Loading...
Madison Street Retaining Wall Repair_Project Acceptance THE CITY OF 411WA Dubuque***** DUBB E All erica City Masterpiece on the Mississippi 2012 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Madison Street Retaining Wall Repair Project (CIP 3501029) DATE: August 1, 2012 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Madison Street Retaining Wall Repair Project, as completed by McAuliffe Excavating, Inc. in the final contract amount of $71,359.20, which is 7.8% under the contract amount of $77,433.00. The project cost decrease is due to reduced project quantities during construction. Specifically, no asphalt paving was required due to the contractor maintaining a compact work site. I concur with the recommendation and respectfully request Mayor and City Council approval. /7AAh kt1&1 Michael C. Van Milligen MCVM:jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Teri Goodmann, Assistant City Manager Gus Psihoyos, City Engineer Masterpiece on the Mississippi TO: FROM: Gus Psihoyos, City Engineer . s- DATE: July 25, 2012 SUBJECT: Madison Street Retaining Wall Repair Project (CIP 3501029) Michael C. Van Milligen, City Manager INTRODUCTION Dubuque blitil AA- Amalca City 11 11 If 2012 The enclosed resolutions provide for the acceptance of the construction contract for the Madison Street Retaining Wall Repair Project. BACKGROUND On October 3, 2011, the City Council authorized (Resolution 328 -11) emergency repairs to the public retaining wall, as well as the associated street and sidewalk portions, between 1805 Madison Street and 1829 Madison Street. The project provides for the: repair of a 45 -foot wall section, with an alternate bid to replace the entire wall section (approximately 80 feet) with a concrete modular block wall system (wall units that look like natural stone and are cast with concrete). On November 7, 2011, the City Council was notified that no bids were received on the initial bid - letting. In working with contractors, it was determined that the original completion date of December 30, 2011 was not conducive due to potential winter weather conditions; therefore the project was rebid with a completion date of June 15, 2012. Through the competitive quotation process for public improvements, this project was awarded on January 12, 2012, to McAuliffe Excavating, of Dubuque, Iowa, in the amount of $77,433.50. The alternate bid was selected due to the very favorable bid pricing received. This project replaced the entire section of retaining wall between 1805 Madison Street and 1829 Madison Street. This,project is partially funded with Federal Emergency Management Agency (FEMA) Disaster Relief funds totaling $62,132.67. DISCUSSION The Madison Street Retaining Wall Repair Project was completed by McAuliffe Excavating, Inc. of Dubuque, Iowa, in the final contract amount of $71,359.20, which is 7.8% under the contract amount of $77,433.00. The project cost decrease is due to reduced project quantities during construction. Specifically, no asphalt paving was required due to the contractor maintaining a compact work site. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $71,359.20 for the Madison Street Retaining Wall Repair Project. BUDGET IMPACT The project cost summary for the Madison Street Retaining Wall Reconstruction Project is summarized as follows: Award Final Construction Contract $77,433.00 $71,359.20 Contingency 9,699.67 0 Construction Engineering 13,069.90 15,539.00 Total Project Cost $100,202.57 $86,898.20 The project funding summary is as follows: CIP No. Fund Description FEMA Disaster Relief Funds 3501029 Stone Retaining Walls Total Project Funding REQUESTED ACTION Fund Amount $62,132.67 $24,765.53 $86,898.20 The City Council is requested to adopt the attached resolutions accepting the improvements and establish the final contract amount for the Madison Street Retaining Wall Repair Project. Prepared by Jon Dienst, P.E. Cc: Don Vogt, Public Works Director John Klostermann, Street Maintenance Supervisor Barry Lindahl, City Attorney Bob Schiesl, Assistant City Engineer Michael Kruser, Engineering Technician 2 RESOLUTION NO. 204 -12 ACCEPTING THE MADISON STREET RETAINING WALL REPAIR PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Madison Street Retaining Wall Repair Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Stone Retaining Walls appropriations for the contract amount of $71,359.20 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 6th day of Au ust , 2012. U Roy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE MADISON STREET RETAINING WALL REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Madison Street Retaining Wall Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $86,898.20. Dated this day of It ` 2012. City Engineer Filed In the office of the City Clerk on thoL day of , 2012. sa 'in 8. F rnstah , Ry Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE MADISON STREET RETAINING WALL REPAIR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Madison Street Retaining Wall Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $86,898.20. Dated this day of 2012. City Engineer Filed in the office of the City Clerk on the day of 2012. Kevin S. Firnstahl, City Clerk City of Dubuque - Engineering Division Partial Payment Form PARTIAL PAYMENT NO: FINAL PROJECT NAME: Madison Street Retaining Wall Emergency Repair CONTRACTOR: McAuliffe Excavating BID ITEM DESCRIPTION DEMOLITION & REMOVAL 1 Sawcut Pavement and Sidewalk 2 Removal of Pavement and Sidewalk 3 Removal of Retaining Wall 4 Excavation, (Unclassified) UNIT RETAINING WALL 5 Structural Concrete w/ Reinforcing Steel 6 Limestone 7 Segmental Block 8 Satisfactory Soil Fill 9 4" Perforated CPE Drain Tile 10 Free Draining Backfill 11 Reinstall Wrought Iron Railiing LF SY LS CY BID QUANTITY STONE & PAVEMENT 12 Stone Base 13 2.5' PCC Curb & Gutter 14 5" HMA Pavement 15 4" PCC Sidewalk 150 260 1 413 DATE: July 31, 2012 CONTRACT AMOUNT: $77,433.00 BID UNIT COST $3.00 $5.00 $3,500.00 $12.00 QUANTITY TO DATE AMOUNT EARNED TO DATE COMP. 183.0 $ 549.00 122.0% 110.5 $ 552.50 42.5% 1.0 $ 3,500.00 100.0% 220.0 $ 2,640.00 53.3% CY 9 $375.00 $ SF 118 $49.50 40.0 $ 1,980.00 33.9% SF 660 $39.50 867.10 $ 34,250.45 131.4% CY 302 $25.00 9.0 $ 225.00 3.0% LF 106 $1.50 98.00 $ 147.00 92.5% TON 46 $20.00 213.15 $ 4,263.00 463.4% LF 93 $44.00 93.00 $ 4,092.00 100.0% TON 79 $14.00 90.68 $ 1,269.52 114.8% LF 103 $18.00 137.00 $ 2,466.00 133.0% SY 136 $25.75 $ - SY 64 $49.50 80.55 $ 3,987.23 125.9% LANDSCAPING /MISCELLANEOUS 16 Mobilization LS 1 $3,500.00 1.00 $ 3,500.00 100.0% 17 Erosion Control LS 1 $480.00 1.00 $ 480.00 100.0% 18 Traffic Control LS 1 $2,780.00 1.00 $ 2,780.00 100.0% 19 Seed, Fertilze, Mulch LS 1 $700.00 1.00 $ 700.00 100.0% 20 Topsoil CY 18 $35.00 18.00 $ 630.00 100.0% 21 Reconstruct Wood Steps & Landing LS 1 $1,500.00 $ - TOTAL AMOUNT EARNED TO DATE: 1 $ 68,011.70 CHANGE ORDERS Engineering Cost from Block Manufacturer due to wall change LS 1.00 $ 1,800.00 1.00 $ 1,800.00 Remove & Replace concrete in front of steps of upper neighbor LS 1.00 $ 1,247.50 1.00 $ 1,247.50 Modify Handrail and Supplies LS 1.00 $ 300.00 1.00 $ 300.00 $ - TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: PAYMENTS PREVIOUSLY APPROVED: 1. $ 58,763.05 7. 2. 8. 3. 9. 4. 10. 5. 11. 6. 12. TOTAL PAYMENTS FORWARDED: $ 58,763.05 $ 3,347.50 CERTIFICATE OF THE CONTRACTOR To the best of my knowledge and belief, I certify that all items, units, quantities, and prices of work and material shown on the face of this Partial Payment form are correct: that all work has been performed and materials supplied in full accordance with the terms and conditions of the contract documents and authorized changes thereto: that the following is a true and correct statement of the contract account up to and including the last day of the period covered by this payment and that no part of the "Total Amount Due" has been received: TOTAL AMOUNT EARNED TO DATE: RETAINED PERCENTAGE: TOTAL EARNED LESS RETAINED PERCENTAGE: TOTAL PREVIOUSLY APPROVED: TOTAL AMOUNT DUE: $ 71,359.20 $ 71,359.20 $ 58,763.05 $ 12,596.15 I further certify that all claims outstanding as of this date against the undersigned as contractor for labor, materials, and expendable equipment employed in the performance of said contract up to this date have been paid in full accordance with the requirements of said contract. CONTRACTOR: McAuliffe Excavating BY: CERTIFICATE OF THE CITY ENGINEER DATE: July 31, 2012 TITLE: /'PCSA,E tiT I certify that I have verified this payment, and that to the best of my knowledge and belief it is a true and correct statement of work performed and materials supplied by the contractor, and that the Contracto s certified statement of the account and the amount due is correct and just, and that all work and material included in this Partial Payment ve been pe . 'red in full accordance with the terms and conditions of the contract documents and authorized changes thereto. CITY OF DUBUQUE BY: DATE: July 31, 2012 TITLE: City of Dubuque - Engineering Division Partial Payment Form PARTIAL PAYMENT NO: COUNCIL FINAL PROJECT NAME: Madison Street Retaining Wall Emergency Repair CONTRACTOR: McAuliffe Excavating BID ITEM DESCRIPTION DEMOLITION & REMOVAL 1 Sawcut Pavement and Sidewalk 2 Removal of Pavement and Sidewalk 3 Removal of Retaining Wall 4 Excavation, (Unclassified) UNIT LF SY LS CY DATE: July 31, 2012 CONTRACT AMOUNT: $77,433.00 BID UNIT COST $3.00 $5.00 $3,500.00 $12.00 QUANTITY TO DATE AMOUNT EARNED TO DATE 183.0 $ 549.00 110.5 $ 552.50 1.0 $ 3,500.00 220.0 $ 2,640.00 RETAINING WALL 5 Structural Concrete w/ Reinforcing Steel 6 Limestone 7 Segmental Block 8 Satisfactory Soil Fill 9 4" Perforated CPE Drain Tile 10 Free Draining Backfill 11 Reinstall Wrought Iron Railiing CY $375.00 $ SF $49.50 40.0 $ 1,980.00 SF $39.50 867.10 $ 34,250.45 CY $25.00 9.0 $ 225.00 LF $1.50 98.00 $ 147.00 TON $20.00 213.15 $ 4,263.00 LF $44.00 93.00 $ 4,092.00 STONE & PAVEMENT 12 Stone Base 13 2.5' PCC Curb & Gutter 14 5" HMA Pavement 15 4" PCC Sidewalk TON $14.00 90.68 $ 1,269.52 LF $18.00 137.00 $ 2,466.00 SY $25.75 $ SY $49.50 80.55 $ 3,987.23 LANDSCAPING/MISCELLANEOUS 16 Mobilization 17 Erosion Control 18 Traffic Control 19 Seed, Fertilze, Mulch 20 Topsoil 21 Reconstruct Wood Steps & Landing LS $3,500.00 1.00 $ 3,500.00 LS $480.00 1.00 $ 480.00 LS $2,780.00 1.00 $ 2,780.00 LS $700.00 1.00 $ 700.00 CY $35.00 18.00 $ 630.00 LS $1,500.00 $ TOTAL AMOUNT EARNED TO DATE: I $ 68,011.70 CHANGE ORDERS Engineering Cost from Block Manufacturer due to wall change Remove & Replace concrete in front of steps of upper neighbor Modify Handrail and Supplies LS LS LS $ 1,800.00 $ 1,247.50 $ 300.00 1.00 1.00 1.00 1,800.00 1,247.50 300.00 TOTAL AMOUNT EARNED TO DATE - CHANGE ORDERS: TOTAL DUE CONTRACTOR: ENGINEERING: TOTAL CONSTRUCTION COST: $ 71,359.20 $15,539.00 $86,898.20 $ 3,347.50 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: APPROVED: Michael Van Milligen t Manager City of Pub .: -e, Iowa .....1„‘..)t„....,... Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, McAuliffe Excavating contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: BY: TITLE: 4 • A K i t Fr e- gle c4- vkr<44, 9# DATE: July 31, 2012