TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: T-Hangar Paving Project Change Order
DATE: July 30, 2012
On April 30, 2010 the Dubuque Regional Airport experienced a severe storm with heavy
winds that severely damaged steel T-Hangars and destroyed wood T-Hangars and Box
Hangars. Through insurance reimbursement, all damaged and destroyed hangars were
replaced in 2010. In 2011 a FAA grant was approved to replace and improve taxiway
and apron paving in the T-Hangar area.
The contractor encountered more unsatisfactory sub-soil than was originally anticipated
during the construction. A change order submitted for this project includes extra
excavation, stabilization, winterization (concrete mix, cover), additional observation,
testing and engineering. This will require an additional local match of approximately
$3,100. Airport Manager Robert Grierson recommends City Council approval to
transfer $3,100 in operating funds to this capital project for the local 5% match in the
event it is needed.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
/7AAh kt1&1
Michael C. Van Milligen
MCVM:jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Teri Goodmann, Assistant City Manager
Robert A. Grierson, Airport Manager
THE CITY OF
Dui
Masterpiece on the Mississippi
TO Michael C Van Milligen, City Manager
FROM RobertA Grierson, Airport Manager
DATE July 20, 2012
SUBJECT T- Hangar Paving Project Change Order
Dubuque
band
All- America City
'I 1 1 I'
2007
INTRO D UCTION
On April 30,2010 the Dubuque Regional Airport experienced a severe storm with heavy
winds that severely damaged steel T- Hangars and destroyed wood T- Hangars and Box Hangars Through insurance reimbursement,
all damaged and destroyed hangars were replaced in 2010 In 2011 a FAA grant was approved to replace and improve taxiway and
apron paving in the T- Hangar area
BACKGROUND
Staff, working with the City of Dubuque insurance carrier Friedman Insurance (Travelers Insurance) and the Federal Aviation
Administration (FAA, established funding mechanisms to reconfigure and rebuild all the hangars that were damaged /destroyed in a
new configuration to optimize the sun and improve snow removal operations
DISCUSSION
Due to delayed Federal funding, construction began laterthan anticipated in 2011 The contractor was able to complete a large
portion of the project (Phase I) prior to shutting down due to winter conditions The contractor was able to resume work early in the
spring of 2012 (Phase II) due to favorable weather conditions and completed the project late spring 2012
The contractor encountered more unsatisfactory sub -soil than was originally anticipated during the construction Achange order
submitted for this project includes extra excavation, stabilization, winterization (concrete mix, cover), additional observation, testing
and engineering This will require an additional local match of approximately $3,100 which will be drawn from FY12 operating funds
(line item 10051200 - 61020) for the locals% match in the event that it is needed Any funds not utilized will revert back to the line item
recognized
RECOMMENDATION
I respectfully recommend approval of transferring $3,100 in operating funds to this capital project forthe local match portion
PROJECT COST- BUDGET IMPACT
FAA Grant Funds $61,212
Operating Funds 3,100
Total $64,312
ACTION TO BE TAKEN
Approve transferring $3,100 in operating funds to capital improvement funds
Prepared by
RobertA Grierson,Airport Manager
cc
Jenny Larson, Budget Officer