Loading...
7th Street Retaining Wall Repair_Project Acceptance THE CITY OF 411WA Dubuque***** DUBB E All erica City Masterpiece on the Mississippi 2012 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 7th Street Retaining Wall Reconstruction Project (CIP 3501029, 3002141, 7101801, 3002326, 3001027, 1021041) DATE: August 1, 2012 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 7th Street Retaining Wall Reconstruction Project, as completed by Portzen Construction, Inc. in the final contract amount of $426,576.72, which is 21.4% over the contract amount of $351,336.20. The project cost increase is due to additional watermain and sanitary sewer work. The project was extended a short distance to include the replacement of additional watermain, valves, and services. This additional watermain work allowed for the watermain to be fed from two locations. I concur with the recommendation and respectfully request Mayor and City Council approval. /7AAh kt1& Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer >d �, S. DATE: July 25, 2012 SUBJECT: 7th Street Retaining Wall Reconstruction Project (C I P 3501029. 3002141, 7101801, 3002326, 3001027, 1021041) INTRODUCTION Dubuque AA- amarca cnr 1I I I if 2012 The enclosed resolutions provide for the acceptance of the construction contract for the 7th Street Retaining Wall Reconstruction Project. BACKGROUND On October 3, 2011, the City Council authorized (Resolution 328 -11) emergency repairs to the public retaining wall along 7th Street and the associated street pavement. The project provides for the: reconstruction of the retaining wall; resurfacing of 7th Street in the area of the wall; replacement of the curb and gutter along the repair; and the replacement of the guardrail along the retaining wall. DISCUSSION The 7th Street Retaining Wall Reconstruction Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $426,576.72, which is 21.4% over the contract amount of $351,336.20. The project cost increase is due to additional watermain and sanitary sewer work. The project was extended a short distance to include the replacement of additional watermain, valves, and services. This additional watermain work also allowed for the watermain to be fed from two locations. Additionally, the sanitary sewer main was going to be left in place and rehabilitated by lining the pipe. As construction progressed, the sewer main was exposed and found in poorer condition than originally thought. The sanitary sewer section was replaced to avoid future issues under the new street. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $426,576.72 for the 7th Street Retaining Wall Reconstruction Project. BUDGET IMPACT The 7th Street Retaining Wall Reconstruction Project was an unfunded project when the wall failed. In order to fund this project, other Capital Improvement Project (CIP) funds were required. Some unused funds were required from the Sunset Ridge reconstruction project. The project cost summary for the 7th Street Retaining Wall Reconstruction Project is summarized as follows: Award Final Construction Contract $351,336.20 $426,576.72 Contingency 35,133.62 0 Construction Engineering 57,970.47 36,428.84 Total Project Cost $444,440.29 $463,005.56 The project funding summary is as follows: CIP No. Fund Description Fund Amount 1021041 Curb /Catch Basin Replacement $74,999.00 3001027 Guardrail 65,999.00 3501029 Stone Retaining Walls 272,008.56 7101801 Sunset Ridge Sanitary 49,999.00 Total Project Funding $463,005.56 REQUESTED ACTION The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount for the 7th Street Retaining Wall Reconstruction Project. Prepared by Jon Dienst, P.E. Cc: Don Vogt, Public Works Director John Klostermann, Street Maintenance Supervisor Bob Green, Water Department Manager Barry Lindahl, City Attorney Bob Schiesl, Assistant City Engineer Michael Kruser, Engineering Technician 2 RESOLUTION NO. ACCEPTING THE 7th STREET RETAINING WALL RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 7th Street Retaining Wall Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Curb & Catch Basin Replacements, Guardrail, Stone Retaining Walls and Sunset Ridge Sanitary appropriations for the contract amount of $426,576.72 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this day of , 2012. Roy D. Buol, Mayor Attest: Kevin S. Firnstahl, City Clerk RESOLUTION NO. 203 -12 ACCEPTING THE 7th STREET RETAINING WALL RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the 7th Street Retaining Wall Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Curb & Catch Basin Replacements, Guardrail, Stone Retaining Walls and Sunset Ridge Sanitary appropriations for the contract amount of $426,576.72 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 6th day of August , 2012. oy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 7th STREET RETAINING WALL RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 7th Street Retaining Wall Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $463,005.56. Dated thi day of /, ,,`x,2012. Filed in the office of the City Clerk on the 2012. Qevin S. Firn-tahl, Ci �Ierk City of Dubuque - Engineering Division FINAL PAYMENT FORM PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: 7th Street Retaining Wall Reconstruction Project CONTRACTOR: Portzen Construction, Inc. BID ITEM DESCRIPTION DEMOLITION & REMOVAL 1 Sawcut Pavement,Curb 2 Pavement and Curb Removal 3 Retaining Wall Removal 4 Excavation (Unclassified) 4a Rock Excavation UNIT LF SY LS CY CY DATE: July 13, 2012 CONTRACT AMOUNT: $351,336.20 QUANTITY TO DATE 156.00 1257.50 1.00 2000.00 39.00 UNIT COST $5.00 $5.00 $13,500.00 $6.00 $100.00 AMOUNT EARNED TO DATE 780.0 6287.5 13500.0 12000.0 3900.0 RETAINING WALL 5 Structural Concrete w/ Reinforcing Steel CY 303.30 $400.00 121320.0 6 Decorative Structural Concrete w/ Reinforcing Steel CY 36.50 $622.00 22703.0 7 Wrought Iron Railing on Barrier LF 271.00 $115.00 31165.0 8 Engineered Fill - Gradation 30 TON 2284.71 $15.00 34270.7 9 Satisfactory Soil Fill CY 189.00 $25.00 4725.0 10 Free Draining Backfill TON 200.59 $22.00 4413.0 11 4" Perforated CPE Drain Tile LF 285.00 $9.00 2565.0 STONE & PAVEMENT 12 7" PCC Pavement w /Integral Curb 13 4" Stone Base 14 2.5' Type 'A' PCC Curb and Gutter 15 5" HMA Pavement Patch LANDSCAPING /MISCELLANEOUS 16 Mobilization 17 Erosion Control 18 Traffic Control 19 Topsoil 20 Erosion Mat with Seed SY 942.00 $33.50 31557.0 TON 550.83 $14.20 7821.8 LF 97.90 $32.00 3132.8 SY 290.00 $35.00 10150.0 LS 1.00 $31,400.00 31,400.00 LS 1.00 $1,500.00 1,500.00 LS 1.00 $2,900.00 2,900.00 CY 63.00 $50.00 3,150.00 SY 247.40 $3.00 742.20 TOTAL AMOUNT EARNED TO DATE: $ 349,982.92 CHANGE ORDERS C1 Tree Removal (Time & Materials) LS 1.00 $ 4,046.00 $ 4,046.00 C2 Rebar stored materials LS $ 6,000.00 $ - C3 Sanitary Sewer Manholes Each 3.00 $ 3,800.00 $ 11,400.00 C4 8" CL 51 DIP Sanitary Sewer Main LF 340.65 $ 53.00 $ 18,054.45 C5 4" DIP Lateral Complete Each 6.00 $ 1,200.00 $ 7,200.00 C6 Connect to existing watermain with new 6" valve Each 1.00 $ 900.00 $ 900.00 C7 Installation of city supplied 6" Watermain LF 324.00 $ 35.00 $ 11,340.00 C8 3/4" Copper Water Service Complete Each 2.00 $ 900.00 $ 1,800.00 C9 Fire Hydrant Assembly supplied by City Each 1.00 $ 1,200.00 $ 1,200.00 C10 Installation of 6" Tee with plug supplied by City Each 1.00 $ 250.00 $ 250.00 C11 Installation of 6" curb wall around fire hydrant Each 1.00 $ 2,500.00 $ 2,500.00 C12 Taking lead line out of service by capping after stop box Each 1.00 $ 800.00 $ 800.00 C13 Lime Screen backfill Ton 1231.21 $ 12.00 $ 14,774.52 C14 Jack Hammer Existing Retaining Wall LS 1.00 $ 1,327.00 $ 1,327.00 C15 Hydro- Seeding of Parkway and grass areas SF 1153.00 $ 0.11 $ 126.83 C16 Fixture Adjustments Each 5.00 $ 175.00 $ 875.00 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL AMOUNT EARNED TO DATE: TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: CERTIFICATE OF THE CITY MANAGER: $ 426,576.72 $36,428.84 $463,005.56 $ 76,593.80 $ 426,576.72 I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: APPROVED: Michael Van Milli City of Du Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Portzen Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: lor-(- G Co - -o / (o o- BY: CLOA+6 L& 7 TITLE: Fr p Th i C15-( DATE: 7' ()-p -,