Loading...
Caradco Landlord, LLC_Brownfield / Grayfield ApplicationMasterpiece on the Mississippi Dubuque bierd All- America City 1 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Brownfield /Grayfield Redevelopment Tax Credit Application for Caradco Landlord, LLC. DATE: May 16, 2012 Economic Development Director David Heiar is requesting City Council approval of a Brownfield /Grayfield Redevelopment Tax Credit Application to the Iowa Economic Development Authority (IEDA), on behalf of Caradco Landlord, LLC. The City Council is requested to adopt the resolution approving the application for Caradco Landlord, LLC. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:sv Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager David Heiar, Economic Development Director Masterpiece on the Mississippi Dubuque All- America City 1 2007 TO: Michael Van Milligen, City Manager FROM: David J. Heiar, Economic Development Director SUBJECT: Brownfield /Grayfield Redevelopment Tax Credit Application for Caradco Landlord, LLC. DATE: May 11, 2012 INTRODUCTION This memorandum presents for City Council approval a Brownfield /Grayfield Redevelopment Tax Credit Application to the Iowa Economic Development Authority (IEDA), on behalf of Caradco Landlord, LLC. The City Council is requested to adopt a resolution approving the application. BACKGROUND The State of Iowa established a tax credit that is available for redevelopment of brownfields and /or grayfields. If the project is redeveloped in a "green" fashion, extra tax credits are available. The percentage of the tax credit can range from 12% to 30% as follows: Twelve percent (12 %) of the taxpayer's qualifying investment in a Grayfield site. Fifteen percent (15 %) if the Grayfield project meets the requirements of green development. Twenty four percent (24 %) of the taxpayer's qualifying investment in a Brownfield site. Thirty percent (30 %) if the Brownfield project meets the requirements of green development. In October 2009, the City Council approved a Brownfield /Grayfield application on behalf of this project. Although this application was approved by the Iowa Department of Economic Development the project did not have other funding secured and could not meet the deadlines established in that award. The State has encouraged resubmittal of an application for these credits. Caradco Landlord, LLC, the former Carr, Adams, and Ryder Company building is a Grayfield site. A developer can qualify for up to $500,000 of tax credits per building. DISCUSSION Attached to this memorandum is a resolution that provides for the approval of the application for a Brownfield /Grayfield Redevelopment Tax Credit Application on behalf of Caradco Landlord, LLC. The resolution authorizes the City to sponsor the application. No local match is required with this application. Caradco Landlord, LLC has estimated a capital investment of $28,605,762 within the Enterprise Zone. A copy of the application is attached to the resolution. RECOMMENDATION I recommend that the City Council approve the proposed application for Caradco Landlord, LLC by adopting the attached resolution. This application will provide State of Iowa financial benefits to a local housing developer making a substantial investment in our downtown. There is no commitment within this application of any further City assistance. ACTION STEP The action step for the Council is to adopt the attached resolution. Attachments F \USERS \Econ Dev \CARADCO \Brownfield Tax Credit\20120511_CARADCO Landlord Brownfield- Grayfield Council Memo doc Prepared by: David Heiar, Economic Dev Director, 50 West 13th Street, Dubuque IA 52001 563 589 -4393 Return to: Kevin S. Firnstahl, City Clerk, 50 West 13th Street, Dubuque IA 52001 563 589 -4121 RESOLUTION NO. 126 -12 RESOLUTION APPROVING A BROWNFIELD /GRAYFIELD REDEVELOPMENT TAX CREDIT APPLICATION TO THE IOWA ECONOMIC DEVELOPMENT AUTHORITY, ON BEHALF OF CARADCO LANDLORD, LLC. Whereas, the State of Iowa has established a Brownfield /Grayfield Tax Credit Program to assist in the redevelopment of Iowa brownfields and grayfields; and Whereas, the former Carr, Adams, and Ryder Company building is considered a grayfield site; and Whereas, the Caradco building project will provide much needed residential development to the downtown area; and Whereas, the City Council finds that the proposed application is acceptable and necessary to the growth and development of the city. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The City of Dubuque agrees to sponsor the Brownfield /Grayfield Redevelopment Tax Credit Application on behalf of Caradco Landlord, LLC. Section 2. That the Mayor is hereby authorized and directed to execute this Resolution on behalf of the City of Dubuque and forward the executed copy to the Iowa Economic Development Authority. Passed, approved and adopted this 21st day of May, 2012. Attest: Trish L. Gleason, Assistant City Clerk Roy D. Buol, Mayor F: \USERS \Econ Dev \CARADCO \Brownfield Tax Credit\20110511_ Resolution Brownfield - Grayfield CARADCO Landlord.docx IOWA economic DEVELOPMENT Debi Durham, Director Iowa Economic Development Authority FY2012 Brownfield /Grayfield Redevelopment Tax Credit Application Business Development Division Iowa Economic Development Authority Completed and signed original forms with attachments should be sent to: Mail: Iowa Economic Development Authority ATTN: Matt Rasmussen 200 East Grand Avenue Des Moines, Iowa 50309 Fax: 515.725.3010 Questions? Need assistance? Contact Matt Rasmussen, Program Manager at 515.725.3126 or matt.rasmussen a(�iowa.gov 082411 PART 1: APPLICANT/SPONSORSHIP/OWNERSHIP INFORMATION Applicant: Caradco Landlord, LLC, co Gronen Restoration, Inc, Managing Member Street Address: 1056 Main St City: Dubuque State: IA Zip Code. 52001 Contact Person: Mary Gronen Telephone Natter: 563 557-7010 Fax NuMber: 563 690-1610 Emall Address: maryg@gronenproperties,com Signature: Applicant ,SpOnsor: City of Dubuque, IA Street Address: 50 W 13th St. City: Dubuque State: IA Contact Person: Mayor Roy Buol Telephone Number: 563.589.4105 Fax Number: 563.589.4149 Email Address: rdbuol@cityordubuque.Org Zip Code: 52001 Signature: To be provided separately Property Owner (if different than applicant): Street Address: City: State: Zip Code: Contact Person: Telephone Number: Fax Number: Email Address: Signature: N/A Applicant is (Please check one): O An individual O Partnership El Limited Liability Company • S Corporation O Estate O Trust electing to have income taxed directly to the individual 1=1 Othel(Specify): ATTENTION: For the purpose of this application‘ for IYOWnfieldlGrayfield twcredits, an investment thall.-be-deerned:to-have-been- --- — made on the date the qualifying redevelopment project is completed (per Iowa Code Section. 15293A), Protects are expected to . be complete no later than 30 months .after Economic Development Authority Board approval (Dor. Iowa Code Section 15.293A). All documentation provided regarding Proof Of expenses and 0'a-1/m6014M need to include an audit by an Independent Certified Public Accountant licensed in Iowa (per Iowa Code Section 15.293A). 2 082211 PART 2: TYPE OF APPLICATION (Please check one) ® Site Owner with Sponsorship of City or County - To be provided separately ❑ Non -Site Owner with Title Transfer Agreement and Sponsorship of City or County Note: Attach copy of city /county resolution for application and /or sponsorship. If the application is from a non -site owner, please attach the title transfer agreement. ** *Sponsorship is NOT a requirement but encouraged as supporting documentation * ** PART 3: ELIGIBILITY Iowa Code Section 15.291 defines a Brownfield and a Grayfield site. A Brownfield site is an abandoned, idled, or underutilized industrial or commercial facility where expansion or redevelopment is complicated by real or perceived environmental contamination. A brownfield site includes property contiguous with the property on which the individual or commercial facility is located. A brownfield site shall not include property which has been placed, or is proposed for placement, on the national priorities list established pursuant to the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), 42 U.S.C. 9601 et seq. A Grayfield site is an industrial or commercial property meeting both (A and B) of the following requirements: A. Infrastructure on the property is outdated or prevents an efficient use of the property, including vacant, blighted, obsolete, or otherwise underutilized property. B. Property improvements and infrastructure are at least 25 years old and one or more of the following conditions exist: • Thirty percent or more of a building located on the property is available for occupancy and has been vacated or unoccupied for at least 12 months; • Assessed value of improvements on the property has decreased by 25 percent or more; • The property is used as a parking lot; • Improvements on the property no longer exist. 3.1 Is the project a brownfield or grayfield site as defined under Iowa Code Section 15.291? Yes ❑ No 3.2 Is the proposed site abandoned? ❑ Yes ® No 3.3 Is the proposed site underutilized? /1 Yes El No 3.4 3.5 Are site improvements and /or infrastructure at least twenty -five years old? ® Yes Regarding subject project site (Please check all that apply): ® Thirty percent or more of a building located on the property is available for occupancy and has been vacated or unoccupied for at least 12 months. El Assessed value of improvements on the property has decreased by 25 percent or more. El The property is used as a parking lot. ❑ Past improvements on the property no longer exist. 3.6 Is there evidence of contamination on the proposed site? Yes El No ❑ No 3 082211 3.7 Is the site proposed to be included on the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) program list? ❑ Yes ® No 3.8 Does the site have contaminants that can be addressed under the state's Leaking Underground Storage Tank (LUST) program? ❑ Yes ® No 3.9 Does the site have other non -LUST contaminants that may be involved within the scope of the project? ❑ Yes ®No 3.10 Please include supporting documentation as to the designation of either a brownfield or grayfield property per definitions above (and Iowa Code section 15.291). This may be included in the city or county sponsorship document or in letter form from a local official. Is this supporting documentation attached? ® Yes ❑ No (Please refer to Attachment C) PART 4: TYPE AND AMOUNT OF TAX CREDIT REQUESTED Grayfield (as defined under Iowa Code Section 15.291) LI Brownfield (as defined under Iowa Code Section 15.291) Iowa Code Section 15.291 defines a Green Development as one which meets or exceeds the sustainable design standards as established by the state building code commissioner pursuant to Iowa Code section 103A.8B. 4.1 Is the project working toward designation as a Green Development? ❑ Yes No (If Yes, approval from Iowa State Building Code Commissioner will be required prior to issuance of tax credit. If not approved by Building Code Commissioner, tax credit shall only be issued as regular Brownfield or Grayfield project.) 4.2 Total Budget of Qualifying Project Expenses (includes purchase price, cleanup cost, and redevelopment cost directly related to a qualifying redevelopment project): $28,605,762 4.3 Tax Credit Percentage applied for (provided under Iowa Code Section 15.293A): ® Twelve percent (12 %) of the taxpayer's qualifying investment in a Grayfield site. ❑ Fifteen percent (15 %) if the Grayfield project meets the requirements of green development. ❑ Twenty four percent (24 %) of the taxpayer's qualifying investment in a Brownfield site. ❑ Thirty percent (30 %) if the Brownfield project meets the requirements of green development. 4.4 Amount of Tax Credit Requested (Total Project Cost times Tax Credit Percentage): $500,000.00 (This is the MAXIMUM amount of potential tax credit, (reserved amount). In the event the actual approved project costs are less than indicated, or green development is not approved, actual tax credit amount on certificate will be recalculated.) * * *NO TAX CREDIT SHALL BE ISSUED FOR AN AMOUNT GREATER THAN $500,000 * ** 4.5 Has the Applicant applied for or received funds from any other federal, state, county or city governmental entities? List sources and provided funding status. IEDA CDBG Funding $8,900,000 IFA low interest loan $4,500,000 City of Dubuque Downtown Housing Incentive $ 720,000 4 082211 PART 5: PROJECT COSTS SECT ON (Please also see Attachment B) 5.1 Use of Funds Financing by Source (Use sources as identified in part 5.2) Activity Site Investigation Cost Source A Source B Source C Source D Source E Source F Tax Credits N/A N/A Source C: IFA Loan 4,477,500 Mortgage 3% Site Remediation Source D: IDED Grant 8,900,000 Grant N/A N/A Source E: City of Dubuque 720,000 Monitoring NIA N/A Total: 28,605,762 Site Acquisition 1,200,000 912,439 287,561 Rehabilitation 21,504,000 13,308,262 4,477,500 3,718,238 Utilities Other Infrastructure Other (Soft Cost, See Exhibit) 5,901,762 5,181,762 720,000 Other Other Subtotal: 28,605,762 New Construction Machinery & Equip Other Subtotal: Total: 28,605,762 5.2 Terms of Proposed Financing (Attach documentation verifying all sources of funds) Source (Include all sources in part 5.1) Amount 912,439 Type Capital Rate N/A Term N/A Source A: Qualifying Applicant Developer Equity Source B: Equity from Enterprise Zone Credits, Historic Tax Credits, and New Market Tax Credits 13,595,823 Tax Credits N/A N/A Source C: IFA Loan 4,477,500 Mortgage 3% 20 yr note Amortized 40 yrs Source D: IDED Grant 8,900,000 Grant N/A N/A Source E: City of Dubuque 720,000 Grant NIA N/A Total: 28,605,762 5 082211 PART 6: PROJECT DESCRIPTION 6.1 Provide Street address and Legal Description of the property: 900 Jackson St., Dubuque, IA 52001 CITY LOTS 394 THRU 398, 420 THRU 424, & S 1 /2 =W BAL OF CITY LOT 505A & CITY LOT 394A 6.2 Provide site description* (size, location, current and past activity on site, etc.) *Please attach map and pictures of the site and surrounding area. (Please see Attachment A) The CARADCO Building -Main Plant, at 900 Jackson Street, Dubuque, Iowa, is a former millwork manufacturing plant and warehouse. Centrally located in Dubuque's Historic Millwork District, the building's footprint covers an entire city block. Total building square footage is approximately 150,000 SF over three floors above grade, with another 35,000 SF in its lower level. The building is currently vacant. 6.3 List the potential known or suspected contamination present on the project site: ❑ Soil ❑ Groundwater ❑ Surface Water ❑ Air ® Other: Lead paint, asbestos, pigeon waste, contained contaminated materials (paints, fluids, oils) 6.4 Does contamination exist throughout the site or in specific areas on the site? Specific areas on the site as described in Attachment D narrative. 6.5 Does Contamination extend beyond the property boundaries? No. 6.6 To what degree have the site contaminates and remediation activities been identified by the applicant? (Check all that apply and provide a brief description) Have any of the following been conducted: ® Phase I Environmental Assessment (describe)_ Have tested and surveyed for lead and asbestos throughout the building. ❑ Phase II Environmental Assessment (describe)_Attached ❑ LUST Investigation Assessment Tier I /and or II (attach copy) ❑ Risk Based Corrective Action Plan (attach copy) ❑ Other: 6 082211 6.7 Project Implementation: Fully describe the project including acquisition, environmental remediation activities, brownfield /grayfield redevelopment and a project implementation schedule. (exhibits may be included but not substituted for this narrative which is limited to two pages) Please see Attachment D Listed below are examples of significant environmental costs incurred: • Environmental remediation, including lead paint, asbestos, pigeon waste and general disinfection. ($350,000) • Cob blasting of interior wood and brick paint removal ($500,000) • Exterior masonry restoration ($1,000,000) • Stair tower and structural improvements. ($300,000) 6.8 Project Implementation Schedule: Identify significant project milestone dates. (Start date, midpoint progress check, and project completion date, etc.) • Design — schematic: Nov 6, 2009 • Design — development: Dec 3, 2010 • Design — construction drawings: Mar 21, 2011 • Demolition & remediation work began: June 2011 • Construction Bids Received: April 28, 2011 • General construction work began: July 2011 • Project completion: December 2012 PART 7: ESTIMATED COMMUNITY IMPROVEMENT IMPACTS 7.1 Current assessed value of the brownfield/grayfield site: $71,710 (land), and $270,800 (building) 7.2 Estimated assessed value of the brownfieldlgrayfield site after project completion: $12,000,000 (after entire rehabilitation project, described in Section 7.5 below) 7.3 As applicable, describe the private investment on the site as a result of the remediation: Owner /Developer is investing $500,000 of equity value of building, $2,000,000 in capital contributions, $834,000 in Tenant Improvements, and $600,000 in build -out of an arts /culture, non - profit center to be located in the lower level of the building. 7.4 As Applicable, describe any anticipated ancillary (offsite) private and /or public investment that will occur as a result of remediation of the site: City of Dubuque has funded adjacent infrastructure repair and replacement — water, sewer, and streets at a cost of $6mil, which included a $5.6 million TIGER grant. The first phase of the future Intermodal Facility is beginning in fall of 2012, an $11miI investment, which includes an $8 million State of Good Repair grant. 7.5 Describe the potential for the project to promote viable community reuse and /or economic development in the area of the site: (use a five year timeframe) This project involves the complete rehabilitation of the CARADCO Building, which will be a $28.6 million project. The completed building is only one part of a planned, three -phase $200,000,000 Millwork District redevelopment initiative, as designated and prioritized by Dubuque's City Council. The completed buildings will provide mixed -use space, adding hundreds of desperately - needed urban residential units for Dubuque's current and incoming workforce (including 1,300 employees due to IBM's operations center in Dubuque's downtown, located just blocks from the District), as well as 1st floor commercial /retail space intended to serve the wants and needs of the district's residents. The Dubuque Food Co -op, a new business, will be investing $1.4 million. An arts /culture, human services organizations center will be created in the lower level of the building with a capital campaign of $750,000. Construction and permanent jobs created is estimated at 425. 7.6 Is the project located in an economic development enterprise zone? ® Yes ❑ No 7 082211 Attachment A Attachment A East Facade North Facade West Facade South Facade Attachment B Brownfield /Grayfield Redevelopment Tax Credit Application Exhibit Soft Costs Development Reimbursables /Project Construction Management Fee 3,000,000 Architectural /Engineering /Construction Administration 620,000 Builder's Risk and Other Insurance 100,000 Tenant Relocation 50,000 Capitalized Interest (during construction period) -IFA Loan 201,488 Capitalized Interest (during construction period) - Bridge Loan 290,330 Post Construction Bridge Loan Interest 164,715 Legal and Accounting 200,000 Loan Fees - Construction Loan 250,000 Loan Fees - Permanent Loan 50,000 Soft Cost Contingency 350,000 Appraisal /Market Study 30,000 Environmental Assessment (See detail below) 50,000 Legal -Title and Recording 75,000 Enterprise Zone Sales Tax Rebate (231,000) Historical Costs (Application /Certification /Preparation) 50,000 Real Estate Taxes 80,000 Total Soft Costs $5,330,534 Attachment C CERTIFICATE OF CITY CLERK STATE OF IOWA ) COUNTY OF DUBUQUE ) 1, Jeanne F. Schneider, do hereby certify that I am the duly appointed, qualified, and acting Clerk of the City of Dubuque, Iowa in the County aforesaid, and as such Clerk I have in my possession or have access to the records of the proceedings of the City Council. I do further state that the hereto attached Resolution No. 381 -09 is a correct copy of the original Resolution No. 381 -09 approved and adopted by the City Council of the City of Dubuque, Iowa, at a session held by said Council on the 5th day of October, 2009. In Testimony Whereof, I hereunto set my hand and official seal of the City of Dubuque, Iowa. Dated at Dubuque, Iowa on this 6th day of October, 2009. Jeanne F. Schneider, CMC City Clerk (SEAL) Attachment C Prepared by: David Heiar, Economic Dev Director, 50 West 13th Street, Dubuque IA 52001 563 589 -4393 Return to: Jeanne Schneider, City Clerk, 50 West 13th Street, Dubuque IA 52001 563 589 -4121 RESOLUTION NO. 381 -09 RESOLUTION APPROVING A BROWNFIELD /GRAYFIELD REDEVELOPMENT TAX CREDIT APPLICATION TO THE IOWA DEPARTMENT OF ECONOMIC DEVELOPMENT, ON BEHALF OF CARADCO BUILDING, LLLP. Whereas, the State of Iowa has established a Brownfield /Grayfield Tax Credit Program to assist in the redevelopment of Iowa brownfields and grayfields; and Whereas, the former Carr, Adams, and Ryder Company building is considered a grayfield site; and Whereas, the Caradco Building project will provide much needed residential development to the downtown area; and Whereas, the City Council finds that the proposed application is acceptable and necessary to the growth and development of the city. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The City of Dubuque agrees to sponsor the Brownfield /Grayfield Redevelopment Tax Credit Application on behalf of Caradco Building, LLLP. Section 2. That the Mayor is hereby authorized and directed to execute this Resolution on behalf of the City of Dubuque and forward the executed copy to the Iowa Department of Economic Development. Passed, approved and adopted this 5th day of October, 2009. Attest: eanne F. Schneider, City Clerk F:IUSERS\Econ DevICARADCO1Brownfield Tax Credit 120091005 Resolution Brownfield- Grayfield CARADCO.docx Au f Roy D. Buol, Mayor Cp gronen restoration Attachment D CARADCO BUILDING Dubuque, Iowa SUSTAINA B E DUBUQUE viable fi: abfc egritable• The Carr, Ryder & Adams Company (CARADCO) Main Plant Building is a former millwork factory in what was once the nations largest window and door manufacturing district. Built in six sections between 1880 and 1906, CARADCO occupies an entire city block and is adjacent to Dubuque's downtown, walkable, working class neighborhoods Dubuque Pop. 57,637 The revitalization of Dubuque's Historic Millwork District was selected by nearly 15,000 tri -state citizens as a primary goal. The Envision 2010 process (undertaken in 2006) identified an opportunity to create a unique commercial and residential product not currently available in the market by defining a Historic Millwork District and converting buildings into multi -use structures containing businesses, restaurants, shops, recreation and residences. Our district's most significant buildings should be preserved and reused. Preserving these existing buildings will be critical to retaining the district's unique character and maintaining a link to Dubuque's millwork industrial past. In 2006, Gronen Restoration acquired the mostly vacant 185,000 square foot CARADCO building, one of the larger buildings in the District. CARADCO had experienced a great deal of water infiltration over the years resulting in extensive roof damage. All mechanical systems, built for factory use, were either non- existent or worn out. There were broken windows throughout and the building had various structural issues. Pigeon waste was prevalent on the second and third floors. Lead was found on multiple windows as well as a dozen or so wood columns. Asbestos was present on roof material, including flashing cement, roofing membrane, and pipe wrap. Years of factory use resulted in layers of filth on the masonry surfaces, which comprise the majority of the building. The basement, having not been properly ventilated over the past 40 years, contained mildew and mold. Basement window openings, in- filled with concrete, were excavated and opened to allow for usable lower level space. The entire interior courtyard space was excavated to expose the perimeter limestone foundation walls such that new drain tile and waterproofing membranes could be installed. In July of 2011, Dubuque experienced a record rainfall of 14 inches in 12 hours, completely flooding the lower level of CARADCO with five feet of water. A tremendous amount of work took place to pump out the standing water and clean up the leftover debris and mud. Water mitigation systems were added to the scope of design helping to prevent this type of occurrence in the future, thereby adding significant cost to the project. This included, but is not limited to, interior /exterior drainage tile, sump basins, and ejector pumps with emergency backup power. Caradco Main Plant, 2010 Workforce urban housing need 550 units over 60% AMI (Real Property Research 10 -09) Attachment D Context This project, located in Dubuque's urban core, is adjacent to the lowest income residential neighborhood in Dubuque, the Washington Neighborhood. The 18,774 square foot non - profit Millwork Community Campus, to be located in CARADCO's lower level, will be a dynamic, multi- tenant facility designed to foster arts and culture, human services organizations, and community initiatives. The expansion of the successful HEART Program which has been providing young people with the education and skills necessary to be successful adults, will revitalize the Washington Neighborhood home by home. The Millwork District will become the closest residential neighborhood to IBM, providing the new 1300 workers with options for affordable, exciting, quality housing in a mixed use, urban environment. The proven strategy moves redevelopment and the building of human capital together at a parallel track. This project develops the building to support living wage jobs, while the Millwork Community Campus trains young people for the same. Project Features: • Grayfield site converted, serving as a catalyst and benchmark for the sensitive and sustainable revitalization of the Historic Millwork District and serving as a model for other projects that will follow • Urban core, mixed -use development to provide critical workforce housing, a vibrant commercial destination, and engaging public gathering spaces • Pedestrian friendly, urban cultural atmosphere will create a Live - Work -Play community serving Iowa's existing and emerging new young workforce • Foster the partnership of public /private entities by creating collaborative spaces that allow non - profits to address relevant arts, workforce and education needs • Sustainable design includes reuse of existing buildings and infrastructure, energy efficient features, complete streets, and connectivity to jobs and services in a downtown setting 'iNMUM�NWNUUa_WY+. BQiH.Dat.WN+!H+.. a. a�..µJ_HV+. -, u.a . ..,'Y� retzttailemeg It Pi tri Economic Development Department City Hall — Second Floor 50 West 13th Street Dubuque, Iowa 52001 -4864 (563) 589 -4393 Office (563) 589 -1733 Fax (563) 589 -6678 TDD May 15, 2012 Iowa Economic Development Authority Attn: Matt Rasmussen 200 East Grand Avenue Des Moines, IA 50309 Masterpiece on the Mississippi Dear Mr. Rasmussen, RE: Grayfield Certification for Caradco I have reviewed the definition of a grayfield site as specified in Section 15.294 of the Iowa Code. The Caradco project at 900 Jackson Street, definitely meets the requirements of a grayfield site. The Caradco building is located in the City's Historic Millwork District, which is the initial industrial center of the City of Dubuque. In the late 1800's and early 1900's, the District was the nation's largest concentration of millworking. Unfortunately, most of these industries closed their doors in the 1960's and 1970's and have been vacant or underutilized since that time. In 2006, the Community endorsed the redevelopment of this 17 square block area as one of our top 10 goals through the Envision 2010 process. The Historic Millwork District Master Plan was approved by the City Council in February of 2009. The plan proposes that the District be redeveloped from its former industrial use to a mixed use, which will include commercial and residential elements. The Caradco Building will be the first major industrial building to be rehabilitated as a part of this Master Plan. I do certify that the Caradco Building meets the grayfield requirements as stated in Section 15.294 of the Iowa Code. Sincerely, David J. Heiar Economic Development Director