Loading...
US 20 Sanitary Sewer Extension Project DU~~E ~ck~ MEMORANDUM October 11 , 2005 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: U.S. Highway 20 Sanitary Sewer Extension Project (CIP 310735-7101336: U.S. 20 Annexation Sanitary Sewer Extension) City Engineer Gus Psihoyos is recommending acceptance of the U.S. Highway 20 Sanitary Sewer Extension Project, as completed by Top Grade Excavating, Inc., in the final contract amount of $357,820.62, which is a 6.35% decrease from the original contract of $382,102.05. I concur with the recommendation and respectfully request Mayor and City Council approval. (l1j l{11 (ltJL Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer DU~~E ~ck~ MEMORANDUM October 10, 2005 FROM: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer .9JQ TO: SUBJECT: U.S. Highway 20 Sanitary Sewer Extension Project (CIP 310735-7101336: US 20 Annexation Sanitary Sewer Extension) INTRODUCTION The enclosed resolutions provide for the acceptance of the U.S. Highway 20 Sanitary Sewer Extension Project. BACKGROUND This project was the first of three phases to connect homes and businesses to sanitary sewer along US Highway 20 and Old Highway Road. This project provided sanitary sewer service to 17 businesses along Highway 20 from Wests ide Court to the Northwest Arterial. Approximately 4,769 feet of 8"- and 12"-diameter gravity sewer was installed from the public sewer installed by Menard's, up to Westside Court, and along the south side of US Highway 20 to the Northwest Arterial. DISCUSSION The U.S. Highway 20 Sanitary Sewer Extension Project has been completed by Top Grade Excavating, Inc. of Dubuque, Iowa, in the final contract amount of $357,820.62, which is a 6.35% decrease from the original contract of $382,102.05. RECOMMENDATION I recommend that the City Council accept the improvements, establish the final contract, and adopt the final schedule of assessments. BUDGET IMPACT The project cost summary for the U.S. Highway 20 Sanitary Sewer Extension Project is as follows: Bid Award Final Construction Contract $382,102.05 $357,820.62 Contingency/Miscellaneous Costs 45,371.30 3,539.00 Engineering 74.862.65 53.673.09 Total Project Cost $502,336.00 $415,032.71 The project will be funded as follows: Award Final City Share $271,327.48 $247,217.73 Special Assessment to Private Property 231.008.52 , 167,814.98 Total Project Cost $502,336.00 $415,032.71 The project was funded with the Sanitary Sewer Construction Fund in the amount of $847,206. Since all the properties are commercial in nature, none of the property owners qualify for financial assistance. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement, establishing the final construction cost, and approving the final schedule of assessments. Prepared by Todd Irwin cc: Dawn Lang, Budget Director Ken TeKippe, Finance Director John Klostermann, Public Works Todd Irwin, Engineering . RESOLUTION NO. 475-05 ACCEPTING THE U.S. HIGHWAY 20 SANITARY SEWER EXTENSION PROJECT Whereas, the contract for the U.S. Highway 20 Sanitary Sewer Extension Project (the Project) has been completed and the City Manager has examined the work and filed a certificate stating that the Project has been completed according to the terms of the contract, plans and specifications and that the City Manager recommends that the Project be accepted. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Manager is approved and the Project is hereby accepted. Section 2. The City Treasurer is hereby directed to pay to the contractor from the Sanitary Sewer Construction Fund appropriation for the contract amount in the amount of $357,820.62 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 17th day of October ,2005. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk RESOLUTION NO. 476-05 FINAL ESTIMATE Whereas, the construction contract for the U.S. Highway 20 Sanitary Sewer Extension Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $415,032.71 and the said amount shall be paid from the allocation from the Sanitary Sewer Construction Fund appropriation ($247,217.73) and special assessments in the amount of $167,814.98 of the City of Dubuque, Iowa. Passed, approved and adopted this 17th day of October RESOLUTION NO. 477 -0 5 A RESOLUTION ADOPTING THE FINAL ASSESSMENT SCHEDULE FOR THE U.S. HIGHWAY 20 SANITARY SEWER EXTENSION PROJECT INCLUDING CERTAIN INFORMATION REQUIRED BY THE CODE OF IOWA, SPECIFICALLY, THE NUMBER OF ANNUAL INSTALLMENTS INTO WHICH ASSESSMENTS ARE DIVIDED, THE INTEREST ON ALL UNPAID INSTALLMENTS, THE TIME WHEN THE ASSESSMENTS ARE PAYABLE AND DIRECTING THE CLERK TO CERTIFY THE FINAL SCHEDULE AND TO PUBLISH NOTICE THEREOF NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That after full consideration of the accompanying final schedule of assessments to be made for the construction of the U.S. Highway 20 Sanitary Sewer Extension Project under contract with Top Grade Excavating, Inc. of Epworth, Iowa, for which the final schedule of assessments were filed in the office of the City Clerk on the 21st day of October, 2005, the said schedule of assessments be and the same is hereby approved and adopted. That there be, and is hereby assessed and levied as a special tax against and upon each of the lots, the respective sums indicated. Provided, further, that the amounts shown in said final schedule of assessments as deficiencies are found to be proper and levied conditionally against the respective properties benefited by the improvements as shown in the schedule, subject to the provisions of Section 384.63 of the Code of Iowa. Said assessments against said lots are hereby declared to be in proportion to the special benefits conferred and not in excess of twenty-five percent of the value of same. That the City Clerk be and is hereby directed to certify said schedule to the County Treasurer of Dubuque County, Iowa, and to publish notice of said certification once each week for two consecutive weeks in the manner provided in Section 362.3, the first publication of which shall be not more than fifteen days from the date of filing of the final schedule. On or before the date of the second publication of the notice, the City Clerk shall also mail a copy of said notice to property owners whose property is subject to assessment, as provided and directed in Section 384.60 of the Code of Iowa. That assessments may be paid in full or in part without interest at the office of the City Treasurer, City Hall, 50 W. 13th Street, Dubuque, Iowa, at any time within 30 days after the date of the first publication of this notice of the filing of the final schedule of assessments with the County Treasurer. After 30 days, unpaid assessments of $100.00 or more are payable in 10 annual installments at the County Treasurer's Office, Dubuque County Courthouse, 720 Central, Dubuque, Iowa, and will draw annual interest at nine (9) percent (commencing on the date of acceptance of the work) computed to the December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. Property owners may elect to pay any annual installments semiannually in advance. Passed, approved and adopted this 17th day of Oc eanne F. Schneider, CMC, City Clerk City Clerk's Office 50 West 13th Street Dubuque, Iowa 52001-4864 (563) 589-4120 Office (563) 589-0890 Fax (563) 690-6678 TOD www.cityofdubuque.org D~ ~Yk,~ October 21, 2005 NOTICE OF FILING OF THE FINAL SCHEDULE OF ASSESSMENTS AGAINST BENEFITED PROPERTIES FOR THE US HIGHWAY 20 SANITARY SEWER EXTENSION PROJECT WITHIN THE CITY OF DUBUQUE, IOWA To the persons owning land located within the district described as the U.S. Highway 20 Sanitary Sewer Extension Project within the City of Dubuque, Iowa: Lot 4, Wests ide Commercial Park Lot 1, Siegert's Place, 3rd Addition Lot 2, Westside Commercial Park Lot 6, Westside Commercial Park 2-1-2 SW SE exc. the S 32.9' & Lot 2-2 SW SE, Sec. 29, T89N, R2E 2-2-1 SE SE & 2-1-2-1 SE SE, Sec. 29, T89N, R2E Lot 1-1-2-1 SE SE, Sec. 29, T89N, R2E Lot 2-2-1-1 SE SE & 2-1-2-1-1 SE SE, Sec. 29, T89N, R2E Lot 2-1-1-1-2-1-1 SE SE, Sec. 29, T89N, R2E Lot 2, Sindt Place 2-1-1-2-1-1 SE SE, Sec. 29,T89N, R2E 1-1-1 SE SE & 2-1-1-1-1-2-1-1 SE SE, Sec. 29, T89N, R2E Lot 1, Sindt Place 2-1-1-1-1 SW % SW %, Sec. 28, T89N, R2E 2-1-1-1-1-1 SW % SW %, Sec. 28, T89N, R2E N %2-1-1 SW%SW%, Sec. 28, T89N, R2E S % 2-1-1 SW % SW %, Sec. 28, T89N, R2E W % 1-2 & 2 of2 SW SW, Sec. 28, T89N, R2E Bal. of Lot 1, Weber Acres Bal. of Lot 2, Weber Acres You are hereby notified that the final schedule of assessments against benefited properties within the District described as the US Highway 20 Sanitary Sewer Extension Project has been adopted and assessments confirmed and levied by the City Council of Dubuque, Iowa, and that said schedule of assessments has been certified to the County Treasurer of Dubuque County, Iowa. Service People Integrity Responsibility Innovation Teamwork YOU ARE FURTHER NOTIFIED THAT ASSESSMENTS MAY BE PAID IN FULL OR IN PART WITHOUT INTEREST AT THE OFFICE OF THE CITY TREASURER, 50 W. 13TH STREET, DUBUQUE, IOWA, 52001 AT ANY TIME WITHIN 30 DAYS AFTER THE DATE OF THIS LETTER. After 30 days, unpaid special assessments of $100.00 or more are payable in 10 annual installments and will draw annual interest at nine percent (9%) computed to the December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1st of each year. Property owners may elect to pay any annual installment semiannually in advance. All properties located within the boundaries of the US Highway 20 Sanitary Sewer Extension Project above described have been assessed for the cost of the making of said improvements, the amount of each assessment and the amount of any conditional deficiency assessment having been set out in the schedule of assessments accompanying the same, which are now on file in the office of the County Treasurer of Dubuque County, Iowa. For further information you are referred to said schedule of assessments. This Notice given by direction of the City Council of the City of Dubuque, Iowa, as provided in Section 384.60 of the Code of Iowa. /J~44<:~LQJ ~~anne F. Schneider, CMC City Clerk BOB BROUGHTON INVESTMENTS 95 WESTSIDE COURT DUBUQUE, IA 52001 STATE OF IOWA PROPERTY MANAGEMENT SUPERVISOR 800 LINCOLN WAY AMES, IA 50010 ROGERJ.BRUGGEMAN 165 WESTSIDE COURT DUBUQUE, IA 52003 ROBERT R. LINK 180 WESTSIDE COURT DUBUQUE, IA 52003 LEROYJ.&JEANETTEBETTCHER 15301 CEDAR RIDGE ROAD DUBUQUE, IA 52002 LEROYJ.&JEANETTEBETTCHER 15301 CEDAR RIDGE ROAD DUBUQUE, IA 52002 YMJ LLC 4488 DODGE STREET DUBUQUE, IA 52001 LEONARD J. & LAVERN F. SINDT 4460 DODGE STREET DUBUQUE, IA 52003 LAVERN F. & LEONARD J. SINDT 4460 DODGE STREET DUBUQUE, IA 52003 WORD OF LIFE CHURCH, INC. 4450 DODGE STREET DUBUQUE, IA 52003 RODNEY D. & DONNA K. CHRIST 6849 NORTH DONNA DRIVE EAST DUBUQUE, IL 61025 INTERSTATE POWER CO. C/O TAX DEPARTMENT PO BOX 77007 MADISON, WI 53707 LEONARD J. & LAVERN F. SINDT 4460 DODGE STREET DUBUQUE, IA 52003 CAROLLC C/O CAROL DAVIS 3640 PHEASANT LANE WATERLOO, IA 50701 TIMOTHY J. SLATTERY 6 UNIVERSITY CIRCLE RANCHO MIRAGE, CA 92270 LAMMERS PROPERTIES, LLC 4692 CAMELOT DRIVE DUBUQUE, IA 52002 QHQ PROPERTIES 3430 DODGE STREET, #6 DUBUQUE, IA 52003 QHQ PROPERTIES 3430 DODGE STREET, #6 DUBUQUE, IA 52003 STATE OF IOWA PROPERTY MANAGEMENT OFFICE OF RIGHT-OF-WAY 800 LINCOLN WAY AMES, IA 50010 STATE OF IOWA PROPERTY MANAGEMENT OFFICE OF RIGHT-OF-WAY 800 LINCOLN WAY AMES, IA 50010 City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ de Sft~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: Broughton Investments, Bob 95 Westside Ct Dubuque, IA 52001 95 Westside Ct 10-32-128-009 Lot 1 Siegert's Place 3rd Addition TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $10,406.591 * I Deficiency Paid Directly By The Ci~ $0.00 1< - ) $0.001 ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $10,406.591 TOTAL: I 1 I $385,000.00 1 I $10,406.60 1 I $395,406.60 1 VALUATION wi PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ de Sft~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: STATE OF IOWA PROPERTY MANAGEMENT SUPERViSe 800 LINCOLN WAY AMES IA 50010 100 Westside Ct 10-32-128-001 Lot4 Wests ide Commercial Park TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $11,493.91 I * I Deficiency Paid Directly By The Ci~ $0.00 1< - ) $0.001 ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $11,493.91 1 TOTAL: 1 1 I $193,600.001 I $11,493.91 1 I $205,093.91 1 VALUATION wi PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ de SftVrit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: Bruggeman, Roger J. 165 Westside Ct. Dubuque, IA 52003 165 Westside Ct. 10-32-128-003 Lot 2 Wests ide Commercial Park TOTAL PUBLIC IMPROVEMENTS . I Sanitary Sewer Assessment $10,756.00 I $0.00 l( - ) $0.00 I * I Deficiency Paid Directly By The Ci~ ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT:. $10,756.00 . TOTAL:. . I $116,248.00 I I $10,756.00 I I $127,004.00 . VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUB~UE S~ tie SftVzit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: Link, Robert R. 180 Westside Ct. Dubuque, IA 52003 180 Westside Ct. 10-32-128-006 Lot 6 Wests ide Commercial Park TOTAL PUBLIC IMPROVEMENTS . I Sanitary Sewer Assessment $11,493.91 I * I Deficiency Paid Directly By The Cit~ $0.00 l( - ) $0.00 I ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT:. $11,493.91 . TOTAL:. . I $393,800.00 I I $11 ,493.91 I I $405,293.91 I VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all publiC improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUB~UE S~ tie SftVzit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: Bettcher, Leroy J. & Jeanette 15301 Cedar Ridge Rd. Dubuque, IA 52002 4506 Dodge St 10-29-453-001 2-1-2 SW SE exc. the S 32.9' & Lot 2-2 SW SE Sec 29 T89N R2E TOTAL PUBLIC IMPROVEMENTS I $11,493.91 I $0.00 I( - ) $0.00 I I Sanitary Sewer Assessment' * I Deficiency Paid Directly By The Ci~ ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: I $11,493.91 I TOTAL: I I I $519,200.00 I I $11,493.91 I I $530,693.91 I VALUATION wi PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBfmUE S~ tie Spvut OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: Betteher, Leroy J. & Jeanette 15043 Cedar Ridge Rd. Dubuque, IA 52002 4490 Dodge St 10-29-477-001 2-2-1 SE SE & 2-1-2-1 SE SE See 29 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $8,824.26 I $0.00 1< - ) $0.00 I * I Deficiency Paid Directly By The Ci~ ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: I $8,824.261 TOTAL: 1 I I $471,600.00 I I $8,824.271 I $480,424.271 VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBWUE S~ de S~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: YMJ LLC. 4488 Dodge St Dubuque, IA 52001 4488 Dodge St 10-29-477 -002 Lot 1-1-2-1 SE SE Sec 29 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $11,493.91 1 * I Deficiency Paid Directly By The Ci~ $0.00 1< - ) $0.00 I ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $11,493.91 I TOTAL: 1 1 I $865,200.00 1 I $11 ,493.91 I I $876,693.91 1 VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 OUBOOUE S~ de Sft~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: SINDT, LEONARD J & LAVERN F 4460 Dodge St. Dubuque, IA 52003 4470 Dodge St 10-29-477-003 Lot 2-2-1-1 SE SE & 2-1-2-1-1 SE SE Sec 29 T89N R2E TOTAL PUBLIC IMPROVEMENTS I I Sanitary Sewer Assessment $11,493.91 I * I Deficiency Paid Directly By The Ci~ $0.00 l( - ) $0.00 I ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: I $11,493.91 I TOTAL: I I I $398,500.00 I I $11,493.91 I I $409,993.91 I VALUATION wi PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ de S~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: SINDT, LAVERN F 1/2 & LEONARD J 1/2 4460 Dodge St. Dubuque, IA 52003 4460 Dodge St 10-29-477 -004 Lot 2-1-1-1-2-1-1 SE SE See 29 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $11,431.851 * I Deficiency Paid Directly By The Cit>l $0.00 1< - ) $0.00 I ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $11,431.851 TOTAL: 1 1 I $314,000.00 I I $11 ,431.861 I $325,431.861 VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ de SfWt<< OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: Word of Life Church, Inc 4450 Dodge St. Dubuque, IA 52003 4450 Dodge St 10-29-477-010 Lot 2 Sindt Place TOTAL PUBLIC IMPROVEMENTS I I Sanitary Sewer Assessment $9,874.80 l $0.00 l< - ) $0.001 * I Deficiency Paid Directly By The Cit>l ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $9,874.80 1 TOTAL: 1 1 I $291,740.00 1 I $9,874.81 1 I $301,614.81 1 VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUB~UE S~ de SfWtit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: Christ, Rodney 0 & Donna K 6849 North Donna Dr. East Dubuque, IL 61025 4440 Dodge St 10-29-477 -005 2-1-1-2-1-1 SE SE Sec 29 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $9,202.031 $0.00 1< - ) $0.00 I * I Deficiency Paid Directly By The Ci~ ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $9,202.031 TOTAL: 1 1 I $312,000.00 I I $9,202.041 I $321,202.041 VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over me maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DunOOUE S~ the Sfti'rit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: Interstate Power Co. c/o Tax Dept. P.O. Box 77007 Madison, WI 53707 none 10-29-477-009 1-1-1 SE SE & 2-1-1-1-1-2-1-1 SE SE See 29 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $0.001 $0.00 I( - ) * I Deficiency Paid Directly By The Ci~ ** I Sanitary Sewer Connection Fee $15,443.991 PRELIMINARY ASSESSMENT: 1 $0.00 1 TOTAL: 1 1 I I I $0.00 I $0.001 $0.00 1 VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of DUbuque Engineering division 50 West 13th Street Dubuque. Iowa 52001-4845 (319) 589-4270 DUB~UE S~ tie Sfti'rit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: Sindt, Leonard J. & Lavern F. 4460 Dodge St. Dubuque, IA 52003 4400 Dodge St. 10-29-477-011 Lot 1 Sindt plaee TOTAL PUBLIC IMPROVEMENTS . I Sanitary Sewer Assessment $11,493.91 I * I Deficiency Paid Directly By The Cit>l $0.00 1< - ) $0.001 ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT:, $11,493.91 . TOTAL:, I I $240.500.00 1 I $11,493.91 1 I $251.993.91 I VALUATION wi PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment. and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 i5UB~UE S~ tie Sft~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: Carol LC clo Carol Davis 3640 Pheasant Lane Waterloo, IA 50701 4390 Dodge St, 10-28-352-001 2-1-1-1-1 SW 1/4 SW 1/4 Sec 28 T89N R2E TOTAL PUBLIC IMPROVEMENTS . I Sanitary Sewer Assessment $11,493.91 I * I Deficiency Paid Directly By The Ci~ $0.00 1< - ) $0.00 I ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT:. $11,493.91 I TOTAL:. . I $432,500.00 I I $11,493.91 I I $443,993.91 . VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ tie Sftvut OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: Slattery, Timothy J. 6 University Circle Rancho Mirage, CA 92270 4370 Dodge St, 10-28-352-002 2-1-1-1-1-1 SW 1/4 SW 1/4 Sec 28 T89N R2E TOTAL PUBLIC IMPROVEMENTS . I Sanitary Sewer Assessment $11,493.91 I * I Deficiency Paid Directly By The Ci~ $0.00 l( - ) $0.00 l ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: I $11,493.91 I TOTAL:, I I $906,700.00 I I $11 ,493.91 I I $918,193.91 . VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ de Sftiltit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: Lammers Properties, LLC 4692 Camelot Dr. Dubuque, IA 52002 4290 Dodge St, 10-28-352-003 N 1/2 2-1-1 SW 1/4 SW 1/4 Sec 28 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $7,684.061 $0.00 l( - ) $0.00 I * I Deficiency Paid Directly By The Cit~ ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $7,684.061 TOTAL: 1 1 I $274,200.00 I I $7,684.061 I $281,884.061 VALUATION wi PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBWUE S~ de SftUzit OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: QHQ Properties 3430 Dodge St. #6 Dubuque, IA 52003 4292 Dodge St, 10-28-352-007 S 1/2 2-1-1 SW 1/4 SW 1/4 See 28 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $7,684.061 $0.00 I( - ) $0.001 * I Deficiency Paid Directly By The CitJI ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: 1 $7,684.061 TOTAL: 1 1 I $85,100.00 , I $7,684.061 I $92,784.061 VALUATION wi PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 589-4270 DUBOOUE S~ de S~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL 10 #: LOT#: SUBDIVISION: QHQ Properties 3430 Dodge St. #6 Dubuque, IA 52003 4292 Dodge St, 10-28-352-012 W1/2 1-2&2of2SW SW Sec 28 T89N R2E TOTAL PUBLIC IMPROVEMENTS 1 I Sanitary Sewer Assessment $0.001 $0.00 1< - ) $15,075.421 * I Deficiency Paid Directly By The CitJi ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT: I $0.00 I TOTAL: 1 1 I $216,100.00 1 I $0.001 I $216,100.00 I VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. City of Dubuque Engineering division 50 West 13th Street Dubuque, Iowa 52001-4845 (319) 5894270 DUBOOUE S~ de S~ OWNER: MAILING ADDRESS: CITY: PARCEL ADDRESS: PARCEL ID #: LOT#: SUBDIVISION: State of Iowa Prop. Mgt. Offiee of R.O.W. 800 Lineoln Way Ames.IA 50010 None 10-32-200-008 Lot 2 Weber Aeres TOTAL PUBLIC IMPROVEMENTS . I Sanitary Sewer Assessment $0.00 I $0.00 l( - ) $16,296.84 I * I Deficiency Paid Directly By The Cit~ ** I Sanitary Sewer Connection Fee PRELIMINARY ASSESSMENT:, $0.00 I TOTAL:, . I I I $0.00 I $0.00 I $0.00 . VALUATION wI PUBLIC IMPROVEMENTS I Property Valuation I Total Public Improvement * Deficiency is the amount over the maximum assessment (Maximum Assessment = 25% of the valuation plus all public improvements) ** Connection Fee is in lieu of an assessment, and applies only to undeveloped lots and will be applied when the lot is developed. Page 1 of 1 Ginny Dougherty From: Ginny Dougherty [gdougher@cityofdubuque.org] Sent: Wednesday, October 12, 2005 8:35 AM To: TODD IRWIN (tirwin@cityofdubuque.org) Cc: KAREN CHESTERMAN (kchester@cityofdubuque.org) Subject: US 20 SANITARY SEWER EXTENSION FINAL ASSESSMENTS Todd-The labels and the individual sheets will be given to Karen Chesterman today for next week's processing. Just as a FYI: You have two individual assessment sheets for Leroy J. & Jeanette Bettcher. One noted an address of 15301 Cedar Ridge Road and the second sheet noted an address of 15043 Cedar Ridge Road. In checking the County Assessor's data base, the mailing address for the Bettchers is 15301 Cedar Ridge Road. Therefore, a change was made so that the both labels show the mailing address of 15301 Cedar Ridge Road. 10/12/2005 CITY OF DUBUQUE. IOWA U.S. HWY 20 SANITARY SEWER FINAL SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the vatuatlons shown opposite each lot are hereby fixed as true valuations of such lots by the city council of the City of Dubuque, Iowa ----------------------------------------------------------------------------------------------- OWNER ADDRESS ' LOT DESCRIPTION _________________________________________________________________~l!_______________~U~Q~~~~____. STATE OF IOWA PROPERTY MANAGEMENT SUPERVISOF 800 LINCOLN WAY Lot 4 Wests ide Commercial Park 2 Broughton Investments, Bob 95 Wests ide Ct Lot 1 Siegert's Place 3rd Addition 3 Bruggeman, Roger J. 165 Wests ide Ct Lot2 Wests ide Commercial Park 4 Link, Robert R. 180 Westside Ct Lot 6 Westside Commercial Park 5 Bettcher, Leroy J. & Jeanette 15301 Cedar Ridge Rd. 2-1-2 SW SE exc. the S 32.9' & Lot 2-2 SW SE Sec 29 T89N R2E 6 Bettcher, Leroy J. & Jeanette 15043 Cedar Ridge Rd. 2-2-1 SE SE & 2-1-2-1 SE SE Sec 29 T89N R2E 7 YMJ LLC. 4488 Dodge St Lot 1-1-2-1 SE SE Sec 29 T89N R2E 8 SINDT, LEONARD J & LAVERN F 4460 Dodge SI. Lot 2-2-H SE SE & 2-1-2-H SE SE Sec 29 T89N R2E 9 SINDT, LAVERN F 1/2 & LEONARD J 1/2 4460 Dodge St Lot 2-H-1-2-1-1 SE SE Sec 29 T89N R2E 10 Word of Lde Church, Inc 4450 Dodge St Lot 2 Sindt Place ------------------------------------------------------------------------------------------------------- OWNER LEGAL GROSS VALUATION VALUATION wi DEFICIENCY TOTAL NET PORTION CONNECTION ___________________________________________~~~SS~~S~~_________I~~~~V~~S~~~2s~S~~~I~~~E2~~SN1__~V~~2~:____~~___ STATE OF IOWA PROPERTY MANAGEMENT SUPERVISOf 10-32-128..Q01 $ 11,493,91 $ 193,600,00 $ 205,093,91 $ $ 11,493,91 30,677.26 $ 2 Broughton Investments, Bob 10-32-128..Q09 $ 10,406.59 $ 385,000.00 $ 395,406,60 $ $ 10,406,60 $ $ 3 Bruggeman, Roger J. 10-32-128-003 10,756,00 $ 116,248,00 $ 127,004.00 $ 10,756,00 $ $ 4 Link, Robert R. 10-32-128-006 $ 11,493,91 $ 393,800,00 $ 405,293,91 $ 11,493,91 $ 1,370,84 5 Bettcher, Leroy J, & Jeanette 10-29-453..Q01 $ 11,493,91 $ 519,200,00 $ 530,693,91 $ 11,493.91 5,522,44 $ 6 Bettcher, Leroy J. & Jeanette 1Q..29-477..Q01 $ 8,824.26 471,600,00 480,424.27 $ 8,824.27 $ 7 YMJ LLC, 10-29-477 ..Q02 $ 11,493,91 $ 865,200,00 $ 876,693,91 $ $ 11,493,91 9,296,28 $ 8 SINDT, LEONARD J & LAVERN F 10-29-477..Q03 $ 11,493,91 $ 398,500.00 $ 409,993,91 $ $ 11,493,91 8,427,34 $ 9 SINDT, LAVERN F 1/2 & LEONARD J 1/2 10-29-477 ..Q04 $ 11,431.85 $ 314,000,00 $ 325,431,86 $ $ 11,431,86 $ 10 Word of Lde Church, Inc 10-29-477-010 $ 9,874,80 $ 291,740,00 $ 301,614.81 $ 9,874,81 $ $ CITY OF DUBUQUE, IOWA U.S. HWY 20 SANITARY SEWER FINAL SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS The following schedute is hereby determined to show each lot proposed to be assessed for the improvement shown in the tiUe together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as true valuations 0' such lots by the city council of the City of Dubuque, Iowa ----------------------------------------------------------------------------------------------. OWNER ADDRESS ' LOT DESCRIPTION ________________________________________________________________~2I!_______________~U~2~~~~____. 11 Christ, Rodney 0 & Donna K 6849 North Donna Dr. 2-1-1-2-1-1 SE SE Sec 29 T89N R2E 12 Interstate Power Co. c/o Tax Dept. P.O. Box 77007 1-1-1 SE SE & 2-1-1-1-1-2-1-1 SE SE Sec 29 T89N R2E 13 Sindt, Leonard J. & Lavern F. 4460 Dodge St. Lot 1 Sindt place 14 Carol LC c/o Carol Davis 3640 Pheasant Lane 2-1-1-1-1 SW 1/4 SW 1/4 Sec 28 T89N R2E 15 Slattery, Timothy J. 6 University Circle 2-1-1-1-1-1 SW 1/4 SW 1/4 Sec 28 T89N R2E 16 Lammers Properties, LLC 4692 Camelot Dr. N 1/2 2-1-1 SW 1/4 SW 1/4 See 28 T89N R2E 17 aHQ Properties 3430 Dodge St. #6 S 112 2-1-1 SW 1/4 SW 1/4 Sec 28 T89N R2E 18 aHQ Properties 3430 Dodge St. #6 W1/2 1-2&20f2SW SW Sec 28 T89N R2E 19 State of Iowa Prop. Mgt. Office of R.O.w. 800 Lincoln Way Lot 2 Weber Acres 20 State of Iowa Prop. Mgt. Office of R.O.W 800 Lincoln Way Bal of Lot 1 Weber Acres . ' ------------------------------------------------------------------------------------------------------- OWNER LEGAL GROSS VALUATION VALUATION wi DEFICIENCY TOTAL NET PORTION CONNECTION ___________________________________________~~~~~~~~~_________I~~~~V~~~~~~~~~S~~~I~~~E~~~~!__~V!~l~~____~E~___ 11 Christ, Rodney 0 & Donna K 10-29-477 -<)05 $ 9,202.03 $ 312,00000 $ 321,202.04 $ $ 9,202.04 $ 12 Interstate Power Co. 10-29-477-009 $ $ $ $ $ $ 15,443.99 13 Sindt, Leonard J. & Lavern F. 10-29-477-<)11 $ 11,493.91 240,500.00 $ 251.993.91 $ $ 11,493.91 $ 8,443.43 $ 14 Carol LC 10-28-352-<)01 $ 11,493.91 $ 432,500.00 $ 443,993.91 $ $ 11,493.91 $ 8,343.82 15 Slattery, Timothy J. 10-28-352-<)02 $ 11,49391 906,700.00 $ 918,193.91 $ 11,493.91 $ 3,573.07 $ 16 Lammers Properties, LLC 10-28-352-003 $ 7,684.06 $ 274,200.00 $ 281,884.06 $ $ 7,684.06 $ 17 aHa Properties 10-28-352-<)07 $ 7,684.06 $ 85,100.00 $ 92,784.06 $ $ 7,684.06 $ $ 18 aHa Properties 10-28-352-<)12 $ $ 216,100.00 $ 216,100.00 $ $ 15,075.42 19 State of Iowa Prop. Mgt. Office of RO.W. 10-32-200-008 $ $ $ $ $ $ 16,296.84 20 State of Iowa Prop. Mgt. Office of RO.W. 10-32-200-010 $ $ $ $ $ $ 76,341.81 TOTALS $ 167,814.97 $ $ 167,814.98 $ 75,654.47 $ 123,158.05