Arboretum Entrance Rd Construction - Marshall Park DUB~E ~Yk.~ MEMORANDUM August31,2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Arboretum Entrance Road Construction Project (CIP No. 1001559 - Marshall Park Entrance Road Reconstruction) City Engineer Gus Psihoyos is recommending acceptance of the Arboretum Entrance Road Construction Project, as completed by Portzen Construction, Inc., in the final contract amount of $105,814.49, which is a 1.7% decrease from the original contract in the amount of $107,601.00. I concur with the recommendation and respectfully request Mayor and City Council approval. 1(' ~; f) /. j ! f!~, ( tJ {j0VQj~ Mich'ael c. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer .r_j " i t1 . I -., -.,/ D~B~E ~Yk.~ MEMORANDUM August 30, 2005 FROM: Michael C. Van Milligen, City Ma~a~.er Gus Psihoyos, City Engineer _~ TO: SUBJECT: Arboretum Entrance Road Construction Project (CIP NO.1 001559 - Marshall Park Entrance Road Reconstruction) INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Arboretum Entrance Road Construction Project. BACKGROUND During the Northwest Arterial Phase 4 construction, the Arboretum Drive was not extended to connect with the Marshall Park entrance. Therefore, the Arboretum Entrance Road Construction Project provided for the construction of a new section of 37-foot wide street which included a 10-foot wide by 150-foot long landscape median, a cul-de-sac for turnaround purposes and the installation of historic lighting. To accommodate and address concerns from two (2) adjacent residential property owners during the project construction phase, the street was extended an additional ten (10) feet. The adjacent property owners agreed to incur this additional pavement cost in the amount of $1,500. DISCUSSION The Arboretum Entrance Road Construction Project has been completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $105,814.49, which is a 1.7% decrease from the original contract in the amount of $107,601.00. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $105,814.49. BUDGET IMPACT The project cost summary for the Arboretum Entrance Road Construction Project is as follows: Estimate Bid Award Final Construction Contract $113,743.50 $107,601.00 $105,814.49 Contingency 11 ,374.35 11 ,374.35 Construction Engineering & Inspection 6.255.89 6.255.89 16.660.66 Total Project Cost ~131.373.74 $125.231.24 $122.475.15 The project funding summary is as follows: CI P No. Fund Description Final 1001559 Marshall Park Entrance Road Reconstruction $122,475.15 Total Project Funding ~122.475.15 The project will be funded from the General Fund in the amount of $120,975.15 and $1,500 from private participation. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Robert Schiesl, PE Ronald J. Turner, PLS cc: Dawn Lang, Budget Director Gil Spence, Leisure Services ~ RESOLUTION NO. 400-05 1 ACCEPTING THE ARBORETUM ENTRANCE ROAD CONSTRUCTION PROJECT Whereas, the contract for the Arboretum Entrance Road Construction Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the Marshall Park Entrance Road Reconstruction Capital Improvement Project, General Fund appropriation in the contract amount of $122,475.15 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 6th day of Septernbe~ 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 401-05 FINAL ESTIMATE Whereas, the construction contract for the Arboretum Entrance Road Construction Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $122,475.15 and the said amount shall be paid from the Marshall Park Entrance Road Reconstruction Capital Improvement Project, General Fund appropriation of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of September, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk City of Dubuque - Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: ARBORETUM ENTRANCE ROAD DATE: August30,2005 CONTRACTOR: PORTZEN CONSTRUCTION, INC. CONTRACT AMOUNT: $107,601.00 BID ITEM DESCRIPTION II UNIT II UNIT COST I QUANTITY AMOUNT EARNED TO DATE TO DATE 1 Clearing & Grubbing SF $1.00 3362 $ 3,362.00 2 Excavation, Unclassified CY $4.50 1214 $ 5,463.00 3 Backfill Limestone Ton $6.25 57.97 $ 362.31 4 Backfill Topsoil CY $15.00 145 $ 2,175.00 5 Granular Subbase Ton $11.50 DELETE 6 Removal of Pavement SY $2.50 1179.25 $ 2,948.13 7 ACC Surface Course (Headers) Ton $81.00 76.72 $ 6,214.32 8 PC Concrete Pavement, (8') wI Integral Curb, Class 'Coo wI CD Baskets SY $28.00 1496.18 $ 41,893.04 9 Remove and Replacement of PC Concrete Curb & Gutter LF $3.00 DELETE 10 PCC Sidewalk, 4' SF $3.50 2361 $ 8,263.50 11 PCC Handicapped Ramp, Dectectable Each $250.00 4 $ 1,000.00 12 RCP Storm Sewer 15' LF $25.00 40 $ 1,000.00 13 RCP Aprons Storm Sewer 15' Each $500.00 1 $ 500.00 14 Storm Sewer, Intake 101-B Each $1,700.00 1 $ 1,700.00 15 Yard Hydrants Each $305.00 1 $ 305.00 16 Sodding SY $4.75 574.37 $ 2,728.26 17 Stone Revetment Class C (Rip Rap) Ton $22.00 22.17 $ 487.74 18 Subdrain, Perforated Plastic Pipe 6' dia LF $6.50 250 $ 1,625.00 19 Sawcut Concrete LF $4.00 5 $ 20.00 20 Asphalt Sawcut LF $3.00 138.8 $ 416.40 21 Conduit, 2' wI Tracer Wire LF $6.10 212.5 $ 1,296.25 22 Electrical Cable #14 AWG 2C Shielded LF $1.00 212.5 $ 212.50 23 PCC Foundation, and Historic Street Light Each $3,920.00 2 $ 7,840.00 24 Electrical Service Each DELETE 25 Pull Box Each $250.00 1 $ 250.00 26 Locate Existing Watermain Tee I Exploration Each $300.00 5.6 $ 1,680.00 27 Traffic Control LS $500.00 1 $ 500.00 TOTAL AMOUNT EARNED TO DATE - BASE BID: 1$ 92,242.45 I 28 3/4' Graded Stone Base Ton $10.45 691.13 $ 7,222.31 29 Neenah Storm Water Curb Box Each $95.00 1 $ 95.00 30 Erosion Mat & Seeding SY $2.00 2100 $ 4,200.00 31 Adjust Existing Fire Hydrant at Bittersweet Each $778.54 1 $ 778.54 32 Mulch, Bark SY $3.85 252 $ 970.20 33 Rock Excavation LS $306.00 1 $ 306.00 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: 1$ 13,572.05 I TOTAL AMOUNT EARNED TO DATE: 1$ 105,814.49 I TOTAL DUE CONTRACTOR: 1$ 1$ 1$ 105,814.49 I 16,660.661 122,475.15 1 ENGINEERING: TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY MANAGER: APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa The undersigned, PORTZEN CONSTRUCTION, INC. CERTIFICATE OF THE CONTRACTOR: contractor for the above improvement, does hereby CONTRACTOR: accept the above 'Total Due Contractor', as full settlement for all claims for said improvement. TITLE: BY: PORTZEN CONSTRUCTION.~ V2J6(/ Ptz~J, /V( ~Il ' ~h%~ / / DATE: