Loading...
City Wide Water Meter Replacement_Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque bierd All-America City 1 2007 SUBJECT: Final Acceptance of the City Wide Water Meter Replacement and Unmeasured Flow Reducer (UFR) Installation Project. CIP #740 -2052 Estimated Cost $8,676,700, Final Cost $7,324,285, Less American Recovery and Reinvestment Act (ARRA) $1,000,000 Forgivable Loan, Final Borrowed Cost $6,324,285 DATE: May 16, 2012 Water Department Manager Bob Green is recommending acceptance of the City Wide Water Meter Replacement and Unmeasured Flow Reducer (UFR) Installation Project, as completed by Northern Water Works Supply, in the final contract amount of $7,324,285. With the original total projected project cost estimate of $8,676,700 and the final project cost of $7,324,285, the project was completed at an estimated $1,352,415 or 15.6% below the projected budgeted amount. Including the unanticipated $1,000,000 forgiveable loan component from Federal Stimulus funds, the project was $2,352,415 or 27.1% under expected City funded costs. The original Northern Waterworks Supply contract price in providing services for this project was $5,493,293. The final cost for the original services provided is $5,290,864.67. Change orders increased the final expense to $6,016,022.79. At the end of September, 2011, each of the 22,168 water meters in the City of Dubuque had been replaced with new meters. These new meters feature automated meter readings (AMR) capabilities, which have eliminated the need to manually read each meter every month, which will save the city more than $144,000 each year. The last time these water meters were replaced was in the early 1980s. In 30 years, not only did the technology change, so did environmental awareness. There needed to be a greater need to conserve resources such as water and the old meters were replaced due to their age and inability to accurately measure flows. The new water meters are equipped with a radio frequency meter interface unit (MIU), which collects meter usage data and remotely transmits the information to data collectors. The MIU and water meter work as a unit to detect intermittent leaks, continuous leaks, reverse flow, and zero usage situations. The system will automatically transmit meter usage data over radio frequency waves each hour to data collectors placed in 14 locations throughout the community and with the IBM portal, will allow customers to see their own meter readings. During the project, the city changed the measurement of water consumption from cubic feet to gallons to allow customers to be more aware of how much water they are using. The new water meters, manufactured in the U.S. by Neptune Technology Group, are also fitted with the Unmeasured Flow Reducer (UFR), manufactured locally by the A.Y. McDonald Manufacturing Corporation. The UFR allows measurement of flows below 1/4 gallon per minute — such as leaks and drips — that have been previously immeasurable by aged meters and customers can easily read the water meter display to see if they have an intermittent leak. A small water faucet icon displayed continuously on the meter shows the customer there is a continuous flow of water. This new system is an example of the City's ongoing sustainability initiative and allows water customers to identify waste and consider corrective measures which will translate into "Smarter" water use and increased energy savings. More efficient water use will also reduce the use of both energy and chemicals in the treating and delivering water. According to national research, 30 percent of households have water leaks. As part of this project, the City created a grant program for financial assistance on costs of repairs of leaks identified through this project. The City will pay 50 percent of the replacement cost, not to exceed $100, for repairs made to devices inside the home. To date, there have been 401 homeowners who have filed for assistance in the total amount of $16,828 being paid back to the customer for repairs completed. Prior to the beginning of the city wide meter replacement program, volunteers were solicited for Dubuque's "Smarter" Water Project, as a pilot study of volunteer households and were provided with advanced water meter technology, or "Smart Meters ". The twelve month study was part of the City of Dubuque's Smarter City Partnership with IBM Research. IBM Technology has interfaced with the City's system to process water consumption data and provide near real time visibility into the overall city water consumption. The project will help citizens become more aware of their habits and how they can change them in order to save money as well improve the environment. A critical objective of the Smarter Sustainable Dubuque Initiative with IBM is to provide Dubuque citizens with information that will be directly helpful in reducing their costs and conserving resources. As part of this project, IBM Research is developing a new service system integration, data management, and analytic technologies that will create new insights for our customers which will translate into better water utilization and energy savings. The vendor, Northern Water Works Supply, Inc., who was selected for this project, hired twelve local citizens as part of their installation team and used two local major plumbing 2 firms as needed with the project. Those being Jaeger Plumbing and Modern Piping, Inc., both of Dubuque. Northern Waterworks subcontracted the sixteen collector antennas that were installed to RACOM Communications of Dubuque. Use of the Unmeasured Flow Reducer (UFR) Device with this project has had the following impact: • The UFR manufactured by the A.Y. McDonald Company directly supports ten positions and indirectly supports a team of 200 manufacturing local employees. • It has assisted consumers in identifying inefficiencies in their water system. • Local plumbers and others in this field have experience significant increases in business. The citizens of Dubuque have been exceptionally cooperative in supporting this project, which is now complete. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Bob Green, Water Department Manager 3 Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Bob Green, Water Department Manager Dubuque bierd All-America City 1 2007 SUBJECT: Final Acceptance of the City Wide Water Meter Replacement and Unmeasured Flow Reducer (UFR) Installation Project. CIP #740 -2052 Estimated Cost $8,676,700, Final Cost $7,324,285, Less American Recovery and Reinvestment Act (ARRA) $1,000,000 Forgivable Loan, Final Borrowed Cost $6,324,285 DATE: April 19, 2012 INTRODUCTION: The enclosed Resolution and Certificate of Completion are provided for the acceptance of the replacement of 22,168 city water meters, the installation of 18,053 Unmeasured Flow Reducers (UFRs) and purchase of the remaining stock material for inventory. The final cost of the project was $7,324,285. DISCUSSION: On December 7, 2009, the city -wide meter change out project was awarded to Northern Water Works Supply of Blaine, Minnesota. Neptune meters were installed, capable of radio transmission of data through 14 collector antennas. In addition, Unmeasured Flow Reducer Devices (UFR) from A.Y. McDonald Corporation of Dubuque, Iowa were installed where applicable. The functionality of the UFR device compliments the new metering system by increasing the ability to detect and measure low -flow usage. This will enable us to more accurately bill our customers for their actual usage and will assist in identifying household leaks. This allows our customers to identify waste and consider corrective measures, which translates into "Smarter" water use and increased energy savings. The original contract price in providing services for this project was $5,493,293. The final cost for the original services provided is $5,290,864.67. Change orders increased the final expense to $6,016,022.79. The difference in cost of $725,158 is as follows: 1 Northern Water Works Expense Summary: Description NWWS Contract NWWS Contract Adj — IBM Pilot NWWS Contract Adj — Inventory Purchases NWWS Contract Adj — Large Meter Plumbing Modif. NWWS Final Project Total Costs Bid Award $5,493,293 - 0- 137,000 - 0- The following is a summary of the costs associated with this project: Postage & Shipping Printing & Binding Miscellaneous Mileage /Local Transp. Telephone Tellecommunication CG Misc. Operating Expenses Audit Services Consulting Engineers Legal Services Software Micro - Computer Northern Water Works J & R Supply UFR Devices 62030 $ 7,829.74 62090 10,987.05 62240 1,620.07 62340 599.00 62421 4,444.65 62423 305.45 62671 1,164.83 62726 5,100.00 62712 366,273.62 62713 8,538.97 71123 16,582.70 71124 5,600.28 73211 6,016,022.79 73211 870,796.21 $ 7,324,285.90 Final Expense $5,290,864.67 367,052.17 290,032.63 68,073.32 $6,016,022.79 FINAL BUDGET IMPACT: The final budget impact cost summary for the City's Water Meter Replacement Project is as follows: DESCRIPTION Construction Contract *Miscellaneous Services Contingency Unmeasured Flow Reducers Engineering & Inspection Total EST. PROJECT COST $ 5,640,293 -0- 1,098,659 $ 1,500,000 $ 356,019 $ 8,594,971 FINAL COST $6,016,022.79 74,447.70 -0- 870, 796.21 363, 019.37 $ 7,324,285.90 *Miscellaneous purchases and services provided are identified in the attached Exhibits I -IV on Page 9 -12. 2 Project Funding — CIP #740 -2052 Estimated Project Cost $ 8,676,700 Final Project Cost 7,324,285 American Recovery Reinvestment Act (ARRA) Forgivable Loan 1,000,000 Final Borrowed Cost $6,324,285 The project funding summary is as follows: CIP No. Funding Description 740 -2052 Water Meter Replacement Project Fund Amount $ 8,775,709 The original budget for the SRF loan on this project was $8,675,700. The final cost is $7,324,285 with $1,000,000 as a forgivable loan that was awarded to the city. This brings the project debt to $6,324,285. With the original total projected project cost estimate of $8,676,700 and the final project cost of $7,324,285, the project was completed at an estimated $1,352,415 or 15.6% below the projected budgeted amount. Including the unanticipated $1,000,000 forgiveable loan component from Federal Stimulus funds, the project was $2,352,415 or 27.1% under expected City funded costs. CHANGE ORDERS: The following summary will focus on the justification with other vendors who had additional costs to this project. They are as follows: 1. HDR Engineering: An increase in the amount of $38,267 was for additional services requested during the project, which provided information concerning water conservation techniques. This delayed the project closure date by six months. 2. Unmeasured Flow Reducer (UFR) No Lead: There were specification changes to the UFR device unit cost. Reduced lead UFR devices were specified after the start of the project. This was to comply with new lead rules mandated by the EPA which will be enforced in 2014. This impacted the project by $43,836. Even with the increased cost of the reduced lead UFR, the overall cost for the device and installation, were below the original projected expense. This was the result of fewer units being installed. The projected number of units was 22,168 and the total units installed were 18,053. The reduction was due to the devices not being able to be installed on lines where the water pressure would be below 35 PSI and where pressure reducing valves were present. (Note: Current standards for lead is 8.0 %, 2014 new standard 0.25 %) 3 3. Water Conservation Pilot Project: An additional expense of $367,052.17 was added to the project to accommodate a pilot study as part of the City's Sustainability Program. In the beginning of the project, 509 Neptune R -900 Hybrid series water meters with Gateway transmitters were installed as part of the City's Sustainability Initiative Pilot Program in part with IBM. These 509 meters were later replaced with the R -450 meter system. SMART WATER METER PROJECT: At the end of September, 2011, each of the 22,168 water meters in the City of Dubuque had been replaced with new meters. These new meters feature automated meter readings (AMR) capabilities, which have eliminated the need to manually read each meter every month, which will save the city more than $144,000 each year. The last time these water meters were replaced was in the early 1980s. In 30 years, not only did the technology change, so did our environmental awareness. There needed to be a greater need to conserve resources such as water and the old meters were replaced due to their age and inability to accurately measure flows. The new water meters are equipped with a radio frequency meter interface unit (MIU), which collects meter usage data and remotely transmits the information to data collectors. The MIU and water meter work as a unit to detect intermittent leaks, continuous leaks, reverse flow, and zero usage situations. The system will automatically transmit meter usage data over radio frequency waves each hour to data collectors placed in 14 locations throughout the community and with the IBM portal, will allow customers to see their own meter readings. During the project, the city changed the measurement of water consumption from cubic feet to gallons to allow customers to be more aware of how much water they are using. The new water meters, manufactured in the U.S. by Neptune Technology Group, are also fitted with the Unmeasured Flow Reducer (UFR), manufactured locally by the A.Y. McDonald Manufacturing Corporation. The UFR allows measurement of flows below 1/4 gallon per minute — such as leaks and drips — that have been previously immeasurable by aged meters and customers can easily read the water meter display to see if they have an intermittent leak. A small water faucet icon displayed continuously on the meter shows the customer there is a continuous flow of water. This new system is an example of the City's ongoing sustainability initiative and allows water customers to identify waste and consider corrective measures which will translate into "Smarter" water use and increased energy savings. More efficient water use will also reduce the use of both energy and chemicals in the treating and delivering water. According to national research, 30 percent of households have water leaks. As part of this project, through a separate CIP, the City created a grant program for financial assistance on costs of repairs of leaks identified through this project. The City will pay 50 percent of the replacement cost, not to exceed $100, for repairs made to devices 4 inside the home. To date, there have been 401 homeowners who have filed for assistance in the total amount of $16,828 being paid back to the customer for repairs completed. The project was accomplished with new meters being installed by geographic "zones" over a 21 month period. Customers received a notification letter when it was time for them to schedule their installation appointment. The City contracted this project with Northern Water Works Supply (NWWS) to install the new meters and UFR devices. A NWWS representative arrived during the scheduled timeframe and with required access to the water meter inside the home or business. Each installation took approximately an hour. Water service was interrupted at each location while the water meter was replaced, but customers were able to use the water as soon as the installation was completed. All NWWS installers were properly trained and background checks were conducted. NWWS employees had identification badges, wore identifiable uniforms and drove properly marked vehicles. Prior to the beginning of the city wide meter replacement program, volunteers were solicited for Dubuque's "Smarter" Water Project, as a pilot study of volunteer households and were provided with advanced (R -900) water meter technology, or "Smart Meters ". The twelve month study was part of the City of Dubuque's Smarter City Partnership with IBM Research. IBM Technology has interfaced with the City's system to process water consumption data and provide near real time visibility into the overall city water consumption. The project will help citizens become more aware of their habits and how they can change them in order to save money as well improve the environment. A critical objective of the Smarter Sustainable Dubuque Initiative with IBM is to provide Dubuque citizens with information that will be directly helpful in reducing their costs and conserving resources. As part of this project, IBM Research is developing a new service system integration, data management, and analytic technologies that will create new insights for our customers which will translate into better water utilization and energy savings. COMMUNITY IMPACT JOBS: The vendor, Northern Water Works Supply, Inc., who was selected for this project, hired twelve local citizens as part of their installation team and used two local major plumbing firms as needed with the project. Those being Jaeger Plumbing and Modern Piping, Inc., both of Dubuque. Northern Waterworks subcontracted the sixteen collector antennas that were installed to RACOM Communications of Dubuque. During the project and its completion, one employee working for Northern Water Works (a Dubuque citizen) became a full -time employee with the City of Dubuque Water Department. A.Y. MCDONALD MANUFACTURING: 5 Use of the Unmeasured Flow Reducer (UFR) Device with this project has had the following impact: • The UFR manufactured by the A.Y. McDonald Company directly supports ten positions and indirectly supports a team of 200 manufacturing local employees. • It has assisted consumers in identifying inefficiencies in their water system. • Local plumbers and others in this field have experience significant increases in business. The citizens of Dubuque have been exceptionally cooperative in supporting this project, which is now complete. ACTION: It is with the City's Consultant Engineers and staff's recommendation that the City Council adopt the attached Resolution and Certificates of Completion (Exhibits V and VI) in accepting the improvement for the City's Water Meter Change Out Project at the final cost of $7,324,285. I have attached for your review a copy of expenses associated to this project (Exhibits I — IV) Staff and I are available to discuss and answer any questions you may have. BG:ve Attachments cc: Ken TeKippe, Finance Director Chris Kohlmann, Information Services Director Mike Brekke, Water Distribution Supervisor Jackie Rodriguez, Water Plant Manager Jenny Larson, Budget Director File 6 EXHIBIT 1 City of Dubuque Water Meter Changeout Project FINAL CIP# 7402052 # 2119 HDR En- ineering =- :.:.;: :. ObjectCode ;. : Original PQ.:. Payments • :: .: Add'l Services /Products PO# 49578 - Engineering /Consultant 62712 356,019,00 324 752.30 38,267.07 PO# 53937 - UFR devices 73211 2,169.50 2,169.50 4,663.00 PO# 53939 -UFR devices 73211 1,084.75 1,084.75 PO# 54680 -UFR devices 73211 2,169.50 2,169.50 208,454.25 PO# 55991- Couplings & Gaskets 73211 Total for HDR $ 324,752.30 $ 38,267.07 #2394 J&R u l Co an ..5 pp.Y .......!:gip. Y. Object Code : J Ori final P® .:.::. ..,.. g ....... :::::.:::::.: Payments ::.:. °::: ... Y > i.. ; : Additional Products PO# 53810 - UFR's FY10 partial 73211 654,198.99 654,198.99 73211 PO# 53937 - UFR devices 73211 2,169.50 2,169.50 4,663.00 PO# 53939 -UFR devices 73211 1,084.75 1,084.75 PO# 54680 -UFR devices 73211 2,169.50 2,169.50 208,454.25 PO# 55991- Couplings & Gaskets 73211 1,330.00 1,330.00 2,748.55 PO# 56692 - 5/8 UFR for Meter Change 62712 3,254.25 3,254.25 975.91 PO# 56908 - UFR devices 73211 4,339.00 4,339.00 PO# 57418 - UFR devices 73211 1,084.75 1,084.75 PO# 57680 - UFR devices 73211 2,169.50 2,169.50 PO# 55530 - Meters and Decoders 73211 PQ# 58171- UFR devices 5/8 73211 44,257.80 44,257.80 16,224.00 PO# 58430 - UFR Re- setting 73211 1,421.00 1,421.00 16,224.00 PQ# 58433 - UFR devices 73211 18,527.53 18,527.53 PO# 58502 - UFR devices 73211 3,037.30 3,037.30 PO# 58432 - Meter wire 73211 PO # 65952 - Meter Adapters 73211 965.00 965.00 556.82 PO # 67549 - Lead Free UFR's 73211 150,000.00 140,618.88 615.76 Credit for Defective UFR 73211 36,605.52 (71.05) PO # 73771 - 3/4" UFR meter setter 73211 675.89 675.89 PO # 62568 - Pit Meters 73211 Credit for UFR's 73211 (10,436.38) 73211 1,593.56 1,593.56 PO # 62160 - Meters 73211 7,634.76 7,634.76 Total for AR Supply $ 870,796.21 $ - #8862 Northern Water Works Supply Object Code :: >:: `` Ori inai PO Payments .: Additional Products '. PO# 53824 - Contract 73211 5,500,000.00 5,290,864.67 PO# 55000 - Meter gallon ecoder 73211 5,434.08 5,434.08 PO# 55001- Equinox -Mr Host software Is actually part of PO# 56148 73211 4,663.00 4,663.00 PO# 56148 - IBM Pilot Project - see also PO# 55001 73211 208,454.25 208,454.25 PO# 55002 - Meters & strainers 73211 2,748.55 2,748.55 PO# 54900 - "DUBUQUE" labels 73211 975.91 975.91 Direct Pay - Meter gaskets 73211 - 22.37 PO# 55293 - Flag, ecoder, strainer 73211 1,756.40 1,756.40 PO# 55294 - Meters 73211 628.92 628.92 PO# 55530 - Meters and Decoders 73211 4,203.90 4,203.90 PO# 56901- Connectors /Pig Tail 73211 16,224.00 16,224.00 PO# 57496 - MIU Assemby /Pigtail 73211 16,224.00 16,224.00 PO# 58002 - 3" Meter & Supplies 73211 1,632.43 1,632.43 PO# 58294 - MIU / Register adapter J 73211 325.00 331.00 PO# 58432 - Meter wire 73211 1,500.00 1,539.79 PO # 62846 - 1 1/2" Meters 73211 556.82 556.82 PO # 62843 - B &G Set 73211 615.76 615.76 PO # 62841- Meters 73211 36,605.52 36,605.52 PO # 62605 - Seal Pins & 3/4 Meters 73211 1,867.76 1,867.76 h PO # 62568 - Pit Meters 73211 1,440.04 1,440.04 PO # 62350 - Meters 73211 1,593.56 1,593.56 PO # 62160 - Meters 73211 7,634.76 7,634.76 PO # 57477 - Handhelds 73211 ............. 15,740.00 13,790.00 PO # 61354 - MIU`s 73211 720.00 720.00 PO # 61541 Phase C2 Misc Equip. 73211 326,964.61 117,629.67 PO # 58530 Meter Part & Acc. 73211 2,913.98 2,913.98 PO # 63518 Meters 73211 9,148.54 9,148.54 EXHIBIT 11 PO # 63517 1 1/2" Meters PO # 63708 - MIU's PO # 63520 - 2" Meters PO # 63521 - Strainers PO # 63522 - 2" Meters 73211 1,113.64 73211 16,224.00 73211 1,097.67 111=M1 924.00 73211 2,195.34 1,113.64 16,224.00 1,097.67 924.00 2,195.34 -PO # 63519 - 2" Meters 73211 1,097.67 1,097.67 PO # 65550 - Pit Miu assy, Register E -Code 73211 2,473.68 2,473.68 { PO # 65918 - Lead Meter Seal 73211 2,600.00 2,600.00 PO # 66221 - Ancillary Op. Support 73211 10,625.00 9,375.00 PO # 66220 - Large Meter Install Add 73211 9,312.76 9,312.73 PO # 66222 - MIU Labels 73211 1,465.00 1,465.09 PO # 66495 - Fastener Screws 73211 220.00 220.00 PO # 66497 - Misc. Suples 73211 4,166.60 4,166.60 PO # 67462 - MIU's 73211 8,112.00 8,112.00 PO # 67126 - Meters, Strainers 73211 6,447.88 6,447.88 PO # 67127 - Pit Register 73211 600.02 600.02 PO # 67128 - G &N sets, Gaskets 73211 994.00 994.00 PO # 67624 - Cmpd meters, strainers 73211 1,632.43 1,632.43 PO # 67763 - Cmpd meters, strainers 73211 7,331.12 7,331.12 PO # 67764 - MIU's 73211 8,112,00 8,112.00 PO # 67765 - Domes, B &N Sets 73211 223.08 223.08 PO # 67766 - Registers 73211 1,000.04 1,000.04 PO # 67767 - Domes, B &N Sets 73211 1,112.90 1,112.90 PO # 67950 - Registers 73211 900.09 900.09 .P0 # 68074 - Large Meters 73211 17,755.52 17,755.52 MMIIIIIIIIIIIIMIM PO # 68125 - Registers 73211 2,500.00 2,500.00 PO # 68475 - Tricon E3 Reg 1,000.04 1,000.04 PO # 68891 - Large Meter Add -On 16,468.70 16,468.70 PO # 69464 - B &N Set, gaskets, brz mtr flg 73211 838.98 838.98 PO # 70022 - Brz mtr flg fipt, B &N 73211 966.42 966.42 PO # 70249 - City stock MIU's, meters, strai 73211 10,398.54 10,398.54 PO # 70231- Large meter add -ons 73211 11,595.00 11,595.23 PO # 70953 - Couplings 73211 709.50 709.50 PO # 70995 - Misc Supplies 73211 140.02 140.02 PO # 70022 - Brz mtr flg fipt, B &N -CR IIMEREI (966.42) (966.42) PO # 71724 - Spud Plugs 73211 313.00 313.00 PO # 72509 - MIU Labels 73211 1,250.00 1,250.00 PO # 73376 - MIU's 2,400.00 2,400.00 PO # 73495 - Large Meters 11,230.00 11,230.98 PO # 73768 - Registers, meters 545.01 545.01 PO # 73769 - 5/8 meters 73211 708.78 708.78 • PO # 73970 - Eclipse 100.008 Scothclok .1=11W‘ 73211 88.68 88.68 PO # 74349 - 3 RR Full Face FIg gasket 73211 2.92 2.92 PO # 74349 - 2-+3 304 SS FLG B &N SET 73211 101.26 101.26 PO # 74531 - 3 Hydrant Meter w /NST CLP 73211 4,692.00 4,692.00 PO # 74451 - Register 3 F/H TUR D/R MBE 420.00 ...................... ........ ............................... 420.00 PO # 74836 - R450 Wall MIU Hi Power MEM 1,071.60 1,071.60 PO # 74760 - Stock 73211 7,386.71 7,386.71 PO # 75249 - Misc. Supplies 73211 5,164.71 5,164.71 PO # 75251 - Supplies 73211 1,045.52 1,045.52 PO # 77351 - Supplies 73211 471.40 471.40 { PO # 77389 - Large Meter Install 982.16 982.16 IIIMBEI PO # 78643 Stock Acquisition 73211 56,981.62 56,981.62 PO # 78560 IBM Pilot 73211 20,081.25 20,081.25 PO # 78561 Large Meter Install 73211 728.00 728.00 Total for NWWS $ 6,016,022.79 IIIIIIIIIIIII EXHIBIT 111 Other ::. :.:: .: Object Code Description Payments Check Date City of Dubuque / Five Flags 62240 10/27/09 beverages 96.76 11/10/09 City of Dubuque / Five Flags 62240 11/17 -18/09 beverages 81.42 12/08/09 Fedex 62030 Ship loan application 24.52: 01/05/10 City of Dubuque / Five Flags 62240 1/5 -6/10 beverages 103.85 01/19/10 First Supply PO #54663 73211 Fittings 813.67 01/26/10 O'Toole Office Supply 62240 Folders 60.00 02/16/10 O'Toole Office Supply 62240 Folders 75.00 02/16/10 Outgoing Postage (City Hall Meter) 62030 Postage - special mailing 2,071.17 ' 03/02/10 Welu Printing 62090 #10 Envelopes - NWWS use 1,830.00 101.67 03/02/10 Welu Printing 62090 UB Window Envelopes - special mailing 345.00 • 04/07/10 03/02/10 Scott Printing 62090 Flyers - special mailing 1,029.10 Dell Computer 71124 Mississippi Valley Sales 62090 Computer Toner cartridge replacement - due to special mailings 1,880.96 169.00 Electronic Communication Systems 71124 LDC projector & case 778.41 03/16/10 Midwest Printing 62090 Brochures 656.00 03/24/10 Hotel Julien 62240 3/10/10 room, breakfast 288.00 03/24/10 O'Toole Office Supply 62240 Clipboards 29.85: 03/24/10 AT &T Mobility 62423 Data Lines 22.10 03/24/10 Dell Computer Laptop Water Distribut 2,097.91 03/24/10 Dubuque Area Chamber of Commerce 62240 Caramels • participants 35.10 03/31/10 Ella M. La hey 62240 Stop watches 90.93 03/31/10 Outgoing Postage (City Hall Meter) 62030 Postage 5,734.05 04/07/10 City of Dubuque - Stores 62090 Copy Paper 101.67 04/07/10 Kenneth J. TeKippe 62340 Mileage 197.00 • 04/07/10 Ahlers & Cooney 62713 Legal services 8,538.97: 04/07/10 Sungard Pentamation - PO# 55406 71123 Meter import project 5,250.00 : 04/07/10 Sungard Pentamation - PO# 55560 71123 Equinox Meter Reading 4,500.00. 04/07/10 Sungard Pentamation - PO# 55406 71123 Meter import project (5,250.00) 04/07/10 Sungard Pentamation - PO# 55560 71123 Equinox Meter Reading (4,500.00) 04/07/10 Scott Printing 62090 Disconnect door hangars 133.00 i 04/21/10 AT &T Mobility 62421 Data Lines 283.35 04/21/10 Sungard Pentamation - PO# 55406 O'Toole Office Supply Dora M. Serna 71123 71124 62240 Scott Printing AT &T Mobility Meter import project Screen & Laser Pointer Translate documents 62090 Leak Repair Grant Policy 1,312.00 05/12/10 843.00 05/12/10 124,95 05/19/10 288.86 05/26/10 Sungard Pentamation - PO# 55560 Journal Entry to City of Dubuque Holy Family Catholic Dubuque Community School Dist J Dubuque County Hospital Board 1St Joseph Key West Parish IAT &T Mobility 62421 Data Lines 71123 62340 62240 62240 62240 62240 62423 Balance of Meter Import 283.35 3,938.00 05/26/10 05/26/10 4 parking meter cards License Agreements License Agreements License Agreements License Agreements 140.00 41.00 82.00 41.00 Data Lines 41.00 283.35 06/10/10 06/15/10 06/15/10 06/15/10 06/15/10 06/22/10 Scott Printing 62090 739.20 06/25/10 i AT &T Corporation 62421 Data Lines 283.35 07/28/10 AT &T Mobility 62421 Data Lines 283.35 08/25/10 Midwest Printing (8985) -PO 4 62847 62090 Printing 1,316.27 08/31/10 AT &T Mobility 62421 Data Lines 283.35 09/28/10 City Treasurer /PC 62340 Meter Money 57.00 10/12/2010 AT &T Mobility 62421 Data Lines 276.35 10/26/2010: Menards - PO# 64105 62671 Misc. Supplies 105.97 10/12/2010! Sisters 62240 License Agreements 21.00 11/23/2010 AT &T Mobility 62421 Data Lines 276.35 11/23/2010 Parking 62340 Parking Meter Cards 105.00 10/29/2010 City Treasurer /PC 62340 Parking Meter Money 50.00 11/24/2010 Lowes 62671 Supplies 363.49 11/30/2010 Midwest Printing - po # 65362 62090 Printing of water mtr reps. f 1,316.27 12/7/2010 Welu Printing 62090 #10 Envelopes - NWWS use 947.85 12/14/2010 Parking 62340 Refill Cards 50.00 12/9/201011 EXHIBIT IV AT &T Mobility 62421 Data Lines 276.55 12/21/2010: Miller Electric - PO 00065919 73211 BJ 1 1/2 to 1 ground clamp 422.54 12/14/2010 Comm.Engineering Co - PO 61029 73211 Magnum Edge Switch Jump 5,870.50 12/21/2011. Comm.Engineering Co - PO 665297 73211 Table Mound Collector 998.38 1/4/2011 Midwest Printing - po # 67555 62090 Printing of water mtr repl. 1,316.27 2/22/2011 _ UPS - po # 66950 62240 Shipping of Sim Card 10.05 2/1/2011 AT &T Mobility 62421 Data Lines 276.75 2/1/2011 Lowes 62671 Misc. Supplies 133.22 2/1/2011 Sungard Public Sector 71123 Meter reading interface 3,200.00 2/8/2011 Comm. Engineering Co - PO 67435 73211 Table Mound Collector Data Lines 1,275.00 2/15/2011 AT &T Mobility 276.55 3/1/2011 AT &T Mobility 62421 Data Lines 276.55 3/22/2011 Lowes 62671 Misc. Supplies 183.91 3/8/2011 Eide Bailley - JE 1108 -71 AT &T Mobility 62726 62421 Audit 2,600.00 3/3/2011 Data Lines 276.35 4/19/2011 Lowes 62671 Misc. Supplies 133.02 4/5/2011 Scott Printing PO# 69081 Comm. Co • 67327 62671 71123 Notice of Disc. Door Hange 139.00 4/18/2011. witch for Marian Hall Data Lines 1,380.20 273.10 4/19/2011 5/24/2011; AT&T � • - • • 70860 62090 Brochures 798.56 6/21/2011 AT&T Mobility Data Lines 273.10 6/21/2011; True Value 62671 1" Copper Adapter 22.47 - 6/30/2011 Mobility 6242Data Lines 273.10 7/26/2011: AT&T • • • • 73528 62421 Data Lines 273.15 8/30/2011 First . • • • 71598 73211 Supplies 1,089.59 8/9/2011 Racom ; • 73529 73211 Col lector Removal 1,056.00 8/23/2011 First . • • • 73770 62240 Supplies 223.18 8/30/2011 Miller Butt Splices 19.26 9/7/2011` KW - Value 62240 Copper Tees &Couplings 59.41 9/7/2011 Sungard Public Sector • • 67104 Meter read import 1,125.00 9/13/2011 Miller - Welter • .: - Supplies Butt Splices 96.31 83.75 1,582.50 2,075.00 10/11/2011 10/11/2011 A/25/2011 10/25/2011. 62671 71123 Totes for Meter Program Maintenance Sungard Public Sector - po 76186 Sungard • - • po 67104 71123 Meter Reading Software Comm. - Co • - 71123 IT Service 1,970.00 10/25/2011 Jaeger Plumbing • • 80428 Eide Bailley - JE 1209 -42 73211 Plumbing Repairs 149.11 2,500.00 2/22/2012. 3/12/2012 62726 Audit Total for Other $ 74,447.53 Total Project Costs To Date Excludes $50,000 for meter testing in FY'09 Excludes 1% origination fee of $76,757 Summary by Account It Postage & Shipping 62030 7,829.74 Printing & Binding 62090 10,987.05 Miscellaneous 62240 1,620.07 Mileage /Local Trans. 62340 599.00 Telephone 62421 4,444.65 Tellecornmunication CG 62423 305.45 Misc. Operating Supplies 62671 1,164.83 Audit Services 62726 5,100.00 Consulting Engineers 62712. 366,273.62 Legal Services 62713 8,538.97 Software 71123 16,582.70 Micro - Computer 71124 5,600.28 Const. Contr -Not Bldg 73211 6,895,239.54 $ 7,324,285.90 7,324,285.90 EXHIBIT V Masterpiece the Mississippi. TO: Bob Green, Water Department Manager � // FFROM: KenTeN]ppe�Finono�Dineotor /(10,, �/ SUBJECT: City Wide Water Meter Replacement P 'ect DATE: April 18, 2012 On behalf of Finance and Utility Billing 1 would like to provide the following information relative to the City Wide Water Meter Replacement Project: Dubuque 2007 O Transition to eliminate outside meter reading contract went well (saved City $144,000 annually) O New meter reading software is working great O Reports relative to high consurnption helpful to staif O Minimal misreads for customers, increased bill accuracy and limited estimated bilis to customers O Overall improved customer service O Coordinated payments for leases to a number of entities for placement of collectors on their properties O Recap of expenses incurred for the project provided regularly to HDR and others as needed, very few expenses not reimbursable with State Revolving Loan Funds O Regu|ardravvdow/no with Iowa Finance Authority (IFA) for State Revolving Loan Funds (SRF) 'ivent wet!, IFA withholding $5,000 until project ject is completely finalized The m jor p 'eotresultedinsignKicantcoord/noLkonand000peratonbetweenthe Water, Information Services and Finance/Utility Billing areas. The City should be in a good position for the next 2030 years relative to meters. It is always good when p 'eot costs come in fess than initial budget. I concur with the City accepting completion of the project. if you have any questions on this information or would like additional data please feel free to contact me. KT/em| cc: Rose Hoerner, Utility Billing Supervisor EXHIBIT VI T iaiMVKVtrzfttgM*yg,-**,..--, April 24, 2012 City of Dubuque 50 West 13th Street Dubuque, -Iowa 52001 Attn: Mr. Bob Green and Mr. Ken Tekippe Re: City of Dubuque Water Meter Replacement Program Project Closeout Dear Mr. Green and Mr. Tekippe: This letter is to inform you that Ferguson / Northern Water Works Supply has completed all bid-item work on the above referenced project as is considered substantially complete as of April 24, 2012. To the best of our knowledge, information, and belief, and on the basis of our observations and inspections, the Work for the above referenced project has been completed in accordance with the terms and conditions of the Contract Documents, State Revolving Loan Fund (SRF), and American Recovery and Reinvestment Act (ARRA). The project was completed within budget with a final project cost of approximately $7,317,000 compared to the original budgeted estimate of $8,610,000. TM wishes to acknowledge the contributions of the City of Dubuque staff for their valuable assistance and participation from the initial planning through the completion of the project. We look forward to opportunities to work together in the future. Very truly yours, HDR ENGINEERING, INC. Patrick Brown, PE Project Engineer VIDE Engineering, inc. Thomas Jakubowski Senior Consultant 300 East Locust Street Suite it 210 Des Moines, Iowa 50309-1823 Phone (515) 280-4940 Fax (515) 280-4955 www.hdrinc,com RESOLUTION NO. 152 -12 ACCEPTING THE CITY OF DUBUQUE, IOWA • WATER METER REPLACEMENT PROJECT Whereas, the Public Improvement Contract for the City Water Meter Replacement Project (the Project) has been completed and HDR Engineering of Omaha, NE, the City's Consulting Engineering Firm, has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and has recommended that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City's Engineering Consultants is approved and the Project is hereby accepted. Passed, approved and adopted this 4th day of June , 2012. Attest: Kevin irnstahl, City Clerk c�- Roy D. Buol, Mayor