Loading...
Third St Overpass Decorative Railing ~~~E ~Yk.~ MEMORANDUM September 21,2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager , I "1 '-v SUBJECT: Third Street Overpass Decorative Railing Project Request Approval for Decorative Railing Design Modification (CIP: 7001702: Third Street Overpass Improvement Project) On September 6, 2005, the Dubuque City Council awarded the construction contract for the Third Street Overpass Decorative Railing Project to Tricon General Construction in the amount of $254,792.80 which will include the base bid plus bid alternative no. 2. The base bid scope of work provides for the complete removal of the existing chain-link fence and the fabrication and installation of the City's standard ornamental wrought iron hoop railing. The hoop railing design has been installed at several downtown locations, including City Hall and the historic 11 th Street Neighborhood area. The bid alternate no. 1 component was not selected because the submitted bids were $83,426 more than the base bid hoop railing. Bid alternate no. 1 was to provide for the custom fabrication and installation of a replica Riverwalk decorative railing. After the construction contract was awarded, City staff met with representatives from both Tricon General Construction and Giese Manufacturing, the railing subcontractor, to discuss value engineering options for the design and fabrication of a railing which would more closely resemble the appearance of the Riverwalk decorative railing. Following the value engineering meeting, Giese Manufacturing provided a modified railing design which closely replicated the appearance of the Riverwalk decorative railing, at an additional cost of $12,000. City Engineer Gus Psihoyos recommends City Council approval to modify the Riverwalk railing design for the Third Street Overpass Decorative Railing Project to incorporate the modified decorative railing. I concur with the recommendation and respectfully request Mayor and City Council approval. tf{ ~..~...l' I l /it ;;" 111" .v Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer D~~~E ~<k~ MEMORANDUM September 21, 2005 TO: FROM: Michael C. Van Milligen, City Manager() Gus Psihoyos, City Engineer .Y1 ~ SUBJECT: Third Street Overpass Decorative Railing Project Request Approval for Decorative Railing Design Modification (CIP: 7001702: Third Street Overpass Improvement Project) INTRODUCTION The City Council is requested to consider and approve a modified railing design to be incorporated for the Third Street Overpass Decorative Railing Project. BACKGROUND On September 6, the Dubuque City council awarded the construction contract for the Third Street Overpass Decorative Railing Project to Tricon General Construction in the amount of $254,792.80, which will include the base bid plus bid alternate nO.2. The base bid scope of work provides for the complete removal of the existing chain-link fence and the fabrication and installation of the City's standard ornamental wrought iron hoop railing. The hoop railing design has been installed at several downtown locations, including City Hall and the historic 11 th Street Neighborhood area. Bid alternate nO.2 provides for the complete removal of the existing separation hand rail that is attached to the top of the concrete barrier railing and the repainting of the pipe hand rail located on the easterly bridge abutment pedestrian stairway. The bid alternate nO.1 component was not selected because the submitted bids were $83,426 more than the base bid hoop railing. Bid alternate nO.1 was to provide for the custom fabrication and installation of a replica Riverwalk decorative railing. DISCUSSION After the construction contract was awarded, City staff met with representatives from both Tricon General Construction and Giese Manufacturing (railing subcontractor) to discuss value engineering options for the design and fabrication of a railing which would more closely resemble the appearance of the Riverwalk decorative railing and would be within the funds allocated for the project. Following the value engineering meeting, Giese Manufacturing provided a modified railing design which closely replicated the appearance of the Riverwalk decorative railing and significantly reduced the cost versus the original bid alternate nO.1 . The proposed modified Riverwalk railing design will remain at six-feet in height and will incorporate similar posts, top and bottom rails. The modified design will include a %" steel plate insert panel which will be laser cut to match the Riverwalk railing infill pattern. Attached is a preliminary layout for the proposed modified Riverwalk railing design. PROJECT COST - BUDGET IMPACT The proposed cost to incorporate the modified Riverwalk railing design will be an approximate $12,000 add to the construction contract. The estimate of probable costs for the Third Street Overpass Decorative Railing Project is summarized as follows: Cost Estimate Bid Award Construction Contract Contingency (10%) Construction Engineering & Inspection (15%) Change Order No.1 - Modified Railing Design $200,000.00 20,000.00 33,000.00 $254,792.80 20,000.00 33,000.00 12,000.00 Total Project Cost $253.000.00 ~319. 792.80 The project funding summary is as follows: CIP No. Fund Description Bid Award 7001702 7001052 Third Street Overpass Improvement Project Conference Center - Savings $169,171.00 150,621.80 Total Project Funding $319.792.80 RECOMMENDATION I recommend the approval of the modified railing design to be incorporated into the project which will compliment the railing installed as part of the Riverwalk project and the decorative railing installed as part of the Bell Street and the Ice Harbor West Road projects. ACTION TO BE TAKEN I respectfully request that the City Council concur with the recommendation to approve the modified Riverwalk railing design for the Third Street Overpass Decorative Railing Project and authorize staff is issue a change order to the construction contract. Prepared by Robert Schiesl, PE cc: Cindy Steinhauser, Assistant City Manager Dawn Lang, Budget Director Tony Zelinskas, PE, WHKS & Co. Roger Walton, PE, Iowa DOT Robert Schiesl, PE Z lr UJ ~ 0<( 1-0- --'~ UJ--' --'z~ tlJC1:lr I-I-UJ (/)::>;:: UJulr ~ffii3 ~~~ <-1.,....J::::2: