TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Release of the Request for Bid (RFB) for the Construction of the ARC
Transfer Center Phase I Project
DATE: July 10, 2012
Director of Transit Operations Barbara Morck recommends City Council approval of the
release of the Request for Bid (RFB) for the construction of the ARC Transfer Center
Phase I Project and further recommends that a public hearing be set for August 6, 2012.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Gus Psihoyos, City Engineer
Dave Heiar, Economic Development Director
Jennifer Larson, Budget Director
Kelley Deutmeyer, Executive Director ECIA
Barbara Morck, Director of Transit Operations
Masterpiece on the Mississippi
TO: Michael Van Milligen, City Manager
FROM: Barbara Morck, Director of Transit Operations
CC: David Heiar, Economic Development Director
Kelley Deutmeyer, Executive Director of ECIA
Dubuque
btrid
All- America City
hill!
2007
SUBJECT: Release of the Request For Bid (RFB) for the Construction of the ARC
Transfer Center Phase I project
DATE: July 3, 2012
BACKGROUND
In August 2010 staff of ECIA, The Jule and Area Residential Care (ARC) began
collaborating on a construction of a transfer center, to be located at the new ARC, Inc.
facility located at the JFK Circle (the old Econo Foods building). The parties agreed to
pursue the project which, based on cost, was been split into two phases: Phase I is to
be a canopy attached to the new ARC facility that will offer protection from the weather
for passengers waiting to board and de- boarding from fixed route and paratransit buses.
Phase I also allows The Jule's Bus Operators access to the building's restroom
facilities.
DISCUSSION
In October 2010 a Public Transit Infrastructure Grant (PTIG) for $298,357 was awarded
for the Phase I construction to The Jule. The PTIG funding requires a 20% local match,
which is being provided by ARC, Inc. On March 28, 2012 City Council awarded IIW a
contract for the final design, compilation of construction documents, construction bid
and oversight of the construction of the Phase I canopy, as well as the preliminary
design work of the Phase II portion of the project. On May 7, 2012 and as part of this
project an Easement Agreement, which includes the area immediately below the
canopy area as well as driveway access to /from the canopy, between the City of
Dubuque and ARC, Inc. was approved by City Council.
A committee, which was comprised of City staff (David Heiar) Jule Staff (Barbara Morck
and Jodi Johnson), ECIA staff (Mark Munson) and ARC staff (Jon Romaine and Karl
Stieglitz), and a member of the Transit Advisory Board (Matt Esser), was formed to
review the design elements of the canopy. All parties came to an agreement on the
elements in the final design in May 2012, and the blueprints and required construction
documents (e.g. building plans and specifications) have been prepared for release
through a Public Bid process (aka Request for Bid).
PROJECT SCHEDULE
Initiate Public Bidding Process
Publish Notice to Bidders, Advertise for Bids
Publish Public Hearing Notice on Plans and Specifications
Plans and Specifications made available to Public for Review
Site Tour and Pre -bid Conference
Public Hearing
Receipt of Bid Proposals (Bid - letting)
Award Construction Contract
Final Project Completion Date
July 16, 2012
July 17, 2012
July 17, 2012
July 18, 2012
August 3, 2012
August 6, 2012
August 28, 2012
September 4, 2012
December 10, 2012
RECOMMENDATION /ACTION STEP
I recommend that the City Council establishes the date of the Public Hearing (to be held
on August 6, 2012), and authorizes The Jule to advertise for bids for the ARC Transfer
Center Phase I Project.
RESOLUTION NO, 193 -12
ARC TRANSFER CENTER
PHASE I CANOPY - 2012 PROJECT
PRELIMARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT,
AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS,
SPECIFICATOINS, FORM OF CONTRACT, AND ESTIMATED COST; AND
ORDERING THE ADVERTISEMENT FOR BIDS
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNICL OF THE CITY OF
DUBUQUE, IOWA:
The proposed plans, specifications, form of contract and estimated cost for the
ARC Transfer Center Phase I Canopy - 2012 Project, in the estimated amount of
$240,000 are hereby preliminarily approved and ordered filed in the office of the City
Clerk for public inspection.
A public hearing will be held on the 6th day of August, 2012, at 6:30 p.m. in the
Historic Federal Building Council Chambers, 350 W. 6th Street, Dubuque, at which time
interested persons may appear and be heard for or against the proposed plans and
specifications, form of contract and estimated cost of said Project, and the City Clerk be
and is hereby directed to cause the attached notice of the time and place of such
hearing to be published in a newspaper having general circulation in the City of
Dubuque, Iowa, which notice shall be published not less than four (4) days nor more the
twenty (20) days prior to the date of such hearing. At the hearing, any interested person
may appear and file objections to the proposed plans, specifications, form of contract, or
estimated cost of the Project.
The ARC Transfer Center Phase I Canopy - 2012 Project is hereby ordered to be
advertised for bids for construction.
The amount of the security to accompany each bid shall be in an amount which
shall conform to the provisions of the Notice of Bidders hereby approved.
The City Clerk is hereby directed to advertise for bids for the construction of the
improvements herein provided, by publishing the attached Notice to Bidders to be
published in a newspaper having general circulation in the City of Dubuque, Iowa, which
notice shall be published not Tess than four (4) but not more than forty -five (45) days
before the date for filing bids before 2:00 p.m. on the 28th day of August, 2012. Bids
shall be opened and read by the City Clerk at said time and will be submitted to the City
Council for final action at 6:30 p.m. on the 3rd day of September, 2012, in the Historic
Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa.
Passed, adopted and approved this 16th day of July, 2012.
Attest:
Kevi
rnstahl, City Cle
NOTICE OF PUBLIC HEARING ON THE PLANS, SPECIFICATOIN, FORM OF
CONTRACT, AND ESTIMATED COST FOR THE ARC TRANSFER CENTER PHASE I
CANOPY - 2012 PROJECT
NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will
hold a public hearing on the proposed plans, specifications, form of contract and
estimated cost for the ARC Transfer Center Phase I Canopy - 2012 Project, in
accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 6th day
of August, 2012, in the Historic Federal Building Council Chambers (second floor), 350
West 6th Street, Dubuque, Iowa. Said proposal plans, specifications, form of contract
and estimated cost are now on file in the office of the City Clerk. At said hearing any
interested person may appear and file objections thereto.
The scope of the Project is as follows:
The ARC Transfer Center Phase I Canopy — 2012 Project includes the construction of
an approximately 45' x 130' canopy structure. The canopy structure will consist of cast
in place concrete columns, precast beams and steel joists and roof deck structure with
standing seam metal roofing. Finished include limited painting of the structure, metal
wall panel and soffit panels. Electrical lighting and the conduit for a future surveillance
system will be part of this project. Limited site work will be completed around the canopy
building including concrete work to tie into existing pavement and concrete islands.
Any visual or hearing impaired persons needing special assistance or persons with
special accessibility needs should contact the City Clerk's office at (563) 589 -4120 or
TDD at (563) 690 -6678 at least 48 hours prior to the meeting.
Published by order of the City Council given on the 16th day of July, 2012.
NOTICE TO BIDDERS
CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT
ARC TRANSFER CENTER
PHASE I CANOPY — 2012 PROJECT
Time and Place for Filing Sealed Proposals. Sealed bids for the work comprising
each improvement as stated below must be file before 2:00 p.m. on August 28,
2012, in the Office of the City Clerk, City Hall — First Floor, 50 West 13th Street,
Dubuque, Iowa.
Time and Place Sealed Proposals Will be Opened and Considered. Sealed
proposals will be opened and bids tabulated at 2:00 p.m. on August 28th, 2012, at
City Hall — Conference Room A, 50 West 13th Street, Dubuque, Iowa, for
consideration by the City Council (Council) at its meeting on September 4, 2012.
The City of Dubuque, Iowa, reserves the right to reject any and all bids.
Time for Commencement and Completion of Work. Work on this project shall be
commenced within 10 days after the Notice to Proceed has been issued based on
the following schedule:
Award of Construction Contract - September 4, 2012
Final Project Completion Date - December 10, 2012
Bid Security. Each bidder shall accompany its bid with a bid security as security that
the successful bidder will enter into a contract for the work bid upon and will furnish after
the award of contract a corporate surety bond, acceptable to the governmental entity,
for the faithful performance of the contract, in an amount equal to one hundred percent
of the amount of the contract. The bid security shall be in the amount of ten percent
(10 %) of the amount of the contract and shall be in the form of a cashier's check or
certified check drawn on a state - chartered or federally chartered bank, or a certified
share draft drawn on a state - chartered or federally chartered credit union, or the
governmental entity may provide for a bidder's bond with corporate surety satisfactory
to the governmental entity. The bid bond shall contain no conditions excepted as
provided in this section.
Contract Documents. Copies of the plans and specifications prepared by IIW, PC, are
available from Tri -State Blueprint & Framing Co. /Rapids Reproduction, 696 Central
Avenue, Dubuque, IA 52001. Telephone number: (563) 556 -3030. No plan deposit is
required.
Copies of the construction documents may be viewed at: the Office of the City Clerk,
City Hall — First Floor, 50 West 13t" Street, Dubuque, Iowa; or at the Office of IIW, P.C.,
4155 Pennsylvania Avenue, Dubuque, Iowa. If there are any questions and /or additional
information is needed, contract IIW Project Manager Mark Fassbinder, AIA - LEED AP
BD +C, at m.fassbinder@iiwenqr.com or by calling (563) 556 -2464.
Project information will also be posted on the City's website at www.civofdubuque.orq.
Preference for Iowa Products and Labor. By virtue of statutory authority, preference
will be given to products and provisions grown and coal produced within the State of
Iowa, and to Iowa domestic labor, to the extent lawfully required under Iowa statutes.
Sales Tax. The bidder should not include sales tax in its bid. A sales tax exemption
certificate will be available for all material purchased for incorporation in this project.
General Nature of Public Improvement.
ARC Transfer Center Phase 1 Canopy — 2012 Project
The ARC Transfer Center Phase 1 Canopy — 2012 Project includes the construction of
an approximately 45' x 130' canopy structure. The canopy structure will consist of cast
in place concrete columns, precast beams and steel joists and roof deck structure with
standing seam metal roofing. Finished include limited painting of the structure, metal
wall panel and soffit panels. Electrical lighting and the conduit for a future surveillance
system will be part of this project. Limited site work will be completed around the canopy
building including concrete work to tie into existing pavement and concrete islands.
Pre -Bid Conference. Each prospective bidder is encouraged to attend the Pre -Bid
Construction Conference to be held at 10:00 a.m. Central Time on August 3, 2012, at
the Office of IIW, P.C., 4155 Pennsylvania Avenue, Dubuque. Attendance by all
prospective bidders is not mandatory but highly recommended.
Published in the Telegraph Herald July 17, 2012.
It 7/17
NOTICE OF PUBLIC
HEARING ON THE
PLANS,
SPECIFICATOIN,
FORM OF CONTRACT,
AND ESTIMATED
COST FOR THE ARC
TRANSFER CENTER
PHASE I CANOPY -
2012 PROJECT
NOTICE IS HEREBY
GIVEN: The City
Council of the City of
Dubuque, Iowa will
hold a public hearing
on the proposed plans,
specifications, form of
contract and estimated
cost for the ARC
Transfer Center Phase
I Canopy - 2012 Project,
in accordance with the
provisions of Chapter
26, Code of Iowa, at
6:30 p.m., on the 6th
day of August, 2012, in
the Historic Federal
Building Council Cham-
bers (second floor),
350 West 6th Street,
Dubuque, Iowa. Said
proposal plans, speci-
fications, form of
contract and estimated
cost are now on file in
the office of the City
Clerk. At said hearing
any interested person
may appear and file
objections thereto.
The scope of the
Project is as follows:
The ARC Transfer
Center Phase I Canopy -
2012 Project includes
the construction of an
approximately 45' x
130' canopy structure.
The canopy structure
will consist of cast in
place concrete col-
umns, precast beams
and steel joists and
roof deck structure
with standing seam
metal roofing. Finished
include limited paint-
ing of the structure,
metal wall panel and
soffit panels. Electrical
lighting and the
conduit for a future
surveillance system
will be part of this
project. Limited site
work will be completed
around the canopy
building including con-
crete work to tie into
existing pavement and
concrete islands.
Any visual or hearing
impaired persons need-
ing special assistance
or persons'with special
accessibility needs
should contact the City
Clerk's office at (563)
589 -4120 or TDD at
(563) 690 -6678 at least
48 hours prior to the
meeting.
Published by order of
the City Council given
on the 16th day of July,
2012.
Kevin S. Firnstahl,
City Clerk
It 1/17
SECTION 001000
NOTICE TO BIDDERS
CITY OF DUBUQUE
PUBLIC TRANSIT
PROJECT
ARC TRANSFER
CENTER CANOPY
PHASE I - 2012
PROJECT
Time and Place for
Filing Sealed Propo-
sals. Sealed bids for
the work comprising
each improvement as
stated below must be
filed before 2:00 p.m.
on August 28, 2012, in
the Office of the City
Clerk, City Hall - First
Floor, 50 West 13th
Street, Dubuque, Iowa.
Time and Place
Sealed Proposals
Will be Opened and
Considered. Sealed
proposals will be
opened and bids
tabulated at 2:00 p.m.
on August 28, 2012, at
City Hall - Conference
Room A, 50 West 13th
Street, Dubuque, Iowa,
for consideration by
the City Council
(Council) at its meeting
on September 4, 2012.
The City of Dubuque,
Iowa, reserves the
right to reject any and
all bids.
Time for Com-
mencement and
Completion of Work.
Work on each
improvement shall be
commenced within 10
days after the Notice to
Proceed has been
issued and shall be
completed by Decem-
ber 10, 2012.
Bid Security. Each
bidder shall accom-
pany its bid with a bid
security as security
that the successful
bidder will enter into a
contract for the work
bid upon and will
furnish after the award
of contract a corporate
surety bond, accept-
able to the govern-
mental entity, for the
faithful performance of
the contract, in an
amount equal to one
hundred percent of the
amount of the con-
tract. The bid security
shall be in the amount
of ten percent (10%) of
the amount of the
contract and shall be in
the form of a cashier's
check or certified
check drawn on a state -
chartered or federally
chartered bank, or a
certified share draft
drawn on a state -
chartered or federally
chartered credit union,
or the governmental
entity may provide for
a bidder's bond with
corporate surety satis-
factory to the govern-
mental entity. The bid
bond shall contain no
conditions excepted as
provided in this
section.
Contract Docu-
ments. Copies of the
Construction Bidding
Documents may be
obtained by contacting
Tri -State Blue Print &
Framing Company, 696
Central Avenue, Dubu-
que, Iowa 52001, 563-
556 -3030. A deposit of
$50.00 per set of
documents or receipt
of AGC, AMC, AMEC,
MBI or NECA card is
required. Deposits will
be refunded upon
return of the
Construction Bidding
Documents in good
condition within ten
(10) days after bid
opening. Plans will be
available for review
after July 18, 2012.
Copies of the
construction docu-
ments may be viewed
at: the Office of the
City Clerk, City Hall
First Floor, 50 West
13th Street, Dubuque,
Iowa; or at the Office
of IIW, P.C., 4155
Pennsylvania Avenue,
Dubuque, Iowa. If there
are any questions
and /or additional
information is needed,
contact IIW Project
Manager Mark Fass-
binder, AIA - LEED AP
BD +C, at m.fassbinder
%iiwengr.com or by
calling (563) 556 -2464.
Project information
will also be posted on
the City's website at
www.cityofdubuque.org.
Statement of State
and /or Federal Par-
ticipation. This project
will be partially funded
with State (Federal
pass- through) funds
from the Iowa Depart-
ment of Transportation
/ Office of Public
Transit (Iowa DOT /
OPT) and therefore is
subject to the State
and Federal laws and
regulations associated
with that program.
Davis -Bacon Feder-
al Prevailing Wage
Requirements. Davis -
Bacon Federal prevail-
ing predetermined
wage rates and related
labor requirements and
regulations WILL
APPLY to work under
the contract.
Preference for Iowa
Products and Labor.
Equipment or products
authorized to be
purchased with federal
funding awarded for
this contract must be
American -made to the
maximum extent
feasible, in accordance
with Public Law 103-
121, Sections 606 (a)
and (b).
Sales Tax. The bidder
should not include
sales tax in its bid. A
sales tax exemption
certificate will be
available for all
material purchased for
incorporation in the
project.
General Nature of
Public Improvement.
The ARC Transfer
Center Phase I project
consists of construc-
tion of an approxi-
mately 45' x 130'
canopy structure. The
canopy structure will
consist of cast in place
concrete columns,
precast beams and
steel joists and roof
deck structure with
standing seam metal
roofing. Finished in-
clude limited painting
of the structure, metal
wall panel and soffit
panels. Electrical
lighting and the
conduit for a future
surveillance system
will be part of this
project. Limited site
work will be completed
around the canopy
building including
concrete work to tie
into existing pavement
and concrete islands.
Pre -Bid Construc-
tion Conference.
Each prospective bid-
der is encouraged to
attend the Pre-Bid
Construction Confer-
ence to be held at 10:00
AM on Friday, August
3, 2012, at the offices
of IIW, 4155 Penn-
sylvania Avenue, Dubu-
que, Iowa. Attendance
by prospective bidders
is not mandatory but
highly recommended.
Published in the
Telegraph Herald, and
posted on the City of
Dubuque and the IA
DOT websites on July
17, 2012.
END OF SECTION
001000
It 7/17
STATE OF IOWA {SS:
DUBUQUE COUNTY
CERTIFICATION OF PUBLICATION
I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa
corporation, publisher of the Telegraph Herald,a newspaper of general circulation
published in the City of Dubuque, County of Dubuque and State of Iowa; hereby
certify that the attached notice was published in said newspaper on the following
dates: July 17, 2012, and for which the charge is $93.96.
Subscribed to before m a Notary Public in and for Dubuque County, Iowa,
I
this day of
,20A .
CJ
(otary Public in and for Dubuque County, Iowa.
; MA RY K. 1YdF r T R ;,
Corm- 11: :51cn
i i'" �r