Arboretum Entrance Rd Construction - Marshall Park
DUB~E
~Yk.~
MEMORANDUM
August31,2005
TO:
The Honorable Mayor and City Council Members
FROM:
Michael C. Van Milligen, City Manager
SUBJECT: Arboretum Entrance Road Construction Project
(CIP No. 1001559 - Marshall Park Entrance Road Reconstruction)
City Engineer Gus Psihoyos is recommending acceptance of the Arboretum Entrance
Road Construction Project, as completed by Portzen Construction, Inc., in the final
contract amount of $105,814.49, which is a 1.7% decrease from the original contract in
the amount of $107,601.00.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
1(' ~;
f) /. j
! f!~,
( tJ {j0VQj~
Mich'ael c. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, Corporation Counsel
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
.r_j
"
i
t1
. I
-.,
-.,/
D~B~E
~Yk.~
MEMORANDUM
August 30, 2005
FROM:
Michael C. Van Milligen, City Ma~a~.er
Gus Psihoyos, City Engineer _~
TO:
SUBJECT: Arboretum Entrance Road Construction Project
(CIP NO.1 001559 - Marshall Park Entrance Road Reconstruction)
INTRODUCTION
The enclosed resolutions provide for the acceptance of the construction contract for the
Arboretum Entrance Road Construction Project.
BACKGROUND
During the Northwest Arterial Phase 4 construction, the Arboretum Drive was not
extended to connect with the Marshall Park entrance. Therefore, the Arboretum
Entrance Road Construction Project provided for the construction of a new section of
37-foot wide street which included a 10-foot wide by 150-foot long landscape median, a
cul-de-sac for turnaround purposes and the installation of historic lighting.
To accommodate and address concerns from two (2) adjacent residential property
owners during the project construction phase, the street was extended an additional ten
(10) feet. The adjacent property owners agreed to incur this additional pavement cost in
the amount of $1,500.
DISCUSSION
The Arboretum Entrance Road Construction Project has been completed by Portzen
Construction, Inc. of Dubuque, Iowa, in the final contract amount of $105,814.49, which
is a 1.7% decrease from the original contract in the amount of $107,601.00.
RECOMMENDATION
I recommend that the City Council accept the improvements and establish the final
contract at $105,814.49.
BUDGET IMPACT
The project cost summary for the Arboretum Entrance Road Construction Project is as
follows:
Estimate Bid Award Final
Construction Contract $113,743.50 $107,601.00 $105,814.49
Contingency 11 ,374.35 11 ,374.35
Construction Engineering & Inspection 6.255.89 6.255.89 16.660.66
Total Project Cost
~131.373.74
$125.231.24 $122.475.15
The project funding summary is as follows:
CI P No.
Fund Description
Final
1001559
Marshall Park Entrance Road Reconstruction
$122,475.15
Total Project Funding
~122.475.15
The project will be funded from the General Fund in the amount of $120,975.15 and
$1,500 from private participation.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolutions accepting the
improvement and establishing the final construction cost.
Prepared by Robert Schiesl, PE
Ronald J. Turner, PLS
cc: Dawn Lang, Budget Director
Gil Spence, Leisure Services
~
RESOLUTION NO. 400-05
1
ACCEPTING THE ARBORETUM ENTRANCE ROAD CONSTRUCTION
PROJECT
Whereas, the contract for the Arboretum Entrance Road Construction Project
(the Project) has been completed and the City Manager has examined the work and
filed a certificate stating that the Project has been completed according to the terms of
the contract, plans and specifications and that the City Manager recommends that the
Project be accepted.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Manager is approved and the Project
is hereby accepted.
Section 2. The City Treasurer is hereby directed to pay to the contractor from the
Marshall Park Entrance Road Reconstruction Capital Improvement Project, General
Fund appropriation in the contract amount of $122,475.15 less any retained percentage
provided for therein as provided in Iowa Code chapter 573, and to pay such retainage
only in accordance with the provisions of Iowa Code chapter 573.
Passed, approved and adopted this 6th day of Septernbe~ 2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
RESOLUTION NO. 401-05
FINAL ESTIMATE
Whereas, the construction contract for the Arboretum Entrance Road
Construction Project has been completed and the City Engineer has submitted
his final estimate showing the cost thereof including the cost of estimates, notices
and inspection and all miscellaneous costs.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF DUBUQUE, IOWA:
Section 1. That the cost of said improvement is hereby determined to
be $122,475.15 and the said amount shall be paid from the Marshall Park
Entrance Road Reconstruction Capital Improvement Project, General Fund
appropriation of the City of Dubuque, Iowa.
Passed, approved and adopted this 6th day of September, 2005.
Terrance M. Duggan, Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
City of Dubuque - Engineering Division
Final Payment Form
PAYMENT NO: COUNCIL FINAL
PROJECT NAME: ARBORETUM ENTRANCE ROAD DATE: August30,2005
CONTRACTOR: PORTZEN CONSTRUCTION, INC. CONTRACT AMOUNT: $107,601.00
BID ITEM DESCRIPTION II UNIT II UNIT COST I QUANTITY AMOUNT EARNED
TO DATE TO DATE
1 Clearing & Grubbing SF $1.00 3362 $ 3,362.00
2 Excavation, Unclassified CY $4.50 1214 $ 5,463.00
3 Backfill Limestone Ton $6.25 57.97 $ 362.31
4 Backfill Topsoil CY $15.00 145 $ 2,175.00
5 Granular Subbase Ton $11.50 DELETE
6 Removal of Pavement SY $2.50 1179.25 $ 2,948.13
7 ACC Surface Course (Headers) Ton $81.00 76.72 $ 6,214.32
8 PC Concrete Pavement, (8') wI Integral Curb, Class 'Coo wI CD
Baskets SY $28.00 1496.18 $ 41,893.04
9 Remove and Replacement of PC Concrete Curb & Gutter LF $3.00 DELETE
10 PCC Sidewalk, 4' SF $3.50 2361 $ 8,263.50
11 PCC Handicapped Ramp, Dectectable Each $250.00 4 $ 1,000.00
12 RCP Storm Sewer 15' LF $25.00 40 $ 1,000.00
13 RCP Aprons Storm Sewer 15' Each $500.00 1 $ 500.00
14 Storm Sewer, Intake 101-B Each $1,700.00 1 $ 1,700.00
15 Yard Hydrants Each $305.00 1 $ 305.00
16 Sodding SY $4.75 574.37 $ 2,728.26
17 Stone Revetment Class C (Rip Rap) Ton $22.00 22.17 $ 487.74
18 Subdrain, Perforated Plastic Pipe 6' dia LF $6.50 250 $ 1,625.00
19 Sawcut Concrete LF $4.00 5 $ 20.00
20 Asphalt Sawcut LF $3.00 138.8 $ 416.40
21 Conduit, 2' wI Tracer Wire LF $6.10 212.5 $ 1,296.25
22 Electrical Cable #14 AWG 2C Shielded LF $1.00 212.5 $ 212.50
23 PCC Foundation, and Historic Street Light Each $3,920.00 2 $ 7,840.00
24 Electrical Service Each DELETE
25 Pull Box Each $250.00 1 $ 250.00
26 Locate Existing Watermain Tee I Exploration Each $300.00 5.6 $ 1,680.00
27 Traffic Control LS $500.00 1 $ 500.00
TOTAL AMOUNT EARNED TO DATE - BASE BID: 1$ 92,242.45 I
28 3/4' Graded Stone Base Ton $10.45 691.13 $ 7,222.31
29 Neenah Storm Water Curb Box Each $95.00 1 $ 95.00
30 Erosion Mat & Seeding SY $2.00 2100 $ 4,200.00
31 Adjust Existing Fire Hydrant at Bittersweet Each $778.54 1 $ 778.54
32 Mulch, Bark SY $3.85 252 $ 970.20
33 Rock Excavation LS $306.00 1 $ 306.00
TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: 1$ 13,572.05 I
TOTAL AMOUNT EARNED TO DATE: 1$ 105,814.49 I
TOTAL DUE CONTRACTOR:
1$
1$
1$
105,814.49 I
16,660.661
122,475.15 1
ENGINEERING:
TOTAL CONSTRUCTION COST:
CERTIFICATE OF THE CITY MANAGER:
APPROVED:
Gus Psihoyos, City Engineer
City of Dubuque, Iowa
The undersigned,
PORTZEN CONSTRUCTION, INC.
CERTIFICATE OF THE CONTRACTOR:
contractor for the above improvement, does hereby
CONTRACTOR:
accept the above 'Total Due Contractor', as full settlement for all claims for said improvement.
TITLE:
BY:
PORTZEN CONSTRUCTION.~
V2J6(/
Ptz~J, /V( ~Il '
~h%~
/ /
DATE: