Loading...
Southwest Arterial_AECOM Supplemental AgreementTHE CITY OF Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Southwest Arterial Project Consultant Professional Services - Supplemental Agreement Final Engineering Design Phase - Scope of Work Modifications Iowa DOT Project No. STP -U -2100 (634)- -70 -31 DATE: May 30, 2012 Dubuque bierd All-America City 1 2007 On March 2, 2009, the City Council approved the selection of AECOM Technical Services, Inc. to provide the final engineering design for the Southwest Arterial Project. The initial agreement included the final engineering design, preparation of construction documents, geotechnical investigation, architectural and landscape enhancements, archaeological and cultural resources mitigation, public involvement, agency coordination and construction engineering services. As a result of proposed design and plan modifications, the original scope of services needs to be revised to reflect the changes. City Engineer Gus Psihoyos recommends City Council approval for the Mayor to execute the Consultant Professional Services — Supplemental Agreement with AECOM Technical Services, Inc. for the final engineering design phase of the Southwest Arterial, subject to the concurrence of the Iowa Department of Transportation. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer 2 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Southwest Arterial Project Consultant Professional Services - Supplemental Agreement Final Engineering Design Phase - Scope of Work Modifications Iowa DOT Project No. STP -U -2100 (634)- -70 -31 DATE: May 30, 2012 INTRODUCTION Dubuque bierd All-America City 1 2007 The enclosed resolution authorizes the Mayor to execute a supplemental agreement with AECOM Technical Services, Inc. (AECOM) which approves revisions to the original scope of services to the Consultant Professional Services Contract to complete the final engineering design phase of the Southwest Arterial Project. BACKGROUND On March 2, 2009 the City Council approved (Res. 87 -09) the selection of AECOM (Waterloo, Iowa) to provide the final engineering design for the Southwest Arterial Project. The initial agreement included: the final engineering design; preparation of construction documents; geotechnical investigation; architectural and landscape enhancements; archaeological and cultural resources mitigation; public involvement; agency coordination and construction engineering services. DISCUSSION Per the terms of the Consultant Professional Services contract and the conditional requirements of the federal aid funding agreement, if the Consultant is of the opinion that any work directed to perform is beyond the scope of said contract, and constitutes "Extra Work ", the Consultant shall promptly notify the City in writing to that effect. Unless written approval for "Extra Work" has been secured in advance of performing said work from the City, the Iowa DOT and the FHWA, said work will be ineligible for federal aid participation. The Consultant Professional Services - Supplemental Agreement authorizes AECOM to provide the revised scope of services to continue to advance the completion of the final engineering design phase in accordance with Iowa DOT and FHWA procedures and requirements. As a result of proposed design and plan modifications, the original scope of services needs to be revised to reflect the following changes: • Transfer archaeological and cultural resources mitigation work for Site 13DB674 from AECOM to Tallgrass Historians. • U.S. 20 Interchange - West Access Road: Perform alternatives analysis in coordination with Dubuque Industrial Center Site development. • U.S. 20 Interchange - West Access Road: Revisions to preliminary plans based on selected alternative for property access and coordination with Dubuque Industrial Center Site on Seippel Road. • U.S. 20 Interchange - West Access Road: Revisions to watermain and sanitary sewer. • U.S. 20 Interchange: Architectural Bridge Enhancements • U.S. 151/61 Interchange: Architectural Bridge Enhancements • Right -of -way property acquisition eminent domain appeal hearings support activities for Bradley (Parcel 124 & 130) and Tigges (Parcel 147). • Military Road Bridge: Revisions to preliminary plans from original 2 -span structure to revised 4 -span bridge. • Roundabout intersection design review and operational analysis by Ourston Roundabout Engineering for oversize and overweight vehicles. • Completion Date: The overall completion date for Final engineering Design has been extended to June 30, 2014. RECOMMENDATION I recommend that the City Council authorize the Mayor to execute the Consultant Professional Services - Supplemental Agreement with AECOM Technical Services, Inc. for the final engineering design phase of the Southwest Arterial project, subject to the concurrence of the Iowa Department of Transportation. BUDGET IMPACT The estimated professional services fee for the proposed design and plan modifications to the original scope of services for the final design phase of the Southwest Arterial project is as follows: Description Amount Supplemental Agreement No. 11 - Scope of Services Revisions $ 174,800 Total Project Cost $ 174,800 The project funding summary is as follows: CIP Funding Source Amount 3001287 Federal SAFETEA -LU Funding (80 %) $ 139,840 3001287 Local Funding (20 %) 34,960 Total Project Funding $ 174,800 ACTION TO BE TAKEN The City Council is requested to authorize the Mayor to execute the Consultant Professional Services - Supplemental Agreement with AECOM Technical Services, Inc. for the final engineering design phase of the Southwest Arterial, subject to the concurrence of the Iowa Department of Transportation through adoption of the enclosed resolution. Prepared by Robert Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Kent Ellis, Iowa DOT Bob Lentz, AECOM F \PROJECTS \SW ARTERIAL - IA HYW 32\AECOM FE CONTRACT\SW Arterial AECOM FE Consultant Agreement Suppl No 11 - Council Approval Memo doc RESOLUTION NO. 139 -12 RESOLUTION APPROVING THE CONSULTANT PROFESSIONAL SERVICES - SUPPLEMENTAL AGREEMENT NO. 11 BETWEEN AECOM TECHNICAL SERVICES, INC. AND THE CITY OF DUBUQUE FOR THE FINAL ENGINEERING DESIGN PHASE OF THE SOUTHWEST ARTERIAL PROJECT Whereas, the City of Dubuque is proceeding with the Southwest Arterial Project, from U.S. Highway 20 to U.S. Highway 151/61, in Dubuque, Iowa; and Whereas, as a result of proposed design and plan modifications, the Consultant Professional Services - Supplemental Agreement authorizes AECOM to provide the revised scope of services to continue to advance the completion of the final engineering design phase. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That said Consultant Professional Services - Supplemental Agreement No. 11 between AECOM Technical Services, Inc. and the City of Dubuque for the final engineering design phase of the Southwest Arterial project is hereby approved, subject to the concurrence of the Iowa Department of Transportation. Section 2. That the Mayor be authorized and directed to execute three copies of said Consultant Professional Services - Supplemental Agreement with AECOM Technical Services, Inc. for the final engineering design phase of the Southwest Arterial project. Passed, approved and adopted this 4th day of June , 2012. Attest: Kevin irnstahl, ' ity C erk Roy D. Buol, Mayor A=COM AECOM 319 232 6531 tel 501 Sycamore Street 319 232 0271 fax Suite 222 Waterloo, Iowa 50703 www.aecom.com SOUTHWEST ARTERIAL FROM SEIPPEL ROAD TO OLDE DAVENPORT ROAD DUBUQUE, IOWA SUPPLEMENTAL AGREEMENT NO. 11 WHEREAS, a Professional Services Agreement was entered into by the City of Dubuque, Iowa (Owner), and AECOM Technical Services, Inc. (Consultant), of Waterloo, Iowa, dated May 8, 2009, for the preparation of final design, plans, specifications and estimates, as well as right -of -way property acquisition, final soils investigation, archaeological and cultural resources Phase III mitigation, public involvement, agency coordination and construction -phase services for the Dubuque Southwest Arterial which includes a new 4 -lane freeway between Seippel Road and Olde Davenport Road in Dubuque, Iowa, in accordance with the preliminary plans completed in March 2008; and WHEREAS, the Owner and Consultant modified the original Scope of Services to include a Value Engineering Workshop as part of Task No. 3 (Initial Value Engineering Review) in the original agreement on July 27, 2009, said document included as Attachment C; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 1 dated August 27, 2009, for the preparation of final design, plan, specifications and estimates, right -of -way property acquisition, final soils investigation, archaeological and cultural resources Phase III mitigation, public involvement and agency coordination for the portion of the project not included in the previous agreement; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 2 dated October 21, 2009, for supplemental Phase 1 archaeological investigation of the Oberbroeckling property in Dubuque County, Iowa; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 3 dated March 10, 2010, to include revisions in the previous Scope of Services based on recent changes in the design concept as a result of a Value Engineering Study of the project and the Owner's desire to extend the recreational trail beyond the previous limits; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 4 dated August 24, 2010, to include engineering services during the construction phase of the North Cascade Road portion of the project; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 5 dated September 27, 2010, to include revisions in the previous Scope of Services based on recent changes in the design concept as a result of ongoing review and value engineering activities; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 6 dated October 19, 2010, to include construction staking for the North Cascade Road portion of the project; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 7 dated March 4, 2011, to include revisions in the previous Scope of Services based on recent changes in the design concept as a result of ongoing review, the public informational meeting and value engineering activities; and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 8 dated February 28, 2011, to include engineering services during construction phase of the North Cascade Road Bridge portion of the project; and A COM Page 2 WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 9 dated July 1, 2011, to include roundabout intersection peer review and design revisions and the preparation of legal plats and descriptions for temporary construction easements, and WHEREAS, the Owner and Consultant entered into Supplemental Agreement No. 10 dated September 12, 2011, to increase the hours for Construction Observation estimated for the North Cascade Road Bridge portion of the project authorized in Supplemental Agreement No. 8; and WHEREAS, the Owner and Consultant desire to amend the previous agreements to include design revisions that have been requested by the City since the original Scope of Services was prepared and the shifting of certain activities among firms on the Design Team. NOW THEREFORE, it is mutually agreed to amend the original Professional Services Agreement as fol lows: I. SCOPE OF SERVICES The services to be provided for the project under this Agreement will include additional activities that have been requested by the City and Iowa DOT, and which are beyond the scope of the existing agreements. Certain activities will be shifted among firms of the design team. The following tasks are included. Task 1. Eliminate Remainder of Durrant's Scope. The original scope of services had split the architectural and enhancement activities between Durrant and RDG. Durrant has completed a portion of their scope, and the remainder of this scope was transferred to RDG as part of Supplemental Agreement No. 7. This task eliminates the remaining unused portion of Durrant's contract. Task 2. Transfer Archaeological Site 13DB674 to Tallgrass Historians. Archaeological Site 13DB674 is located on the Cate property west of U.S. 20. The Phase III Cultural Resources Survey for this site was originally included in AECOM's scope of services. This task transfers the field data recovery and report preparation work for Site 13DB674 to Tallgrass Historians. The scope of this task is further defined in Supplemental Agreement No. 3 between AECOM and Tallgrass Historians. Task 3. Modify Roundabout Intersection Design Scope. The original scope of services included three roundabout intersections at the U.S. 20 interchange. This task includes eliminating one of the three roundabout intersections and substituting a 5 -leg roundabout in its place. The previous Supplemental Agreement No. 7 also provided staff hours to redesign the east access road to connect with a new roundabout intersection east of the interchange. The current design connects the east access connector to the east interchange roundabout, removing the need for the allocated staff hours. This task will be completed by WHKS. Task 4. U.S. 20 West Access Road Revisions. The original access road west of U.S. 20 included a connection to Cousins Road, providing access to the three residential properties along Cousins Road, and an access road extension to serve the Kluck property. The evaluation and conceptual design of the west access road alternatives were included in Supplemental Agreement No. 7. This task includes the design revisions resulting from the evaluation and the associated coordination with the Dubuque Industrial Center West project. The following subtasks are included: a. Modify design of original west access road. This task includes the redesign of the West Access Connector Road in accordance with the results of the alternatives studies. The proposed roadway will be located south and west of the existing A=COM Page 3 intersection of Cousins Road with U.S. 20. The work under this task will also include the design of a relocated access to Parcel 105, Kluck, and an additional roadway and intersection to serve three (3) parcels adjacent to existing Cousins Road. Additional staff hours are included for the revisions in scope for the roadway associated design. b. Modify design of bridge over South Fork Catfish Creek. The west access road alignment requires a structure over the South Fork of Catfish Creek. Previous supplemental agreements reduced the structural staff hours, since the original design was changed from a three -span PPCB bridge to a three -span concrete slab bridge with no aesthetic treatments. The preferred alignment will now require a three -span PPCB bridge, so the original structural staff hours will be required and are restored by this supplement. Task 5. Condemnation Hearings for Tigges and Bradley Properties. This task includes on -call services requested by the City and /or Iowa DOT related to the condemnation hearings for Parcel 147 (Tigges) and Parcels 124 and 130 (Bradley). This task may include such activities as staking the properties for condemnation, preparing for and attending hearings and meetings, and providing information or assistance related to the appeal process. The scope of this task is defined by the estimated hours assigned to the task. Additional activities and hours, if requested, will be included in a future supplemental agreement. Task 6. Redesign Military Road Project. The design of the Military Road area has been revised from the original approved concept. The original 2 -span bridge and MSE retaining walls have been revised to provide a 4 -span bridge without retaining walls and to substitute a sloped end -slope on the bridge. Associated with these revisions, the on -site detour road will be redesigned and lengthened to fit with the revised bridge design. The following subtasks are included. a. Modify the Bridge Design From a 2 -Span to a 4 -Span Bridge (WHKS Task) b. Delete MSE Retaining Walls and Substitute a Sloped End -Slope (WHKS) c. Redesign On -Site Detour Road (AECOM) Subtasks a. and b. are considered no cost revisions in scope for the bridge associated designs. Task 7. Additional Su • • lemental Surve and Stakin•. This task includes on -call advance construction staking as requested by the City and additional supplemental survey as required for the redesigned roadway elements. Advance construction staking is anticipated for such activities as right -of -way locations for farming operations, utility relocations, etc. The extent of this task is defined by the estimated hours assigned to the task. Additional construction staking, if requested by the City, will be covered under a future supplemental agreement. The following subtasks are included: a. Advance Construction Staking b. Additional Supplemental Survey Task 8. Water and Sewer Main Relocations. This task includes the final design of water main and sanitary sewer relocations on the west side of U.S. 20. These relocations, which were not included in the original scope of services, are needed to facilitate the construction of the U.S. 20 interchange and relocated Seippel Road. The following subtasks are included: a. Water Main Relocation. The water main relocation includes the evaluation, design and plan preparation for relocating an existing 16 -inch diameter water main and appurtenances outside the proposed U.S. 20 right -of -way. Approximately 4,700 linear feet of water main will be relocated to the west side of Ramp A and north side of A=COM Page 4 Seippel Road, including provisions for jacking a liner under U.S. 20. Coordination with Owner and Iowa DOT for review of proposed design is assumed to require four meetings. IDOT and Iowa DNR permits will be developed. The following subtasks are included: • Design • Plan and Detail Sheets • Permit Development • Meetings • Special Provisions b. Sanitary Sewer Relocation. The sewer main relocation includes the evaluation, design and plan preparation for the staged relocation of an existing 18 -inch diameter sanitary sewer line due to conflicts with the location of the bridges near the South Fork of Catfish Creek. Approximately 400 linear feet of sanitary sewer will be relocated, requiring the modification of two (2) existing manholes and the construction of one (1) new manhole. Coordination with the Owner and Iowa DOT for review of proposed design is assumed to require two meetings. IDOT and Iowa DNR permits will be developed. The following subtasks are included: • Design • Plan and Detail Sheets • Permit Development • Meetings Task 9. Modify Plans for Revised Construction Schedule. This task includes modifying the completed plans for English Mill Road and Military Road to accommodate the Iowa DOT bi- annual updates. The final check plans for these projects were completed in January 2011 and June 2011, respectively. The plan updates will include revisions for new Iowa DOT standard details, specification changes, bid item updates and Standard Road Plan updates. a. English Mill Road Revisions b. Military Road Revisions Task 10. Modify Right -of -Way Plats and Descriptions. This task includes modifications to the right -of -way plats, descriptions, temporary easement exhibits, plot plans and summary sheets to accommodate the design revisions included in this supplemental agreement. The right -of -way documents for a total of 10 parcels are included in this task. The anticipated parcels are Nos. 112, 113, 114, 127B, 150B, 152, 161, 184, 187 and 195A. Task 11. Delete Newsletters. This task deletes Task No. 140 from Supplemental Agreement No. 1. The original Task No. 140 included three newsletters, which are no longer being used for public communications. Task 12. Gateway Bridge Design Modifications. The original scope anticipated "moderate enhancement" design elements for the bridges, including enhancements to the piers, abutments, railings, surface treatments and bridge coloring. Additional enhancements are now being proposed for the "gateway" bridges at U.S. 20 and U.S. 151/61. The gateway bridge enhancements will include additional arch elements and special lighting which were not anticipated in the original scope. This task includes the additional design effort for the added enhancement elements, in accordance with the recently approved "Option 1" concept. A=COM Page 5 a. Southwest Arterial Bridge Over U.S. 20 and South Fork Catfish Creek. Additional scope for this task shall include design, detailing and coordination of the added truss - arch aesthetics similar to Option 1 as shown in RDG's presentation dated October 29, 2011. This includes design and detailing of the truss arch and the truss -arch connections to the piers, design of Piers 2 and 3 to accommodate the loading from the truss arch, and coordination with City staff and design team members. b. Southwest Arterial Bridge Over U.S. 151/61 and Granger Creek. Additional scope for this task shall include design, detailing and coordination of the added truss -arch aesthetics similar to Option 1 as shown in RDG's presentation dated October 29, 2011. This includes design and detailing of the truss arch and the truss -arch connections to the piers, design of Piers 1 and 2 to accommodate the loading from the truss arch and coordination with City staff and design team members. The following assumptions pertain to the aesthetic design: a. Shop drawing review is not included. Shop drawing review will be part of construction administration. b. All four aesthetic arch trusses and connections to the piers will be identical. Task 13. Project Meetings and Coordination. This task includes the additional meetings, conference calls, web meetings and external coordination associated with the scope modifications and revised time of completion in this supplemental agreement. Task 14. Project Administration. This task includes the additional in -house administrative activities and project team coordination between consultants which are associated with the revised scope of services and revised time of completion in this supplemental agreement. Task 15. Modify Roundabout Intersection Scope. The City of Dubuque and the Iowa Department of Transportation have requested additional evaluation of over -size, over - weight (OSOW) trucks for certain movements at the U.S. 20 and U.S 61 interchanges with the SW Arterial. The following movements will be evaluated: 1) Westbound SW Arterial to southbound U.S. 20 2) Northbound U.S. 20 to eastbound SW Arterial 3) Eastbound SW Arterial to southbound U.S. 61 4) Southbound U.S. 61 to westbound SW Arterial 5) Eastbound SW Arterial to northbound U.S. 61 6) Northbound U.S. 61 to westbound SW Arterial The previous scope of services is modified to include the following additional work effort: • Modifications to preliminary design geometrics to accommodate the OSOW truck movements listed above. • Provide additional design review of the vertical geometrics for OSOW modifications. • Attendance at one design coordination meeting in Dubuque and exchange of comments with the City of Dubuque and Iowa DOT. A=COM II. TIME OF BEGINNING AND COMPLETION Page 6 The work under this agreement shall be in accordance with the schedule of the previous associated agreements, which is extended from June 30, 2012, to June 30, 2014. III. COMPENSATION The Consultant shall be reimbursed for the actual costs incurred in accordance with Article 3 of the original Agreement. The Estimated Actual Costs, Fixed Fee, Contingency and Maximum Amount Payable for this supplemental agreement as stated below and as shown in Attachment A, are to be integrated with those covered under the original agreement. Base Value Eng. Agreement Modification S.A. No. 1 S.A. No. 2 Estimated Actual Costs $391,700.00 $56,200.00 $7,978,200.00 $19,900.00 Fixed Fee 22,500.00 5,200.00 427,000.00 0.00 Contingency 38,400.00 5,500.00 761,900.00 2,000.00 Maximum Amount Payable $452,600.00 $66,900.00 $9,167,100.00 $21,900.00 S.A. No. 3 S.A. No. 5 S.A. No. 7 S.A. No. 9 Estimated Actual Costs $175,200.00 $233,600.00 $334,600.00 $114,800.00 Fixed Fee 14,000.00 28,400.00 11,000.00 5,300.00 Contingency (2,400.00) 0.00 0.00 6,600.00 Maximum Amount Payable $186,800.00 $262,000.00 $345,600.00 $126,700.00 S.A. No. 11 Total Amount Estimated Actual Costs $323,500.00 $9,627,700.00 Fixed Fee 3,200.00 516,600.00 Contingency ($151,900.00) 660,100.00 Maximum Amount Payable $174,800.00 $10,804,400.00 IV. In all other aspects, the obligations of the Owner and Consultant shall remain as specified in the Professional Services Agreement dated May 8, 2009, and subsequent amendments. Page 7 IN WITNESS WHEREOF, the parties hereto have executed this Supplemental Agreement No. 11 as of the dates shown below: AECOM TECHNICAL SERVICES, INC. By Date May 23, 2012 Douglas W. Schindel, P.E. Sub - District Manager CITY OF DUBUQUE, IOWA By - iz 1 , Date June 4, 2012 � Roy Buol Mayor IOWA DEPARTMENT OF TRANSPORTATION ACCEPTED FOR FHWA AUTHORIZATION* By Date Kent L. Ellis, P.E. Local Systems Engineer District 6 *The Iowa DOT is not a party to this agreement. However, by signing this agreement, the Iowa DOT is indicating the work proposed under this agreement is acceptable for FHWA authorization of federal funds. L: \work ADMIMAGREE \SUPPLE \SA1 I DubuqueSWArt.doc Southwest Arterial Seippel Road to Olde Davenport Road City of Dubuque, Iowa Supplemental Agreement No. 11 COST ANALYSIS Direct Labor Cost (AECOM) Category Hours Rate /Hour Amount Senior Professional 348 $83.50 $29,058.00 Project Professional 68 $59.60 $4,052.80 Staff Professional 112 $40.00 $4,480.00 CADD Operator II 140 $30.00 $4,200.00 Technician 88 $25.50 $2,244.00 Project Support 200 $27.00 $5,400.00 956 AECOM Direct Labor for Archaelogy Total AECOM Direct Labor II. Payroll Burden and Overhead Provisional Costs Portion Not Including Archaelogy 160.00% $79,095.68 Portion For Archaelogy 165.00% ($64,915.95) III. Direct Project Expenses IV. V. Category Mileage Per Diem Lodging B/W Copies Color Copies Plan Copier GPS Equipment Survey Equipment Miscellaneous, Other AECOM Expenses for Archaelogy AECOM Estimated Actual Costs Units 2500 0 0 4000 500 0 10 20 Subcontract Expense WHKS & Co. Tallgrass Historians The Durrant Group Ourston Roundabout Engineering VI. Estimated Actual Costs VII. Fixed Fee VIII. Contingency AECOM WHKS & Co. Tallgrass Historians The Durrant Group Rate /Unit 0.510 40.00 80.00 0.06 0.12 0.50 25.00 12.50 Amount $1,275.00 $0.00 $0.00 $240.00 $60.00 $0.00 $250.00 $250.00 $450.00 $2,525.00 ($213,675.00) Rounded $146,100.00 $420,500.00 ($65,100.00) $8,900.00 ($140,000.00) $0.00 $0.00 ($11,900.00) Attachment A $49,434.80 ($39,343.00) $10,091.80 $14,179.73 ($211,150.00) ($186,878.47) ($186,900.00) $510,400.00 $323,500.00 $3,200.00 ($151,900.00) IX. Maximum Amount Payable $174,800.00 Attachment A Southwest Arterial Seippel Road to Olde Davenport Road City of Dubuque, Iowa Staff Hour Estimate AECOM Portion - Supplemental Agreement No. 11 Senior Prof. Project Prof. Staff Prof. CADD Oprt 11 Technician Project Support Total ENGINEERING SERVICES 1 Eliminate remainder of Durrant's scope 2 Transfer archaeological site 13DB674 to Tallgrass 3 Modify roundabout intersection design scope 4 U.S. 20 West Access Road revisions a. Modify original West Access Road b. Delete bridge over West Fork Catfish Creek 5 Condemnation hearings for Tig9es and Bradley properties ................ 6 Redesign Military Road project ..................................... ........_...................._. a. Modify bridge from 2- span to 4-span ....................... b. Delete MSE retaining walls and substitute end slope c. Redesign on -site detour 7 Additional supplemental survey and staking a. Advance construction staking b. Additional supplemental survey 8 Water and sewer main relocations a. Water main relocation 42 8 32 8 2 b. Sanitary sewer relocation 9 Modify plans for revised construction schedule a. English Mill Road revisions b. Military Road revisions 10 Modify right -of -way plats and descriptions 11 Delete newsletters 24 8 48 32 24 48 32 24 24 60 12 Gateway bridge design modifications a. U.S. 20 overpass bridge (24) b. U.S. 151/61 overpass bridge 13 Project meetings and coordination ................... 14 Project administration 15 Modify roundabout intersection scope ........................................................................... .............................. 172 156 (16) (32) 24 24 60 24) 20 48) 72 156 WHKS WHKS WHKS ....................... WHKS 90 WHKS .......................... 58 96 .................... WHKS .......................... WHKS .......................... WHKS .......................... 48 48 (144) WHKS ....................... WHKS ...................... WHKS 244 ....................... Ourston TOTAL HOURS 348 68 112 140 88 200 956 Attachment A Southwest Arterial Seippel Road to Olde Davenport Road City of Dubuque, Iowa Staff Hour Estimate & Cost Estimate Phase III Archeological Data Recovery - AECOM Portion - Site 13DB674 Transfer Total Senior Advisor Project Director Field Director Construction Manager Construction Inspector Cost Analyst Editor GIS Analyst Transfer Archaeological Site 13DB674 to Tallgrass Pre -field & Site Excavation 2,430 Analysis........................................... ............................... ....._......................972 Draft. Report .................................. ............................... ..........................._294 Final Report 100 12 66 26 26 20 110 88 18 16 128 10 10 14 14 4 TOTAL HOURS 3,796 12 138 216 16 128 10 28 14 Rate Per Hour $55.00 $48.00 $40.00 $46.00 $24.00 $28.00 $26.00 $31.50 Direct Labor Amount $660.00 $6,624.00 $8,640.00 $736.00 $3,072.00 $280.00 $728.00 $441.00 Total Records Manager Prinicipal Investigator Lab Director Surveyor Report Coordinator Technician GIS /CADD Illustrator Admin. Assist. Transfer Archaeological Site 13DB674 to Tallgrass Pre -field & Site Excavation 2,430 Analysis 972 294 Draft Report Final Report 100 12 26 110 26 26 66 20 216 14 66 6 14 14 1.936 600 4 54 20 4 TOTAL HOURS 3,796 38 138 288 124 28 2,536 78 4 Rate Per Hour $23.00 $30.00 $25.00 $25.50 $23.50 $0.00 $26.00 $25.00 Direct Labor Amount $874.00 $4,140.00 $7,200.00 $3,162.00 $658.00 $0.00 $2,028.00 $100.00 165.00% Factor Weeks Staff Hours Rate 1.0 2.5 20 40 $22.50 1.5 2.5 20 10 $22.50 Cost Estimate Total Direct Labor $39,343.00 Overhead Costs $64,915.95 Direct Expense Costs $213,675.00 Expense Table $151,800.00 Field Labor Regular Time $45,000.00 Field Labor Overtime $16,875.00 Miscellaneous $0.00 Total Estimated Costs $317,933.95 Estimated Costs Rounded $318,000.00 Fixed Fee $13,500.00 Contingency $32,000.00 Maximum Amount Payable $363,500.00 165.00% Factor Weeks Staff Hours Rate 1.0 2.5 20 40 $22.50 1.5 2.5 20 10 $22.50 Attachment A Southwest Arterial Seippel Road to Olde Davenport Road City of Dubuque, Iowa Staff Hour Estimate & Cost Estimate WHKS & Co. Portion Project Manager Structural Engineer 1 Structural Engineer 2 Roadway Engineer 1 Roadway Engineer 2 Structural Technician Roadway Technician Survey Technician Land Surveyor Total ENGINEERING SERVICES 1 Eliminate remainder of Durrant's scope 2 Transfer archaeological site 13DB674 to_Tallgrass 3 Modify roundabout intersection design scope 4 U.S. 20 West Access Road revisions a. Modify original West Access Road_ __.__• b Modify bridge over West Fork Catfish Creek.......__ —_ . _._. 5 Condemnation hearings for Tigges and Bradley., properties 6 Redesign Military Road.profect a. Modify bridge from 2:-span to 4-span ...._._.._ b. Delete MSEretaining_walls and substitute end slope...,,..,., c. Redesign on site detour 7 Additional supplemental, survey and staking.,,,,..- .- __- ,,,_,,,.. -, a Advance construction staking b. Additional supplemental survey __._ _....._..__._._...._...__.____. _. 8 Water and sewer main relocations a. Water main relocation b. Sankey sewer relocation _..._ ......_ ................_..__._. __._. 9 Modify plans for revised construction schedule,- _,,.., -_._. _. a_ English Mill Road revisions — b_Militanr Road revisions 10 Modify right-of-way plats and descriptions 11 Delete newsletters 12Gateway bridge-design modcations a. U.S. 20 overpass bridge b:U.S_151/61 overpass bridge __. ..— __._.._.__._.— ._........___. 13 Project meetings and coordination _ 14 Project - administration _- .— _.___. (241. 8 156 12 6 180 180 16 78 90 90 24 24 8 24 24 16 248 120 120 -(361 24 48 20 16 (144) 80 482 108 50 390 390 16 16 TOTAL HOURS 34 516 Rate Per Hour $57.65 $42.12 258 $42.38 20 16 488 56 0 0 1,388 $25.64 $52.85 $24.70 $19.50 $21.15 $35.76 Direct Labor Amount 1,960.10 21 ,733.92 10,934.04 512.80 845.60 12,053.60 1,092.00 0.00 0.00 Total Direct Labor Overhead Costs Direct Expense Costs Mileage Meals Lodging Miscellaneous Total Estimated Costs Estimated Costs Rounded Fixed Fee Contingency Maximum Amount Payable $3,052.50 $0.00 $0.00 $500.00 $49,132.06 $78,119.98 159.00% $3,552.50 $130,804.54 $130,810.00 $15,290.00 $0.00 $146,100.00 5500 $0.555 $0.00 0 $70.00 $500.00 Attachment A Southwest Arterial Seippel Road to Olde Davenport Road City of Dubuque, Iowa Staff Hour Estimate & Cost Estimate Archaeological Data Recovery for Site 13DB674 - Tallgrass Historians Portion Principal Investigator Research Associate Research Associate Research Assistant Crew/ Clerical Total Task Group 1 Prefield Activities Archival Research 48 Project Start-up Remote Sensing 2012 Rates 40 $68.00 $3,264.00 Expenses Mileage Per Diem Photocopies $38.08 $1,523.20 40 $34.05 $1,362.00 Unit Mile Days No. Rate 1622 15 $0.55 $100.00 Supplies, Shipping, Etc. I-Sites Pro Access Fee Subtotal Expenses Total Estimate Costs Group 1 40 $27.78 $1,111.20 Amount $892.10 $1,500.00 $100.00 $100.00 $60.00 $2,652.10 $11,560.50 80 $20.60 $1 648.00 248 $8,908.40 $11,600.00 Task Group 2 Excavation 340 640 Tallgrass Historians L.C. only Subcontractor Cost Eatimates Below 2012 Rates Expenses Mileage Per Diem Photocopies Equipment Rental (water pump, transit) Field Supplies Subtotal Expenses Total Estimate Costs Group 2 $68.00 $23,120.00 Unit Mile Days $38.08 $24,371.20 640 $34.05 $21,792.00 No. 27068 208 Rate $0.55 $100.00 640 $27.78 $17,779.20 Amount $14,887.40 $20,800.00 $50.00 $3,000.00 $1,000.00 $39,737.40 $146,575.80 960 $20.60 $19,776.00 3,220 $106,838.40 $146,600.00 Task Group 3 Comparative Studies Processing & Analysis Tallgrass Historians L.C. only Subcontractor Cost Eatimates Below Expenses 2012 Rates Mileage Per Diem Photocopies Shipping/Postage Lab/Curation/Photo/Printing Supplies Subtotal Expenses Total Estimate Costs Group 3 176 $68.00 $11,968.00 Unit Mile Days 320 $38.08 $12,185.60 No. 5250 25 320 $34.05 $10,896.00 Rate $0.55 $100.00 320 $27.78 $8,889.60 Amount $2,887.50 $2,500.00 $50.00 $300.00 $1,000.00 $6,737.50 $53,972.70 160 $20.60 $3,296.00 1,296 $47,235.20 $54,000.00 Attachment A Southwest Arterial Seippel Road to Olde Davenport Road City of Dubuque, Iowa Staff Hour Estimate & Cost Estimate Archaeological Data Recovery for Site 13DB674 - Tallgrass Historians Portion Principal Investigator Research Associate Research Associate Research Assistant Crew/ Clerical Total Task Group 4 Report Preparation 2013 Rates Expenses Mileage Per Diem I-Sites Pro Fee Shipping/Postage/Other Supplies Report Reproduction/Binding Printing Supplies Subtotal Expenses Total Estimate Costs Group 4 176 $68.00 $11,968.00 Unit Mile Days 160 $39.42 $6,307.20 No. 2550 8 160 160 $34.94 $5,590.40 Rate $0.55 $100.00 160 816 $27.78 $4,444.80 Amount $1,402.50 $800.00 $60.00 $150.00 $1,000.00 $1,000.00 $4,412.50 $36,018.90 $20.60 $3,296.00 $31,606.40 $36,000.00 Total Tallgrass Estimate $248,200.00 Specialized Studies/Consulation services Hours Remote Sensing-Jason Thompson 80 Transit Survey - Jason Thompson 380 Lithic & Faunal Analysis - Jason Thompson 480 Geomorphological Consultation - Office of the State Archeologist Macrofloral/Pollen/Parasite/Phytolith Analysis Paleo Research Institute - Golden, Colorado Giddings Drill Rig Earthview Environmental, Coralville, IA Backhoe/Bulldozer/Skid Loader Drew Cook & Sons, Dubuque Curation Office of State Archaeologist Portable Toilet Rental & Servicing Total Specialized Studies/Consulation services Total Estimate Costs Site 13DB674 Rate $45.00 $45.00 $45.00 Amount $3,600.00 $17 100.00 $21,600.00 $33,400.00 $42,700.00 $12,600.00 $26,500.00 $14,000.00 $800.00 $172,300.00 $420,500.00 AMENDMENT #1 Cost Analysis Sheet SW Arterial Dubuque, IA ORE Project: 11957 I. Direct Labor Cost Category Hours Rate/Hour Principal 12 $61.57 Project Manager 26 $40.31 Design Engineer 40 $27.86 Amount $738.84 $1,048.06 $1,114.40 Payroll Total: $2,901.30 II. Payroll Burden and Overhead Costs Indirect Cost Factor: 1.7264 $5,008.80 III. Direct Project Expenses Lunch $24.00 Mileage $111.00 200 miles @ $0.56 IV. Subcontract Expenses (Designate if Cost Plus or Fixed Fee) List First Subconsultant Total Costs List Second Subconsultant Total Costs List the remaining Subconsultant for this contract Total Indirect Project Expenses: $135.00 $0.00 $0.00 $0.00 Total Subcontractor Costs: $0.00 V. Estimated Actual Costs (I +II +III +IV) $8,000.00 (Rounded) VI. Fixed Fee (Prime Only) 12.00% x (I +II) $900.00 (Rounded) VIII. Actual Cost Not to Exceed (V +VI +VII) $8,900.00 (Maximum Amount Payable) (Rounded)