Worksession Material CITY OF DUBUQUE, IOWA MEMORANDUM March 12, 1999 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Worksession Material /51 ~ On March,..81St, the City Council held a worksession on the design, financing, and scheduling of improvements to 8th Street and the Town Clock Plaza. Based on questions raised the design consultant, WHKS, and the design committee have done further research. City staff is working with the property owners to get concurrence from a majority for assessments of 30 percent for both 8th Street and Main Street improvements. A majority have already agreed to a phasing plan which would allow 8th Street and Main Street to be reconstructed over the next two years with the funding currently available from the City. The area surrounding the Town Clock itself would be delayed until 2005, and the property owners agreed to that schedule. The preference of most of the property owners is that more than cosmetic repairs should be done. Public Works Director Mike Koch has given further consideration to the condition of the thirty year old Town Clock Plaza and concluded in his attached report that there would be a significant decrease in the life of the improvements if total reconstruction is not done. He bases this on prior experience in the City street program where patching and overlays were costing almost as much as complete reconstructions and twenty years of life was being sacrificed. J(j ~{)It g,el p1l\. . ~ Qb~'~~~~ V, -: Jr ~ /J;1 ~,,< (~3 l't"tlt.. ~ fA ~ '."l.v~ Michael C. Van Milllgen 1.1i'" J \ ~~t \, G ~\(7 VO ~S(r I ~'Y's l~ / ~v r'^- /l4.,/i.< 'I.{" MCVM/j Attachment cc: Barry Lindahl, Corporation Counsel Tim Moerman, Assistant City Manager Mike Koch, Public Works Director 1--' {iV' ~. CITY OF DUBUQUE, IOWA MEMORANDUM March 12, 1999 To: Michael C. Van Milligen, City Manager From: Tim Moerman, Assistant City Manager"7;1Jt--- RE: City Council Worksession on Town Clock Plaza Improvements Introduction A City Council worksession is scheduled for March 15, 1999 on the Eighth Street reconstmction project and plans for improvements to the rest of the Town Clock Plaza. The Plans are for a worksession beginning at 5:30 p.m. Background The City Council held a worksession on March 1, 1999 to review the progress of the consultant and City staff on plans for the reconstruction of Eighth Street and improvements to the rest of the Town Clock Plaza. Plans for the project were reviewed by the City Council and a presentation was made on the financial issues surrounding the project. The worksession concluded with the understanding that a second worksession would be held on March 15, 1999 and that additional information on the project would be gathered and presented by the consultant and City staff Discussion The discussion at the worksession resulted in the identification of areas in which more information was required by the City Council. The City Council requested: .. information on the alternative of grinding and overlaying the existing surface .. a consensus among Town Clock Plaza property owners on the participation level (assessments) for the project .. a consensus among Town Clock Plaza property owners on how best to phase the proposed improvements .. a final proposed plan for construction and financing of Town Clock Plaza improvements . . Alternative of Grinding and Overlaying City statThas been working with the consultant, W.H.K.S. & Co. on analyzing the feasibility of using the grinding and overlaying alternative for the Town Clock Plaza improvements. A separate memo on the alternative is attached to this memo. There will be a further explanation of the alternati \'e at the \vorksession. Project Information Prcsentatin to Property Owners City statTand Tony Zelinskas met with the property owners of the Town Clock Plaza on March 11. 1999 to discuss the project and to attempt to build a consensus on financing and phasing issues. There was a review of the options of cosmetic improvements and the rebuild approach. Below is a summary of the information on the project costs which were used in the presentation: Project Phnse Reconstruction Project~ Eighth Street Project # Project Year Project Cost (Mid-range) $1,031,000 Phase I FY1999 Phase I ( Main - 8th/9th Main - 7th/8th Main - 6th/7th Main - 5th/6th 2 3 6 10 FY2000 FY2000 FY2000 FY2000 $ 535,000 $ 410,000 $ 325,000 $ 484,000 $1.754,000 Total of Ph~lSC I and H FY99-00 $2,785,000 Phas~ III TO\vn Clock Area 4 FY2005 $ 695,000 TOll,1 of Phase I, II, nnd III $3,485,000 The total cost of the perimeter improvement of Phase IV is $1,072,500, which would be done nileI' FY2005. Prop~..t)' Owru.'rs' Pllrticipation Level Preferences Following the review, discussions centered on the levels of support for the various assessment lewls fl.11' Iht.' project. Scenarios were reviewed with participations levels for the Eighth Street projects und th~ Main Street project aI15%, 20%, 25%, and 30%. Analysis of each scenario also re"ealed the amount of the funding gap to complete the project. The scenarios did not include the improvemcnts 10 the pcrimeter of the project delincd at the prior worksession as Phase IV, Stich as the connections to Locust Street, the alley connections on Sixth and Seventh Streets and on Fitlh Slreet. There \\'as u consenslIs that the rcbuild approach for TOvvl1 Clock Plaza improvements be pursllcd. I I O\\'c\'er. thcre was not a clear consensus on the participation levels. Nearly all of the prnpt.'rly OWllers agreed that the 15% assessment should be the minimum. Several property \nVIK'rs on the north end of the Town Clock Plaza believe that the participation level should go up to 30%, if that is what it takes for the City Council to approve the improvements under the rebuild approach. City staff has been contacting the property owners not in attendance at the March 11th meeting to get their preferences on the assessment levels. A summary of the assessment level preferences is attached to this memo. At this time, property owners with 30% of the lineal footage eligible for assessments have agreed to the 30% assessment level. City staff wilJ be contacting another property owners with 45% of the lineal footage on Monday to get their preferences on the assessment levels. We would like to receive City Council input at the worksession on their preferences on the participation levels by property owners. Property Owners' Project Phasing Preferences City staff reviewed the different components of the project. The components are the twelve areas defined by the consultant which were presented to the City Council at the prior worksession and grouped into the phases. There was discussion as to how to best accomplish the project within the funding constraints and in a way that can minimize the construction disruption and maximize the project's aesthetic impact as soon as possible. There was a consensus that the project should be completed in phases according to the schedule defined above. This means that Eighth Street would be reconstructed this summer, Main Street, less the Town Clock area, would be constructed in next summer, and the Town Clock area would be constructed by FY2005. They were also comfortable with having the perimeter improvements being done after FY2005 as the funding became available. Final Proposed Plan for Construction and Financing of Town Clock Plaza Improvements While the participation levels by the property owners have not been finalized, some projections can be made as to how the project could be financed. Below is a summary of the a proposed financing plan: Available City Funding FY99-00 Project Phase~ Yeal: Cost Phase I Eighth Street FY1999 $lt031tOOO Phase II Main Street FY2000 $1,754,000 Less: Total of Phase I and II FY99-00 $2,239,165 - $2.785.000 Required Property Owner Contribution FY99-00 $ 635,835 The reconstruction of the Town Clock Area (Phase III) is estimated to cost $695,000 and would occur in FY2005 or perhaps sooner if additional funds became available. If the City Council supports the above phasing proposal, City staff could meet again with the Town Clock Pjaza property owners and discuss the combination of assessment levels for filling the financing gap. Conclusion The consultant and City staffwilI be revie\ving the information on the identit1ecl City Council issues at the worksession. We will also be able to answer questions about each aspect. Our goal for the worksession is to present the infonnation and receive City Council direction on how to proceed with the project. CC: Design Committee Members Tony Zelinskas, W. H. K. S & Co. Town Clock Plaza Property Owners - Summary of Assessment Preferences Property Owner Lineal Footage Preference Percent of Area Cottingham & Butler 478.68 30% 18.8% American Trust 153.51 30% 6.0% Graham's Store For Men 90.66 - 30% 3.6% Firstar Bank 43.00 30% 1.6% Grand Opera House 70.00 30% 2.8% Northeast Iowa Community College 74.84 3.0% (NICC is very supportive of improvements _ Board would decide on assessment preference) Cigna (Trilog) Current Site 284.90 11.2% Cigna (Trilog) East Site 240.34 9.5% (Will return call on Monday - has been interested in the improvements in the past) Michael Steele (Steele Financial Center) 210.00 8.3% (Will return call on Monday - has been very supportive in the past) Richard Hartig (Hartig Drug) 82.84 3.3% (Will retllrn call on Monday) Plastic Center Inc. (Walker Shoes) 23.00 20% 1.0% (Tenant would support this amount) Nesler Centre 239.34 15% 9.4% first National Bank (Mercantile Bank) 202.32 15% 8.0% Cycare 114.00 15% 4.5% John Stuer (Star Uniforms) 37.50 1.5% (I-lave not attended meetings) Dubuque TV Ltd. (Fox - 40) 35.00 1.4% (Have not attended meetings) Plastic Center (Fischer Arcade) 114.00 4.5% (Have not attended meetings) Department of Corrections ...fl.iQ 0% 1.9% Total Area 2,541.43 CITY OF DUBUQUE, IOWA MEMORANDUM March 12, 1999 FROM: TO: Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director JJf~ kuC SUBJECT: Eighth Street Reconstruction and Main Street Streetscape INTRODUCTION This a follow-up to the City Council work session of March 1, 1999 on the Eighth Street Reconstruction and Main Street Streetscape Improvement Project. BACKGROUNQ One of the issues discussed during the work session was whether it would be possible to mill any remaining portions of the terrazzo in the Plaza area under the Cosmetic Only improvement alternative. The City staff was directed to research this issue and report back at the next planned work session of March 15, 1999. At the last meeting, a Council Member asked a question regarding the condition of the pavement in the Plaza. I responded by saying that the concrete pavements were in good condition, however, I believe now that I misinterpreted the question. The concrete streets surrounding the Plaza are in good condition, Main Street for example. However, we do not know the condition of the concrete beneath the terrazzo in the Mall. This concrete is nearly 30 years old and would have a total life expectancy normally from 40 to 50 years. DISCUSSION The terrazzo in the Town Clock Plaza consists of 5" thick concrete-base typical section, with 7" in the fire lane. The concrete was then capped with a 3/4"-thick layer of terrazzo. Normal concrete pavements intended for traffic are from 7" to about 9" in thickness. 1. COSMETIC APPROACH The Cosmetic alternative would require: the removal of the terrazzo for street light removals and replacements; improvement of the electrical service; planter removals; removal of all tiles; and placement of new planters and new trees; and any other items scheduled for removal. This would leave a "patchwork" of new and older-looking terrazzo, which aesthetically would look better if sandblasted, stained, and the entire surface sealed so that the older areas would more closely match the new. The cost for the paving portion of the cosmetic approach is between $784,000.00 and $981,000.00. 2.. MILLING APPROACH An alternate to the "patchwork" effect of the cosmetic approach would be to mill the top surface and to pour an entirely new surface over the entire Plaza area. It is estimated that 33,630 square feet, or 37 % of the existing surface of 91,100 square feet would have to be removed and repaved prior to the milling process. This would leave approximately 57,470 square feet to be milled. The cost for the paving portion of the milling approach is between $887,000.00 and $1,070,000.00 This is about $100,000.00 greater than leaving the old patches and trying to match the two vintages of surfacing used in the cosmetic approach. However, there are some difficulties and disadvantages with a milling operation. First of all, milling machines can only mill approximately 2" horizontally away from any vertical surface. This remaining area would either have to remain or be removed in some other fashion. The Portland Cement Concrete Association suggests that a bonded overlay should be a minimum of 2" in thickness. When this 2" is milled, the concrete remaining would only be 3-3/4" typical and 5-3/4" in the fire lane areas. There is a concern that this thin layer of concrete would not hold together under the stress of the construction and any damaged portions of concrete would have to be removed. Ultimately, there is also a concern over the life expectancy of the patching alternative because of the almost 30-year age of the concrete. The patching alternative may be the most economical if substantial maintenance is periodically required. Also it is not known how long a bonded overlay would be expected to last in such an application. A 10- to 20-year life expectancy, given the age of the concrete below could probably be expected. , . RE-BUllD APPROACH The cost of the paving portion of the Re-Build Approach is between $910,000.00 and $1,093,000.00. While it may seem like the difference between a total re-build and the milling approach should be greater, it fact it is not. The difference between the two is because the Re-Build Approach would be less labor~intensive work and the economy of scale from utilizing only one method for replacement of the surface. The total re-build would also be a benefit in the staging of the work both for the contractor and for pedestrian movements since larger panels could be done. Experience has shown that approximately 30% removal and 70% salvage is a break- even point in the cost of reconstruction. Removal of more than 30% of the base under a street, for example, is more expensive than removing the entire base. Furthermore, there is no concern for patching new material against old material. Also, the life expectancy is not limited to the salvaged material, but to the full life expectancy of the new material. ACTION TO BE TAKEN The City Council is requested to give City staff and the consulting firm of WHKS direction on which alternative shall be planned for in relation to the Plaza surface improvements, and to authorize WHKS to begin preparing final design drawings and bidding documents for the reconstruction of Eighth Street between Locust Street and Iowa Street. MAK/vjd