Villa St Retaining Wall Acceptance D~~~E ~~~ MEMORANDUM August 30, 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Villa Street Retaining Wall 2004 Reconstruction Project City Engineer Gus Psihoyos is recommending acceptance of the Villa Street Retaining Wall Reconstruction Project, as completed by WC Stewart Construction Company, in the final contract amount of $324,416.69, which is a 14.3% increase from the original contract in the amount of $283,952.79 due to unexpected subsurface conditions. I concur with the recommendation and respectfully request Mayor and City Council approval. . 1 t1 I .,- I ... {!lz./ (~/ hcL Michael C. Van Mi ligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer () 1---' ~~~E ~~~ MEMORANDUM August 29,2005 FROM: Michael C. Van Milligen, City Mar;;gf) Gus Psihoyos, City Engineer ./J ~ TO: SUBJECT: Villa Street Retaining Wall 2004 Reconstruction Project INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Villa Street Retaining Wall Reconstruction Project. BACKGROUND As a result of the rain events on the weekend of May 22, 2004 the limestone retaining wall adjacent to Villa Street, between Rush Street and Cleveland Avenue was damaged. As a result of significant movement at the top of the wall and in the interest of public safety, the wall has been dismantled and the embankment slope excavated to a safe condition. Due to the Presidential Disaster Declaration for Dubuque County, the Villa Street Retaining Wall Reconstruction Project is eligible for FEMA funding. FEMA funding will provide 75% Federal reimbursement, 10% State reimbursement with the remaining 15% as the City's cost share. The Villa Street retaining wall was reconstructed using a reinforced concrete foundation grade beam which was anchored to the existing bedrock shelf and a conventional reinforced concrete stem wall was constructed. The concrete stem wall was then faced with limestone block to match the remaining wall sections to the north and south and is in conformance with the city's native historic bluffs and character of the neighborhood. The storm sewer system, asphalt roadway and sidewalk along the top of the wall were also repaired as part of the project. DISCUSSION The Villa Street Retaining Wall Reconstruction Project has been completed by WC Stewart Construction Company of Dubuque, Iowa, in the final contract amount of $324,416.69, which is a 14.3% increase from the original contract in the amount of $283,952.79. The reason for the increase in cost associated with the Villa Street retaining wall reconstruction contract, resulted from change orders to the original project scope of work to address unexpected subsurface conditions, which required design build modifications to be implemented for the reinforced concrete pier and the rock bolt anchorage system. Due to the delays, the contractor was authorized to work additional hours and overtime as required get the project back on schedule to ensure that the retaining wall construction was completed and the supported roadway was in-service by the time the winter season arrived in December 2004. RECOMMENDATION I recommend that the City Council accept the improvements and the final contract be established at $324,416.69. BUDGET IMPACT The project cost summary for the Villa Street Retaining Wall Reconstruction Project is as follows: Estimate Bid Award Final Construction Contract $309,419.00 $283,952.79 $324,416.69 Contingency 46,413.00 46,413.00 Engineering Design Services 10,000.00 10,000.00 7,143.75 Construction Engineering & Inspection 25,583.00 25,583.00 31.476.32 Total Project Cost ~391.415.00 J365.948.79 J363.036.76 The project funding summary is as follows: Bid Award Final FEMA 75% $274,416.59 $272,277.57 State of Iowa 10% 36,594.88 36,303.68 City 15% 54,892.32 54,455.51 Total Project Funding J365.948.79 J363.036.76 There are sufficient funds available for the project in the Fiscal Year 2005 General Retaining Wall Repair budget to cover the City's 15% cost share. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Robert Schiesl, PE cc: Dawn Lang, Administrative Services Manager RESOLUTION NO. 397-05 ACCEPTING IMPROVEMENT FOR THE VILLA STREET RETAINING WALL - 2004 RECONSTRUCTION PROJECT Whereas, the contract for the Villa Street Retaining Wall - 2004 Reconstruction Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor the contract amount less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Section 3. The City shall be reimbursed for eligible costs from FEMA (75%), the State of Iowa (10%), and the remaining City share (15%) shall be paid from the Fiscal Year 2005 General Retaining Wall Repair funds of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of September, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 398-05 FINAL ESTIMATE Whereas, the contract for the Villa Street Retaining Wall - 2004 Reconstruction Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $363,036.76 and the said amount shall be paid by the City and shall be reimbursed for eligible costs from FEMA (75%), the State of Iowa (10%), and the remaining City share (15%) shall be paid from the Fiscal Year 2005 General Retaining Wall Repair funds of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of September, 2005 Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk 38 Contractor shall provide a DEDUCT cost to reduce the nominal LUMP SUM $ 8,000.00 DELETED dimension of the 24" deep veneer wall stone (Base Bid) for the reinforced concrete stem wall to 12" deep veneer wall stone (Altemate Bid) TOTAL AMOUNT EARNED TO DATE - ALTERNATE BID - DEDUCT: $0.00 39 Slope Embankment Protection, Plastic LUMP SUM $ 516.00 1.0 $ 516.00 40 Rock Bolt Anchor & Grout LUMP SUM $ 8,536.73 1.0 $ 8,536.73 41 Rock Bolt Anchor Installation - Equipment Rental LUMP SUM $ 4,564.88 1.0 $ 4,564.88 42 Rock Bolt Anchor Extensions & Grout LUMP SUM $ 2,344.10 1.0 $ 2,344.10 43 Rock Bolt Anchor Extensions - Shipping LUMP SUM $ 230.40 1.0 $ 230.40 44 Drilling Contractor - Drill for Rock Anchors LUMP SUM $ 1,340.00 1.0 $ 1,340.00 45 Drilling Contractor - Remobilization & Re-Drill LUMP SUM $ 1,340.00 1.0 $ 1,340.00 46 Flowable Grout, Rock Bolt Anchor Encasement LUMP SUM $ 5,001.09 1.0 $ 5,001.09 47 Concrete Fill, Reinforced Concrete Foundation Grade Beam C.Y. $ 71.19 47.0 $ 3,345.93 48 Misc. Materials - Caps for Rock Anchor Holes LUMP SUM $ 58.37 1.0 $ 58.37 49 Misc. Materials - PVC Pipe to Blow Out Rock Anchor Holes LUMP SUM $ 99.45 1.0 $ 99.45 50 Misc. Materials - Rock Bolt Mounting Anchor Plate LUMP SUM $ 100.50 1.0 $ 100.50 Rock Bolt Anchors, Steel Cage Extentions for Reinforced 51 Concrete Foundation Grade Beam LUMP SUM $ 946.01 1.0 $ 946.01 52 Misc. Rental Tools & Equipment, Rock Bolt Anchor Installation LUMP SUM $ 523.07 1.0 $ 523.07 53 Labor Overtime, Stewart Construction - Bid Items NO.4 LUMP SUM $ 9,245.00 1.0 $ 9,245.00 54 Additional Performance Bond (5%) and Insurance LUMP SUM $ 728.07 1.0 $ 728.07 55 Labor Overtime, Conlon Construction - Bid Items NO.5 and 6 LUMP SUM $ 3,450.16 1.0 $ 3,450.16 56 Labor Overtime, Stewart Construction - Bid Items No.8 LUMP SUM $ 437.50 1.0 $ 437.50 57 Sanitary Sewer Lateral, Residential, Repair Force Main LUMP SUM $ 323.02 1.0 $ 323.02 58 Retaining Wall, Limestone, Dress Double Face Stone S.F. $ 21.05 274.0 $ 5,767.70 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: 1$ 48,897.98 I TOTAL AMOUNT EARNED TO DATE: I $324,416.69 I TOTAL DUE CONTRACTOR: I $324,416.69 I ENGINEERING: 1 $31,476.32 I TOTAL CONSTRUCTION COST: I $355,893.01 1 Michael Van Milligen, City Manager City of Dubuque, Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, WC Stewart Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: BY: WC Stewart Construction, 1:/ ---/Mi~~ Z.''3T1#I~ B~'0>-- I I TITLE: DATE: