2005 Curb Ramp Installation CDBG #1 Proj D~~~E ~~~ MEMORANDUM July 25, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2005 Curb Ramp Installation - CDBG Project #1 (CIP 2601236: ADA Curb Ramp Construction Project) City Engineer Gus Psihoyos is recommending acceptance of the 2005 Curb Ramp Installation - CDBG Project #1 , as completed by Perry Construction, in the final contract amount of $18,020.55, which is a 16.1 % decrease from the original contract amount of $20,926.00. This decrease was due to the elimination of two curb ramps that were constructed in conjunction with other projects. I concur with the recommendation and respectfully request Mayor and City Council approval. 0JWv Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer DU~~ ~~~ MEMORANDUM July 26, 2005 FROM: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer ~O TO: SUBJECT: 2005 Curb Ramp Installation - CDBG Project #1 (CIP 2601236: ADA Curb Ramp Construction Project) INTRODUCTION The enclosed resolutions provide for the acceptance of the 2005 Curb Ramp Installation - CDBG Project #1. BACKGROUND This project included 34 ramps in the downtown area of Elm Street to Central Avenue and 11th Streetto 14th Street. DISCUSSION The 2005 Curb Ramp Installation - CDBG Project #1 has been completed by Perry Construction of Dubuque, Iowa, in the amount of $18,020.55, which is a 16.1% decrease from the original contract amount of $20,926.00. The project was decreased in size by the elimination of two curb ramps that were constructed in conjunction with other projects. The bid quantities were also reduced from its original estimated amount due to actual field quantities. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $18,020.55. BUDGET IMPACT The project cost summary for the 2005 Curb Ramp Installation - CDBG Project #1 is as follows: Bid Award Final Construction Contract $20,926.00 $18,020.55 Contingency 2,270.00 0 Engineering 3,745.50 2.703.08 Total Project Cost $26,941.50 $20,723.63 The project is funded through the Community Development Block Grant Funds from Fiscal Year 2005, with a budget amount of $38,962.00. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Jane Smith, Engineering Assistant cc: Dawn Lang, Budget Director Aggie Tauke, Housing & Community Development Jane Smith, Engineering Assistant . . # City of Dubuque FINAL ESTIMATE FOR: 2005 CURB RAMP INSTALLATION - CDBG PROJECT #1 DATE: 07/12/2005 ITEM QTY. UNIT UNIT COST TOTAL COST 1. PCC Curb & Gutter, Remove, Replace 83 L.F. $ 24.95 $2,070.85 2. PCC Curb, Straight, Remove, Replace 300 L.F. $ 24.95 $7,485.00 3. PCC Concrete 6" Sidewalk, Remove, Replace 1326 SF $ 4.45 $5,900.70 4. Placement of Detectable Warning Area 32 Units $ 34.00 $1,088.00 (Unit consists of 2'x4' Dome Area) EXTRA WORK 5. Extra for 10" concrete 804 S.F. $ 1.50 $1,206.00 6, Asphalt 90 S.F. $ 3.00 $270.00 CONSTRUCTION COST $18,020.55 ENGINEERING $2.703.08 TOTAL COST $20,723.63 I hereby certify that the above statement shows in detail the corect amount 0 complete the abov~ti(nt. . r1 , APPROVED: {lv""- (i~ Michael Van Milligen, City Manager City of Dubuque, Iowa Gus Psihoyos City Engineer The undersigned, -FE/lilt {VAJ A.,ltu<:... t'faJ, contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CO.NTRACT~... UEf/fl7 ~.5 mUerJC>\! BY. ~ IN - - r- DATE: 7-1[0-65' RESOLUTION NO. 343-05 ACCEPTING THE 2005 CURB RAMP INSTALLATION - COBG PROJECT #1 Whereas, the contract for the 2005 Curb Ramp Installation - CDBG Project #1 (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the Fiscal Year 2005 Community Development Block Grant Funds appropriation for the contract amount in the amount of $18,020.55 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 1st day of August ,2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 344-05 FINAL ESTIMATE Whereas, the construction contract for the 2005 Curb Ramp Installation - CDBG Project #1 has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $20,723.63 and the said amount shall be paid from the allocation from the Fiscal Year 2005 Community Development Block Grant Funds. Passed, approved and adopted this 1st day of August, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC City Clerk