Loading...
Sunset Ridge Reconstruction_Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque bierd All-America City 1 2007 SUBJECT: Sunset Ridge Reconstruction Project CIP 3002142 - Fiscal Year 2011 Street Construction Program CIP 7401405 - Fiscal Year 2011 Watermain Replacement Program CIP 3001629 - Fiscal Year 2011 Sunset Ridge Street Lighting CIP 7101801 - Fiscal Year 2008 Sunset Ridge Sanitary Sewer CIP 7202242 - Fiscal Year 2011 Storm Sewer DATE: May 29, 2012 City Engineer Gus Psihoyos recommends City Council acceptance of the improvements, establish the final contract at $1,225,080.15 and adopt the Final Schedule of Assessments for the Sunset Ridge Reconstruction Project. Based upon final construction costs, the total amount of special assessments for street improvements, water services, sanitary sewer, and sidewalk improvements is in the amount of $561,640.21, which is 16.99% ($114,913.35) below the preliminary special assessment estimate that was presented to the property owners and approved at the project public hearing. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on thc Mississippi T0: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Dubuque krfrid All-America City 2007 SUBJECT: Sunset Ridge Reconstruction Project CIP 3002142 - Fiscal Year 2011 Street Construction Program CIP 7401405 - Fiscal Year 2011 Watermain Replacement Program CIP 3001629 - Fiscal Year 2011 Sunset Ridge Street Lighting CIP 7101801 - Fiscal Year 2008 Sunset Ridge Sanitary Sewer CIP 7202242 - Fiscal Year 2011 Storm Sewer DATE: May 29, 2012 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract and the establishment of the Final Schedule of Assessments for the Sunset Ridge Reconstruction Project. BACKGROUND The Sunset Ridge Reconstruction Project provided for the following: - Reconstruction of a new 21 -foot wide concrete roadway with curb and gutter. - Installation of sidewalk on the west side of the street. - Reconstruction of approximately 1,600 lineal feet of watermain, mainline valves, fire hydrants, and the replacement of 5 lead residential water services and installation of one new copper service for a recently built lot. The cost of the individual lead residential water service replacements will be assessed to each of the 6 respective private property owners. - Reconstruction of approximately 500 lineal feet of storm sewer and 7 catch basins to improve the storm water conveyance in the area. - Installation of a sanitary sewer system. - Installation of historic pedestal street lights. The property owners have paid for this expense since it is above and beyond the City standard. DISCUSSION The Sunset Ridge Reconstruction Project was completed by Eastern Iowa Excavating and Concrete, LLC of Cascade, Iowa, in the final contract amount of $1,225,080.15 which is a 0.4% increase from the original contract in the amount of $1,220,261.22. RECOMMENDATION I recommend that the City Council accept the improvements, establish the final contract at $1,225,080.15 and adopt the Final Schedule of Assessments for the Sunset Ridge Reconstruction Project. BUDGET IMPACT The project cost summary for the Sunset Ridge Reconstruction Project is summarized as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost The project category cost summary is as follows: Award $1,220,261.22 113,924.79 170,887.19 $1,505,073.20 Street Construction Improvements Special Assessment — Street Improvement, Residential Properties Special Assessment — Street Improvement Deficiency, Paid by the City Special Assessment — Water Services, Residential Properties Special Assessment — Sanitary Sewer Lateral, Residential Properties Special Assessment — Sanitary Sewer Lateral Deficiency, Paid by the City Special Assessment — Water Service Deficiency, Paid by the City Sanitary Sewer Construction Fund Special Assessment — Concrete Sidewalk, Residential Properties Watermain Improvements Storm Sewer Improvements Street Lighting Improvements Total Project Cost Summary Final $1,225,080.15 0 98,498.09 $1,323,578.24 Amount $ 457,022.00 84,258.85 0.00 8,344.95 448,127.42 2,892.09 147.27 42,594.15 20,908.99 180,431.24 47,178.33 31,672.95 $1,323,578.24 The project funding summary is as follows: CIP No. Fund Description 3002142 Street Construction Program Special Assessments (Street, Sidewalk) 7401405 Watermain Replacement Program 7101801 Sunset Ridge Sanitary Sewer 7202242 Sunset Ridge Storm Sewer Improvements 3001629 Sunset Ridge Street Lighting Total Project Funding Fund Amount $ 457,022.00 105,167.84 188,923.46 493,613.66 47,178.33 31,672.95 $1,323,578.24 The Sunset Ridge Reconstruction Project will be funded through the annual capital improvement project appropriation of City funds as noted above in the amount of $758,898.67. The project, as outlined, will require Special Assessments in the amount of $561,640.21 and expenditure from the FY 2011 Annual Street Construction Program (funded through Local Option Sales Tax) in the amount of $457,022.00. SPECIAL ASSESSMENTS Based upon final construction costs, the total amount of special assessments for street improvements, water services, sanitary sewer, and sidewalk improvements is in the amount of $561,640.21, which is 16.99% ($114,913.35) below the preliminary special assessment estimate that were presented to the property owners and approved at the project public hearing. FINANCIAL ASSISTANCE Property owners subject to street improvements, water services, sanitary sewer, and sidewalk assessments may be eligible for the City's low and moderate income special assessment assistance program, ranging from 20% to 100% of the assessment, for the owner - occupied residential property depending on family size and income level. To allow sufficient administrative time to process financial assistance applications for low - to moderate - income families, eligible property owners will be given approximately 30 days from the date of mailing the Notice of Filing the Final Schedule of Assessments to apply for financial assistance that may reduce the amount of the assessment payable by the property owner. During this 30 -day period, assessments may be paid in full or in part without interest at the City of Dubuque, Office of the City Treasurer. After approximately 30 days, any unpaid assessment will be levied against said benefited property with the Dubuque County Treasurer and will be payable in 15 annual installments at the County Treasurer's Office, and will draw annual interest at nine percent (9 %). FINAL ASSESSMENT SCHEDULE The schedule for the Final Assessment process is as follows: Council Approve Final Schedule of Assessments Mail Final Special Assessments Notice to Property Owners Mail Financial Assessment Information to Property Owners Publish Notice of Final Assessment lst 1st Publication: 2nd Publication: Deadline for Financial Assistance Applications Deadline for Paying Assessment to City, Without Interest ACTION TO BE TAKEN June 4, 2012 June 8, 2012 June 8, 2012 June 8, 2012 June 15, 2012 July 16, 2012 July 18, 2012 The City Council is requested to adopt the attached resolutions accepting the improvements, establishing the final contract amount, and approving the Final Schedule of Assessments for the Sunset Ridge Reconstruction Project. Prepared by Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Bob Green, Water Department Manager Mary Rose Corrigan, Public Health Specialist Dan Brown, Fire Chief Rich Russell, Building Services Manager Ken Tekippe, Finance Director Greg Doeden, Civil Engineer Deron Muehring, Civil Engineer Dave Ness, Civil Engineer RESOLUTION NO.140 -12 ACCEPTING THE SUNSET RIDGE RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Sunset Ridge Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Street Construction Program, Watermain Replacement Program, Sunset Ridge Street Lighting, Sunset Ridge Sanitary Sewer, and Storm Sewer appropriations for the contract amount of $1,225,080.15 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 4th day of June , 2012. D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE SUNSET RIDGE RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Sunset Ridge Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,323,578.24. Dated this as day of PAM , 2012. City ngineer Filed in the office of the City Clerk on theJ ""day of .. , 2012. Kevin S. Firnsta , City Clerk RESOLUTION NO. 141 -12 ADOPTING THE FINAL ASSESSMENT SCHEDULE FOR THE SUNSET RIDGE RECONSTRUCTION PROJECT NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: After full consideration, the Final Schedule of Assessments as shown on the attached sheet(s), Page 1 to Page 1 inclusive, is hereby approved for the Sunset Ridge Reconstruction Project. There is hereby assessed and levied as a special tax against and upon each of the benefited properties, the respective sums indicated. The amounts shown in said Final Schedule of Assessments as deficiencies are found to be proper and levied conditionally against the respective properties benefited by the improvements a s shown in the Final Schedule of Assessments, subject to the provisions of Iowa Code § 384.63. Said assessments against said lots are hereby declared to be in proportion to the special benefits conferred and not in excess of twenty -five percent of the value of same. The City Clerk be and is hereby directed to certify the Final Schedule of Assessments to the County Treasurer of Dubuque County, Iowa, and to publish notice of said certification once each week for two consecutive weeks in the manner provided in Iowa Code § 362.3, the first publication of which shall be not more than fifteen days from the date of filing of the Final Schedule of Assessments. On or before the date of the second publication of the notice, the City Clerk shall also mail a copy of said notice to property owners whose property is subject to assessment, as provided in Iowa Code § 384.60. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13th Street, Dubuque, Iowa, at any time within 30 days after the date of the first notice of the Final Schedule of Assessments. Thereafter, unpaid assessments of $100.00 or more are payable in 15 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9 %) computed to December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi - annually in advance. Passed, approved and adopted this 4th day of June j 2012. oy D. Buo , Mayor NOTICE TO PROPERTY OWNERS OF FILING OF THE FINAL SCHEDULE OF ASSESSMENTS FOR THE SUNSET RIDGE RECONSTRUCTION PROJECT TO THE PERSONS OWNING PROPERTY WITHIN THE DISTRICT DESCRIBED AS FOLLOWS IN THE CITY OF DUBUQUE, IOWA: Sunset Ridge from Wartburg Place to the End The public improvement and location is as follows: The reconstruction of Sunset Ridge included the: reconstruction of the watermain; installation of a sanitary sewer system; installation of a street lighting system; installation of sidewalk on the west side of the street; and reconstruction of the roadway with a new 21 -foot wide concrete roadway with curb and gutter. The street is 1,600 feet long. Consisting of the properties which are described as follows: All properties along Sunset Ridge and additionally Lot 1 -1 & 2 -1 of ML 132 and "All" McDonald Wartburg Place. All property included with the areas described so as to include one -half of the privately owned property between each such street to be improved and the next street, whether such privately owned property situated more than 300 feet from the street to be improved be assessed. You are hereby notified that the Final Schedule of Assessments against the benefited properties within the District described above, a copy of which Final Schedule of Assessments is attached hereto, has been adopted and the assessments confirmed by the City Council of the City of Dubuque, Iowa, and that said Final Schedule of Assessments has been certified to the Dubuque County Treasurer. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13th Street, Dubuque, Iowa, at any time within 30 days after the date of the first notice of the Final Schedule of Assessments. Thereafter, unpaid assessments of $100.00 or more are payable in 15 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9 %) computed to December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi - annually in advance. Kevin S. Firnstahl, City Clerk CITY OF DUBUQUE IOWA SUNSET RIDGE RECONSTRUCTION PROJECT FINAL SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE May 10. 2012 The tollocong_cheduler hereby determined to :hoe, each lot propo :etl to be azezed for the impro ement :ho' ^'nin the title together '^n[h the amount propo:ed to be 3zezetl againd each lot and the glut ion : :ho' "moppo :tte each lot are hereby ti eda: the Oue aluation :of :uch lot by the Lit, =ounol of the {iq ot Dubuque PROPERTY OWNER NAME LOT DESCRIPTION PARCEL NUMBER VALUATION WITH IMPROVENENT CITT,STATE NET PAVING IMPROVEMENT COST TOTAL PUBLIC IMPROVEMENT COST WATER SERVICE COSTS SANITARY SEWER PRIVATE LATERAL COST CONCRETE SIDEWALK COST TOTAL NET ASSESSNENT WATER SERVICE DEFICIENCY SANITARY SEWER DEFICIENCY SANITARY SEWER CONNECTION CHARGE Hemmer:, e F Lot 1- _9 &_ -_9 Sun :et Pidge Sub 10352_52_001 P33_28959 Dubuque 14 52_003 P328449 P328449 (19805 10 PO 00 $22289 59 I oopmann, Leonard Jody Scott l oopr Lot I-1-2 ML 1_9 & Lot _ -1 Sun :et Pidge 10 35 1,9 003 F41659905 Dubuque 14 52_003 P8958, P8958, P194018 PO 00 $20299 05 w,agner, Hubert & Elma 11 Lot 1 -1 Sun :et Pidge sub 10352_51001 P3,9,,883, Dubuque 14 52_003 (3401,, P3401,, P16,988 55 0,39805 $22788 37 Scott, Michael H &1licola M Lot 2 Sun :et Ridge & Lot _ -1 -_ ML 129 10 35 179 004 P365,_1350 Dubuque 14 52_003 F2582 75 0582_75 P16,77014 P1,_6060 $20613 50 LEhmrtg, Margaret B Tru:tee Lot_, 1 -__2 _ -_' +run :et Phi, mh 10352_52_003 P34, d, 184 Dubuque 14 52_003 P,, 8139 F4,,9139 P14153, P19,0, 508 PO 00 $25271 80 w,ahlert,Su: n L TmYee Pe ocable Tr Sun :et Pidge Ho 2 Lot: 2-2 &2-1 Both ot ML 129 10351,9010 P59153206 Dubuque 14 52_003 P495980 P4,969 80 P18892 59 04596, $26,33206 ubbml, Bruce &18:ti P Lot 25 Sun :et Pidge sub 10352_52_004 P484283 25 Dubuque 14 52_003 F248490 048490 P19,38836 PO 00 $21873 26 Mohr, Matthe!! L' & Jenniter M Lot 25 Sun :et Pidge sub 10352_52_005 P3532548_ Dubuque 14 52_003 F248490 048490 P14153, P16,15455 PO 00 $2005082 Eddy, Jettrey 95 & L hahene4 Lot _ -1 -I ML 1_9 & Lot 5 sun :et Pidge 10351,900, 095298,2_ Dubuque 14 52_003 051412 051412_ PI ,53350 (185100 $2109872 Lie Long, Myra E Lot 24 Sun :et Pidge sub 10352_52_005 P408,3,503 Dubuque 14 52_003 050893 050893 PI,,35510 PO 00 $19,87503 Ienned, Jame: re & Fr ance_L' L!t :un :2 RdaeA Lot l -1 -11 L 1_'+ 10 35 1,9 008 P43489_ 51 Dubuque 14 52_003 F2,, 1359 0,,1359 018511, P102 55 $25692 51 I rein, Jon 11 & Mo1y4 Lot 22 & 5_0' Lot 23 Sun :et Pidge sub 10352_52_008 (342_81958 Dubuque 14 52_003 (3,033,9 P3833, 9 P1,885, 9 PO 00 $20,11958 Poling, Benjamin M Lot _1 mnr2 Rd, cut, 10352_52_009 (340,1512_4 Dubuque 14 52_003 053055 053066 PI,53058 PO 00 $20,161 20 onion, Stephen Li Lot l Sun :et Pidge #4 10352_51005 ( ,,9503_3 Dubuque 14 52_003 (,8842_3 ID 884 23 01,,42_35 09,555 $32,803 23 Pichard:on, Jame: P Lot l Sun :et Pidge #3 10 35 252 012 P34,506 I3 Dubuque 14 52003 F254545 054545 P198506, PO 00 $21,606 13 Their, Tony- & Enna 1 Lot _ Sun :et Ridge #3 &II 1,2 Lot 18 Sun :et Pidge 10352_52_014 094,,402_3 Dubuque 14 52_003 (392_153 P392163 (14153, P1965323 P000 $20,99023 P5380_ I alb, 4 ndre' ,,'E E. 8 onion, Rebecca E Lot l Sun :et Pidge #5 10351_51006 PO,,I,, 29 Dubuque 14 52_003 P4,388 81 P4,388 81 F21551, 8 042_5,0 $28 377 29 Fie der, M artn L & Fromm, Scott 1 310 Lot 1EEun_et Fiche 1035402_002_ 053,9812_9 Dubuque 14 52_003 PI_4447 P124447 P125810 P16,55972 PO 00 $19,181 29 P1472_7 P702 43 w,ertheimer, Mad & Barbara P Lot: 13, l -1- 14,2- 12 411in Sun :et Pidge 10 35 401 002 P550244 ,9 Dubuque 14 52_003 P3502 51 P350_51 PI 415815 (14,413 $22,10079 Heitman, 95e :Ie 95 &Harriet Lot 1- 15 Sun :et Pidge 1035402_005 P2,5,,0180 Dubuque 14 52_003 P340445 P340445 P14153, (184819, PO 00 $23 301 80 ,00 d "ar d, Thorns- II E. '1 bodice L Lot 2 Faldort Place 145 -c) & Lot_ _- 14 &_ -15 1035402_009 P55_43809 Dubuque 14 52_003 P7,00655 P7,006 56 F2_,18917 P542 35 $29,738 09 Smith, Peter L &Su :an M Lot 2-14 Sun :et Pidge 10 35 401 003 F251,39904 Dubuque 14 52_003 F283442 P28344_ (158,2_35 P1,392 _, $20,099 00 Iennedy, Jame: re &France =❑ Let_ un_etpidae_et 10352_51002_ P2,,59600 Dubuque l4 52_003 PI,1,2 18 PI,IC18 P000 PO 00 $1,17218 P1,558 ,3 Lie Long, M yra E II 80' or Bal Lot 23 Sun :et Pidge Sub 10352_52_007 P65,389 43 Dubuque 14 52_003 F2,00311 080311 048532_ PO 00 $0,089 03 Donlon, Stephen Li Lot.: :umet Fiche n5 10 35 401 005 P75,725 22 Dubuque 14 52_003 PI,978 89 P197889 PO 00 P1,_1806 $3,19695 045358 Fie der, M artn L & Fromm, Scott 1 Lot 17 Sun :et Pidge 1035402_003 (32_84179 Dubuque 14 52_003 F249317 049317 P3,04862 PO 00 $5501 79 _her mn, Timoth, 1 A 4 e1, 11 Lot lc mnrt Pdae 1035402_004 P51500, 1 Dubuque 14 52_003 F2 49085 049085 P14153, P9,394 48 PO 00 $13,30071 P155164 003 [burg Theological _ emmar 10 35 128 006 (991291 85 Dubuque 14 52003 PO 00 PO 00 PO 00 (n 1 85 $771 85 Donlon, '1hritine "ull" I LGOnaId VVn [burg Fla:e 10352_01007 P730,755 82 Dubuque 14 52_003 PO 00 PO 00 F244558_ PO 00 $2045582 $80258 85 $8,30095 $008,12702 $20,90899 $561,60021 $107 27 $2,89209 $0,01231 Ivinsterpieceon the Mississippi City of Dubuque - Engineering Division COUNCIL FINAL PROJECT NAME: SUNSET RIDGE RECONSTRUCTION CONTRACTOR: DATE: May 14, 2012 Eastern Iowa Excavating CONTRACT AMOUNT: $ 1,220,261.22 BID ITEM DESCRIPTION UNIT CONTRACT QUANTITY AMOUNT EARNED UNIT COST TO DATE TO DATE DEMOLITION & REMOVAL 1 Clearing & Grubbing 2 Remove Pavement 3 Remove Driveway 4 Remove Existing Storm Sewer 5 Remove Existing Storm Intake 6 Remove Existing Light Pole w. /Base 7 Remove and Salvage Hydrant EXCAVATION & STONE 8 Excavation, Unclassified 9 Excavation, Borrow 10 Excavation, Rock 11 Excavation, Common Utility Trench 12 Backfill, Limestone 13 Bedding Stone, 1" Clean 14 Backfill, Topsoil 15 Granular Sub -Base 16 Graded Stone Base 17 3" Crushed Stone Base 18 Trench Stabilization Stone LS SY SY LF Ea Ea Ea PAVEMENT 19 PC Concrete Pavement, (7 ") w/ Integral Curb, Class "C" 20 HMA 300k Surface Course, 1/2" (PG 64 -22) 21 Fixture Adjustment 22 PC Concrete Driveway, 6 ", Construct 23 PC Concrete Sidewalk, 4 ", Construct 24 6" Subdrain, Perforated Plastic Drain Tile 25 Reinforcing Steel, #4 Grade 60, Furnish and Install $ 2,500.00 $ 3.80 $ 6.65 $ 4.75 $ 115.00 $ 300.00 $ 350.00 1.00 $ 2,500.00 3462.91 $ 13,159.06 815.37 $ 5,422.21 50.00 $ 237.50 3.00 $ 345.00 10.00 $ 3,000.00 4.00 $ 1,400.00 Sub Total $ 26,063.77 CY $ 7.25 4320.00 $ 31,320.00 CY $ 16.00 325.00 $ 5,200.00 CY $ 90.00 280.99 $ 25,289.10 LF $ 4.25 $ - Ton $ 7.00 8704.61 $ 60,932.27 Ton $ 13.00 456.95 $ 5,940.35 SY $ 2.50 3280.81 $ 8,202.03 Ton $ 15.25 2188.91 $ 33,380.88 Ton $ 13.50 37.58 $ 507.33 Ton $ 13.80 2441.67 $ 33,695.05 Ton $ 20.00 $ - Sub Total $ 204,467.00 SY $ 38.90 4065.30 $ 158,140.17 Ton $ 130.00 93.14 $ 12,108.20 Each $ 250.00 6.00 $ 1,500.00 SY $ 35.70 804.14 $ 28,707.80 SY $ 29.75 638.50 $ 18,995.38 LF $ 8.00 2820.00 $ 22,560.00 LF $ 1.80 $ - Sub Total $ 242,011.54 STORM SEWER 26 Intake 101 -8 Each $ 1,700.00 7.00 $ 11,900.00 27 24" Dia. Preformed Storm Structure, Nyoplast or equal Each $ 1,450.00 5.34 $ 7,743.00 28 Storm Sewer, 12" HDPE Smooth Walled Pipe LF $ 24.25 516.00 $ 12,513.00 28A Storm Sewer, 15" HDPE Smooth Walled Pipe LF $ 27.50 _ 130.00 $ 3,575.00 29 Storm Sewer, 12" Flared End Section, HDPE Each $ 250.00 2.00 $ 500.00 29A Storm Sewer, 15" Flared End Section, HDPE Each $ 250.00 1.00 $ 250.00 30 Storm Sewer, 12" SDR 17 HDPE Pipe, Directional Bored LF $ 85.00 175.00 $ 14,875.00 31 Engineering Fabric (State Spec. 4196.01 -3) SY $ 3.00 73.30 $ 219.90 32 Stone Revetment Riprap - Class A SY $ 45.00 88.67 $ 3,990.15 Sub Total $ 55,566.05 SANITARY SEWER FORCEMAIN 33 Tie Into Existing Manhole Complete Inc. Pavement Patch LS $ 2,300.00 1.00 $ 2,300.00 34 Directional Drilling for HDPE - All Sizes LF $ 10.50 2467.00 $ 25,903.50 35 Trenching for HDPE - All Sizes LF $ 11.00 603.00 $ 6,633.00 36 Air Relief Station, Complete LS $ 5,600.00 1.00 $ 5,600.00 37 Flushing / Isolation Valve Manhole, Complete LS $ 3,100.00 1.00 $ 3,100.00 38 Flushing Manhole, Complete LS $ 2,200.00 1.00 $ 2,200.00 39 Connect 1 1/4" Lateral to Main Inc. fittings Each $ 400.00 27.00 $ 10,800.00 40 Curb Stop w/ Box , Complete Each $ 700.00 27.00 $ 18,900.00 41 3" SDR -11 HDPE LF $ 2.00 1852.00 $ 3,704.00 42 2" SDR -11 HDPE LF $ 1.75 495.00 $ 866.25 43 1 1/2" SDR -11 HDPE LF $ 1.00 198.00 $ 198.00 44 1 1/4" SDR -11 HDPE In R.O.W. LF $ 1.00 589.00 $ 589.00 Sub Total $ 80,793.75 SANITARY SEWER LATERAL 45 E -One Extreme Simplex Pump "D- Series" Inc Installation EA $ 5,750.00 23.00 $ 132,250.00 46 E -One Extreme Simplex Pump "D- Series" No Installation EA $ 4,300.00 1.00 $ 4,300.00 47 Electrical Connection - Inc Electrician & Permits EA $ 1,300.00 23.00 $ 29,900.00 48 1 1/4" SDR -11 HDPE Lateral LF $ 3.00 3611.00 $ 10,833.00 49 4" SDR -26 PVC Lateral LF $ 2.50 887.00 $ 2,217.50 50 4" Clean -out EA $ 300.00 24.00 $ 7,200.00 51 Trenching LF $ 15.50 2520.00 $ 39,060.00 52 Directional Drilling LF $ 11.25 2807.00 $ 31,578.75 53 Connect 4" to Existing Lateral - Inc Plumber & Permits EA $ 850.00 23.00 $ 19,550.00 54 Pump and Clean Existing Septic Tank Gal $ 0.15 33100.00 $ 4,965.00 55 Fill existing Septic Tank w /Sand Inc. Compaction Ton $ 50.00 329.96 $ 16,498.00 56 Fill existing Septic Tank w /Flowable Cy $ 165.00 20.00 $ 3,300.00 57 Protect and Repair Existing Landscape LS $ 16,500.00 1.00 $ 16,500.00 Sub Total $ 318,152.25 WATER MAIN 58 8" DIP, Class 52 w. /Polywrap LF $ 52.50 1582.00 $ 83,055.00 59 6" DIP, Class 52 w. /Polywrap LF $ 50.00 24.00 $ 1,200.00 60 8" RS Gate Valve & Box EA $ 1,250.00 2.00 $ 2,500.00 61 6" RS Gate Valve & Box EA $ 1,050.00 4.00 $ 4,200.00 62 8 X 6 Anchoring Tee MJ EA $ 500.00 4.00 $ 2,000.00 63 Fitting (8 ") Bend MJ EA $ 150.00 3.00 $ 450.00 64 8" Cap MJ EA $ 175.00 1.00 $ 175.00 65 6" Cap MJ EA $ 100.00 1.00 $ 100.00 66 Connect to Existing EA $ 1,000.00 2.00 $ 2,000.00 67 8" Mega Lug EA $ 100.00 16.00 $ 1,600.00 68 6" Mega Lug EA $ 90.00 27.00 $ 2,430.00 69 8" Field Lock Gasket EA $ 100.00 4.00 $ 400.00 70 Eclipse #88 Sampling Station EA $ 1,725.00 0.36 $ 621.00 71 8" Solid Sleeve EA $ 175.00 $ - 72 8 X 6 Reducer MJ X PE EA $ 175.00 1.00 $ 175.00 73 Fire Hydrant MJ EA $ 2,250.00 4.00 $ 9,000.00 74 Tracer Wire Access Box EA $ 50.00 4.00 $ 200.00 75 Copper Tracer Wire LF $ 0.35 1582.00 $ 553.70 76 3/4" Copper Service Line TYPE K LF $ 16.00 402.00 $ 6,432.00 77 1" Copper Service Line TYPE K LF $ 17.00 40.00 $ 680.00 78 1 1/4" Copper Service Line TYPE K LF $ 19.50 80.00 $ 1,560.00 79 Water Service Lines Stop Box, Curb Stop, Tap Installation 3/4" EA $ 1,150.00 21.00 $ 24,150.00 80 Water Service Lines Stop Box, Curb Stop, Tap Installation 1" EA $ 1,175.00 5.00 $ 5,875.00 81 Water Service Lines Stop Box, Curb Stop, Tap Installation 1 1/4" EA $ 1,300.00 1.00 $ 1,300.00 82 3/4" Copper Service Reconnect EA $ 1,000.00 14.00 $ 14,000.00 83 1" Copper Service Reconnect EA $ 1,050.00 5.00 $ 5,250.00 84 1 1/4" Copper Service Reconnect EA $ 1,200.00 1.00 $ 1,200.00 85 Insulation Board, 2 -Inch SY $ 30.00 64.00 $ 1,920.00 Sub Total $ 173,026.70 LIGHTING 86 Street Light Installation w /Precast Concrete Foundation EA $ 1,225.00 _ 10.00 $ 12,250.00 86A 24 -Inch Round Handhole EA $ 750.00 4.00 $ 3,000.00 87 Electrical Service, Main Controller, Install EA $ 2,200.00 1.00 $ 2,200.00 88 2" PVC Conduit, Schedule 40 - Trenched LF $ 4.00 1600.00 $ 6,400.00 89 Electrical Cable #8 XHHW LF $ 1.25 2900.00 $ 3,625.00 90 Electrical Cable #10 XHHW LF $ 1.00 300.00 $ 300.00 91 Electrical Cable #8 Ground LF $ 1.00 1450.00 $ 1,450.00 92 Electrical Cable #10 Ground LF $ 0.60 150.00 $ 90.00 Sub Total $ 29,315.00 MISCELLANEOUS 93 Sawcut, Concrete, Full Depth LF $ 2.00 499.00 $ 998.00 94 Sawcut, Asphalt, Full Depth LF $ 2.00 306.00 $ 612.00 95 Sod SY $ 5.00 472.00 $ 2,360.00 96 Watering MGAL $ 45.00 95.60 $ 4,302.00 97 Tree Preservation Measures LS $ 4,000.00 1.00 $ 4,000.00 98 Dust Control Surface Treatment MGAL $ 52.85 $ - 99 Erosion Control Plan - Operating Procedures LS $ 4,100.00 1.00 $ 4,100.00 100 Traffic Control & Safety Control LS $ 15,000.00 1.00 $ 15,000.00 101 Mobilization LS $ 30,000.00 1.00 $ 30,000.00 Sub Total $ 61,372.00 $ 1,190,768.06 RESOLUTION NO. 141-12 ADOPTING THE FINAL ASSESSMENT SCHEDULE FOR THE SUNSET RIDGE RECONSTRUCTION PROJECT NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: After full consider- ation, the Final, Schedule of Assess- ments as shown on the attached sheet(s), Page 1 to Page 1 inclusive, is hereby approved for the Sunset Ridge Recon- struction Project. There is hereby assessed and levied as a special' tax against and upon each of the benefited properties, the respective sums indicated. The amounts shown in said Final Schedule of Assess- ments as deficiencies are found to be proper and levied condi- tionally against the respective properties benefited by the improvements as shown in the Final Schedule of Assess- ments, subject to the provisions of Iowa Code § 384.63. Said assessments against said lots are hereby declared to be in proportion to the special benefits conferred and not in excess of twenty -five percent of the value of same. The City Clerk be and is hereby directed to certify the Final Schedule of Assess- ments to the County Treasurer of Dubuque County, Iowa, and to publish notice of said certification once each week for two consecutive weeks iri the manner provided in Iowa Code § 362.3, the first publication of which shall be not more than fifteen days from the date of filing of the Final Schedule of Assessments. On or before the date of the second publication of the notice, the City Clerk shall also mail a copy of said notice to property owners whose property is subject to assessment, as provided in Iowa Code § 384.60. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13th Street, Dubu- que, Iowa, at any time within 30 days after the date of the first notice of the Final Sdhedule of Assess- ments. Thereafter, unpaid assessments of $100.00 or more are payable in 15 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9 %) computed to December 1 next following the due dates of the respective installments as pro- vided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi - annually in ad -. vance. Passed, approved and adopted this 4th day of June, 2012. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, City Clerk NOTICE TO PROPERTY OWNERS OF FILING OF THE FINAL SCHEDULE OF ASSESSMENTS FOR THE SUNSET RIDGE RECONSTRUCTION PROJECT TO THE PERSONS OWNING PROPERTY WITHIN THE DISTRICT DESCRIBED AS FOL- LOWS IN THE CITY OF DUBUQUE, IOWA: Sunset Ridge from Wartburg Place to the End The public improve- ment and location is as follows: The reconstruction of Sunset Ridge included the: reconstruction of the watermain; instal- lation of a sanitary sewer system; instal- lation of a street lighting system; instal- lation of sidewalk on the west side of the street; and recon- struction of the roadway with a new 21- foot wide concrete roadway with curb and gutter. The street is 1,600 feet long. Consisting of the properties which are described as follows: All properties along Sunset Ridge and additionally Lot 1 -1 & 2- 1 of ML 132 and "All" McDonald ' Wartburg Place. All property - included with the areas described so as to include one -half of the privately owned pro- perty between each such street, to be improved and the next street, whether such privately owned pro- perty situated more than 300 feet from the street to be improved be assessed. You are hereby notified that the Final Schedule of Assess- ments against the benefited properties within the District described above, a copy of which Final Schedule of Assess- ments is attached hereto, has been adopted and, the assessments con- firmed by the City Council of the City of Dubuque, Iowa, and that said Final Schedule of Assess- ments has been cer- tified to the Dubuque County Treasurer. The assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13th Street, Dubu- que, Iowa, at any time within 30 days after the date of the first notice of the Final Schedule of Assess- ments. Thereafter, unpaid assessments of $100.00 or more are payable in 15 annual installments at the County Treasurer's Of- fice, Dubuque County Courthouse, 720 Cen- tral Avenue, Dubuque, Iowa, and will draw annual interest at nine percent (9 %) com- puted to December 1 next following the due dates of the respective installments as pro- vided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its . due date on July 1 of each year. However, when the last day of September is a Saturday or Sunday, that amount shall be delinquent from the second business day of October. Delinquent installments will draw the same delinquent interest as ordinary taxes. Property owners may elect to pay any annual installments semi - annually in, advance. Kevin S. Firnstahl, City Clerk FINAL SCHEDULE OF ASSESSMENTS SUNSET RIDGE RECONSTRUCTION PROJECT MAY 14,2012 PROPERTY OWNER NAME, LOT DES- CRIPTION, PARCEL NUMBER, CITY, STATE, TOTAL NET ASSESSMENT Nemmers, Genevieve F., Lot 1 -29 & 2 -28 Sunset Ridge Sub, 10 35 252 001, Dubuque IA 52003, $22,289.59 Koopmann, Leonard & Jody Scott Koopmann, Lot 1 -1 -2 ML 129 & Lot 2 -1 Sunset Ridge, 10 35 179 003, Dubuque • IA 52003, $20,299.05 Wagner, Hubert & Elma N., Lot 1 -1 Sunset Ridge Sub, 10 35 251 001, Dubuque IA 52003, $22,788.37 Scott, Michael H. & Nicola M., Lot 2 Sunset Ridge & Lot 2 -1 -2 ML 129, 10 35 179 004, Dubuque IA 52003, -$20,613.50 Schmitz, Margaret B. Trustee, Lots 27, 1 -28 & 2 -29 Sunset Ridge Sub, 10 35 252 003, Dubuque IA 52003, $25,271.84 Wahlert, Susan L. Trustee Revocable Tr., Sunset Ridge No 2 Lots 2 -2 & 2 -1 Both of ML 129, 10 35 179 010, Dubuque IA 52003, $26,332.06 Obbink, Bruce A. & Kristi R., Lot 26 Sunset Ridge Sub, 10 35 252 004, Dubuque IA 52003, $21,873.26 Mohr, Matthew D. & Jennifer M., Lot 25 Sunset Ridge Sub, 10 35 252 005, Dubuque IA 52003, $20,054.82 Eddy, Jeffrey W. & Charlene A., Lot 2 -1 -1 ML 129 & Lot 5 Sunset Ridge, 10 35 179 007, Dubuque IA 52003, $21,098.72 De Long, Myra E., Lot 24 Sunset. Ridge Sub, 10 35 252 006, Dubuque IA 52003, $19,875.03 Kennedy, James G. & Frances D., Lot 6 Sunset Ridge & Lot 1 -1- 1 ML 129, 10 35 179 008, Dubuque IA 52003, $25,692.51 Kreiss, Jon N. & Molly A., Lot 22 & S 20' Lot 23 Sunset Ridge Sub, 10 35 252 008, Dubuque IA 52003, $20,119.58 Roling, Benjamin M., Lot 21 Sunset Ridge Sub, 10 35 252 009, Dubuque IA 52003, $20,161.24 Conlon, Stephen D., Lot 1 Sunset Ridge #4, 10 35 251 005, Dubuque IA 52003, $32,803.23 Richardson, James R., Lot 1 Sunset Ridge #3, 10 35 252 012, Dubuque IA 52003, $21,606.13 Their, Tony A. & Anna K., Lot 2 Sunset Ridge #3 & N 1/2 Lot 18 Sunset Ridge, 10 35 252 014, Dubuque IA 52003, $24,990.23 Kalb, Andrew E. & Conlon, Rebecca E., Lot 1 Sunset Ridge #5, 10 35 251 006, Dubuque IA 52003, $28,377.29 Fiesler, Martin L. & • Fromm, Scott I., S 1/2 Lot 18 Sunset Ridge, 10 35 402 002, Dubuque IA 52003, $19,181.29 Wertheimer, Mark & Barbara R., Lots 13,1-1 - 14, 2 -12 All in Sunset Ridge, 10 35 401 002, Dubuque IA 52003, $22,144.79 Heitzman, Wesley W. & Harriet, Lot 1 -15 Sunset Ridge, 10 35 402 005, Dubuque IA 52003, $23,301.80 Woodward, Thomas N. & Charlice L, Lot 2 Faldorf Place (4.6 Ac) & Lots 2 -14 & 2-15 Sunset Ridge, 10 35 402 009, Dubuque IA 52003, $29,738.09 Smith, Peter L. & Susan M., Lot 2 -14 Sunset Ridge, 10 35 401 003, Dubuque IA 52003, $20,099.04 2t 6/7, 14 STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald,a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: June 07 & 14, 2012, and for which the charge is $185.20. Subscribed to before me a Notary Public in and for Dubuque County, Iowa, this 7540 day of , 20 /Z. . Notary Public in and for Dubuque County, Iowa. fi P WESTERMEYER ; � o C®mmlielon Number 154885 CHANGE ORDER - EXTRA WORK ITEMS 1 Repair 22 yards that were ready for seed and 9 that were seeded = 50% of Yard restore 2 Straw Mulch for steep yards - $2.22/SY x 1500 SY = $3,300 3 Hydroseeding behind curb and walk on both sides of street 4 4" HDPE & Adapters 5 Cut MH Top in setting PDMH #1 6 Check valves for E -one pumps 7 Hydrant Risers PREVIOUS CURRENT TOTAL TOTAL PAY PERIOD ADJUSTMENT ADJUSTMENT ADJUSTMENT TO DATE $ 8,275.00 $ 8,275.00 $ 3,300.00 $ 3,300.00 $ 13,160.00 $ 13,160.00 $ 1,783.60 $ 1,783.60 $ 2,265.49 $ 2.265.49 $ 3,696.00 $ 3,696.00 $ 1,832.00 $ 1,832.00 total Amount Earned to Date - Change Order: Total Amount Earned to Date: Total Due Contractor: Total Engineering: Misc Costs: Total Project Cost: $ 1,225,080.15 $ 98,498.09 $ 1,323,578.24 Ls 34,312.09 $ 1,225,080.15 CERTIFICATE OF THE CITY MANAGER: a) m .5) C as w 3 _> • O U aj a o O o o t ❑ a o 0 U CERTIFICATE OF THE CONTRACTOR: W ac 0 C d 0 m The undersigned, C E a) O 0. E a N O N E m U m 0 a) E a) a) 0 U) of 0 O m F Z O 0 0 a) is 0 F a) 0 n m a) L 0 m O U 03