TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Acceptance of Stormwater Detention Facilities in Eagle Valley Subdivision
DATE: July 10, 2012
As a condition of subdivision plat approval, the developer of Eagle Valley Subdivision
was required to install certain improvements including street paving with curb, sanitary
sewer main, watermain, storm sewer and catch basins, boulevard street lighting, and
storm water detention facilities, and to dedicate these improvements to the City upon
completion. All public improvements, except the detention facilities, were accepted on
December 15, 2008. The detention facilities were designed to capture runoff from the
abutting property to the north, now being developed as Sky Blue Estates.
City Engineer Gus Psihoyos is recommending acceptance of the storm water detention
facilities and Lot G of Eagle Valley Subdivision. Maintenance of the facilities will be the
responsibility of the City, which will assess said costs to the property owners in Eagle
Valley Subdivision and a portion of Sky Blue Estates.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Masterpiece on the Mississippi
Dubuque
All- AmericaCilV
1 1 1 1 I
2007
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
SUBJECT: Acceptance of Stormwater Detention Facilities in Eagle Valley Subdivision
DATE: July 8, 2012
INTRODUCTION
The enclosed material provides for City Council acceptance of the detention facilities that the
developer, Fondell Excavating, Inc., has completed in Eagle Valley Subdivision in the City of
Dubuque, Iowa.
BACKGROUND
As a condition of subdivision plat approval through Resolution Nos. 434 -05, 479 -04, and 293-
03, the developer of Eagle Valley Subdivision was required to install certain improvements
including street paving with curb, sanitary sewer main, watermain, storm sewer and catch
basins, boulevard street lighting, and storm water detention facilities, and to dedicate these
improvements to the City upon completion. All public improvements, except the detention
facilities, were accepted on December 15, 2008 by Resolution No. 437 -08. The detention
facilities were designed to capture runoff from abutting property to the north, now being
developed as Sky Blue Estates.
DISCUSSION
The Subdivision Ordinance requires that upon completion of the required public improvements,
the subdivider shall notify the City in writing of the completion of the improvements, requesting
that the City either approve or reject the acceptance of the improvements, together with a
statement of reasons for any rejection.
In June, 2012, Fondell Excavating, Inc. requested the City's acceptance of the detention
facilities in Eagle Valley Subdivision. Upon inspection by the City, it has been determined that
all the detention facilities required by Resolution Nos. 434 -05, 479 -04, and 293 -03 have been
completed in accordance with plans approved by the City Council and in conformance with
City specifications. Maintenance of the detention facility would become the responsibility of the
City with the costs for same being assessed to the property owners within Eagle Valley
Subdivision and Sky Blue Estates, an abutting development to the north, since a portion of Sky
Blue Estates will drain to the detention facilities.
The stormwater detention facilities were constructed on Lot G of Eagle Valley Subdivision and
dedicated on the Final Plat thereof.
RECOMMENDATION
I would, therefore, recommend that the City Council accept the stormwater detention facilities
and Lot G of Eagle Valley Subdivision. Maintenance of the facilities will be the responsibility of
the City which will assess said costs to the property owners in Eagle Valley Subdivision and a
portion of Sky Blue Estates.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution accepting the stormwater
detention facilities in Eagle Valley Subdivision and accept the dedication of Lot G Eagle Valley
Subdivision.
Prepared by Ron Turner, PLS
2
RESOLUTION NO. 188 -12
ACCEPTING STORMWATER DETENTION FACILITIES AND LOT G IN
EAGLE VALLEY SUBDIVISION IN THE CITY OF DUBUQUE, IOWA
Whereas, pursuant to 434 -05, 479 -04, and 293 -03, certain public
improvements including stormwater detention facilities were installed by the
developer of Eagle Valley Subdivision in the City of Dubuque, Iowa; and
Whereas, the stormwater detention facilities have been completed and the
City Manger has examined the work and has filed a certificate stating that the
same has been completed in accordance with the plans approved by the City
Council and in conformance with City specifications, and has recommended that
the improvements be accepted by the City Council; and
Whereas, Lot G of the Final Plat of Eagle Valley Subdivision was
dedicated to the public for the construction of storm water detention facilities.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF,DUBUQUE, IOWA:
Section 1. That the recommendation of the City Manager be approved
and that said stormwater detention facilities, in Eagle Valley Subdivision in the
City of Dubuque, Iowa, be and the same is hereby accepted.
Section 2. That the dedication of Lot G of the Final Plat of Eagle Valley
Subdivision is hereby accepted.
Section 3. That maintenance of said improvements shall be the
responsibility of the City and assessable to the property owners as outlined in
Resolution Nos. 434 -05, 479 -04, 293 -03.
Passed, approved and adopted this 16th da, of July
2012.
Attest:
Key'
S. Firnstahl, Cit
Roy D. Buol, Mayor
'LH CITY
DUB
Masterpiece on the Mississippi
Eagle Valley Subdivision.
Accept Stormwater Detention Facilities
01.1111090 0:091411110 111rCAMATION
using the Dubuque Area Geographic Information System
(DAG/S), Include: data created by both the 01111 0?
Dubuque and Dubuque County. It is understood 01.01, 001.110
the City of Dubuque end participating agencies utilized the
most current 0114 accurate information available, DAGIS and
It's suppliers do not warrant the accuracy or currency 011 0.0
information or dam concilnad herein. The 01011 0110 participating
agencies shall not be held liable for any direct, Indirect, Inddental,
cons.equential, punitive, or special 0317.2., whether foreseeable er
unfore.eable, arising out 00 01.0 authorised or unauthorlaed use of
00)0 data or the Inability to use this data or out of any breach of
warranty whaWeeyer.
1 inch = 300 feet
100 50 0 100 200 300 400 Feet
WE
Map Prepared by:
City of Dubuque
Engineering Division
50 West 13th Street
Dubuque, Iowa 52001
Phone: (563) 589-4270
Fax: (563) 589-4205