MEMORANDUM
July 27, 2005
TO:
The Honorable Mayor and City Council Members
FROM:
Michael C. Van Milligen, City Manager
SUBJECT: Nowata Street Reconstruction Project
City Engineer Gus Psihoyos recommends City Council approval of the plans and
specifications for the Nowata Street Reconstruction Project, and adoption of the
Resolution of Necessity.
Incorporated in the design are traffic-calming measures which include two roadway
bump-outs.at both the University Avenue and Loras Boulevard intersections. The
bump-out design reduces the street width from 37 -feet to 31-feet at both ends of the
project, which is designed to aid in the reduction of traffic speeds.
These are justified because the street is adjacent to a major City park and is used as a
shortcut connecting University Avenue and Loras Boulevard.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
j2M~Ak
Michilel C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Gus Psi hoyos, City Engineer
; ,
DU~~E
~~~
MEMORANDUM
July 27, 2005
FROM:
Michael C. Van Milligen, City Man~~(f)
Gus Psi hoyos, City Engineer A \-0 1
TO:
SUBJECT:
Nowata Street Reconstruction Project
INTRODUCTION
The enclosed resolutions are in reference to the public hearing on the Nowata Street
Reconstruction Project.
BACKGROUND
The Nowata Street Reconstruction Project will provide for the complete reconstruction
of all underground utilities, roadway sub-base and mainline concrete pavement from
University Avenue and Loras Boulevard.
Currently Nowata Street is 27 -foot wide and allows for parking on the east side of the
street while the proposed improvements incorporate a 37 -foot wide roadway which will
accommodate parking on both sides of the street. The additional parking will provide
alternate parking options for users of the adjacent Allison-Henderson Park and should
improve parking congestion concerns for local residents.
Incorporated in the design are traffic-calming measures which include two roadway
bump-outs at both the University Avenue and Loras Boulevard intersections. The
bump-out design reduces the street width from 37-feet to 31-feet at both ends of the
project which is designed to aid in the reduction of traffic speeds.
The storm sewer system will be reconstructed to incorporate larger capacity storm water
intakes with new 15-inch diameter sewer pipe which will improve the storm water
conveyance in the area.
The existing sanitary sewer system will be completely upgraded to include a new 8-inch
mainline sewer; the reconstruction of deteriorated brick manholes; and the replacement
of all private sanitary sewer laterals. The cost for the individual sanitary sewer lateral
replacements will be assessed to each respective private property owner.
The watermain system is scheduled for complete reconstruction which will include new
main line water service, valves and fire hydrants.
, .
The project will also provide for the installation of fiber optics and telecommunications
conduit infrastructure and the complete reconstruction of the existing pedestrian
sidewalks along the east side of Nowata Street between University Avenue and Loras
Boulevard. New sidewalk will be constructed along the Allison-Henderson Park side.
RECOMMENDATION
I recommend that the City Council approve the plans and specifications and the
Resolution with Respect to the Adoption of the Resolution of Necessity for the Nowata
Street Reconstruction Project.
ACTION TO BE TAKEN
The City is requested to approve the plans and specifications and the Resolution with
Respect to the Adoption of the Resolution of Necessity through the adoption of the
enclosed resolutions for the Nowata Street Reconstruction Project.
Prepared by Robert Schiesl, PE
cc: Dawn Lang, Budget Director
Bob Green, Water Plant Manager
Don Vogt, Public Works Director
Robert Schiesl, PE
Jon Dienst, PE
Greg Doeden, PE
.
RESOLUTION NO. 364-05
RESOLUTION ADOPTING PLANS AND SPECIFICATIONS
Whereas, on the 5th day of July, 2005, plans, specifications, form of
contract and estimated cost were filed with the City Clerk of Dubuque, Iowa for
the Nowata Street Reconstruction Project.
Whereas, notice of hearing on plans, specifications, form of contract, and
estimated cost was published as required by law.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the said plans, specifications, form of contract and estimated cost are
hereby approved as the plans, specifications, form of contract and estimated cost
for said improvements for said project.
Passed, adopted and approved this 1st day of August
,2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 365-05
RESOLUTION WITH RESPECT TO THE ADOPTION OF THE
RESOLUTION OF NECESSITY PROPOSED FOR THE NOWATA
STREET RECONSTRUCTION PROJECT
Whereas, the City Council has proposed a Resolution of Necessity for the
Nowata Street Reconstruction Project has given notice of the public hearing
thereon as required by law; and
Whereas, the public hearing has been held, all persons offering objections
have been heard and consideration given to all objections and is pending before
this Council; and
Whereas, this is the time and place set as provided for the taking of action
on the proposed Resolution of Necessity.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
That the proposed Resolution of Necessity described above is hereby:
X Adopted, without amendment, and all objections filed or made having
been duly considered are overruled.
Adopted as amended by the Schedule of Assessments attached hereto as
Exhibit A, and made a part hereof by reference. All objections filed or
made having been duly considered are overruled.
Deferred for later consideration to a City Council meeting to be held on the
day of , 2005, next at 6:30 p.m. in the Public Library
Auditorium, with jurisdiction retained for further consideration and action at
the adjourned meeting.
Abandoned.
Passed, adopted and approved this 1st day of August, 2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 366-05
ORDERING BIDS
NOW THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
That the Nowata Street Reconstruction Project is hereby ordered to be
advertised for bids for construction.
BE IT FURTHER RESOLVED that the amount of the security to accompany each
bid shall be in an amount which shall conform to the provisions of the Notice to Bidders
hereby approved as a part of the plans and specifications heretofore adopted.
That the City Clerk is hereby directed to advertise for bids for the construction of
the improvements herein provided, to be published in a newspaper having general
circulation in the City of Dubuque, Iowa, which notice shall not be less than four days
nor more than forty-five days prior to the receipt of said bids at 2:00 p.m. on the 9th day
of August, 2005. Bids shall be opened and read by the City Clerk at said time and will
be submitted to the Council for final action at 6:30 p.m. on the 15th day of August, 2005.
Passed, adopted and approved this 1st day of August ,2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, City Clerk
. .
Du~~
~~~
1/3 S3
~I
I _
8 I !O~~
MEMORANDUM
June 24, 2005
TO:
The Honorable Mayor and City Council Members
FROM:
Michael C. Van Milligen, .City Manager
SUBJECT: Nowata Street Reconstruction Project
Fiscal Year 2006 Street Construction Program
City Engineer Gus Psihoyos recommends initiation of the bidding process for the
Nowata Street Reconstruction Project, and further recommends that a public hearing be
set for August 1, 2005.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
(l1tJ i~ 01~
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
DU~~E
~~~
MEMORANDUM
June 24, 2005
TO:
Michael C. Van Milligen, City Manager
Gus Psihoyos, City Engineer ~
SUBJECT: Nowata Street Reconstruction Project
Fiscal Year 2006 Street Construction Program
FROM:
INTRODUCTION
The enclosed resolutions authorize the public bidding procedure for the Nowata Street
Reconstruction Project.
DISCUSSION
The Nowata Street Reconstruction Project will provide for the complete reconstruction of all
underground utilities, roadway sub-base and mainline concrete pavement from University
Avenue and Loras Boulevard.
Currently Nowata Street is 27-foot wide and allows for parking on the east side of the street
while the proposed improvements incorporate a 37 -foot wide roadway which will
accommodate parking on both sides of the street.. The additional parking will provide
alternate parking options for users of the adjacent Allison-Henderson Park and should
improve parking congestion concems for local residents.
Incorporated in the design are traffic-calming measures which include two roadway bump-
outs at both the University Avenue and Loras Boulevard intersections. The bump~out
design reduces the street width from 37-feet to 31-feet at both ends of the project which is
designed to aid in the reduction of traffic speeds.
The storm sewer system will be reconstructed to incorporate larger capacity storm water
intakes with new 15-inch diameter sewer pipe which will improve the storm water
conveyance in the area.
The existing sanitary sewer system will be completely upgraded to include a new 8-inch
mainline sewer; the reconstruction of deteriorated brick manholes; and the replacement of
all private sanitary sewer laterals. The cost for the individual sanitary sewer lateral
replacements will be assessed to each respective private property owner.
The watermain system is scheduled for complete reconstruction which will include new main
line water service, valves and fire hydrants.
The project will also provide for the installation of fiber optics and telecommunications
conduit infrastructure and the complete reconstruction of the existing pedestrian sidewalks
along the east side of Nowata Street between University Avenue and Loras Boulevard. New
sidewalk will be constructed along the Allison-Henderson Park side.
PROJECT COORDINATION
In an effort to inform the Nowata Street residents about the proposed underground utility
improvements and the street reconstruction plans, the Engineering Department staff
conducted two (2) public informational meetings. The open forum meetings allowed staff to
discuss the scope of the project, construction schedule, special assessment procedures,
availability of financial assistance, as well as to answer any other questions relating to the
project. The public informational meetings proved to offer mutual benefit to both staff and
residents that attended.
Additionally, Engineering Department staff held constructability review meetings with several
local contractors to discuss the scope of the project and completion schedule. The valuable
comments and input from the contractors have been incorporated into the construction
documents and the completion schedule.
PROJECT SCHEDULE
The schedule for the project is as follows:
Initiate Public Bidding Process
Advertisement for Bid Proposals
Mail Special Assessment Notice to Property Owners
Publish Notice to Property Owners 1 st Publication:
2nd Publication:
Notice of Public Hearing on Plans & Specs, Assessments
Pre-Bid Construction Conference
Public Hearing, Plans & Specs, Spec. Assessments
Receipt of Bid Proposals
Award of Construction Contract
Preconstruction Conference
Project Completion Date
RECOMMENDATION
July 5, 2005
July 8, 2005
July 8, 2005
July 8, 2005
July 15, 2005
July 22, 2005
August 1, 2005
August 1, 2005
August 9, 2005
August 15, 2005
August 22, 2005
November 23,2005
I recommend that the City Council give preliminary approval to the construction plans and
specifications; approve the Resolution of Necessity; approve the Preliminary Assessment
Schedule; establish August 1, 2005 as the date of the public hearing; and hereby authorize
the City Clerk to advertise for bid proposals for the Nowata Street Reconstruction Project.
. .
BUDGET IMPACT
The estimate of probable cost for the Nowata Street Reconstruction Project is summarized
as follows:
Construction Contract
Contingency (1 0%)
Construction Engineering & Inspection (15%)
Total Project Cost
The project funding summary is as follows:
CIP No. Fund Description
300C90 FY 2006 Street Construction Program
Special Assessment - Street Improvement, City Properties
Special Assessment - Street Improvement, Commercial Properties
Special Assessment - Street Improvement, Residential Properties
Special Assessment - Sanitary Sewer Laterals, Residential
Properties
340539 Watermain Replacement Program
310A62 Sanitary Sewer Lining Program
310A63 Street Program Related Sanitary Sewer Improvements
320027 FY2006 Storm Sewer Improvement Fund
010285 FY2006 Fiber Optic Conduit - Paving Projects
Total Project Funding
Estimate
$ 363,921.48
36,392.15
60,047.04
$460,360.67
Fund Amount
$ 252,602.67
32,965.50
3,861.89
21,778.15
15,987.70
57,639.83
30,965.71
22,383.00
7,870.16
18,627.39
~460,360.67
The Nowata Street Reconstruction Project will be funded through the annual capital
improvement project appropriation of City funds as noted above in the amount of
$133,627.77. The project, as outlined, will require Special Assessments in the amount of
$41,627.74 and expenditure from the Annual Street Construction Program (Funded through
Local Option Sales Tax) in the amount of $285,568.17.
PROPERTY ASSESSMENTS
Low- to moderate-income property owners subject to street assessment will be eligible for
financial assistance ranging from 20 to 100 percent of the street assessment for the owner-
occupied resident property depending on family size and income level. This financial
assistance program is made available through the One Percent Local Option Sales Tax.
ACTION TO BE TAKEN
The City Council is requested to give preliminary approval to the Resolution of Necessity, to
approve the preliminary assessment schedule, to establish the date of the public hearing,
and to authorize the City Clerk to advertise for proposals through the adoption of the
enclosed resolutions.
Prepared by Robert Schiesl, Civil Engineer
Greg Doeden, Civil Engineer
cc: Dawn Lang, Budget Director
Bob Green, Water Plant Manager
Gil Spence, Leisure SeNices Manager
Don Vogt, Public Works Director
Deron Muehring, Civil Engineer
Jon Dienst, Civil Engineer
RESOLUTION NO.
PRELIMINARY APPROVAL OF PLANS AND SPECIFICATIONS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the proposed plans, specifications, form of contract and estimated cost for
the Nowata Street Reconstruction Project in the estimated amount of $460,360.67 are
hereby approved and ordered filed in the office of the City Clerk for public inspection.
Passed, adopted and approved this
day of
,2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
FIXING DATE OF HEARING ON PLANS AND SPECIFICATIONS
Whereas, the City Council of the City of Dubuque, Iowa has given its preliminary
approval on the proposed plans, specifications, and form of contract and placed same
on file in the office of the City Clerk for public inspection of the Nowata Street
Reconstruction Project.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That a public hearing will be held on the 1 st day of August, 2005, at 6:30 p.m. in
the Public Library Auditorium at which time interested persons may appear and be
heard for or against the proposed plans and specifications, form of contract and cost of
said improvement, and the City Clerk be and is hereby directed to cause a notice of
time and place of such hearing to be published in a newspaper having general
circulation in the City of Dubuque, Iowa, which notice shall be not Jess than four days
nor more than twenty days prior to the day fixed for its consideration. At the hearing,
any interested person may appear and file objections to the proposed plans,
specifications, contract, or estimated cost of the improvement.
Passed, adopted and approved this
day of
,2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne, F. Schneider, CMC, City Clerk
NOTJCE OF HEARING ON PLANS AND SPECIFICATIONS
Notice of public hearing on the proposed plans and specifications, proposed form
of contract and estimate of probable cost for the Nowata Street Reconstruction Project.
The project shall provide for the complete reconstruction of all underground utilities,
roadway sub-base and mainline concrete pavement from University Avenue and Loras
Boulevard. Underground utility improvements shall include the reconstruction of the
sanitary sewer system and private service laterals; improvements to the storm sewer
system; the reconstruction of the water main; the installation of fiber optics and
telecommunications conduit infrastructure and the complete reconstruction of the
existing pedestrian sidewalks.
NOTICE IS HEREBY GIVEN: The City Council of Dubuque, Iowa will hold a
public hearing on the proposed plans, specifications, form of contract and estimate of
cost for the Nowata Street Reconstruction Project in accordance with the provisions of
Chapter 384, City Code of Jowa, at 6:30 p.m., on the 1st day o-f August, 2005, in the
Public Library Auditorium, 360 West 11th Street, in Dubuque, Iowa. Said proposed
plans, specifications, form of contract and estimate of cost are now on file in the office of
the City Clerk. At said hearing any interested person may appear and file objections
thereto or to the cost of the improvements.
Any visual or hearing-impaired persons needing special assistance or persons
with special accessibility needs should contact the City Clerk's office at (563) 589-4120
or TDD at (563) 690-6678 at least 48 hours prior to the meeting.
Published by order of the City Council given on the
,2005.
day of
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
RESOLUTION OF NECESSITY
Whereas, proposed plans have been duly prepared and approved by the City
Council of the City of Oubuque and are now on file in the office of City Clerk showing
among other things the plans, specifications, form of contract, estimated cost and
preliminary plat and schedule showing the amount proposed to be assessed against
each lot and the valuation of each lot as filed by the City Council, for the Nowata Street
Reconstruction Project.
NOW THEREFORE, BE IT RESOLVEO BY THE CITY COUNCIL OF THE CITY
OF OUBUQUE, IOWA:
That the City Council deems it advisable and necessary for the public welfare to
make the herein mentioned improvements, and unless property owners at the time of
the final consideration of this proposed resolution have 'on file with the City Clerk
objections to the Resolution of Necessity, they shall be deemed to have waived all
objections pertaining to the regularity of the proceeding and the legality of using the
special assessment procedure.
Said improvements shall be constructed and done in accordance with the plans
and specifications which have been approved by the City Council and now on file with
the City Clerk. That the cost and expense of making such improvement will be
assessed partially or totally against privately owned property lying with the assessment
limits, and in an amount not to exceed that provided by law, and in proportion to the
special benefits conferred.
The portion of the cost which shall be borne by the City will be paid from the
Annual Street Construction Program (Local Option Sales Tax); Watermain Replacement
Fund; Sanitary Sewer Lining Program; Street Program Related Sanitary Sewer
Improvements; FY2006 Storm Sewer Improvement Fund; FY2006 Fiber Optic Conduit -
Paving Projects and special assessment bonds may be issued in anticipation of
deferred payments of special assessments when a contract has been performed and
accepted, and the proceeds thereof used to pay the contractor.
The above resolution was introduced, approved and ordered placed on file with
the City Clerk this day of , 2005.
Approved and placed on file for final action.
Terrance M. Ouggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
. .
RESOLUTION NO.
FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY
Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary
approval on the proposed plans, specifications and form of contract and placed same
on file in the office of the City Clerk for public inspection for the Nowata Street
Reconstruction Project; and
Whereas, the proposed Resolution of Necessity for said improvement has been
introduced and is now on file in the City Clerk's office for public inspection.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That on the 1st day of August, 2005, a public hearing will be held at 6:30 p.m. in
the Public Library Auditorium in the City of Dubuque at which time the owners of
property subject to assessment for the proposed improvement or any other person
having an interest in the matter may appear and be heard for or against the making of
the improvement, the boundaries of the district, the cost, the assessment against any
lot, or the final adoption of a Resolution of Necessity and the City Clerk be and is hereby
authorized and directed to cause a notice of time and place of such hearing to be
published in a newspaper having general circulation in the City of Dubuque, Iowa, which
notice shall be published once each week for two consecutive weeks, the first
publication of which shall be not less than ten days prior to the day fixed for its
consideration. Unless property owners at the time of the final consideration of this
proposed resolution have on file with the City Clerk objections to the Resolution of
Necessity they shall be deemed to have waived all objections thereto.
Passed, adopted and approved this
day of
,2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
NOTICE TO PROPERTY OWNERS
Notice is given that there is now on file for public inspection in the office of the
City Clerk of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost,
and a plat and schedule showing the amounts proposed to be assessed against each
lot and the valuation of each lot within a district approved by the City Council of
Dubuque, Iowa, for an improvement of the type(s) and in the location(s) as follows:
The Nowata Street Reconstruction Project will provide for the complete
reconstruction of all underground utilities, roadway sub-base and mainline
concrete pavement from University Avenue and Loras Boulevard. Underground
utility improvements shall include the reconstruction of the sanitary sewer system
and private service laterals; improvements to the storm sewer system; the
reconstruction of the water main; the installation of fiber optics and
telecommunications conduit infrastructure and the complete reconstruction of the
existing pedestrian sidewalks. '
That the proposed district to be benefited and subject to assessment for the cost
of such improvements is described as follows:
Nowata Street, between University Avenue and Loras Boulevard
All property included within the areas described so as to include one-half of the
privately-owned property between each such street to be improved and the next
street, whether such privately-owned property abuts upon the street to be
improved or not. In no case shall property situation more than 300 feet from the
street to be improved be assessed.
The City Council will meet at 6:30 p.m. on the 1 st day of August, 2005, at the Public
Library Auditorium, 360 West 11 th Street, at which time the owners of property subject to
assessment for the proposed improvement or any other person having an interest in the
matter may appear and be heard for or against the making of the improvement, the
boundaries of the district, the cost, the assessment against any lot, or the final adoption
of a Resolution of Necessity. A property owner will be deemed to have waived all
objections unless at the time of hearing he has filed objections with the City Clerk.
Any visual- or hearing-impaired persons needing special assistance or persons
with special accessibility needs should contact the City Clerk's office at (563) 589-4120
or TDD (563) 690-6678 at least 48 hours prior to the meeting.
Published by order of the City Council given on the
,2005.
day of
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO.
RESOLUTION APPROVING PRELIMINARY SCHEDULE OF ASSESSMENTS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
That the attached sheet(s), Page 1 to Page 1 inclusive, are hereby determined to
be the schedule of proposed assessments for the Nowata Street Reconstruction Project
and the valuations set out herein are hereby approved.
Passed, approved and adopted this
day of
,2005.
'Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
....
liiffi
z:;
." ...JrJl
as <rJl
~ I-W
OrJl
>- I-rJl
.0 <
I!?
as ...J
s: <....
I!? a:z
as Ww
12 ....:;
<rJl
s: ...JrJl
0 a:w
as WrJl
as
J!! ;:rJl
Ui w<
0 rJl
a. W
a.
0 0....
e: -Z
~ >w
0 ffi~
s:
'" IIIrJl
'" a:w
e:
.2 WrJl
OJ ....rJl
:l ~<
;;;
> III
as ....1-
,5 zz
." OWW
" -:;:;
as ...JWrJl
12 lIl>rJl
::low
s: a.a:rJl
0
.. a.rJl
as ;;!<
..
e: ~!Z
..
'"
.. ffi~
."
as _rJl
~ OrJl
as ffi~
'"
'" 0<
III as
as
.... .0 z....
Z g _z
_W <w
O:!i ." :!i:!i
a:rJl as a:rJl
..
<rJl 0 wrJl
>w a. I-W
WrJl e <III
...JrJl a. ;:rJl
::l< C <
00
IIlw 5 ....
Z
rJlrJl E a:W
<0 as w:!i
a: a. as ;:11I
00 ,5
< ...J a: s: ~~
;:00. l
0....0 III
-. W Z ~ <
w::l < s: ....
::l Z Z a; ~z
OWo '" ...JW
i6~~ g <:;
~ ;:rJl
::l>::l will
c!:::.... <D OW
ILrJl< _rJl
oa:> ,5 rJlrJl
>WIL .S <
1-2:0 " ~ffi
(3Zw ~
2....J 0
I-::l -5i >:!i
wO C <rJl
a.rJl
w W as ....w
a::J: E
1-0 ~ wrJl
rJlrJl zrJl
< > 0 <
a
I-a: .5 l~
<<
;: ~ <D ZW
O:!i ,5 0:;
Z:J ',E -w
W !;(>
a: ." ::lo
a. <D ...Ja:
'"
.. <a.
as >;;!
~
as
.2: oj ..
o 5- ...J
;.5 w
0
:16 a:
h <
a.
a~
(50
- as
S:s:
0_
as_ Z
as 0
~g 0
>=
'" 5 a.
a:
gU 0
.,,;:- rJl
~u W
~~ 0
....
0
- >- ...J
as.o
." '"
>--
.0.2
I!?s:
as 0
s: :l
.!!~
as 0
"3 '"
." e:
(D .9
"fie; W
",.2 :!i
",as <
" > Z
~~ a:
W
:~ Z
;:
s: .. 0
I-as
N 0 '" ;;; N N 0 N N N N N r- '" N 0 N '"
"l "': '" '" "l N "l "! "l 5j "! 0 a> '" ~ "! "l "!
::; ... ui "! ui C\i ai '" " ci
N '" r- .; N u; N N N N " N :g. "! r:: N ... C\i N "
"! N '" "'- a> "! N "! "! "! "! r- "! r- '" "! r- '" "! o.
N r: co; r- N co; -.i N N N r- N N co; N r- N N
'" ;;; '" '" ;;; '" .. ;;;
.. .. .. '" '" .. .. '" '" .. .. .. .. '"
;;; ;;; ~ '" ;;; ;;; ;;; '" ;;; ;;;
"! "! '"
C\i C\i '" C\i C\i C\i C\i C\i i, '" C\i
r- r- ::;- "! r- r- r- r- r- I'-
"'- "'- "!. "'- "'- "'. "'- "'. "'- "'-
- - - - - - - - - - -
;; 0 '" <0 ;; '" a> ;; ;; ;; ;; '" I'- '" ;; ;; '"
"': '" '" 0 '" 0 0 oo '" 0 "! "!
ai ::; ;2; ui "! ai ... C\i ai ai ai '" ai C\i ai '" ai '" " ai ci
" I'- .; ~ '" '" " " ~ ... " '" "! I'- " ... C\i " C'!.
"< '" '" "'- oo oo- "! "< "'. I'- "'. o_ r,-- 1'-. "'. I'- '" "'-
r: I'- I'- I'- '"
;;; '" co; ;;; .. ;;; ;;; N ;;; ;;; ;;; .. ;;; ;;; '" ;;; ;;; .. .. ;;; ;;;
.. .. .. '"
;; 0 '" <0 '" oo ;; ;; ;; ;; '" I'- '" ;; ;; '"
"': '" '" 0 0 '" 0 0 a> '" 0 "! "!
ai ::; ... ui "! ai ... C\i ai ai ai '" ai C\i ai '" ai '" " ai ci
" '" I'- .; " '" '" " " " ... " :g- "! I'- " r! C\i ~. C'!.
"< '" '" "'- oo "'. oo- "! "< "< "< I'- "< I'- ": "< '"
r: co; I'- N I'- ",. I'- '"
;;; '" .. ;;; ;;; ;;; ;;; ;;; '" ;;; ;;; ;;; ;;; ... '" .. ;;;
'" '" '" '" ..
8 8 8 0 :5 8 0 0 :5 :5 :5 :5 :5 0
0 0 :5 0 ~ S! 0
g ~ ii ii ii ci <Xi <Xi g ~ ci g ci g g g ci ~ <Xi
.E E E E 0 ;! ~ :5 0 15 15 0 ;g.
'" ~ ~ ~ ~ '" '" "'. '" <') '"
0 on ,,; co; ,,; <"i on '" <0 ...J 0 co; ...J on N
oo w w W W I'- " oo I'- oo 0 '" '" ;;; ~ <') 0 ~ "! 0 0;
.. .. ;;; .. II> .. ;;; .. ;;; '" ;;; ;;; .. ;;; ..
I'- ~ '" 8 '" 8 <') oo '" '" '" 8 ;; 8 0 '" '" '" "! "
8 0 8 ;; 9 0 8 8 8 ;; 8 0 '" 8 '"
0 0 0 9 0 9
,.:. '" cO cb ~ ,.:. ,:. I'- ,.:. ,.:. ,:. ,:. ,:. cO cO ,:. ~ I'- ,:. ,:. I'-
0 lil 0 0 0 0 0 0 0 0 0 0 '" '" 0 0 0 0 0
'" '" '" '" '" '" '" '" '" '" '" '" " " '" '" '" '" '" '"
cO cO cO cO cO cO cb cO cO cO cO cO cO .;, .;, cb cO cb ~ cO cO
'" '" '" '" '" '" '" '" '" '" N '" N '" '" '" '" '" '" '"
6 ~ ~ ~ ~ ~ ~ ~ ~ ~ 6 6 6 6 6 ~ ~ ~ 6 ~ ~
.ci .ci
'"
CJl :l
CJl
.. u;
.ci .ci .ci .ci .ci .ci '5 .ci .ci .ci .ci '5
s: .ci
.ci .ci :l '" :l :l .ci .ci .ci '" :l as :l ::> ::> .ci '" .c: .ci .ci
::> ::> CJl CJl CJl Ul ::> '" ::> CJl CJl e: Ul CJl CJl '" CJl <D ::> ::> ::>
Ul CJl u; u; 1;; CJl Ul CJl c: CJl e: Ul Ul CJl
'" 1;; u; 1;; u; u; '" ii:
1;; u; '5 '5 '5 '5 '" ~ 1!! '5 '5 :: :; :; '5 '" '5 1!! u; u;
:; '5 .c: s: .c: .c: '5 ::> ::> .c: .c: .c: s: .c: '5 .c: :: ::> '5 '5
.c: .c: " as as as s: .c: .c: " as 15 as as as .c: as 15 .c: s: .c:
as as " e: " e: as as as .S e: ...J " " e: as e: " as as
" e: ii: ii: ii: ii: " e: " Q. ii: ii: ii: ii: e: ii: ...J .S e: .S
ii: ii: '" ~ 0 ~ ii: ii: ii: ;! ~ ~ '" ~ ~ ii: ;! ~ Q. ii: Q.
"! - - '" '" '" oo - '" " r- <')
15 15 15 15 15 15 15 15 15 15 :9 ~ 15 15 15 15 15 w 15 15 15
...J ...J ...J ...J ...J ...J ...J ...J ...J ...J Z ...J ...J ...J ...J ...J Ul ...J ...J ...J
as ,.: -<.
e:
-i ui as .! f
as ~ -; Ii
~ -2 as 'c ui ::E ::E as s:
as Qj e: Q.
.c: .. :; E as 1 .. .. .. e: .S
OJ s: ..., .. " 1: E '" e: u; ""
" OJ "" as "" " " 0 ::i ::i <( ~ u:
U as Q. " II: "" "" s:
"" 0 "" ~ ::; " " ~ ~ e: U
"" e: ." 1: "" ~ ~ .. -g
-<. .. .. as as Ii -; as -<. "" .. .. E E -; as "" ~
.. ~ ~ ~ ~ -'" 3 ::E " " 0 0 :c >-'
'" e: as ai ai U U .. OJ
as ;;; .. as as ...J '5 as as
(; :l :l :l :l ...J ." (!J (!J " -'" as
.0 .0 .0 .0 ::; E > ai '" ::> (5 (5 0 ~ II:
-5 '" :l :l :l " '-' .. :; " " ...J g- C C
Z 0 0 0 0 .c ..., Iii .c: " .c: s: ~ ~ -0 0 E c
s .,; :Jf :ll 0 " " ~ as '" ~ ~ as
<i "0 ~ "0 ~ ..; ~ as " ~ ;;; ~ as ~
.2: .2: ::; '" as e: Qj "0 "0 ~ as .c 0
" .. .. .. Qj 0 " (; (; ::> ::> '" a; a; 0 s: ~
!D (i (i (i (i 0 a I :J: :J: " ::;: :; ::;: ::;: 0 Q. Q. Ul ....
'"
N
.;
en
In
-.i
I'-
II>
o
I'-
si
en
on
II>
...
'"
.,;
o
'"
cD
'"
...
...
'"
.,;
o
'"
cD
'"
'"