMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dubuque Industrial Center South Grading & Utilities - 2012, Phase I CIP 3602160 - Design, South Siegert Farm DATE: March 23, 2012 Dubuque bierd All- America City 1 2007 City Engineer Gus Psihoyos and Economic Development Director Dave Heiar recommend City Council approval of the plans, specifications, form of contract and the estimated cost of $4,744,572 for the Dubuque Industrial Center South Grading and Utilities — 2012 Project, Phase I. In 1997, the City acquired approximately 175 acres of farmland known as the South Siegert Farm. Until March 1, 2012, the property between Highway 20 and Seippel Road was leased for agricultural purposes until there was an identified need for commercial/ industrial growth. With more than 10 recent business expansions in the Dubuque Industrial Center West (DICW), the City of Dubuque has seen unprecedented growth. In less than three years, the City has sold over 125 acres. The City Council identified the Dubuque Industrial Center Economic Development District (District) as a high priority for the City's future commercial /industrial growth. On March 7, 2011, the City Council approved the inclusion of the South Siegert Farm (Subarea E) within that District. The Dubuque Industrial Center South — Grading /Expansion of South Siegert Farm will be completed in phases based on budget and developmental needs. This project would complete construction of DICW and DICS, which includes grading, road construction, a bridge, utility extensions, and the development of a recreational area. The Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I includes the grading of approximately 1,350,000 cubic yards of excavation. The project includes: — Temporary and permanent erosion control measures: Sediment basins; detention basins; vegetated swales; seeding; inlet and outlet projection; and energy dissipaters. — Grading: Clearing and grubbing topsoil removal; stockpile and spreading; removal of unsuitable material; subdrains; excavation; and embankment fill. — Deconstruction and demolition: Removal of existing structures; well abandonment; and septic system removal. — Storm sewer: Approximately 600 lineal feet of storm sewer pipe. — Sanitary sewer: 2,788 lineal feet of 8- and 12 -inch sanitary sewer pipe. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Dave Heiar, Economic Development Director 2 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer David Heiar, Economic Development Director SUBJECT: Dubuque Industrial Center South Grading & Utilities — 2012, Phase I CIP 3602160 — Design, South Siegert Farm DATE: March 23, 2012 INTRODUCTION Dubuque btrid All- America City I II 1 2007 The enclosed resolution is in reference to the public hearing for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I. BACKGROUND In 1997 the City acquired approximately 175 acres of farmland known as the South Siegert Farm. Until March 1, 2012, the property between Highway 20 and Seippel Road was leased for agricultural purposes until there was an identified need for commercial/ industrial growth. With more than 10 recent business expansions in the Dubuque Industrial Center West (DICW), the City of Dubuque has seen unprecedented growth. In less than three years, the City has sold over 125 acres. The City Council identified the Dubuque Industrial Center Economic Development District (District) as a high priority for the City's future commercial /industrial growth. In March 7, 2011, the City Council approved (Resolution 87 -11) the inclusion of the South Siegert Farm (Subarea E) within that District. The Dubuque Industrial Center South — Grading /Expansion of South Siegert Farm will be completed in phases based on budget and developmental needs. This project would complete construction of DICW and DICS which includes grading, road construction, a bridge, utility extensions, and the development of a recreational area. DISCUSSION The Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I includes the grading of approximately 1,350,000 cubic yards of excavation. The project includes: — Temporary and permanent erosion control measures: Sediment basins; detention basins; vegetated swales; seeding; inlet and outlet projection; and energy dissipaters. — Grading: Clearing and grubbing topsoil removal; stockpile and spreading; removal of unsuitable material; subdrains; excavation; and embankment fill. — Deconstruction and demolition: Removal of existing structures; well abandonment; and septic system removal. — Storm sewer: Approximately 600 lineal feet of storm sewer pipe. — Sanitary sewer: 2,788 lineal feet of 8- and 12 -inch sanitary sewer pipe. Since this project will be funded by a bond sale, the project's schedule has been revised to reflect a June, 2012 bond completion: Initiate Public Bidding Process Publish Public Hearing Notice on Plans & Specifications Public Hearing on Plans & Specifications Publish Notice to Bidders, Advertise for Bids Pre -Bid Conference Receipt of Bid Proposals (Bid- Letting) Award Construction Contract Roadway Subgrade Areas Completed Final Project Completion Date March 19, 2012 March 23, 2012 April 2, 2012 April 6, 2012 April 24, 2012 May 10, 2012 June 4, 2012 July 1,2013 November 1, 2013 The project specifications provide for a $1,000 /day cost mutually agreed between the City and contractor if the roadway subgrade areas are not completed by July 1, 2013, and /or the total project is not completed by November 1, 2013. The specifications also provide for an incentive of $1,000 per day for early completion of the subgrading for the streets and /or the total project. The total incentive for the completed project cannot exceed $50,000. The incentive for the street subgrading area cannot exceed $25,000 of this total incentive available for the overall grading project. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and the estimated cost for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I. BUDGET IMPACT The estimate of probable cost for Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I is summarized as follows: Estimate Phase I: Construction Contract - Base $3,518,967 Phase I: Construction Contract - Alternates 405,080 Contingency 392,405 Consultant Services: Engineering Design, Administration & Inspection 428,120 Total Project Cost $4,744,572 The funding summary for the Dubuque Industrial Center South Project is as follows: CIP No. Fund Description 3602160 General Obligation (GO) Bonds (TIF Abated) Transfer from Unused Portion of North Siegert G.O. Bond Sale Total Project Funding Fund Amount $4,585,004 1,000,000 $5,585,004 The maximum budget for the project is $5,585,004 including preliminary and final design, environmental review and construction of public infrastructure (Phase II). The estimate of probable cost of Phase I includes a 10% contingency and will also include several alternate bid items to allow for flexibility when reviewing bid proposals to ensure that the project remains within budget. The initial CIP had shown $990,548 in funding coming from land sales. With the savings from the North Siegert project, this funding source is not needed. Land sales revenue can now be used for other purposes including the annual contribution to the Greater Dubuque Development Corporation. Budget Director Jenny Larson intends to initiate a bond sale to finance this project in early April, with the actual award of a bond sale scheduled for the June 4 meeting. ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and the estimated cost for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I. Prepared by David Heiar, Economic Development Director cc: Jenny Larson, Budget Director Bob Green, Water Department Manager Gus Psihoyos, City Engineer Deron Muehring, Civil Engineer Todd Irwin, Engineering Technician RESOLUTION NO. 87 -12 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE DUBUQUE INDUSTRIAL CENTER SOUTH GRADING & UTILITIES - 2012 PROJECT, PHASE NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Dubuque Industrial Center South Grading & Utilities - 2012 Project, Phase I, in the estimated amount $4,744,572, are hereby approved. Passed, adopted and approved this 2nd day of Apr i 1 , 2012. Attest: Key',' S. Firnstahl, City Cler oy D. Buol, Mayor Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Dubuque Industrial Center South Grading & Utilities -2012, Phase I CIP 3602160- Design, South Siegert Farm DATE: March 12, 2012 Dubuque All America City 2007 Economic Development Director David Heiar and City Engineer Gus Psihoyos are recommending setting a public hearing for April 2, 2012, and authorizing the public bidding procedure for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I. I concur with the recommendation and respectfully request Mayor and City Council approval. Priolf4 Michael C. Van Milligen MCVM:sv Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer David Heiar, Economic Development Director Rick Dickinson, President & CEO Greater Dubuque Development Corporation Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer David Heiar, Economic Development Director SUBJECT: Dubuque Industrial Center South Grading & Utilities — 2012, Phase I CIP 3602160 — Design, South Siegert Farm DATE: March 15, 2012 INTRODUCTION Dubuque katil *America City 1 , 2007 The enclosed resolutions authorize the public bidding procedure for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I. BACKGROUND In 1997 the City acquired approximately 175 acres of farmland known as the South Siegert Farm. Until March 1, 2012, the property between Highway 20 and Seippel Road was leased for agricultural purposes until there was an identified need for commercial/ industrial growth. With more than 10 recent business expansions in the Dubuque Industrial Center West (DICW), the City of Dubuque has seen unprecedented growth. In less than three years, the City has sold over 125 acres. The City Council identified the Dubuque Industrial Center Economic Development District (District) as a high priority for the City's future commercial /industrial growth. In March 7, 2011, the City Council approved (Resolution 87 -11) the inclusion of the South Siegert Farm (Subarea E) within that District. The Dubuque Industrial Center West — Grading /Expansion of South Siegert Farm will be completed in phases based on budget and developmental needs. This project would complete construction of DICW and DICS which includes grading, road construction, a bridge, utility extensions, and the development of a recreational area. DISCUSSION The Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I includes the grading of approximately 1,350,000 cubic yards of excavation. The project includes: — Temporary and permanent erosion control measures: Sediment basins; detention basins; vegetated swales; seeding; inlet and outlet projection; and energy dissipaters. — Grading: Clearing and grubbing topsoil removal; stockpile and spreading; removal of unsuitable material; subdrains; excavation; and embankment fill. — Deconstruction and demolition: Removal of existing structures; well abandonment; and septic system removal. — Storm sewer: Approximately 600 lineal feet of storm sewer pipe. — Sanitary sewer: 2,788 lineal feet of 8- and 12 -inch sanitary sewer pipe. PROJECT SCHEDULE The schedule for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans & Specifications Public Hearing on Plans & Specifications Pre -Bid Conference Receipt of Bid Proposals (Bid- Letting) Award Construction Contract Roadway Subgrade Areas Completed Final Project Completion Date March 19, 2012 March 23, 2012 March 23, 2012 April 2, 2012 April 17, 2012 May 1,2012 May 21, 2012 July 1,2013 November 1, 2013 The project specifications also provide for a $750 /day cost mutually agreed between the City and contractor if the roadway subgrade areas are not completed by July 1, 2013, and /or the total project is not complete by November 1, 2013. The specifications also provide for an incentive of $1,000 per day for early completion of the subgrading for the streets and /or the total project. The total incentive for the completed project cannot exceed $50,000. The incentive for the street subgrading area cannot exceed $25,000 of this total incentive available for the overall grading project. RECOMMENDATION It is recommended that the City Council establish the date of the public hearing and authorize the City Clerk to advertise for proposals for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I. BUDGET IMPACT The estimate of probable cost for Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I is summarized as follows: Estimate Phase I: Construction Contract - Base $3,518,967 Phase I: Construction Contract - Alternates 405,080 Contingency 392,405 Consultant Services: Engineering Design, Administration & Inspection 428,120 Total Project Cost $4,744,572 The funding summary for the Dubuque Industrial Center South Project is as follows: CIP No. Fund Description 3602160 General Obligation (GO) Bonds (TIF Abated) Transfer from Unused Portion of North Siegert G.O. Bond Sale Total Project Funding Fund Amount $4,585,004 1,000,000 $5,585,004 The maximum budget for the project is $5,585,004 including preliminary and final design, environmental review and construction of public infrastructure (Phase II). The estimate of probable cost of Phase I includes a 10% contingency and will also include several alternate bid items to allow for flexibility when reviewing bid proposals to ensure that the project remains within budget. The initial CIP had shown $990,548 in funding coming from land sales. With the savings from the North Siegert project, this funding source is not needed. Land sales revenue can now be used for other purposes including the annual contribution to the Greater Dubuque Development Corporation. Budget Director Jenny Larson intends to initiate a bond sale to finance this project in early April, with the actual award of a bond sale scheduled for the May 21 meeting. ACTION TO BE TAKEN The City Council is requested to establish the date of the public hearing and authorize the City Clerk to advertise for proposals for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I. Prepared by David Heiar, Economic Development Director cc: Jenny Larson, Budget Director Bob Green, Water Department Manager Gus Psihoyos, City Engineer Deron Muehring, Civil Engineer Todd Irwin, Engineering Technician RESOLUTION NO. DUBUQUE INDUSTRIAL CENTER SOUTH GRADING & UTILITIES — 2012 PROJECT, PHASE I PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I, in the estimated amount $4,744,572, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on 2nd day of April, 2012, at 6:30 p.m. in the Historic Federal Building Council Chambers at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four but not more than forty -five days before the date for filing bids before 2:00 p.m. on the 1st day of May, 2012. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 21st day of May, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this day of , 2012. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE DUBUQUE INDUSTRIAL CENTER SOUTH GRADING & UTILITIES — 2012 PROJECT, PHASE I NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 2nd day of April, 2012, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I includes the grading of approximately 1,350,000 cubic yards of excavation. The project includes: — Temporary and permanent erosion control measures: Sediment basins; detention basins; vegetated swales; seeding; inlet and outlet projection; and energy dissipaters. Grading: Clearing and grubbing topsoil removal; stockpile and spreading; removal of unsuitable material; subdrains; excavation; and embankment fill. — Deconstruction and demolition: Removal of existing structures; abandonment; and septic system removal. — Storm sewer: Approximately 600 lineal feet of storm sewer pipe. — Sanitary sewer: 2,788 lineal feet of 8- and 12 -inch sanitary sewer pipe. well Any visual or hearing- impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD at (563) 690 -6678 at least 48 hours prior to the meeting. 2012. Published by order of the City Council given on the day of Kevin S. Firnstahl, City Clerk NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT DUBUQUE INDUSTRIAL CENTER SOUTH GRADING & UTILITIES — 2012, PHASE I Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on May 1, 2012, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on May 1, 2012, at City Hall - Conference Room B, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on May 21, 2012. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued based on the following schedule: roadway subgrade areas completed by July 1, 2013, and final completion by November 1, 2013. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the plans and specifications prepared by IIW, PC, are available from Tri -State Blueprint & Framing Co. /Rapids Reproduction, 696 Central Avenue, Dubuque, IA 52001. Telephone number: 563 - 556 -3030. No plan deposit is required. Copies of the construction documents may be viewed at: the Office of Economic Development, City Hall - Second Floor, 50 West 13th Street, Dubuque, Iowa; or at the Office of IIW, P.C., 4155 Pennsylvania Avenue, Dubuque, Iowa. If there are questions and /or additional information is needed, contact IIW Project Manager John Wandsnider, PE at j.wandsnider @iiwengr.com or by calling (563) 556 -2464. Project information will also be posted on the City's website at www.cityofdubuque.org. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I The Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I includes the grading of approximately 1,350,000 cubic yards of excavation. The project includes: — Temporary and permanent erosion control measures: Sediment basins; detention basins; vegetated swales; seeding; inlet and outlet projection; and energy dissipaters. — Grading: Clearing and grubbing topsoil removal; stockpile and spreading; removal of unsuitable material; subdrains; excavation; and embankment fill. — Deconstruction and demolition: Removal of existing structures; well abandonment; and septic system removal. — Storm sewer: Approximately 600 lineal feet of storm sewer pipe. — Sanitary sewer: 2,788 lineal feet of 8- and 12 -inch sanitary sewer pipe. Pre -Bid Conference. Each prospective bidder is encouraged to attend the Pre -Bid Construction Conference to be held at 1 PM Central Time on April 17, 2012, at the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Attendance by all prospective bidders is not mandatory but highly recommended. Published in the Telegraph Herald, March 23, 2012. NOTICE TO BIDDERS CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT DUBUQUE INDUSTRIAL CENTER SOUTH GRADING & UTILITIES — 2012, PHASE I Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising each improvement as stated below must be filed before 2:00 p.m. on May 10, 2012, in the Office of the City Clerk, City Hall - First Floor, 50 West 13th Street, Dubuque, Iowa. Time and Place Sealed Proposals Will be Opened and Considered. Sealed proposals will be opened and bids tabulated at 2:00 p.m. on May 10, 2012, at City Hall - Conference Room B, 50 West 13th Street, Dubuque, Iowa, for consideration by the City Council (Council) at its meeting on June 4, 2012. The City of Dubuque, Iowa, reserves the right to reject any and all bids. Time for Commencement and Completion of Work. Work on each improvement shall be commenced within 10 days after the Notice to Proceed has been issued based on the following schedule: roadway subgrade areas completed by July 1, 2013, and final completion by November 1, 2013. Bid Security. Each bidder shall accompany its bid with a bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bid security shall be in the amount of ten percent (10 %) of the amount of the contract and shall be in the form of a cashier's check or certified check drawn on a state - chartered or federally chartered bank, or a certified share draft drawn on a state - chartered or federally chartered credit union, or the governmental entity may provide for a bidder's bond with corporate surety satisfactory to the governmental entity. The bid bond shall contain no conditions excepted as provided in this section. Contract Documents. Copies of the plans and specifications prepared by IIW, PC, are available from Tri -State Blueprint & Framing Co. /Rapids Reproduction, 696 Central Avenue, Dubuque, IA 52001. Telephone number: 563 - 556 -3030. No plan deposit is required. Copies of the construction documents may be viewed at: the Office of Economic Development, City Hall - Second Floor, 50 West 13th Street, Dubuque, Iowa; or at the Office of IIW, P.C., 4155 Pennsylvania Avenue, Dubuque, Iowa. If there are questions and /or additional information is needed, contact IIW Project Manager John Wandsnider, PE at j.wandsnider @iiwengr.com or by calling (563) 556 -2464. Project information will also be posted on the City's website at www.cityofdubuque.org. Preference for Iowa Products and Labor. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes. Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption certificate will be available for all material purchased for incorporation in the project. General Nature of Public Improvement. Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I The Dubuque Industrial Center South Grading & Utilities — 2012 Project, Phase I includes the grading of approximately 1,350,000 cubic yards of excavation. The project includes: — Temporary and permanent erosion control measures: Sediment basins; detention basins; vegetated swales; seeding; inlet and outlet projection; and energy dissipaters. — Grading: Clearing and grubbing topsoil removal; stockpile and spreading; removal of unsuitable material; subdrains; excavation; and embankment fill. — Deconstruction and demolition: Removal of existing structures; well abandonment; and septic system removal. — Storm sewer: Approximately 600 lineal feet of storm sewer pipe. Sanitary sewer: 2,788 lineal feet of 8- and 12 -inch sanitary sewer pipe. Pre -Bid Conference. Each prospective bidder is encouraged to attend the Pre -Bid Construction Conference to be held at 10 AM Central Time on April 24, 2012, at the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Attendance by all prospective bidders is not mandatory but highly recommended. Published in the Telegraph Herald, March 23, 2012. NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE DUBUQUE INDUSTRIAL CENTER SOUTH GRADING & UTILITIES - 2012 PROJECT, PHASE I NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Dubuque Industrial Center South Grading & Utilities - 2012 Project, Phase I, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 2nd day of April, 2012, in the Historic Federal Building Council Cham- bers (second floor), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: The Dubuque Industrial Center South Grading & Utilities - 2012 Project, Phase I includes the grading of approximately 1,350,000 cubic yards of excavation. The project includes: - Temporary and permanent erosion control measures: Sediment basins; detention basins; vegetated swales; seeding; inlet and outlet projection; and energy dissipaters. - Grading: Clearing and grubbing topsoil removal; stockpile and spreading; removal of unsuitable material; subdrains; excavation; and embankment fill. - Deconstruction and demolition: Removal of existing structures; well abandonment; and septic system removal. - Storm sewer: Approximately 600 lineal feet of storm sewer pipe. - Sanitary sewer: 2,788 lineal feet of B- and 12 -inch sanitary sewer pipe. Any visual or hearing - impaired persons need- ing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or TDD at (563) 690 -6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 19th day of March, 2012. Kevin S. Firnstahl, City Clerk It 3/23 STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: March 23, 2012, and for which the charge is $27.60. Subscribed to before me, Notary Public in and for Dubuque County, Iowa, ,200,E . this 6376 day of Notary Public in and for Dubuque County, Iowa. MAriY K WEGTaRMEY R Omm ioIor7 Novi ar °?ti,yly grlp