Marshall Prk San. Sewer Ext. final i5li'B~JE ~ck~ MEMORANDUM August27,2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Marshall Park Sanitary Sewer Extension Project (CIP 310592-7101329: Marshall Park Sanitary Sewer) City Engineer Gus Psihoyos is recommending acceptance of the Marshall Park Sanitary Sewer Extension Project, as completed by Fondell Excavating, in the final contract amount of $85,689.65, which is a 4.54% decrease from the original contract amount of $89,766.00. I concur with the recommendation and respectfully request Mayor and City Council approval. (11) fl{ ! L (~ 1-, Mi MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer . i I -, J (0 " I D~~~E ~ck~ MEMORANDUM August 26,2005 FROM: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer J::O TO: SUBJECT: Marshall Park Sanitary Sewer Extension Project (CIP 310592-7101329: Marshall Park Sanitary Sewer) INTRODUCTION The enclosed resolutions provide for the acceptance of the Marshall Park Sanitary Sewer Extension Project. BACKGROUND The Marshall Park Sanitary Sewer Extension Project provided service for the Leisure Services future restroom facility (currently under construction) and the existing greenhouse, caretaker house, and main building. DISCUSSION The Marshall Park Sanitary Sewer Extension Project has been completed by Fondell Excavating of Dubuque, Iowa, in the final contract amount of $85,689.65 which is a 4.54% decrease from the original contract amount of $89,766.00. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $85,689.65. BUDGET IMPACT The project cost summary for the Marshall Park Sanitary Sewer Extension Project is as follows: Bid Award Final Construction Contract $ 89,766.00 $85,689.65 Contingency 11,909.50 0 Engineering 17,864.25 12.853.45 Total Project Cost $119,539.75 $98,543.10 The project was funded from the Sanitary Sewer Construction Fund from a Fiscal Year 2004 appropriation in the amount of $153,500. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final construction cost. Prepared by Todd Irwin, Engineering Assistant cc: Dawn Lang, Budget Director Gil Spence, Leisure Services Manager Todd Irwin, Engineering Assistant ,. RESOLUTION NO. 391-05 ACCEPTING THE MARSHALL PARK SANITARY SEWER EXTENSION PROJECT Whereas, the contract for the Marshall Park Sanitary Sewer Extension Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the Fiscal Year 2004 Sanitary Sewer Construction Fund appropriation for the contract amount in the amount of $85,689.65 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 6th day of September, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk RESOLUTION NO. 392-05 FINAL ESTIMATE Whereas, the construction contract for the Marshall Park Sanitary Sewer Extension Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $98,543.10 and the said amount shall be paid from the allocation from the Fiscal Year 2004 Sanitary Sewer Construction Fund appropriation of the City of Dubuque, Iowa. Passed, approved and adopted this 6th day of September, 2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk FINAL CONTIlACT AMOUNT FOR: DESCRIPTION I MISCELLANEOUS 1 Abandon Existing Septic Tanks 2 Electrical & PIl.mbing Connections - Green House 3 Electrical & PIl.mbing Connections - Cartaker's House 4 Electrical & Plumbing Connections - Main building ISANITARY SEWER 6 Simplex Grinder Pump Units 2010 8 1 1/4' SDR-11 HOPE 9 2' SDR-11 HOPE 10 Curb Stop wi Box 11 Isolation Valve Manhole, Complete 12 Tie into Existing Manhole 13 Flushing Manhole, Complete 14 l' Clean Bedding Stone 15 Limestone Screening Backfill 16 Rock Excavation I PAVEMENT REPAIR 17 AC Street Patch 18 3/4' Rolled Stone Base I EXTRA WORK 1 4' SOR-11 HOPE - Green house to pump 2 Electrical & PIl.mbing Connections - Maint. Shed 3 Sidewalk Remove & Replace City of Dubuque ENGINEERING DIVISION Date: MARSHALL PARK E-ONE SANITARY SEWER EXTENSION PROJECT crp #: 7101329 QUANTITY 2.00 EA $ 0.00 LS $ 1.00 LS $ 1.00 LS $ 750.00 SY $ 3.00 EA $ 770.00 LF $ 2920.00 LF $ 3.00 EA $ 1.00 EA $ 1.00 EA $ 2.00 EA $ 0.00 Ton $ 38.50 Ton $ 2.00 CY $ 0.00 Ton $ 0.00 Ton $ 120.00 LF $ 1.00 LS $ 1.00 LS $ TOTAL DUE CONTIlACTOR: ENGINEERING: TOTAL PROJECT COST: I hereby certify that the above statement shows, in detail, the correct amount of all worG required to complete the above improvement. APPROVED: Michael Van Milligen. City Manager City of Dubuque. Iowa The Undersigned, f 01{) lYI5 J.)., 6 X e. ~ contractor for the above improvement, does hereby accept the above 'Total Due Contractor', as full settlement for all claims for said improvement. "7j ~ - BY: ~ ~ 12-Aug-GS