Loading...
Central Avenue HMA Resurfacing Project AcceptanceMasterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager Dubuque bierd All-America City 1 2007 SUBJECT: Central Avenue HMA Resurfacing Project, from 21st to 32nd Street Iowa DOT Project No. STPN- 052 - 2(106)- -2J -31 Iowa DOT Agreement No. 2011 -16 -079 CIP 3002248, 7101289, 7201066 DATE: July 10, 2012 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Central Avenue HMA Resurfacing Project, from 21st to 32nd Street, as completed by River City Paving, a Division of Mathy Construction Company, in the final contract amount of $1,202,047.31, which is an 11.7% decrease from the original contract amount of $1,361,772.11 due to the use of value engineering during construction. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi Dubuque htid All•AmericaCity 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Central Avenue HMA Resurfacing Project, from 21st to 32nd Street Iowa DOT Project No. STPN- 052 - 2(106)- -2J -31 Iowa DOT Agreement No. 2011 -16 -079 C I P 3002248, 7101289, 7201066 DATE: July 9, 2012 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Central Avenue HMA Resurfacing Project, from 21st to 32nd Street, Iowa DOT Project No. STPN- 052 - 2(106)-- 2J -31. BACKGROUND The Central Avenue HMA Resurfacing Project, from 21st to 32nd Street, was a joint partnership project between the City and the Iowa Department of Transportation (Iowa DOT). The pavement rehabilitation project on Central Avenue provided the following improvements: — Pavement milling on U.S. 52 (Central Avenue) between 21st and 32nd Street. — Pavement sub -base repair and patching as needed. — Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. — Spot curb, driveway, and sidewalk replacement. — Storm sewer intake replacement and reconstruction. — Installation of ADA- compliant curb access ramps. Through the cooperative agreement, the Iowa DOT was responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and the costs associated with the pedestrian access curb ramps for pedestrian crossings along U.S. 52 (Central Avenue). The City was responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, pedestrian access curb ramps for pedestrian crossing along the side streets and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection, were to be funded solely with City funding. DISCUSSION The Central Avenue HMA Resurfacing Project, from 21St to 32nd Street was completed by River City Paving, A Division of Mathy Construction Company, of Dubuque, Iowa, in the final contract amount of $1,202,047.31, which is an 11.7% decrease from the original contract amount of $1,361,772.11. There was a decrease in the contract value because value engineering was utilized during construction. The value engineering change on the project was replacing the full -depth concrete base repair with milling deteriorated joints and replacing them with an HMA repair versus a full - depth concrete repair. The next step was placing a 1 -inch lift of a crack relief membrane HMA mix over the entire pavement to reduce the migration of cracks up through the final asphalt surface. This change reduced the dollar amount of the pavement rehab work required. The change of scope was done in full cooperation with the IDOT Materials Section. This change in design is serving as a pilot project for future IDOT urban pavement rehab projects. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $1,202,047.31 to River City Paving, A Division of Mathy Construction Company, for the Central Avenue HMA Resurfacing Project, from 21st to 32nd Street. BUDGET IMPACT The project cost summary for the Central Avenue HMA Resurfacing Project, from 21st to 32nd Street, Iowa DOT Project No. STPN- 052 - 2(106)- -2J -31 is as follows: Award Construction Contract $1,361,772.11 Contingency 137,981.90 Design, Construction Engineering & Inspection 137,981.90 $1,637,735.91 The project funding summary is as follows: CIP No. 3002248 3002248 7201066 7101289 Fund Description Iowa DOT Funding Central Avenue Pavement Rehabilitation General Storm Sewer General Sanitary Sewer Total Project Funding Original Budget $ 913,000.00 743,055.00 0 0 $1,656,055.00 Final $1,202,047.31 0 96, 854.82 $1,298,902.13 Fund Amount $ 669,170.79 601,185.34 20,092.60 8,453.40 $1,298,902.13 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $1,202,047.31 to River City Paving, A Division of Mathy Construction Company, for the Central Avenue HMA Resurfacing Project, from 21St to 32nd Street, Iowa DOT Project No. STPN -052- 2(106)-- 2J -31. Prepared by Robert Schiesl, Assistant City Engineer cc: Art Gourley, Iowa DOT District Engineer Jenny Larson, Budget Director Jon Dienst, Civil Engineer II Deron Muehring, Civil Engineer II Greg Doeden, Civil Engineer RESOLUTION NO. 185 -12 ACCEPTING THE CENTRAL AVENUE HMA RESURFACING PROJECT, FROM 21ST TO 32 ND STREET, IOWA DOT PROJECT NO. STPN- 052 - 2(106)- -2J -31 AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Central Avenue HMA Resurfacing Project, from 21st to 32nd Street, Iowa DOT Project No. STPN- 052 - 2(106) -- 2J-31 (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Central Avenue Pavement Rehabilitation (CIP 3002248), General Storm Sewer (CIP 7201066), General Sanitary Sewer (CIP 7101289) appropriation for the contract amount of $1,202,047.31 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Attest: Passed, approved and adopted this 16th day of July' Kevin S. ' irnstahl, Cle 2012. o Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CENTRAL AVENUE HMA RESURFACING PROJECT, FROM 21ST TO 32ND STREET, IOWA DOT PROJECT NO. STPN- 052 - 2(106)- -2J -31 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Central Avenue HMA Resurfacing Project, from 21st to 32nd Street, Iowa DOT Project No. STPN- 052 - 2(106)-- 2J -31, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $1,298,902.13. Dated this / day of �L �, 2012. Filed in the office of the City Clerk on theta %/ day of '7v �Ai , 2012. evin S. Fir stahl,v" y Clerk PAYMENT NO: PROJECT NAME: CONTRACTOR: City of Dubuque - Engineering Division Final Payment Form COUNCIL FINAL Central Avenue HMA Resurfacing With Milling Project (From 21st Street to 32nd Street) River City Paving BID ITEM DESCRIPTION UNIT DATE: June 18, 2012 LETTING DATE: March 29, 2011 CONTRACT AMOUNT: $1,361,772.11 UNIT COST QUANTITY TO DATE AMOUNT EARNED TO DATE IOWA DEPARTMENT OF TRANSPORTATION 0030 2210- 0475115 - Graded Stone Base 0040 2212- 0475095 - Cleaning and Preparation of Base 0050 2212- 5070310 - Patch, Full -Depth Repair 0060 2212- 5075001 - Hot Mix Asphalt Surface Patches 0080 2213- 6745500 - Removal of Curb 0090 2214- 5145150 - Pavement Scarification 0100 2303- 0000100 - HMA Commercial Mix ( Includes Asphalt Binder), As Per Plan 0110 2303- 0001000 - Hot Mix Asphalt Mixture, Wedge, Leveling or Strengthening Course 0120 2303- 0041500 - HMA (3,000,000 ESAL), Base Course, 1/2 - IN. Mix 0130 2303- 0043500 - HMA (3,000,000 ESAL), Surface Course, 1/2 - IN. Mix, NO FRIC RE( 0140 2303- 0246428 - Asphalt Binder, PG 64 -28 0150 2303- 6911000 - HMA Pavement Samples 0180 2511- 6745900 - Removal of Sidewalk 0190 2511- 7526004 - Sidewalk, PCC, 4 -IN. 0200 2511- 7526006 - Sidewalk, PCC, 6 -IN. 0210 2511- 7528100 - Detectable Warnings For Curb Ramps 0220 2512- 1725256 - Curb Plus Gutter, PCC, 2.5' 0250 2527- 9263109 - Painted Pavement Marking, Waterborne or Solvent 0260 2527 - 9263137 - Painted Symbols and Legends, Waterborne or Solvent 0270 2528 - 8445110 - Traffic Control 0280 2528- 8445113 - Flagger 0290 2533 - 4980005 - Mobilization 0310 2599- 9999020 - 3" Crushed Stone Base 0320 2599- 9999005 - Fixture Adjustment 0340 2599- 9999005 - Intake Protection 0350 2599- 9999009 - PCC Barrier Curb, 6" Wide 0380 2599- 9999009 - Sawcut, Full- Depth, Concrete & HMA/Concrete Composite Pavement 0420 2599- 9999005 - Epoxy Coated Deformed Tie Bar, 5/8 -Inch, 24" TON $ 14.00 MILE $ 850.00 SY $ 51.75 TON $ 350.00 STA $ 690.00 SY $ 3.56 TON $ 89.00 TON $ 36.78 TON $ 38.40 TON $ 38.66 TON $ 552.00 LS $ 2,500.00 SY $ 6.30 153.21 SY $ 27.00 134.93 SY $ 31.50 72.52 SF $ 20.00 72.00 LF $ 12.00 136.00 STA $ 50.00 57.64 EACH $ 85.00 6 LS $ 20,169.56 EACH $ 300.00 LS $ 12,091.67 TON $ 17.00 EACH $ 375.00 84 EACH $ 60.00 34 LF $ 15.00 107.50 LF $ 3.20 1,250 EACH $ 3.00 446 106.11 1.22 413.38 38.18 2.26 17,542 20.84 1,189.31 2,011.94 1,734.61 219.52 1 $ 1,485.54 $ 1,037.00 $ 21,392.42 $ 13,363.00 $ 1,559.40 $ 62,449.52 $ 1,854.76 $ 43,742.82 $ 77,258.50 $ 67,060.02 $ 121,175.04 $ 2,500.00 $ 965.22 $ 3,643.11 $ 2,284.38 $ 1,440.00 $ 1,632.00 $ 2,882.00 $ 510.00 1 $ 20,169.56 37 $ 11,100.00 1 $ 12,091.67 30.30 $ 515.10 $ 31,500.00 $ 2,040.00 $ 1,612.50 $ 4,000.00 $ 1,338.00 TOTAL AMOUNT EARNED TO DATE - BASE BID (STATE): CHANGE ORDER (CENTRAL AVENUE RESURFACING PROJECT) - EXTRA WORK ITEMS - STATE C1 Remove Composite Pavement (State) SY $ 22.00 44.38 C3 Safety Wedge Cut LS $ 2,700.00 1 C3 Milling Transverse Joints LF $ 14.98 1,919 C3 Milling Longitudinal Joints LF $ 4.94 2,424 C3 HMA Joint Repair, 5" Depth Average TON $ 131.26 160.33 C3 Milling Mobilization LS $ 900.00 1.0 C4 PG 64-40 Binder @ 9.0% TON $ 752.00 109.16 C4 Tenser GlasGrid 8502 SY $ 11.90 417.43 C5 Specialty Signage LS $ 1,320.00 1 C5 Remove Schurbs LS $ 353.10 1 C5 HMA, PWL Incentive LS $ 1,497.94 1 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS (STATE): CITY OF DUBUQUE 0010 2101- 0850002 - Clearing and Grubbing 0020 2105- 8425005 - Topsoil, Furnish & Spread 0030 2210- 0475115 - Graded Stone Base 0050 2212 - 5070310 - Patch, Full -Depth Repair 0060 2212- 5075001 - Hot Mix Asphalt Surface Patches 0070 2213- 2713300 - Excavation, Class 13, For Widening 0080 2213- 6745500 - Removal of Curb 0090 2214- 5145150 - Pavement Scarification 0100 2303- 0000100 - HMA Commercial Mix ( Includes Asphalt Binder), As Per Plan 0110 2303- 0001000 - Hot Mix Asphalt Mixture, Wedge, Leveling or Strengthening Course 0120 2303- 0041500 - HMA (3,000,000 ESAL), Base Course, 1/2 - IN. Mix 0130 2303- 0043500 - HMA (3,000,000 ESAL), Surface Course, 1/2 - IN. Mix, NO FRIC RE( 0140 2303- 0246428 - Asphalt Binder, PG 64 -28 0160 2503- 0112015 - Storm SWR, G -Main, Trenched, PVC, 15 IN. 0170 2503- 0200036 - Remove Storm Sewer Pipe Less Than or Equal to 36 IN. UNIT CY TON SY TON CY STA SY TON TON TON TON TON LF LF $ 512,601.56 $ 976.36 $ 2,700.00 $ 28,746.62 $ 11,974.56 $ 21,044.92 $ 900.00 $ 82,088.32 $ 4,967.42 $ 1,320.00 $ 353.10 $ 1,497.94 $ 156,569.23 32.00 119.00 $ 3,808.00 50.00 17.6 $ 880.00 14.00 460.67 $ 6,449.38 51.75 726.24 $ 37,582.92 350.00 26.54 $ 9,289.00 15.00 130.0 $ 1,950.00 690.00 16.84 $ 11,619.60 3.56 12,809 $ 45,600.04 89.00 222.32 $ 19,786.48 36.78 722.85 $ 26,586.42 38.40 956.03 $ 36,711.55 38.66 1,247.60 $ 48,232.22 552.00 129.20 $ 71,318.40 39.00 226 $ 8,814.00 13.10 230 $ 3,013.00 0180 2511- 6745900 - Removal of Sidewalk SY $ 6.30 799.64 $ 5,037.73 0190 2511- 7526004 - Sidewalk, PCC, 4 -IN. SY $ 27.00 731.75 $ 19,757.25 0200 2511- 7526006 - Sidewalk, PCC, 6 -IN. SY $ 31.50 264.32 $ 8,326.08 0210 2511- 7528100 - Detectable Warnings For Curb Ramps SF $ 20.00 160.00 $ 3,200.00 0220 2512- 1725256 - Curb Plus Gutter, PCC, 2.5' LF $ 12.00 514.00 $ 6,168.00 0230 2515- 2475006 - Drives, PCC, 6 -IN. SY $ 29.25 141.18 $ 4,129.52 0240 2515- 6745600 - Removal of Paved Driveway SY $ 16.00 169.49 $ 2,711.84 0270 2528 - 8445110 - Traffic Control LS $ 13,312.44 1 $ 13,312.44 0290 2533 - 4980005 - Mobilization LS $ 7,980.83 1 $ 7,980.83 0300 2599- 9999005 - Concrete Collar EACH $ 306.00 5 $ 1,530.00 0330 2599- 9999009 - Galvanized, 1 1/2" -2" Outside Dia. Steel Railing LF $ 100.00 $ - 0350 2599- 9999009 - PCC Barrier Curb, 6" Wide LF $ 15.00 989.21 $ 14,838.15 0360 2599- 9999005 - Reconstruct Intake EACH $ 2,460.00 1 $ 2,460.00 0370 2599- 9999014 - Reinforced Thicken PCC Sidewalk SF $ 6.00 $ - 0380 2599- 9999009 - Sawcut, Full- Depth, Concrete & HMA/Concrete Composite Pavement LF $ 3.20 3,882 $ 12,422.40 0390 2599- 9999005 - Storm Water Curb Opening EACH $ 100.00 $ - 0400 2601 - 2639010 - Sodding SQ $ 70.00 31.363 0410 2601- 2643110 - Watering for Sod, Special Ditch Control or Slope Protection MGAL $ 50.00 27.521 0420 2599- 9999005 - Epoxy Coated Deformed Tie Bar, 5/8 -Inch, 24" EACH $ 3.00 1,045 TOTAL AMOUNT EARNED TO DATE - BASE BID (CITY): CHANGE ORDER (CENTRAL AVENUE RESURFACING PROJECT) - EXTRA WORK ITEMS - CITY C1 New Top, Adjust & Clean Existing Water Box EACH $ 300.00 3 C1 Remove Composite Pavement (City) SY $ 22.00 135.59 C1 Storm Sewer, Box Channel LS $ 675.00 1 C2 New Intake, 101 -B Special EACH $ 3,410.00 2 C2 Replace Entire Water Box @ 2565 Central Avenue EACH $ 880.00 1 C3 Milling Transverse Joints LF $ 14.98 596.5 C3 Milling Longitudinal Joints LF $ 4.94 383.0 C3 HMA Joint Repair, 5" Depth Average TON $ 131.26 47.38 C3 Milling Mobilization LS $ 600.00 1 C4 Remove & Install, 8" SDR -26 PVC Sanitary Pipe LF $ 47.00 28 C4 1 -Inch Clean Bedding Stone TON $ 13.00 15 C4 Backfill, Limestone TON $ 7.90 114.1 C4 Stainless Steel Mission Band EACH $ 110.00 1 C4 PG 64 -40 Binder @ 9.0% TON $ 752.00 66.34 C4 Tensar GlasGrid 8502 SY $ 11.90 185.93 C5 New R -1642 Frame & Cover Each $ 325.00 17 C5 New R -1642 Cover Each $ 175.50 11 C5 Ladteck Adjusting Rings LS $ 672.00 1 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS (CITY): TOTAL AMOUNT EARNED TO DATE - BASE BID (STATE & CITY): TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS (STATE & CITY): TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: TOTAL AMOUNT EARNED TO DATE: $1,202,047.31 $96,854.82 $1,298,902.13 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to eo plete the above improvement. APPROVED: L APPROVED: $ 2,195.41 $ 1,376.05 $ 3,135.00 $ 440,221.71 $ 900.00 $ 2,982.98 $ 675.00 $ 6,820.00 $ 880.00 $ 8,935.57 $ 1,892.02 $ 6,219.10 $ 600.00 $ 1,316.00 $ 195.00 $ 901.39 $ 110.00 $ 49,887.68 $ 2,212.57 $ 5,525.00 $ 1,930.50 $ 672.00 $ 92,654.81 952,823.27 $ 249,224.04 $ 1,202,047.31 Michael Van Mill City ofD *n+ e , Cityy $er Iowa Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, contractor for the above improvement, does hereby accept the above "Total Due Contractor ", as full settlement for all claims for said improvement. CONTRACTOR: '>4 2 i,- BY: ; TITLE: /1j2eYj DATE: 2 Jr, y /L